<iati-activities version="2.03" generated-datetime="2026-10-25T20:57:29"><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P128534</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Cameroon Social Safety Nets</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The project development objective (PDO) is to support the establishment of a basic national safety net system including piloting targeted cash transfers and public works programs for the poorest and most vulnerable people in participating areas within the Recipient's territory.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Social Safety Net Project for Cameroon is to support the establishment of a basic national safety net system including piloting targeted cash transfers and public works programs for the poorest and most vulnerable people in participating areas within the Recipient?s territory. The project has three components. The first is laying the foundations of a safety net system and supporting project management (US$7.8 million). This component has following two sub-components: (1) help the Borrower to develop systems to coordinate and manage safety nets programs for the poor and vulnerable; and (2) finance the cost of the management, coordination, and monitoring and evaluation (M and E) activities under this and the other two project components. The second component is the pilot cash transfer program with accompanying measures to boost household productivity (US$36.3 million). This component is for supporting the development and to boost the productivity of chronically poor households and serve as the cornerstone of Cameroon?s social safety net. Accompanying measures are to be developed to maximize the impact of the cash transfers on the welfare and productivity of beneficiary households. The third component is the public works program pilot (US$5.9 million). This component is for developing and piloting a labor-intensive public works program aimed to help vulnerable households deal with exogenous shocks (such as droughts or floods). The public works activities are to be coordinated with the cash transfer program so as to facilitate its implementation and reinforce its effectiveness.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0007825"><narrative>THE REPUBLIC OF CAMEROON</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="CM-COA-0007824"><narrative>MINEPAT</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2013-02-25"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2013-03-21"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2022-12-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2022-12-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Erkin Mamadaliev</narrative></person-name><telephone>+1-202-473-1000</telephone><email>emamadaliev@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002223602" />
            <name><narrative>North-West Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.3666701 10.36667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002223603" />
            <name><narrative>North Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.5 14</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002231755" />
            <name><narrative>Far North Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>11 14.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002231835" />
            <name><narrative>East Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.8333299 14.16667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002232593" />
            <name><narrative>Douala</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.0482702 9.7042799</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002233376" />
            <name><narrative>Centre Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.75 11.83333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002236015" />
            <name><narrative>Adamaoua Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.8333302 13.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="16011" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AZ" percentage="6.00000000" xml:lang="en"><narrative>FY17 - Other Agriculture, Fishing and Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="78.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SG" percentage="16.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="94" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="6" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="6" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000521" percentage="78" xml:lang="en"><narrative>Social Safety Nets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="6" xml:lang="en"><narrative>Gender</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">275000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">275000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">275000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">275000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">275000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">275000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">275000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">275000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">275000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">275000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">275000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">275000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">666666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">850416.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">850416.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">850416.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">850416.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">850416.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">850416.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">850416.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">850416.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">850416.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">850416.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">850416.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">850416.69</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">769166.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">769166.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">769166.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">769166.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">769166.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">769166.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">769166.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">769166.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">769166.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">769166.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">769166.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">769166.69</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">733333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">733333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">733333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">733333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">733333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">733333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">733333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">733333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">733333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">733333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">733333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">733333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">995421.06</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">256190.17</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">329932.06</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">572138.95</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">152767.64</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">120943.84</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">172746.50</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">2180456.15</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">921640.06</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">412330.98</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">434650.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">1525877.50</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">671189.08</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">5373554.72</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">72266.02</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">197696.08</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">1254299.09</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">4180487.91</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">868722.53</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">485120.47</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">1069423.01</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">291514.94</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">4586303.88</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">914067.98</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">379555.55</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-30"/>
<value currency="USD" value-date="2022-12-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-30"/>
<value currency="USD" value-date="2022-12-30">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">50000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">30000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">30000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-26438</value><description xml:lang="en"><narrative>Total Commitment Cancellations in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-1199499</value><description xml:lang="en"><narrative>Total Commitment Cancellations in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-816083</value><description xml:lang="en"><narrative>Total Commitment Cancellations in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">995421</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">256190</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">329932</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">572139</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">152768</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">120944</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">172747</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">2180456</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">921640</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">412331</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">434651</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">1525878</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">671189</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">5373555</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">72266</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">197696</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">1254299</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">4180488</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">868723</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">485120</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">1069423</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">291515</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">4586304</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">914068</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">379556</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">592950</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">7420135</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">273691</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">2330682</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">975179</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">589663</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">552798</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">325862</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">323264</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">250861</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">2328365</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">347565</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">281083</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">328712</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">231960</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">54831</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">114940</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">425</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">737750</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">1139436</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">505391</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">668824</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">3235630</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">3453582</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">715672</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-27731</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-23822</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">64616</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">601135</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">762801</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">1019097</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">138428</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">573787</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">668213</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">56188</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">3867495</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">6389193</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">85036</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">381892</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">260057</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">581027</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">270855</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">63161</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">568615</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">615269</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">1034516</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">885778</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">8458439</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">7633774</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">123363</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">38804</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">361182</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">509237</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">2966591</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">3827773</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">484087</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">339854</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">158415</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">213314</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">15424</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-493906</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-689483</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-63318</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">-2876</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">-3634</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">-7421</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">-16934</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">-36327</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">-67638</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-102685</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-1772</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-137099</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">-567</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-152925</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-165416</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-170760</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-10527</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-651</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-171438</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-53844</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-175188</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-53704</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-172399</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-79589</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-167622</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-95711</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-156401</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-122375</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-167416</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-189243</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-162286</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-180237</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-154831</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-177427</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-165507</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-177536</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-153089</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-182580</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-163311</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-181659</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-152206</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-182703</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-432759</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-426926</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-429663</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-419248</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-437390</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-426663</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-6944</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-418852</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-446274</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-447502</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-451998</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-11258</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-432049</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-461892</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-7824"><narrative>MINEPAT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P128534"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P128534?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P128534"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Frequency of publication of monitoring reports
</narrative></title>
<baseline year="2014" iso-date="2014-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-06-30" />
<period-end iso-date="2022-12-30" />
<target value="18.00">
<comment><narrative>
&lt;p&amp;gt;The target was partially&amp;nbsp;achieved with a total of 16&amp;nbsp;monitoring reports having been produced over 9 years against an end target of one monitoring report having been produced every 6 months, or 18 reports over 9 years.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="16.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2014" iso-date="2014-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-06-30" />
<period-end iso-date="2022-12-30" />
<target value="834000.00">
<comment><narrative>
&lt;p&amp;gt;The target was exceeded with 1,169,099 total beneficiaries for the cash transfers and public works program, against an end target of 834,000.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="1169099.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of effective days worked
</narrative></title>
<baseline year="2014" iso-date="2014-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-06-30" />
<period-end iso-date="2022-12-30" />
<target value="3180000.00">
<comment><narrative>
&lt;p&amp;gt;The target was exceeded with 3,683,412 effective days worked on the public works program, against a revised end target of 3,180,000 days.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="3683412.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Timely payments of emergency cash transfers
</narrative></title>
<baseline year="2014" iso-date="2014-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-06-30" />
<period-end iso-date="2022-12-30" />
<target value="80.00">
<comment><narrative>
&lt;p&amp;gt;The target was partially&amp;nbsp;met with 70.19% of payments for the emergency cash transfers made in a timely manner, against an end target of 80%.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="70.19">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Refugees registered in the Management Information System MIS for the LIPW/Cash for Work program
</narrative></title>
<baseline year="2014" iso-date="2014-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-06-30" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;This indicator was added for the 2018 restructuring &amp;amp; AF.&amp;nbsp;The target was not met with 5,780 refugee households ultimately registered in the MIS for the LIPW/ Cash for Work Program, against an end target of 17,000.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="5780.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiary households of regular cash transfers participating in accompanying measures
</narrative></title>
<baseline year="2014" iso-date="2014-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-06-30" />
<period-end iso-date="2022-12-30" />
<target value="80.00">
<comment><narrative>
&lt;p&amp;gt;The target was exceeded with 100% of beneficiary households of regular cash transfers having participated in the accompanying measures, against an end target of 80%. There were challenges in delivering the accompanying measures to those in the North-West region due to the security situation, but these were eventually overcome.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Cash transfer payment system developed and implemented
</narrative></title>
<baseline year="2014" iso-date="2014-06-30" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-06-30" />
<period-end iso-date="2022-12-30" />
<target value="Y">
<comment><narrative>
&lt;p&amp;gt;The target was met with a cash transfer payment system being developed and implemented under the project, which facilitated the payment of regular and emergency cash transfers throughout the implementation of the project.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households benefiting from the emergency cash transfers program
</narrative></title>
<baseline year="2014" iso-date="2014-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-06-30" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;This indicator was added for the 2018 restructuring &amp;amp; AF. The target was exceeded with 34,500 households benefitting from the emergency cash transfer program, against the&amp;nbsp;end target of 18,000.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="34500.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiary households of regular cash transfers who have adopted essential family practices
</narrative></title>
<baseline year="2014" iso-date="2014-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-06-30" />
<period-end iso-date="2022-12-30" />
<target value="80.00">
<comment><narrative>
&lt;p&amp;gt;It is not feasible to determine whether the end target for this indicator has been achieved, given it had&amp;nbsp;not been measured at project completion.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Program management expenses as share of total program
</narrative></title>
<baseline year="2014" iso-date="2014-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-06-30" />
<period-end iso-date="2022-12-30" />
<target value="20.00">
<comment><narrative>
&lt;p&amp;gt;The target was achieved&amp;nbsp;with 18.17% of the total program budget going towards program management expenses, against an end target of 20%.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="18.17">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households benefitting from regular cash transfer program
</narrative></title>
<baseline year="2014" iso-date="2014-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-06-30" />
<period-end iso-date="2022-12-30" />
<target value="82000.00">
<comment><narrative>
&lt;p&amp;gt;The target was exceeded with 85,000 household benefiting from regular cash transfers, against an end target of 82,000.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="85000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
The per capita consumption level of households benefitting from cash transfers
</narrative></title>
<baseline year="2014" iso-date="2014-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-06-30" />
<period-end iso-date="2022-12-30" />
<target value="15.00">
<comment><narrative>
&lt;p&amp;gt;No data was collected on per capita consumption effects.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Timely payment of LIPW workers
</narrative></title>
<baseline year="2014" iso-date="2014-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-06-30" />
<period-end iso-date="2022-12-30" />
<target value="80.00">
<comment><narrative>
&lt;p&amp;gt;The target was not met with only 45.56% of LIPW workers receiving their payment in a timely manner, against an end target of 80%.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="45.56">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Creation and implementation of a permanent safety net institution within the Government
</narrative></title>
<baseline year="2014" iso-date="2014-06-30" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-06-30" />
<period-end iso-date="2022-12-30" />
<target value="Y">
<comment><narrative>
&lt;p&amp;gt;While progress was made against this objective, the target was only partially achieved.&amp;nbsp;There are two institutions affiliated with the project at the central level, which includes the Social Protection Steering Committee and the PIU.&amp;nbsp;The Steering Committee, which consists of representatives of key ministries and is headed by the Secretary General of MINEPAT, is responsible for all activities related to the implementation of a safety net system. The PIU has been extended beyond the life of this project with additional funds from the Government and the World Bank financing.&amp;nbsp;The Government has also developed a social protection strategy that incorporates safety nets and allocated its own funds to expand the coverage of&amp;nbsp;the project.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="N">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Refugees that are direct LIPW beneficiaries
</narrative></title>
<baseline year="2014" iso-date="2014-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-06-30" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;This indicator was added for the 2018 restructuring &amp;amp; AF.&amp;nbsp;The target was partially&amp;nbsp;met with 5,696 refugees benefitting from the LIPWs, against an end target of 8,500.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="5696.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new community assets created or existing assets maintained
</narrative></title>
<baseline year="2013" iso-date="2013-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-06-30" />
<period-end iso-date="2022-12-30" />
<target value="315.00">
<comment><narrative>
&lt;p&amp;gt;The target was exceeded with 479 new community assets created or existing assets maintained, against an end target of 315.&amp;nbsp;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="479.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
The share of beneficiary households (of both cash transfer and public works program) who live below the poverty line
</narrative></title>
<baseline year="2014" iso-date="2014-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-06-30" />
<period-end iso-date="2022-12-30" />
<target value="70.00">
<comment><narrative>
&lt;p&amp;gt;The target was exceeded with 93.3% of beneficiaries selected for the CT and public works program living below the poverty line, against an end target of&amp;nbsp; 70%.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="93.30">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Refugee households registered in the Management Information System
</narrative></title>
<baseline year="2018" iso-date="2018-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;This indicator was added for the 2018 restructuring &amp;amp; AF.&amp;nbsp;The target was exceeded with 19,143 refugee households ultimately registered in the MIS, against an end target of 10,000.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="19143.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered related to delivery of project benefits addressed (%)
</narrative></title>
<baseline year="2014" iso-date="2014-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-06-30" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;This indicator was added for the 2018 restructuring &amp;amp; AF.&amp;nbsp;The target was exceeded with 82.6% of total grievances registered related to delivery of project benefits addressed, against an end target of 80.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="82.60">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Development and implementation of a functional and effective MIS system for the cash transfer and public works programs
</narrative></title>
<baseline year="2013" iso-date="2013-06-30" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-06-30" />
<period-end iso-date="2022-12-30" />
<target value="Y">
<comment><narrative>
&lt;p&amp;gt;The target was achieved with an MIS for both the cash transfer and public works program developed during the initial stages of the project. This existing MIS was subsequently upgraded for integrated management of the ordinary cash transfer program, emergency cash transfer program, public works program, procurement, accounting, and monitoring and evaluation.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total direct beneficiaries of LIPW
</narrative></title>
<baseline year="2014" iso-date="2014-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-06-30" />
<period-end iso-date="2022-12-30" />
<target value="53000.00">
<comment><narrative>
&lt;p&amp;gt;The target was exceeded with 60,500 total direct beneficiaries of LIPWs, against an end target of 53,000.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="60500.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Development and implementation of an effective targeting mechanism for cash transfer programs
</narrative></title>
<baseline year="2013" iso-date="2013-06-30" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-06-30" />
<period-end iso-date="2022-12-30" />
<target value="Y">
<comment><narrative>
&lt;p&amp;gt;The target was achieved with an effective targeting mechanism established for both the cash transfers and emergency cash transfers, which incorporated elements of geographic, community and poverty targeting.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Monitoring and evaluation system developed and implemented
</narrative></title>
<baseline year="2014" iso-date="2014-06-30" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-06-30" />
<period-end iso-date="2022-12-30" />
<target value="Y">
<comment><narrative>
&lt;p&amp;gt;The target was met with a functional&amp;nbsp;monitoring and evaluation system having been developed for the project. It involved field teams (regional coordinators, focal points, field operators, etc.). Methods and tools to collect monitoring data were developed and tested. Field teams produced monthly reports on all project activities in their areas. Several evaluations (qualitative and quantitative) were designed and implemented. Regular quarterly reports were produced.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Timely payments of regular cash transfers
</narrative></title>
<baseline year="2014" iso-date="2014-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-06-30" />
<period-end iso-date="2022-12-30" />
<target value="80.00">
<comment><narrative>
&lt;p&amp;gt;The target was exceeded with 86.8% of beneficiaries receiving their cash transfers on time, against an end target of 80%. The PIU had the capacity to ensure that all regular transfers were delivered on time. However, the delays observed for some payments were related to: (i) the baseline survey being carried out in some municipalities before the first payment; (ii) the security situation that emerged in the North-West; and (iii) the difficulties in replenishing the designated account for payment due to suspension of advances at&amp;nbsp;the country portfolio level.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="86.80">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P151155</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>CAMEROON - Strengthening Public Sector Effectiveness and Statistical Capacity Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The project development objective is to improve the effectiveness of public spending in selected sectors and strengthen the statistics system for evidence-based decision making.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Strengthening Public Sector Effectiveness and Statistical Capacity Project for Cameroon is to improve the effectiveness of public spending in selected sectors and strengthen the statistics system for evidence-based decision making. The project comprises of five components. The first component, consolidating the program budgeting reform in selected sectors aims to translate program budgeting into reality in some selected sectors, all the way from planning to oversight under the leadership of Ministry of Finance (MINFI). It consists of following sub-components: (i) strengthening program budgeting; (ii) enhancing programs execution and monitoring system; (iii) deploying new payroll management; and (iv) strengthening state-owned enterprise (SOE) portfolio management. The second component, improving quality of public investment in selected sectors aims to address some key bottlenecks in the maturation, programming, budgeting, and execution monitoring processes of public investment activities. It consists of following sub-components: (i) strengthening public investment budget programming and budgeting; (ii) enhancing public investment budget execution monitoring; and (iii) strengthening the management of public investment projects financed by international and bilateral donors. The third component, strengthening the performance of the public procurement system and developing capacity for better service delivery is to improve the performance of the public procurement system by improving the efficiency, effectiveness, and value for money. It consists of following sub-components: (i) strengthening the competencies of public officials responsible for public procurement; (ii) enhancing the capacity of organizations in the procurement system to carry out their functions; (iii) streamlining the procurement regulatory framework; and (iv) improving the management and monitoring of procurement performance. The fourth component, enhancing the use of statistics for policy making is to improve the national statistical system to produce regular and reliable economic and social population statistics and in-depth analysis. It consists of following sub-components: (i) improvement of poverty-related data; (ii) strengthening the national accounts production; and (iii) enhancing statistical data dissemination and use by the government to improve policy making and implementation. The fifth component, project coordination is to support the project coordination unit (PCU) in coordinating and managing the implementation of the project. It consists of following sub-components: (i) management support; and (ii) just-in-time technical assistance.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0020214"><narrative>Republic of Cameroon</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="CM-COA-0020213"><narrative>Ministry of Economy Planning and Regional Development</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2016-02-22"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2017-11-20"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2023-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2023-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Hugues Agossou</narrative></person-name><telephone>+1-202-473-1000</telephone><email>hagossou@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002233387" />
            <name><narrative>Republic of Cameroon</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6 12.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="15117" percentage="54" xml:lang="en"/><sector vocabulary="1" code="16062" percentage="33" xml:lang="en"/><sector vocabulary="1" code="15126" percentage="13" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="100.000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="48" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="40" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="53" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="40" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="40" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000441" percentage="40" xml:lang="en"><narrative>Data production, accessibility and use</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="53" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="53" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000441" percentage="40" xml:lang="en"><narrative>Data production, accessibility and use</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">77190.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">92597.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">51987.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">115010.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">128371.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">140492.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">156891.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">176576.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">189317.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">195579.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">200725.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">207855.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">211451.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">105989.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">207452.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">204104.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">208568.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">220937.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">235507.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">242017.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">254293.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">274164.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">287587.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">148614.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">311085.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">335079.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">351850.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">360127.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">378727.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">407340.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">428544.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">445594.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">473587.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">249860.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">525822.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">555582.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">586644.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">617644.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">653077.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">687673.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">715511.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">736436.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">762910.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">392832.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">804729.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">828072.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">857398.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">891250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">912578.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">926125.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">934898.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">951018.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">968812.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">488994.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">988280.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">1007066.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">1024426.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">1040143.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">1055705.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">1071577.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">1087790.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">851942.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">5397079.70</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">5397079.70</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">31000000</value><description xml:lang="en"><narrative>Total Commitment in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-3032150</value><description xml:lang="en"><narrative>Total Commitment Cancellations in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">2902185</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">20169</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">47556</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">96286</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">103995</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">181144</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">59878</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">98306</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">120280</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">71520</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">134227</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">192905</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">61792</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">201557</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">192532</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">314891</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">42759</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">81422</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">243967</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">81766</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">91901</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">166257</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">492508</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">313269</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">146743</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">268568</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">653927</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">636392</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">1037108</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">390917</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">435508</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">359842</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">761534</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">1042242</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">978514</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">256164</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">299560</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">524263</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">838168</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">873695</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">405689</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">386797</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">837631</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">628754</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">607326</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">969132</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">4083031</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-205652</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">258069</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">1007654</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">574739</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">488073</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-222285</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-32253</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-13230</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-24685</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-31579</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-40128</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-45360</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-51790</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-62721</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-95873</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-117746</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-156761</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-175476</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-182499</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-185057</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-182331</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-475706</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-475116</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-473323</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-411114</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-436273</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-452944</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-453684</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20213"><narrative>Ministry of Economy Planning and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P151155"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P151155?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P151155"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average procurement time of public contracts under MINSANTE's exclusive competence
</narrative></title>
<baseline year="2017" iso-date="2017-07-17" value="128.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-17" />
<period-end iso-date="2023-12-31" />
<target value="90.00">

</target>
<actual value="86.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Validation of Public Investment Selection Manual that include Poverty in selection criteria
</narrative></title>
<baseline year="2017" iso-date="2017-07-17" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-17" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public investment execution rate by December 31 in selected sectors (MINSANTE)
</narrative></title>
<baseline year="2017" iso-date="2017-07-17" value="52.60"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-17" />
<period-end iso-date="2023-12-31" />
<target value="75.00">

</target>
<actual value="95.10">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Publication of annual budget and spending through on-line BOOST database by July 31st
</narrative></title>
<baseline year="2017" iso-date="2017-07-17" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-17" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average procurement time of public contracts subject to MINMAP's prior review
</narrative></title>
<baseline year="2017" iso-date="2017-07-17" value="255.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-17" />
<period-end iso-date="2023-12-31" />
<target value="180.00">

</target>
<actual value="107.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Variance between the annual budget allocation and the MTEF projection for the first MTEF year (MINEDUB)
</narrative></title>
<baseline year="2017" iso-date="2017-07-17" value="50.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-17" />
<period-end iso-date="2023-12-31" />
<target value="20.00">

</target>
<actual value="0.31">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Public investment projects database available online and updated at least twice a year
</narrative></title>
<baseline year="2017" iso-date="2017-07-17" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-17" />
<period-end iso-date="2023-12-31" />
<target value="Y">

</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries of procurement training among women
</narrative></title>
<baseline year="2017" iso-date="2017-07-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-17" />
<period-end iso-date="2023-12-31" />
<target value="70.00">

</target>
<actual value="34.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average procurement time of public contracts under MINEDUB's exclusive competence
</narrative></title>
<baseline year="2017" iso-date="2017-07-17" value="128.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-17" />
<period-end iso-date="2023-12-31" />
<target value="90.00">

</target>
<actual value="189.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
ECAM 5 survey revised methodology is aligned with new international standards on Poverty surveys
</narrative></title>
<baseline year="2017" iso-date="2017-07-17" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-17" />
<period-end iso-date="2023-12-31" />
<target value="Y">

</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Regions for which cross border trade statistics are produced and taken into account in National accounts
</narrative></title>
<baseline year="2017" iso-date="2017-07-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-17" />
<period-end iso-date="2023-12-31" />
<target value="7.00">

</target>
<actual value="7.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public investment execution rate by December 31 in selected sectors (MINEDUB)
</narrative></title>
<baseline year="2017" iso-date="2017-07-17" value="73.15"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-17" />
<period-end iso-date="2023-12-31" />
<target value="85.00">

</target>
<actual value="71.80">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual performance plans prepared on the basis of the new program format and indicators in MINSANTE
</narrative></title>
<baseline year="2022" iso-date="2022-05-31" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="N">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
4th Population Census mapping revised
</narrative></title>
<baseline year="2017" iso-date="2017-07-17" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-17" />
<period-end iso-date="2023-12-31" />
<target value="Y">

</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Satisfaction of public statistics users
</narrative></title>
<baseline year="2017" iso-date="2017-07-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-17" />
<period-end iso-date="2023-12-31" />
<target value="70.00">

</target>
<actual value="82.30">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Publication of audited financial statements of SOEs
</narrative></title>
<baseline year="2017" iso-date="2017-07-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-17" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="12.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Variance between the annual budget allocation and the MTEF projection for the first MTEF year (MINSANTE)
</narrative></title>
<baseline year="2017" iso-date="2017-07-17" value="50.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-17" />
<period-end iso-date="2023-12-31" />
<target value="20.00">

</target>
<actual value="0.25">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Procurement staff trained with demonstrated competency in procurement
</narrative></title>
<baseline year="2017" iso-date="2017-07-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-17" />
<period-end iso-date="2023-12-31" />
<target value="70.00">

</target>
<actual value="76.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual performance plans prepared on the basis of the new program format and indicators in MINEDUB
</narrative></title>
<baseline year="2022" iso-date="2022-05-31" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="N">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P163881</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>CM- Rural Electricity Access Project  for Underserved Regions</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objective is to increase electricity  access in Underserved  Regions of  Cameroon.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Rural Electricity Access Project for Underserved Regions Project for Cameroon is to increase electricity access in underserved regions of Cameroon. The project comprises of five components. The first component, rural electrification by grid extension consists of two sub-components: (i) rural electrification by extension of medium voltage and low voltage (MV and LV) networks; and (ii) reinforcements and extension of existing High Voltage Level B and High Voltage Level A and Low Voltage Level A (HTB and HTA and BTA) networks to enhance the security of power supply to new villages in far-north regions. The second component, decentralized rural electrification is based on two concepts: (a) a public-private partnership (PPP) concept where the private sector, including energy of Cameroon (ENEO), will play a role as operator and not direct investor, and (b) securing supply of existing isolated mini-grids operated by ENEO in selected localities by hybridization, namely, adding photovoltaic (PV) solar mini-plants and extension of the existing HT and /BTA networks for better service coverage. It consists of two sub-components: (i) development of a pilot PPP for decentralized rural electrification; and (ii) securing the power supply of isolated sites by hybridization. The third component, support to households for connection costs will support the establishment of a revolving fund to help finance initial household connection costs (including ready boards) to obtain grid supply in the 417 localities (targeted under sub-component 1.1 and component 2) and in approximately 12 localities that are already electrified. The fourth component, strengthening institutional capacity of electricity sector and project management will support capacity building of implementing agencies and entities and project management. It consists of six sub-components: (i) strengthening institutional capacity of the electricity sector; (ii) owner's engineer for project supervision; (iii) structuring: (a) an industrial strategy built on rural electrification activities, and (b) local expertise for engineering, construction, and maintenance of HTA and BTA networks; (iv) income generation and capacity building for women and youth; (v) support to institutional reform of the rural electrification agency (AER); and (vi) project management support. The fifth component, contingent emergency response will be available if needed, to redeploy some of the project resources alongside those of other projects in the Cameroon project portfolio to respond to crisis and emergency needs.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0033219"><narrative>Republic of Cameroon</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0033219"><narrative>Republic of Cameroon</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="CM-COA-0033217"><narrative>-Ministry of Economy,  planning and  Regional Developpement</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2018-07-16"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2018-12-13"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2026-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2026-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Nash Fiifi Eyison</narrative></person-name><telephone>+1-202-473-1000</telephone><email>neyison@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002221030" />
            <name><narrative>Yagoua</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.34107 15.23288</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002221109" />
            <name><narrative>Waza</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>11.39879 14.57067</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002221204" />
            <name><narrative>Vongna</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.71667 14.38333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002221308" />
            <name><narrative>Mayo Tsanaga</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.78333 14.66667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002221788" />
            <name><narrative>South-West Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.2 9.3</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002221987" />
            <name><narrative>Sobia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.18333 12.7</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002222175" />
            <name><narrative>Sava</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>11.01444 14.20168</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002223602" />
            <name><narrative>North-West Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.36667 10.36667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002223603" />
            <name><narrative>North Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.5 14</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002224493" />
            <name><narrative>Ngoumi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.7637 15.1845</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002224508" />
            <name><narrative>Ngoum</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.68333 11.6</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002224845" />
            <name><narrative>Ngandou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.11667 12.1</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002228373" />
            <name><narrative>Maroua</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.59095 14.31593</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002228770" />
            <name><narrative>Mali</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.46667 12.58333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002229292" />
            <name><narrative>Logone Birni</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>11.77934 15.10285</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002229700" />
            <name><narrative>Labaye</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.71667 14.43333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002231755" />
            <name><narrative>Far North Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>11 14.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002231835" />
            <name><narrative>East Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.83333 14.16667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002236015" />
            <name><narrative>Adamaoua Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.83333 13.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006620518" />
            <name><narrative>Somie</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.45843 11.43299</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006730660" />
            <name><narrative>Taram</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.71403 14.77121</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007670947" />
            <name><narrative>Faro-et-Deo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.46684 12.49612</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008334597" />
            <name><narrative>Sanaga River</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.92333 11.51732</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008696072" />
            <name><narrative>Malidja</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.56448 12.73836</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008696083" />
            <name><narrative>Bello</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.61791 12.95498</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002234618" />
            <name><narrative>Tongo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.67905 12.32263</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002225549" />
            <name><narrative>Nabemo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.4 14.18333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="23630" percentage="60" xml:lang="en"/><sector vocabulary="1" code="23230" percentage="20" xml:lang="en"/><sector vocabulary="1" code="23111" percentage="11" xml:lang="en"/><sector vocabulary="1" code="23220" percentage="9" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LH" percentage="4.00000000" xml:lang="en"><narrative>FY17 - Renewable Energy Hydro</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LU" percentage="9.00000000" xml:lang="en"><narrative>FY17 - Renewable Energy Solar</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LP" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Energy and Extractives</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LT" percentage="77.0000000" xml:lang="en"><narrative>FY17 - Energy Transmission and Distribution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000223" percentage="11" xml:lang="en"><narrative>Youth Employment</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="16" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="27" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="64" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="13" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000863" percentage="89" xml:lang="en"><narrative>Access to Energy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000862" percentage="31" xml:lang="en"><narrative>Energy Policies &amp; Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="11" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="11" xml:lang="en"><narrative>Jobs</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">176250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">197250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">448050.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">251550.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">556500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">303000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">651150.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">346800.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">759150.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">417300.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">889950.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">463200.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">946350.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">481200.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">989400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">1017000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">512550.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">1017750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">498900.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">987600.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">499500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">1033500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">545250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">1139550.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">580800.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">1195200.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">625500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">1326600.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">689100.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">1421550.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">739950.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">1560600.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">826050.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">1702500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">863700.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">1780200.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">1898250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">1003950.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">2073600.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">1064250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">2218050.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">1165350.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">2463300.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">1290000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">2688300.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">1400400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">2913750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">1513050.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">3160050.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">1645200.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">3398550.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">1745850.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">3563400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">1825950.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">3766350.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">1932150.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">3951450.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">2017050.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">4148700.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">4312500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">2198400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">4449450.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">2249100.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">4523700.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">2288700.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">4648200.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">2352600.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">4746450.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">2401650.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">4872900.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">2468700.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">4995450.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">2525700.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">5108250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">2582850.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">5224050.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">2641650.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">4122300.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">69970001.62</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">69970001.62</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">150000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-30000000</value><description xml:lang="en"><narrative>Total Commitment Cancellations in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">1097271</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">5816369</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">327459</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">177308</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">5346144</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">17722</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">2570969</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">84696</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">265802</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">1573088</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">392248</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">146782</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">1108255</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">1559664</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">152330</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">2378029</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">149297</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">463493</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">14767088</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">144797</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">6023</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">1055714</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">858405</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">267335</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">1148847</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">103010</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">2191490</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">579564</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">331344</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">3592754</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">1844042</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">2251695</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">2708733</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">1678163</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">6089206</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">4917148</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">1223722</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">407880</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">1878281</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">3581232</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">256409</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">1056590</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">317078</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">1095676</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">1735951</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">314895</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-44414</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-89108</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-96443</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-89520</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-111765</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-130698</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-224114</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-259599</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-271203</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-364467</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-481898</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-1808368</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-1864037</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-1827402</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-1993736</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-1954574</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33217"><narrative>-Ministry of Economy,  planning and  Regional Developpement; Rural Electrification Agency</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P163881"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P163881?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P163881"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Distribution BTA lines constructed under the project in rural areas
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2025-06-25" />
<target value="1,237.00">
<comment><narrative>
This indicator measures the length in km of the low voltage transmission lines constructed under the project. The baseline value for this indicator is expected to be zero. This is dependent on the overall grid extension works and will be measured progressively. Materials are at project site, pegging, digging and planting of poles ongoing.
</narrative></comment>
</target>
<actual value="135.8km">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Distribution HTA lines constructed under the project in rural areas
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2025-06-25" />
<target value="1,136.00">
<comment><narrative>
This indicator measures the length in km of the medium voltage transmission lines constructed under the project. The baseline value for this indicator is expected to be zero. As the stringing and commissioning of grid extension works of Component 1 continuous, this indicator will measured progressively
</narrative></comment>
</target>
<actual value="177km">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Feasibility studies of mini-hydropower sites completed under the project
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2026-06-14" />
<target value="1">
<comment><narrative>
The studies for the first site (Koudini) started in
November 2023 and expected to be finalized in August 2024. The study for the second site was cancelled due to non accessibility to the site.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Diagnostic study of AER
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2026-06-13" />
<target value="Yes">
<comment><narrative>
This indicator will measure the completion of the Diagnostic study of AER. Diagnostic was finalized in 2022.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Beneficiary satisfaction survey completed
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2026-06-12" />
<target value="Yes">
<comment><narrative>
This indicator measures the completion of the Beneficiary Satisfaction Survey.
2 surveys has been concluded, the first has been cleared by the Bank's team whilst the second survey report is being reviewed by the PIU prior to submitting for the Bank's review.
</narrative></comment>
</target>
<actual value="YES">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Beneficiary satisfaction survey completed
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2026-06-12" />
<target value="Yes">
<comment><narrative>
This indicator will measure the completion of the Beneficiary Satisfaction Survey.
Survey has been concluded and final report submitted for the Bank's review
</narrative></comment>
</target>
<actual value="YES">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of villages electrified
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2025-06-25" />
<target value="280.00">
<comment><narrative>
This indicator measures the number of new medium voltage substations constructed and
commissioned under the project. The indicator will start to be measured when the grid
extension works will start and localities will be connected to the grid. The first substations are
expected to be constructed in 1st Qtr of CY 2025
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Beneficiary satisfaction survey completed
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2026-06-12" />
<target value="Yes">
<comment><narrative>
This indicator measures the completion of the Beneficiary Satisfaction Survey.
2 surveys has been concluded, the first has been cleared by the Bank's team whilst the second survey report is being reviewed by the PIU prior to submitting for the Bank's review.
</narrative></comment>
</target>
<actual value="YES">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Distribution BTA lines constructed under the project in rural areas
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2025-06-25" />
<target value="1,237.00">
<comment><narrative>
This indicator measures the length in km of the low voltage transmission lines constructed under the project. This is dependent on the overall grid extension works and will be measured progressively.
</narrative></comment>
</target>
<actual value="330.41km">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health centers electrified through solar systems
</narrative></title>
<baseline year="2020" iso-date="2020-06-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-07" />
<period-end iso-date="2026-06-14" />
<target value="31.00">
<comment><narrative>
The electrification of 31 health centers using solar energy has been successfully completed..
</narrative></comment>
</target>
<actual value="31">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Communication strategy of the project validated by stakeholders
</narrative></title>
<baseline year="2023" iso-date="2023-04-13" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-13" />
<period-end iso-date="2026-06-13" />
<target value="Yes">
<comment><narrative>
This communication strategy was disseminated through a workshop in November, 2023
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase of national electrification access rate
</narrative></title>
<baseline year="2018" iso-date="2018-08-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-29" />
<period-end iso-date="2026-06-14" />
<target value="5.00">
<comment><narrative>
The indicator measures the increase in rural electrification access rate national wide through grid household connections.? This indicator will start to be measured?when the grid extension works will start and localities will be connected to the grid. The first localities are expected to be electrified first week of November 2025 in the east region.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Feasibility Study  for industrial unit for cable manufacturing completed
</narrative></title>
<baseline year="2023" iso-date="2023-04-13" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-13" />
<period-end iso-date="2026-06-13" />
<target value="Yes">
<comment><narrative>
The study is completed and approved by the technical review committee. The final report dissemination is planned for November 2025.
</narrative></comment>
</target>
<actual value="YES">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Diagnostic study of AER
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2026-06-13" />
<target value="Yes">
<comment><narrative>
This indicator will measure the completion of the Diagnostic study of AER. Diagnostic was finalized in 2022.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2018" iso-date="2018-08-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-28" />
<period-end iso-date="2026-06-14" />
<target value="1,400,000">
<comment><narrative>
This indicator measures the number of new or improved electricity service connections achieved under the project. 271,502 household connections have been completed through the revolving fund in support of ENEO. This figure does not yet include the number of people expected to be connected through grid extension works in rural areas, as those works are still ongoing.
</narrative></comment>
</target>
<actual value="1,357,510">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private enterprises trained under the project
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2026-06-13" />
<target value="50.00">
<comment><narrative>
This indicator measures the number of private enterprises of the various sector trained in the project.
</narrative></comment>
</target>
<actual value="50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Feasibility Study  for industrial unit for cable manufacturing completed
</narrative></title>
<baseline year="2023" iso-date="2023-04-13" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-13" />
<period-end iso-date="2026-06-13" />
<target value="Yes">
<comment><narrative>
The study is completed and approved by the technical review committee. The final report dissemination is planned for November 2025.
</narrative></comment>
</target>
<actual value="YES">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Diagnostic study of AER
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2026-06-13" />
<target value="Yes">
<comment><narrative>
This indicator will measure the completion of the Diagnostic study of AER. Diagnostic was finalized in 2022.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to electricity
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2026-06-11" />
<target value="28,7825">
<comment><narrative>
This indicated relates to number of people provided access to electricity through newly constructed grid extensions. The first localities are expected to be electrified in November 2025.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of villages electrified
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2025-06-25" />
<target value="280.00">
<comment><narrative>
This indicator measures the number of new medium voltage substations constructed and
commissioned under the project. The indicator will start to be measured when the grid
extension works will start and localities will be connected to the grid. The first villages are expected to be electrified in November 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Distribution HTA lines constructed under the project in rural areas
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2025-06-25" />
<target value="1,136.00">
<comment><narrative>
This indicator measures the length in km of the medium voltage transmission lines constructed under the project. The baseline value for this indicator is expected to be zero. As the stringing and commissioning of grid extension works of Component 1 continuous, this indicator will measured progressively
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase of national electrification access rate
</narrative></title>
<baseline year="2018" iso-date="2018-08-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-29" />
<period-end iso-date="2026-06-14" />
<target value="5.00">
<comment><narrative>
The indicator measures the increase in rural electrification access rate national wide.  This indicator will start to be measured when the grid extension works will start and localities will be connected to the grid. The first localities are expected to be electrified starting end of June 2025.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Beneficiary satisfaction survey completed
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2026-06-12" />
<target value="Yes">
<comment><narrative>
This indicator measures the completion of the Beneficiary Satisfaction Survey.
2 surveys has been concluded, the first has been cleared by the Bank's team whilst the second survey report is being reviewed by the PIU prior to submitting for the Bank's review.
</narrative></comment>
</target>
<actual value="YES">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Feasibility studies of mini-hydropower sites completed under the project
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2026-06-14" />
<target value="1">
<comment><narrative>
Feasibility studies including hydrological, technical, financial, and environmental assessments for the small hydropower plants (SHPs) at Koudini (Adamawa region) has been finalized and been reviewed by the Bank's team. The contract for the Njii SHP was dropped due to security constraints
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Communication strategy of the project validated by stakeholders
</narrative></title>
<baseline year="2023" iso-date="2023-04-13" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-13" />
<period-end iso-date="2026-06-13" />
<target value="Yes">
<comment><narrative>
This communication strategy was disseminated through a workshop in November, 2023
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Project-related grievances registered under the project GRM and addressed
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2026-06-13" />
<target value="100.00">
<comment><narrative>
This indicator measures as a percentage the number of addressed grievances over the number of registered grievances.
</narrative></comment>
</target>
<actual value="87.9">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women employed during grid extension electrification
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2025-06-25" />
<target value="50.00">
<comment><narrative>
19 women are currently employed for grid extensions works under the project.
</narrative></comment>
</target>
<actual value="19.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Project-related grievances registered under the project GRM and addressed
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2026-06-13" />
<target value="100.00">
<comment><narrative>
This indicator measures as a percentage the number of addressed grievances over the number of registered grievances. 1516 out 1525.
</narrative></comment>
</target>
<actual value="99.4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Distribution HTA lines constructed under the project in rural areas
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2025-06-25" />
<target value="1,136.00">
<comment><narrative>
This indicator measures the length in km of the medium voltage transmission lines constructed under the project. As the stringing and commissioning of grid extension works of Component 1 continuous, this indicator will measured progressively
</narrative></comment>
</target>
<actual value="308.1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households connected to electricity through the Revolving Fund
</narrative></title>
<baseline year="2020" iso-date="2020-06-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-06" />
<period-end iso-date="2026-06-11" />
<target value="163,000.00">
<comment><narrative>
This exceeds the target
</narrative></comment>
</target>
<actual value="340,553">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Distribution HTA lines constructed under the project in rural areas
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2025-06-25" />
<target value="1,136.00">
<comment><narrative>
This indicator measures the length in km of the medium voltage transmission lines constructed under the project. The baseline value for this indicator is expected to be zero. As the stringing and commissioning of grid extension works of Component 1 continuous, this indicator will measured progressively
</narrative></comment>
</target>
<actual value="177km">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Distribution BTA lines constructed under the project in rural areas
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2025-06-25" />
<target value="1,237.00">
<comment><narrative>
This indicator measures the length in km of the low voltage transmission lines constructed under the project. The baseline value for this indicator is expected to be zero. This is dependent on the overall grid extension works and will be measured progressively. Materials are at project site, pegging, digging and planting of poles ongoing.
</narrative></comment>
</target>
<actual value="135.8km">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Feasibility studies of mini-hydropower sites completed under the project
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2026-06-14" />
<target value="1">
<comment><narrative>
Feasibility studies including hydrological, technical, financial, and environmental assessments for the small hydropower plants (SHPs) at Koudini (Adamawa region) has been finalized and been reviewed by the Bank's team. The contract for the Njii SHP was dropped due to security constraints
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to electricity
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2026-06-11" />
<target value="1,102,825">
<comment><narrative>
This indicated relates to number of people provided access to electricity through newly constructed grid extensions. The first localities are expected to be electrified in November 2025.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2018" iso-date="2018-08-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-28" />
<period-end iso-date="2026-06-14" />
<target value="1,400,000">
<comment><narrative>
This indicator measures the number of new or improved electricity service connections achieved under the project. 304,216 household connections have been completed through the revolving fund in support of ENEO. This figure does not yet include the number of people expected to be connected through grid extension works in rural areas, as those works are still ongoing.
</narrative></comment>
</target>
<actual value="1400000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households provided with an electricity connection in rural areas under the project
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2025-06-25" />
<target value="57,565.00">
<comment><narrative>
This indicator measures the number of household connections completed in rural areas under the project. As of today 269 connections has been realized.
</narrative></comment>
</target>
<actual value="269">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Feasibility Study  for industrial unit for cable manufacturing completed
</narrative></title>
<baseline year="2023" iso-date="2023-04-13" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-13" />
<period-end iso-date="2026-06-13" />
<target value="Yes">
<comment><narrative>
The study is ongoing. The final report is now due by end of August 2024.
</narrative></comment>
</target>
<actual value="YES">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households provided with an electricity connection in rural areas under the project
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2025-06-25" />
<target value="57,565.00">
<comment><narrative>
This indicator measures the number of new medium voltage substations constructed and
commissioned under the project. The indicator will start to be measured when the grid
extension works will start and localities will be connected to the grid. The first villages are expected to be electrified in November 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women employed during grid extension electrification
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2025-06-25" />
<target value="50.00">
<comment><narrative>
19 women are currently employed for grid extensions works under the project.
</narrative></comment>
</target>
<actual value="19.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households connected to electricity through the Revolving Fund
</narrative></title>
<baseline year="2020" iso-date="2020-06-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-06" />
<period-end iso-date="2026-06-11" />
<target value="163,000.00">
<comment><narrative>
This exceeds the target
</narrative></comment>
</target>
<actual value="322,926">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Feasibility Study  for industrial unit for cable manufacturing completed
</narrative></title>
<baseline year="2023" iso-date="2023-04-13" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-13" />
<period-end iso-date="2026-06-13" />
<target value="Yes">
<comment><narrative>
The study is completed and approved by the technical review committee. The final report dissemination is planned for November 2025.
</narrative></comment>
</target>
<actual value="YES">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private enterprises trained under the project
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2026-06-13" />
<target value="50.00">
<comment><narrative>
This indicator measures the number of private enterprises of the various sector trained in the project.
</narrative></comment>
</target>
<actual value="50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to electricity
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2026-06-11" />
<target value="28,7825">
<comment><narrative>
This indicated relates to number of people provided access to electricity through newly constructed grid extensions. As of today, works have been completed in 118 rural localities, with 1345 people provided with access (269 connections)
</narrative></comment>
</target>
<actual value="1,345">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Diagnostic study of AER
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2026-06-13" />
<target value="Yes">
<comment><narrative>
This indicator will measure the completion of the Diagnostic study of AER. Diagnostic was finalized in 2022.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase of national electrification access rate
</narrative></title>
<baseline year="2018" iso-date="2018-08-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-29" />
<period-end iso-date="2026-06-14" />
<target value="5.00">
<comment><narrative>
The indicator measures the increase in rural electrification access rate national wide.  This indicator will start to be measured when the grid extension works will start and localities will be connected to the grid. As of today, work has been completed in 118 rural localities, reflecting meaningful advancement toward the target. However, the team notes that even if all 280 targeted rural localities were electrified, achieving a 5 percent increase in the rural electrification access rate would remain unlikely. The team therefore assesses that this target was overly ambitious and likely overestimated at the time of design.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households connected to electricity through the Revolving Fund
</narrative></title>
<baseline year="2020" iso-date="2020-06-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-06" />
<period-end iso-date="2026-06-11" />
<target value="163,000.00">
<comment><narrative>
This exceeds the target
</narrative></comment>
</target>
<actual value="304216">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health centers electrified through solar systems
</narrative></title>
<baseline year="2020" iso-date="2020-06-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-07" />
<period-end iso-date="2026-06-14" />
<target value="31.00">
<comment><narrative>
The electrification of 31 health centers using solar energy has been successfully completed..
</narrative></comment>
</target>
<actual value="31">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private enterprises trained under the project
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2026-06-13" />
<target value="50.00">
<comment><narrative>
This indicator measures the number of private enterprises of the various sector trained in the project. The PIU has planned trainings for staffs of contactors and sub-contractors in CY 2024. When the training start, this indicators will be adjusted.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health centers electrified through solar systems
</narrative></title>
<baseline year="2020" iso-date="2020-06-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-07" />
<period-end iso-date="2026-06-14" />
<target value="31.00">
<comment><narrative>
The electrification of 31 health centers using solar energy has been successfully completed..
</narrative></comment>
</target>
<actual value="31">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase of national electrification access rate
</narrative></title>
<baseline year="2018" iso-date="2018-08-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-29" />
<period-end iso-date="2026-06-14" />
<target value="5.00">
<comment><narrative>
The indicator measures the increase in rural electrification access rate national wide through grid household connections.? This indicator will start to be measured?when the grid extension works will start and localities will be connected to the grid. The first localities are expected to be electrified first week of November 2025 in the east region.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households provided with an electricity connection in rural areas under the project
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2025-06-25" />
<target value="57,565.00">
<comment><narrative>
This indicator measures the number of new medium voltage substations constructed and
commissioned under the project. The indicator will start to be measured when the grid
extension works will start and localities will be connected to the grid. The first villages are expected to be electrified in November 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Communication strategy of the project validated by stakeholders
</narrative></title>
<baseline year="2023" iso-date="2023-04-13" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-13" />
<period-end iso-date="2026-06-13" />
<target value="Yes">
<comment><narrative>
This communication strategy was disseminated through a workshop in November, 2023
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Feasibility studies of mini-hydropower sites completed under the project
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2026-06-14" />
<target value="1">
<comment><narrative>
Feasibility studies including hydrological, technical, financial, and environmental assessments for the small hydropower plants (SHPs) at Koudini (Adamawa region) has been finalized and been reviewed by the Bank's team. The contract for the Njii SHP was dropped due to security constraints
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of staff trained under the project
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2026-06-13" />
<target value="300.00">
<comment><narrative>
This indicator measures the number of staff of the various sector agencies trained under the project.
</narrative></comment>
</target>
<actual value="1070">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of staff trained under the project
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2026-06-13" />
<target value="300.00">
<comment><narrative>
This indicator measures the number of staff of the various sector agencies trained under the project.
</narrative></comment>
</target>
<actual value="1070">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of staff trained under the project
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2026-06-13" />
<target value="300.00">
<comment><narrative>
This indicator measures the number of staff of the various sector agencies trained under the project.
</narrative></comment>
</target>
<actual value="1070">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Distribution BTA lines constructed under the project in rural areas
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2025-06-25" />
<target value="1,237.00">
<comment><narrative>
This indicator measures the length in km of the low voltage transmission lines constructed under the project. The baseline value for this indicator is expected to be zero. This is dependent on the overall grid extension works and will be measured progressively. Materials are at project site, pegging, digging and planting of poles ongoing.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of villages electrified
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2025-06-25" />
<target value="280.00">
<comment><narrative>
This indicator measures the number of new medium voltage substations constructed and
commissioned under the project. The indicator will start to be measured when the grid
extension works will start and localities will be connected to the grid. The first villages are expected to be electrified in November 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Project-related grievances registered under the project GRM and addressed
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2026-06-13" />
<target value="100.00">
<comment><narrative>
This indicator measures as a percentage the number of addressed grievances over the number of registered grievances. 1531 out 1671.
</narrative></comment>
</target>
<actual value="91.6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women employed during grid extension electrification
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2025-06-25" />
<target value="50.00">
<comment><narrative>
19 women are currently employed for grid extensions works under the project.
</narrative></comment>
</target>
<actual value="19.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Feasibility Study  for industrial unit for cable manufacturing completed
</narrative></title>
<baseline year="2023" iso-date="2023-04-13" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-13" />
<period-end iso-date="2026-06-13" />
<target value="Yes">
<comment><narrative>
The study is completed, approved by the technical review committee and dissemination done in November 2025.
</narrative></comment>
</target>
<actual value="YES">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women employed during grid extension electrification
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2025-06-25" />
<target value="50.00">
<comment><narrative>
19 women are currently employed for grid extensions works under the project.
</narrative></comment>
</target>
<actual value="19.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Feasibility Study  for industrial unit for cable manufacturing completed
</narrative></title>
<baseline year="2023" iso-date="2023-04-13" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-13" />
<period-end iso-date="2026-06-13" />
<target value="Yes">
<comment><narrative>
The study is completed, approved by the technical review committee and dissemination done in November 2025.
</narrative></comment>
</target>
<actual value="YES">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Distribution BTA lines constructed under the project in rural areas
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2025-06-25" />
<target value="1,237.00">
<comment><narrative>
This indicator measures the length in km of the low voltage transmission lines constructed under the project. This is dependent on the overall grid extension works and will be measured progressively.
</narrative></comment>
</target>
<actual value="417.1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Distribution BTA lines constructed under the project in rural areas
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2025-06-25" />
<target value="1,237.00">
<comment><narrative>
This indicator measures the length in km of the low voltage transmission lines constructed under the project. This is dependent on the overall grid extension works and will be measured progressively.
</narrative></comment>
</target>
<actual value="417.1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Communication strategy of the project validated by stakeholders
</narrative></title>
<baseline year="2023" iso-date="2023-04-13" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-13" />
<period-end iso-date="2026-06-13" />
<target value="Yes">
<comment><narrative>
This communication strategy was disseminated through a workshop in November, 2023
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Communication strategy of the project validated by stakeholders
</narrative></title>
<baseline year="2023" iso-date="2023-04-13" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-13" />
<period-end iso-date="2026-06-13" />
<target value="Yes">
<comment><narrative>
This communication strategy was disseminated through a workshop in November, 2023
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Distribution HTA lines constructed under the project in rural areas
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2025-06-25" />
<target value="1,136.00">
<comment><narrative>
This indicator measures the length in km of the medium voltage transmission lines constructed under the project. As the stringing and commissioning of grid extension works of Component 1 continuous, this indicator will measured progressively
</narrative></comment>
</target>
<actual value="390.9">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Distribution HTA lines constructed under the project in rural areas
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2025-06-25" />
<target value="1,136.00">
<comment><narrative>
This indicator measures the length in km of the medium voltage transmission lines constructed under the project. As the stringing and commissioning of grid extension works of Component 1 continuous, this indicator will measured progressively
</narrative></comment>
</target>
<actual value="390.9">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Diagnostic study of AER
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2026-06-13" />
<target value="Yes">
<comment><narrative>
This indicator will measure the completion of the Diagnostic study of AER. Diagnostic was finalized in 2022.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Diagnostic study of AER
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2026-06-13" />
<target value="Yes">
<comment><narrative>
This indicator will measure the completion of the Diagnostic study of AER. Diagnostic was finalized in 2022.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2018" iso-date="2018-08-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-28" />
<period-end iso-date="2026-06-14" />
<target value="1,400,000">
<comment><narrative>
This indicator measures the number of new or improved electricity service connections achieved under the project. 304,216 household connections have been completed through the revolving fund in support of ENEO. This figure does not yet include the number of people expected to be connected through grid extension works in rural areas, as those works are still ongoing.
</narrative></comment>
</target>
<actual value="1614630">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households provided with an electricity connection in rural areas under the project
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2025-06-25" />
<target value="57,565.00">
<comment><narrative>
This indicator measures the number of household connections completed in rural areas under
the project. The indicator will start to be measured when the rural localities will be
electrified and households will start to be connected to the grid in those localities. The first
households are expected to be connected in early 2nd Qtr of CY 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Project-related grievances registered under the project GRM and addressed
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2026-06-13" />
<target value="100.00">
<comment><narrative>
This indicator measures as a percentage the number of addressed grievances over the number of registered grievances. 1628 out 1635.
</narrative></comment>
</target>
<actual value="99.5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Project-related grievances registered under the project GRM and addressed
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2026-06-13" />
<target value="100.00">
<comment><narrative>
This indicator measures as a percentage the number of addressed grievances over the number of registered grievances. 1628 out 1635.
</narrative></comment>
</target>
<actual value="99.5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health centers electrified through solar systems
</narrative></title>
<baseline year="2020" iso-date="2020-06-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-07" />
<period-end iso-date="2026-06-14" />
<target value="31.00">
<comment><narrative>
The electrification of 31 health centers using solar energy has been successfully completed..
</narrative></comment>
</target>
<actual value="31">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health centers electrified through solar systems
</narrative></title>
<baseline year="2020" iso-date="2020-06-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-07" />
<period-end iso-date="2026-06-14" />
<target value="31.00">
<comment><narrative>
The electrification of 31 health centers using solar energy has been successfully completed..
</narrative></comment>
</target>
<actual value="31">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households connected to electricity through the Revolving Fund
</narrative></title>
<baseline year="2020" iso-date="2020-06-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-06" />
<period-end iso-date="2026-06-11" />
<target value="163,000.00">
<comment><narrative>
This exceeds the target
</narrative></comment>
</target>
<actual value="372402">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households connected to electricity through the Revolving Fund
</narrative></title>
<baseline year="2020" iso-date="2020-06-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-06" />
<period-end iso-date="2026-06-11" />
<target value="163,000.00">
<comment><narrative>
This exceeds the target
</narrative></comment>
</target>
<actual value="372402">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households provided with an electricity connection in rural areas under the project
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2025-06-25" />
<target value="57,565.00">
<comment><narrative>
This indicator measures the number of household connections completed in rural areas under the project. As of today 291 connections has been realized.
</narrative></comment>
</target>
<actual value="291">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households provided with an electricity connection in rural areas under the project
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2025-06-25" />
<target value="57,565.00">
<comment><narrative>
This indicator measures the number of household connections completed in rural areas under the project. As of today 291 connections has been realized.
</narrative></comment>
</target>
<actual value="291">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private enterprises trained under the project
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2026-06-13" />
<target value="50.00">
<comment><narrative>
This indicator measures the number of private enterprises of the various sector trained in the project.
</narrative></comment>
</target>
<actual value="50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private enterprises trained under the project
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2026-06-13" />
<target value="50.00">
<comment><narrative>
This indicator measures the number of private enterprises of the various sector trained in the project.
</narrative></comment>
</target>
<actual value="50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Feasibility studies of mini-hydropower sites completed under the project
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2026-06-14" />
<target value="1">
<comment><narrative>
Feasibility studies including hydrological, technical, financial, and environmental assessments for the small hydropower plants (SHPs) at Koudini (Adamawa region) has been finalized and been reviewed by the Bank's team. The contract for the Njii SHP was dropped due to security constraints
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Feasibility studies of mini-hydropower sites completed under the project
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2026-06-14" />
<target value="1">
<comment><narrative>
Feasibility studies including hydrological, technical, financial, and environmental assessments for the small hydropower plants (SHPs) at Koudini (Adamawa region) has been finalized and been reviewed by the Bank's team. The contract for the Njii SHP was dropped due to security constraints
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Beneficiary satisfaction survey completed
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2026-06-12" />
<target value="Yes">
<comment><narrative>
This indicator measures the completion of the Beneficiary Satisfaction Survey.
2 surveys has been concluded.
</narrative></comment>
</target>
<actual value="YES">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Beneficiary satisfaction survey completed
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2026-06-12" />
<target value="Yes">
<comment><narrative>
This indicator measures the completion of the Beneficiary Satisfaction Survey.
2 surveys has been concluded.
</narrative></comment>
</target>
<actual value="YES">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of villages electrified
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2025-06-25" />
<target value="280.00">
<comment><narrative>
This indicator measures the number of new medium voltage substations constructed and
commissioned under the project. As of today, work has been completed in 132 rural localities but only 65 localities are electrified.
</narrative></comment>
</target>
<actual value="65">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of staff trained under the project
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2026-06-13" />
<target value="300.00">
<comment><narrative>
This indicator measures the number of staff of the various sector agencies trained under the project.
</narrative></comment>
</target>
<actual value="1093">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of staff trained under the project
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2026-06-13" />
<target value="300.00">
<comment><narrative>
This indicator measures the number of staff of the various sector agencies trained under the project.
</narrative></comment>
</target>
<actual value="1093">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase of national electrification access rate
</narrative></title>
<baseline year="2018" iso-date="2018-08-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-29" />
<period-end iso-date="2026-06-14" />
<target value="5.00">
<comment><narrative>
As of today, works have been completed in 132 localities, reflecting meaningful advancement toward the target. It is worth noting that, as highlighted in the previous ISR, even if all 280 targeted rural localities were electrified, achieving a 5 percent increase in the rural electrification access rate would remain unlikely. The team therefore considers that this target was overly ambitious and likely overestimated at the time of project design. A more conservative and operationally relevant approach would be to adopt an access indicator that can be more easily monitored, such as the increase in the utility's rural customer database. In this regard, it is important to highlight that, between 2022 and May 2026, the utility recorded a 37 percent increase in its rural customer base (63,585 new customers out of a baseline of 168,919).
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of villages electrified
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2025-06-25" />
<target value="280.00">
<comment><narrative>
This indicator measures the number of new medium voltage substations constructed and
commissioned under the project. As of today, work has been completed in 132 rural localities but only 65 localities are electrified.
</narrative></comment>
</target>
<actual value="65">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase of national electrification access rate
</narrative></title>
<baseline year="2018" iso-date="2018-08-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-29" />
<period-end iso-date="2026-06-14" />
<target value="5.00">
<comment><narrative>
The indicator measures the increase in rural electrification access rate national wide.  This indicator will start to be measured when the grid extension works will start and localities will be connected to the grid. As of today, work has been completed in 118 rural localities, reflecting meaningful advancement toward the target. However, the team notes that even if all 280 targeted rural localities were electrified, achieving a 5 percent increase in the rural electrification access rate would remain unlikely. The team therefore assesses that this target was overly ambitious and likely overestimated at the time of design.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase of national electrification access rate
</narrative></title>
<baseline year="2018" iso-date="2018-08-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-29" />
<period-end iso-date="2026-06-14" />
<target value="5.00">
<comment><narrative>
The indicator measures the increase in rural electrification access rate national wide through grid household connections.? This indicator will start to be measured?when the grid extension works will start and localities will be connected to the grid. The first localities are expected to be electrified first week of November 2025 in the east region.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase of national electrification access rate
</narrative></title>
<baseline year="2018" iso-date="2018-08-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-29" />
<period-end iso-date="2026-06-14" />
<target value="5.00">
<comment><narrative>
The indicator measures the increase in rural electrification access rate national wide through grid household connections.? This indicator will start to be measured?when the grid extension works will start and localities will be connected to the grid. The first localities are expected to be electrified first week of November 2025 in the east region.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase of national electrification access rate
</narrative></title>
<baseline year="2018" iso-date="2018-08-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-29" />
<period-end iso-date="2026-06-14" />
<target value="5.00">
<comment><narrative>
As of today, works have been completed in 132 localities, reflecting meaningful advancement toward the target. It is worth noting that, as highlighted in the previous ISR, even if all 280 targeted rural localities were electrified, achieving a 5 percent increase in the rural electrification access rate would remain unlikely. The team therefore considers that this target was overly ambitious and likely overestimated at the time of project design. A more conservative and operationally relevant approach would be to adopt an access indicator that can be more easily monitored, such as the increase in the utility's rural customer database. In this regard, it is important to highlight that, between 2022 and May 2026, the utility recorded a 37 percent increase in its rural customer base (63,585 new customers out of a baseline of 168,919).
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase of national electrification access rate
</narrative></title>
<baseline year="2018" iso-date="2018-08-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-29" />
<period-end iso-date="2026-06-14" />
<target value="5.00">
<comment><narrative>
The indicator measures the increase in rural electrification access rate national wide.  This indicator will start to be measured when the grid extension works will start and localities will be connected to the grid. The first localities are expected to be electrified starting end of June 2025.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2018" iso-date="2018-08-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-28" />
<period-end iso-date="2026-06-14" />
<target value="1,400,000">
<comment><narrative>
This indicator measures the number of new or improved electricity service connections achieved under the project. 372,402 household connections have been completed through the revolving fund in support of ENEO/SOCADEL.
</narrative></comment>
</target>
<actual value="1862010">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2018" iso-date="2018-08-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-28" />
<period-end iso-date="2026-06-14" />
<target value="1,400,000">
<comment><narrative>
This indicator measures the number of new or improved electricity service connections achieved under the project. 340,553 household connections have been completed through the revolving fund in support of ENEO. This figure does not yet include the number of people expected to be connected through grid extension works in rural areas, as those works are still ongoing.
</narrative></comment>
</target>
<actual value="1614630">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2018" iso-date="2018-08-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-28" />
<period-end iso-date="2026-06-14" />
<target value="1,400,000">
<comment><narrative>
This indicator measures the number of new or improved electricity service connections achieved under the project. 304,216 household connections have been completed through the revolving fund in support of ENEO. This figure does not yet include the number of people expected to be connected through grid extension works in rural areas, as those works are still ongoing.
</narrative></comment>
</target>
<actual value="1614630">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2018" iso-date="2018-08-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-28" />
<period-end iso-date="2026-06-14" />
<target value="1,400,000">
<comment><narrative>
This indicator measures the number of new or improved electricity service connections achieved under the project. 304,216 household connections have been completed through the revolving fund in support of ENEO. This figure does not yet include the number of people expected to be connected through grid extension works in rural areas, as those works are still ongoing.
</narrative></comment>
</target>
<actual value="1400000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2018" iso-date="2018-08-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-28" />
<period-end iso-date="2026-06-14" />
<target value="1,400,000">
<comment><narrative>
This indicator measures the number of new or improved electricity service connections achieved under the project. 372,402 household connections have been completed through the revolving fund in support of ENEO/SOCADEL.
</narrative></comment>
</target>
<actual value="1862010">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2018" iso-date="2018-08-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-28" />
<period-end iso-date="2026-06-14" />
<target value="1,400,000">
<comment><narrative>
This indicator measures the number of new or improved electricity service connections achieved under the project. 271,502 household connections have been completed through the revolving fund in support of ENEO. This figure does not yet include the number of people expected to be connected through grid extension works in rural areas, as those works are still ongoing.
</narrative></comment>
</target>
<actual value="1,357,510">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private enterprises trained under the project
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2026-06-13" />
<target value="50.00">
<comment><narrative>
This indicator measures the number of private enterprises of the various sector trained in the project.
</narrative></comment>
</target>
<actual value="50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to electricity
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2026-06-11" />
<target value="28,7825">
<comment><narrative>
This indicated relates to number of people provided access to electricity through newly constructed grid extensions. As of today, works have been completed in 132 rural localities, with 1455 people provided with access (291 connections)
</narrative></comment>
</target>
<actual value="1455">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to electricity
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2026-06-11" />
<target value="28,7825">
<comment><narrative>
This indicated relates to number of people provided access to electricity through newly constructed grid extensions. As of today, works have been completed in 132 rural localities, with 1455 people provided with access (291 connections)
</narrative></comment>
</target>
<actual value="1455">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase of national electrification access rate
</narrative></title>
<baseline year="2018" iso-date="2018-08-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-29" />
<period-end iso-date="2026-06-14" />
<target value="5.00">
<comment><narrative>
As of today, works have been completed in 132 localities, reflecting meaningful advancement toward the target. It is worth noting that, as highlighted in the previous ISR, even if all 280 targeted rural localities were electrified, achieving a 5 percent increase in the rural electrification access rate would remain unlikely. The team therefore considers that this target was overly ambitious and likely overestimated at the time of project design. A more conservative and operationally relevant approach would be to adopt an access indicator that can be more easily monitored, such as the increase in the utility's rural customer database. In this regard, it is important to highlight that, between 2022 and May 2026, the utility recorded a 37 percent increase in its rural customer base (63,585 new customers out of a baseline of 168,919).
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase of national electrification access rate
</narrative></title>
<baseline year="2018" iso-date="2018-08-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-29" />
<period-end iso-date="2026-06-14" />
<target value="5.00">
<comment><narrative>
The indicator measures the increase in rural electrification access rate national wide.  This indicator will start to be measured when the grid extension works will start and localities will be connected to the grid. As of today, work has been completed in 118 rural localities, reflecting meaningful advancement toward the target. However, the team notes that even if all 280 targeted rural localities were electrified, achieving a 5 percent increase in the rural electrification access rate would remain unlikely. The team therefore assesses that this target was overly ambitious and likely overestimated at the time of design.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase of national electrification access rate
</narrative></title>
<baseline year="2018" iso-date="2018-08-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-29" />
<period-end iso-date="2026-06-14" />
<target value="5.00">
<comment><narrative>
The indicator measures the increase in rural electrification access rate national wide through grid household connections.? This indicator will start to be measured?when the grid extension works will start and localities will be connected to the grid. The first localities are expected to be electrified first week of November 2025 in the east region.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase of national electrification access rate
</narrative></title>
<baseline year="2018" iso-date="2018-08-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-29" />
<period-end iso-date="2026-06-14" />
<target value="5.00">
<comment><narrative>
The indicator measures the increase in rural electrification access rate national wide through grid household connections.? This indicator will start to be measured?when the grid extension works will start and localities will be connected to the grid. The first localities are expected to be electrified first week of November 2025 in the east region.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase of national electrification access rate
</narrative></title>
<baseline year="2018" iso-date="2018-08-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-29" />
<period-end iso-date="2026-06-14" />
<target value="5.00">
<comment><narrative>
As of today, works have been completed in 132 localities, reflecting meaningful advancement toward the target. It is worth noting that, as highlighted in the previous ISR, even if all 280 targeted rural localities were electrified, achieving a 5 percent increase in the rural electrification access rate would remain unlikely. The team therefore considers that this target was overly ambitious and likely overestimated at the time of project design. A more conservative and operationally relevant approach would be to adopt an access indicator that can be more easily monitored, such as the increase in the utility's rural customer database. In this regard, it is important to highlight that, between 2022 and May 2026, the utility recorded a 37 percent increase in its rural customer base (63,585 new customers out of a baseline of 168,919).
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase of national electrification access rate
</narrative></title>
<baseline year="2018" iso-date="2018-08-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-29" />
<period-end iso-date="2026-06-14" />
<target value="5.00">
<comment><narrative>
The indicator measures the increase in rural electrification access rate national wide.  This indicator will start to be measured when the grid extension works will start and localities will be connected to the grid. The first localities are expected to be electrified starting end of June 2025.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2018" iso-date="2018-08-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-28" />
<period-end iso-date="2026-06-14" />
<target value="1,400,000">
<comment><narrative>
This indicator measures the number of new or improved electricity service connections achieved under the project. 372,402 household connections have been completed through the revolving fund in support of ENEO/SOCADEL.
</narrative></comment>
</target>
<actual value="1862010">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2018" iso-date="2018-08-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-28" />
<period-end iso-date="2026-06-14" />
<target value="1,400,000">
<comment><narrative>
This indicator measures the number of new or improved electricity service connections achieved under the project. 340,553 household connections have been completed through the revolving fund in support of ENEO. This figure does not yet include the number of people expected to be connected through grid extension works in rural areas, as those works are still ongoing.
</narrative></comment>
</target>
<actual value="1614630">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2018" iso-date="2018-08-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-28" />
<period-end iso-date="2026-06-14" />
<target value="1,400,000">
<comment><narrative>
This indicator measures the number of new or improved electricity service connections achieved under the project. 304,216 household connections have been completed through the revolving fund in support of ENEO. This figure does not yet include the number of people expected to be connected through grid extension works in rural areas, as those works are still ongoing.
</narrative></comment>
</target>
<actual value="1614630">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2018" iso-date="2018-08-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-28" />
<period-end iso-date="2026-06-14" />
<target value="1,400,000">
<comment><narrative>
This indicator measures the number of new or improved electricity service connections achieved under the project. 304,216 household connections have been completed through the revolving fund in support of ENEO. This figure does not yet include the number of people expected to be connected through grid extension works in rural areas, as those works are still ongoing.
</narrative></comment>
</target>
<actual value="1400000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2018" iso-date="2018-08-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-28" />
<period-end iso-date="2026-06-14" />
<target value="1,400,000">
<comment><narrative>
This indicator measures the number of new or improved electricity service connections achieved under the project. 372,402 household connections have been completed through the revolving fund in support of ENEO/SOCADEL.
</narrative></comment>
</target>
<actual value="1862010">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2018" iso-date="2018-08-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-28" />
<period-end iso-date="2026-06-14" />
<target value="1,400,000">
<comment><narrative>
This indicator measures the number of new or improved electricity service connections achieved under the project. 271,502 household connections have been completed through the revolving fund in support of ENEO. This figure does not yet include the number of people expected to be connected through grid extension works in rural areas, as those works are still ongoing.
</narrative></comment>
</target>
<actual value="1,357,510">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women employed during grid extension electrification
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2025-06-25" />
<target value="50.00">
<comment><narrative>
19 women are currently employed for grid extensions works under the project.
</narrative></comment>
</target>
<actual value="19.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2018" iso-date="2018-08-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-28" />
<period-end iso-date="2026-06-14" />
<target value="1,400,000">
<comment><narrative>
This indicator measures the number of new or improved electricity service connections achieved under the project. 340,553 household connections have been completed through the revolving fund in support of ENEO. This figure does not yet include the number of people expected to be connected through grid extension works in rural areas, as those works are still ongoing.
</narrative></comment>
</target>
<actual value="1614630">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health centers electrified through solar systems
</narrative></title>
<baseline year="2020" iso-date="2020-06-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-07" />
<period-end iso-date="2026-06-14" />
<target value="31.00">
<comment><narrative>
The electrification of 31 health centers using solar energy has been successfully completed..
</narrative></comment>
</target>
<actual value="31">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Communication strategy of the project validated by stakeholders
</narrative></title>
<baseline year="2023" iso-date="2023-04-13" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-13" />
<period-end iso-date="2026-06-13" />
<target value="Yes">
<comment><narrative>
This communication strategy was disseminated through a workshop in November, 2023
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of staff trained under the project
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2026-06-13" />
<target value="300.00">
<comment><narrative>
This indicator measures the number of staff of the various sector agencies trained under the project.
</narrative></comment>
</target>
<actual value="1000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households connected to electricity through the Revolving Fund
</narrative></title>
<baseline year="2020" iso-date="2020-06-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-06" />
<period-end iso-date="2026-06-11" />
<target value="163,000.00">
<comment><narrative>
This exceeds the target
</narrative></comment>
</target>
<actual value="271,502">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women employed during grid extension electrification
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2025-06-25" />
<target value="50.00">
<comment><narrative>
This indicator measures the number of women   employed during grid extension electrification under the project.
</narrative></comment>
</target>
<actual value="10.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to electricity
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2026-06-11" />
<target value="28,7825">
<comment><narrative>
This indicator relates to number of people provided access to electricity through newly constructed grid extensions
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Project-related grievances registered under the project GRM and addressed
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2026-06-13" />
<target value="100.00">
<comment><narrative>
This indicator measures as a percentage the number of addressed grievances over the number of registered grievances. 1516 out 1525.
</narrative></comment>
</target>
<actual value="99.4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of villages electrified
</narrative></title>
<baseline year="2018" iso-date="2018-08-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-26" />
<period-end iso-date="2025-06-25" />
<target value="280.00">
<comment><narrative>
This indicator measures the number of new medium voltage substations constructed and
commissioned under the project. As of today, work has been completed in 118 rural localities.
</narrative></comment>
</target>
<actual value="118">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P174108</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Cameroon COVID-19 Preparedness and Response Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To prevent, detect and respond to the threat posed by COVID-19 and strengthen national systems for public health preparedness in selected regions in Cameroon.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[NA]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0045726"><narrative>Republic of Cameroon</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="CM-COA-0045725"><narrative>Ministry of Public Health</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2020-05-14"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2020-09-22"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2024-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2024-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Aissatou Diack</narrative></person-name><telephone>+1-202-473-1000</telephone><email>adiack@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002233387" />
            <name><narrative>Republic of Cameroon</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6 12.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="12110" percentage="39" xml:lang="en"/><sector vocabulary="1" code="12191" percentage="20" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="18" xml:lang="en"/><sector vocabulary="1" code="12220" percentage="12" xml:lang="en"/><sector vocabulary="1" code="12281" percentage="11" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="17.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HF" percentage="24.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="59.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="1" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="93" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="10" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="1" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="83" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="12" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000533" percentage="5" xml:lang="en"><narrative>Forced Displacement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000626" percentage="100" xml:lang="en"><narrative>Pandemic Response</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000261" percentage="40" xml:lang="en"><narrative>ICT Solutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="100" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="12" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000521" percentage="10" xml:lang="en"><narrative>Social Safety Nets</narrative></sector><humanitarian-scope type="1" vocabulary="1-2" code="EP-2020-000012-001"> </humanitarian-scope><humanitarian-scope type="2" vocabulary="2-1" code="HCOVD20"> </humanitarian-scope><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">2083333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">333333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">2688058.05</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">2688058.05</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">29000000</value><description xml:lang="en"><narrative>Total Commitment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-45725"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">29600000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-45725"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-28114920</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-45725"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-1171367</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-45725"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-617153</value><description xml:lang="en"><narrative>Total Commitment Cancellations in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-45725"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">26929095</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-45725"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-617153</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-45725"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-92104</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-45725"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-159979</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-45725"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-162808</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-45725"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-168236</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-45725"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-168311</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-45725"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-169393</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-45725"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-2107</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-45725"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-468307</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-45725"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-480685</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-45725"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P174108"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P174108?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P174108"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Priority population vaccinated against COVID-19, based on targets defined in the national plan (proportion of females)
</narrative></title>
<baseline year="2021" iso-date="2021-11-30" value="5.70"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-11-30" />
<period-end iso-date="2024-06-30" />
<target value="40.00">
<comment><narrative>
Numerator: Number of people who have received at least one dose of COVID-19 vaccine through financing to vaccine acquisition or deployment . Denominator: Number of target population (Aged 18 or above) as per national plan. Numerator and denominator are also provided for women for the sub-indicator.
</narrative></comment>
</target>
<actual value="46.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Doses of eligible COVID-19 vaccines procured
</narrative></title>
<baseline year="2021" iso-date="2021-11-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-11-10" />
<period-end iso-date="2024-06-30" />
<target value="5,300,000.00">
<comment><narrative>
Number of doses of eligible COVID-19 vaccines procured
</narrative></comment>
</target>
<actual value="5,300,000.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P180884</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Sustainable Cities and Land Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To improve access to climate-resilient infrastructure and enhance land administration services in targeted urban areas in Cameroon.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The project supports unlocking potentials of urban development, livability, and land administration services in the largest cities as an essential driver of socio-economic growth in Cameroon, through a sustainable, climate-resilient, and inclusive approach. The project design is complementary to other relevant projects in Cameroon financed by the Bank and development partners. The project is structured around four integrated components:Component 1. Transformative, Climate-Resilient Urban Infrastructure     Sub-component 1.1. Improvement of Urban Infrastructure     Sub-component 1.2. Policy and Technical Support and Capacity Building for Sustainable Urbanization   Component 2. Improvement of Urban Land Administration Systems     Sub-component 2.1. Policy Dialogue and Legal Reform     Sub-component 2.2. Modernization of Land Administration Services     Sub-component 2.3. Piloting Land Tenure SecurityComponent 3. Project ManagementComponent 4. Contingent Emergency Response Component (CERC)]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–00006100"><narrative>Republic of Cameroon</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–00006100"><narrative>Republic of Cameroon</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="CM-COA-00005921"><narrative>Ministry of Housing and Urban Development (MINHDU)</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2025-05-30"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2025-05-30"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2031-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2031-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Zheng Judy Jia</narrative></person-name><telephone>+1-202-473-1000</telephone><email>zjia@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2220957" />
                <name><narrative>Yaounde</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>3.86667 11.51667</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="74020" percentage="49" xml:lang="en"/><sector vocabulary="1" code="43032" percentage="44" xml:lang="en"/><sector vocabulary="1" code="43031" percentage="7" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BBH" percentage="100.000000" xml:lang="en"><narrative>Sub-National Government</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">666677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">1250011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">2500011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">4333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">4333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">4333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">4333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">4333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">4333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">4333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">4333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">4333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">4333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">4333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">4333344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">4999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">4999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">4999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">4999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">4999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">4999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">4999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">4999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">4999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">4999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">4999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">5000011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">2916677.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">666677.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">1250011.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">2500011.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">4333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">4333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">4333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">4333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">4333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">4333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">4333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">4333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">4333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">4333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">4333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">4333344.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">4999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">4999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">4999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">4999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">4999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">4999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">4999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">4999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">4999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">4999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">4999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">5000011.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">2916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">2916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">2916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">2916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">2916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">2916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">2916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">2916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">2916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">2916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">2916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">2916677.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">184521317.16</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">184521317.16</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">119200000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-5921"><narrative>Ministry of Housing and Urban Development (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">80800000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-5921"><narrative>Ministry of Housing and Urban Development (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">119272</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-5921"><narrative>Ministry of Housing and Urban Development (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">118297</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-5921"><narrative>Ministry of Housing and Urban Development (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">2027</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-5921"><narrative>Ministry of Housing and Urban Development (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">9342388</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-5921"><narrative>Ministry of Housing and Urban Development (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">5896699</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-5921"><narrative>Ministry of Housing and Urban Development (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-198</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-5921"><narrative>Ministry of Housing and Urban Development (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P180884"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P180884?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P180884"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land laws and regulations submitted for adoption (cumulative)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="3">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Climate-resilient socio-economic facilities built or rehabilitated
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="2">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total length of urban roads and drainage maintained or improved in a resilient manner through Performance-Based Contracts
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="40">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Cities Modernization Program formulated and adopted by the Government of Cameroon
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="no"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="yes">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
User satisfaction with land administration services in the Wouri and Mfoundi DDDCAFs
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="75">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Operational strategy for slum upgrading developed and adopted by the Government of Cameroon
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="no"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="yes">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Project-related grievances addressed within the timeframe specified by the project's GRM procedures
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of capacity-building activities
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="1732">
<comment><narrative>
Participating in the Livable Cities Workshop: Integrated Urban Flood Risk Management
</narrative></comment>
</target>
<actual value="36">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land titles issued in the DDDCAFs of Wouri and Mfoundi
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="6444"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="12200">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land titles issued in the DDDCAFs of Wouri and Mfoundi
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="6444"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="12200">
<comment><narrative>
MINHDU/MINDCAF are coordinating with the DDDCAFs for the data
</narrative></comment>
</target>
<actual value="Under collection">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
GBV support centers built or strengthened and operational financed by the project
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="2">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Government-endorsed operational instruments and investment studies for sustainable urbanization
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="13">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation plans for increasing land tenure security have been formulated for select urban areas
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="no"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="yes">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="663,286">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation plans for increasing land tenure security have been formulated for select urban areas
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="no"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="yes">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="56,1630">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="56,1630">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land titles issued in the DDDCAFs of Wouri and Mfoundi
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="6444"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="12200">
<comment><narrative>
MINHDU/MINDCAF are coordinating with the DDDCAFs for the data
</narrative></comment>
</target>
<actual value="Under collection">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land titles issued in the DDDCAFs of Wouri and Mfoundi
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="6444"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="12200">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Areas with improved resilience against disaster and climate risks
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="756">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Areas with improved resilience against disaster and climate risks
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="756">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="56,1630">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Operational strategy for slum upgrading developed and adopted by the Government of Cameroon
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="no"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="yes">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Kilometers of roads built
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="29">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Development and operationalization of a Land Information System (LIS) within the Wouri and Mfoundi DDDCAFs
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="no"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="LIS operationalized within the Wouri and Mfoundi DDDCAF">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Kilometers of roads built
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="29">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
GBV support centers built or strengthened and operational financed by the project
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="2">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Cities Modernization Program formulated and adopted by the Government of Cameroon
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="no"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="yes">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land laws and regulations submitted for adoption (cumulative)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="3">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Areas improved through nature-based solutions (NBS)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="22">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Project-related grievances addressed within the timeframe specified by the project's GRM procedures
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Climate-resilient urban drainage systems built or rehabilitated
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="18.9">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Areas with improved resilience against disaster and climate risks
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="756">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Satisfaction of beneficiaries of project-financed activities
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="75">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
User satisfaction with land administration services in the Wouri and Mfoundi DDDCAFs
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="75">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total length of urban roads and drainage maintained or improved in a resilient manner through Performance-Based Contracts
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="40">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of beneficiaries employed
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="900">

</target>
<actual value="153">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Government-endorsed operational instruments and investment studies for sustainable urbanization
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="13">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of capacity-building activities
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="1732">
<comment><narrative>
Participating in the Livable Cities Workshop: Integrated Urban Flood Risk Management
</narrative></comment>
</target>
<actual value="3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National land policy document submitted for adoption
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="no"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Areas improved through nature-based solutions (NBS)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="22">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="56,1630">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="56,1630">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land titles issued in the DDDCAFs of Wouri and Mfoundi
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="6444"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="12200">
<comment><narrative>
MINHDU/MINDCAF are coordinating with the DDDCAFs for the data
</narrative></comment>
</target>
<actual value="Under collection">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land titles issued in the DDDCAFs of Wouri and Mfoundi
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="6444"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="12200">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Areas with improved resilience against disaster and climate risks
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="756">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Areas with improved resilience against disaster and climate risks
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="756">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Development and operationalization of a Land Information System (LIS) within the Wouri and Mfoundi DDDCAFs
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="no"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="LIS operationalized within the Wouri and Mfoundi DDDCAF">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="56,1630">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of beneficiaries employed
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="900">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National land policy document submitted for adoption
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="no"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="yes">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Functional urban road maintenance mechanisms
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="2">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="663,286">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Climate-resilient urban drainage systems built or rehabilitated
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="18.9">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Functional urban road maintenance mechanisms
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="2">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Climate-resilient socio-economic facilities built or rehabilitated
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="2">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Satisfaction of beneficiaries of project-financed activities
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="75">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Areas with improved resilience against disaster and climate risks
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-06-15" />
<target value="756">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P177782</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Emergency Project to Combat the Food Crisis in Cameroon</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objective (PDO) is to strengthen food and nutrition security and increase resilience to climate shocks of targeted households and producers.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Emergency Project to Combat the Food Crisis Project for Cameroon is to strengthen food and nutrition security and increase resilience to climate shocks of targeted households and producers. The project comprises of five components. The first component, support for early response food and nutrition stabilization towards early recovery and resilience building will address immediate food and nutrition insecurity needs in project targeted areas in response to climate stresses and shocks such as droughts, floods, or uncertainty in rainfall patterns that are a primary driver of food insecurity. It consists of following sub-components: (i) provision of emergency food and nutrition assistance; and (ii) labor-intensive public works (LIPW) for resilience. The second component, strengthening productive capacities of smallholders through crop and livestock support for climate and nutritional resilience will focus on improving sustainable, climate smart agriculture (CSA) production including postharvest management, processing, and market access for producers to improve food security. It consists of following sub-components: (i) support for food production for farmers and agri-food processors; and (ii) support to pastoralists and fishermen, and related processing. The third component, support for strengthening government food security crisis monitoring capacity, information systems, and agrometeorological services will strengthen food security early warning and information systems and preparedness such that Cameroon can minimize both humanitarian and climate vulnerability linked costs of future food security crises. It consists of following sub-components: (i) strengthening of government capacity and information on food security, agrometeorological conditions, market prices; and (ii) development of digital tools to support food security response and climate resilience. The fourth component, project management, monitoring and evaluation aim is to support the Project Implementation Unit (PIU) in facilitating efficient implementation of project activities and tracking of results. The fifth component, contingent emergency response component (CERC) is included to allow for quick disbursement of systems, and agrometeorological services uncommitted balances to respond to unanticipated future crisis.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0050759"><narrative>The Republic of Cameroon</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0050759"><narrative>The Republic of Cameroon</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="CM-COA-0050760"><narrative>Ministry of Agriculture and Rural Development</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2022-03-31"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2022-05-02"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2025-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2025-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Fidele Honorine Yobo A Koue Epse Nhiomog</narrative></person-name><telephone>+1-202-473-1000</telephone><email>fyoboakoueepsenh@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002224827" />
            <name><narrative>Ngaoundere</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.32765 13.58472</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002228373" />
            <name><narrative>Maroua</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.59095 14.31593</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002233410" />
            <name><narrative>Buea</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.15342 9.24231</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002234359" />
            <name><narrative>Bertoua</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.57728 13.68459</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002234974" />
            <name><narrative>Bamenda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.9597 10.14597</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="31110" percentage="33" xml:lang="en"/><sector vocabulary="1" code="31310" percentage="28" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="18" xml:lang="en"/><sector vocabulary="1" code="31163" percentage="11" xml:lang="en"/><sector vocabulary="1" code="31166" percentage="7" xml:lang="en"/><sector vocabulary="1" code="31210" percentage="3" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AF" percentage="6.00000000" xml:lang="en"><narrative>FY17 - Fisheries</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AT" percentage="18.0000000" xml:lang="en"><narrative>FY17 - Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AB" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Agricultural Extension, Research, and Other Support Activities</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AK" percentage="40.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Agriculture, Fishing &amp; Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AL" percentage="26.0000000" xml:lang="en"><narrative>FY17 - Livestock</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000067" percentage="100" xml:lang="en"><narrative>Nutrition and Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000441" percentage="17" xml:lang="en"><narrative>Data production, accessibility and use</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="34" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="17" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="21" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000441" percentage="17" xml:lang="en"><narrative>Data production, accessibility and use</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="17" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="21" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="21" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="22" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="63" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000753" percentage="22" xml:lang="en"><narrative>Disaster Preparedness</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000533" percentage="34" xml:lang="en"><narrative>Forced Displacement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="44" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="17" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">3000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">3000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">3000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">3000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">3000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">2916666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">2916666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">1666666.64</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">3000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">3000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">3000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">3092322.06</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">3092322.06</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">100000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-50760"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">938874</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-50760"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">5617260</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-50760"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">7118122</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-50760"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">5633530</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-50760"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">156901</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-50760"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">672459</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-50760"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">710394</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-50760"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">2653583</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-50760"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">21927067</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-50760"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">680823</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-50760"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">3212366</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-50760"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">3276529</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-50760"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">1855753</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-50760"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-1618017</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-50760"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">8340834</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-50760"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">3190933</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-50760"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">2581013</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-50760"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">5242305</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-50760"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">4050685</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-50760"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">1516105</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-50760"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">707037</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-50760"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">5797125</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-50760"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">3932049</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-50760"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">3518707</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-50760"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">4901661</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-50760"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">293583</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-50760"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-3774</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-50760"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-36712</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-50760"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-112938</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-50760"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-193586</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-50760"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-331405</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-50760"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-5290</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-50760"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-435094</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-50760"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-545532</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-50760"><narrative>Ministry of Agriculture and Rural Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P177782"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P177782?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P177782"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Government officials (national and regional) trained in food security planning and monitoring (data and methods)
</narrative></title>
<baseline year="2022" iso-date="2022-07-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-15" />
<period-end iso-date="2025-07-15" />
<target value="510.00">
<comment><narrative>
The data for the year 2024 were obtained following training on food (DESA/MINADER), cereal (DESA/MINADER) and fodder (DPAIE/MINEPIA) assessments and training for Heads of Zootechnical and Veterinary Centers (DEPCS /MINEPIA). These capacity building sessions were carried out respectively from February 21 to 25, 2024, February 16 to 20, 2024, February 19 to 23, 2024 and March 13 to 21, 2024. the values of this indicator are exceeded from 2024. initially 510 civil servants should be trained but in the end 1221 were trained i.e. in 2023 and 1007

This indicator will be further defined and included both national and regional agents receiving a certain minimum number of hours of training and participating in a minimum number of planning sessions.
the target was exceeded because of the approach used for the training. It consisted in regrouping the participants in low cost sites so as to rationalize costs and have more civil servants trained.
</narrative></comment>
</target>
<actual value="1,007.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional volume of post-harvest storage and processing capacity created
</narrative></title>
<baseline year="2022" iso-date="2022-07-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-08" />
<period-end iso-date="2025-07-08" />
<target value="20,000.00">
<comment><narrative>
This indicator reflects the small community stores constructed by WFP (76 stores of dimensions 8m6m3m completed out of 96). Construction of the large storage stores is ongoing by PULCCA (50 stores of dimensions 11.35m9.1m3.5m completed). Out of the 75 under contract, 50 are ready for handover and 14 are less than 20% complete. This indicator has been updated following the initial provisional handovers.
</narrative></comment>
</target>
<actual value="29,019">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of social safety net programs
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2025-12-15" />
<target value="0">
<comment><narrative>
This corporate indicator was introduced at the corporate level. As the project is closing in December 2025, every efforts will be made to collect data by the end of the Project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A national online repository (open source) for food security data and information
</narrative></title>
<baseline year="2022" iso-date="2022-07-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-15" />
<period-end iso-date="2025-07-15" />
<target value="Yes">
<comment><narrative>
The recruitment of this consultant to carry out this process is being finalized.

The repository should be available at the end of year 1 and maintained / upgraded during year 2 and year 3.

???????The acquisition of servers is finalized. The repository will be finalized in quarter four of 2025
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Government officials (national and regional) trained in food security planning and monitoring (data and methods)
</narrative></title>
<baseline year="2022" iso-date="2022-07-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-08" />
<period-end iso-date="2025-07-08" />
<target value="510.00">
<comment><narrative>
The data for the year 2024 were obtained following training on food (DESA/MINADER), cereal (DESA/MINADER) and fodder (DPAIE/MINEPIA) assessments and training for Heads of Zootechnical and Veterinary Centers (DEPCS /MINEPIA). These capacity building sessions were carried out respectively from February 21 to 25, 2024, February 16 to 20, 2024, February 19 to 23, 2024 and March 13 to 21, 2024. the values of this indicator are exceeded from 2024. initially 510 civil servants should be trained but in the end 1221 were trained i.e. in 2023 and 1007

This indicator will be further defined and included both national and regional agents receiving a certain minimum number of hours of training and participating in a minimum number of planning sessions.
the target was exceeded because of the approach used for the training. It consisted in regrouping the participants in low cost sites so as to rationalize costs and have more civil servants trained.
</narrative></comment>
</target>
<actual value="1,007.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of target beneficiaries with rating &quot;satisfied&quot; or above with services provided by the project interventions
</narrative></title>
<baseline year="2022" iso-date="2022-07-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-08" />
<period-end iso-date="2025-07-08" />
<target value="75.00">
<comment><narrative>
This indicator will be filled in at the end of the satisfaction survey which will be held in August 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of social safety net programs
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2025-12-15" />
<target value="40,4816">
<comment><narrative>
This corporate indicator was introduced at the corporate level. As the project is closing in December 2025, every efforts will be made to collect data by the end of the Project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of beneficiaries receiving the adequate number of distributions of food and nutrition assistance (program adherence)
</narrative></title>
<baseline year="2022" iso-date="2022-07-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-08" />
<period-end iso-date="2025-07-08" />
<target value="70.00">
<comment><narrative>
Implementation is continuous. Data is collected on a quarterly basis. This data represents the third quarter and will be updated with the fourth quarter.
</narrative></comment>
</target>
<actual value="62.9">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries accessing market information and climate advisories via digital tools
</narrative></title>
<baseline year="2022" iso-date="2022-07-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-14" />
<period-end iso-date="2025-07-14" />
<target value="60,200.00">
<comment><narrative>
The system has been established. Field data collection and operational deployment are ongoing through the Market and Climate Information System (SIMC) and the Integrated Climatic Information System (SIIC).
</narrative></comment>
</target>
<actual value="23,800">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with strengthened food and nutrition security
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2025-12-15" />
<target value="33,5312">
<comment><narrative>
This corporate indicator was introduced at the corporate level. The data is derived from the project final evaluation report, completed in December 2025
</narrative></comment>
</target>
<actual value="33,5312">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with strengthened food and nutrition security
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2025-12-15" />
<target value="33,5312">
<comment><narrative>
This corporate indicator was introduced recently. As the project is closing in December 2025, every efforts will be made to collect data by the end of the Project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of primary production inputs distributed to producers
</narrative></title>
<baseline year="2022" iso-date="2022-07-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-07" />
<period-end iso-date="2025-12-07" />
<target value="32,400.00">
<comment><narrative>
During the project restructuring this indicator has been revised upwards. The targeting of an increased number of beneficiaries of primary production inputs is underway and the volume of inputs increased accordingly. This data represents second quarter 2025 and will be updated in 3rd quarter 2025
</narrative></comment>
</target>
<actual value="22,397">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Equipment acquired and distributed to producers
</narrative></title>
<baseline year="2022" iso-date="2022-07-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-08" />
<period-end iso-date="2025-07-08" />
<target value="20,000.00">
<comment><narrative>
Data is not yet available to inform this indicator. Activities that could provide information have not yet started.
this data represents a portion of what is effectively distributed and comprised in the kits distributed. The indicator will be disaggregated and updated with third and fourth quarter data

&amp;nbsp;
</narrative></comment>
</target>
<actual value="48,116">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Equipment acquired and distributed to producers
</narrative></title>
<baseline year="2022" iso-date="2022-07-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-08" />
<period-end iso-date="2025-07-08" />
<target value="20,000.00">
<comment><narrative>
This indicator was underestimated. It relates to all agricultural, livestock, and fisheries production materials procured and distributed.
</narrative></comment>
</target>
<actual value="51,177">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with strengthened food and nutrition security
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2025-12-15" />
<target value="0">
<comment><narrative>
This corporate indicator was introduced recently. As the project is closing in December 2025, every efforts will be made to collect data by the end of the Project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of households with food consumption score (FCS) &amp;gt;35 or considered acceptable
</narrative></title>
<baseline year="2022" iso-date="2022-07-14" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-14" />
<period-end iso-date="2025-07-14" />
<target value="60.00">
<comment><narrative>
This indicator was obtained from the results of the Harmonized Framework for the period from October to December 2025, which were produced on 25 October 2025. Although this value has improved, it remains below the national average of 65.5%
</narrative></comment>
</target>
<actual value="61.6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of beneficiaries receiving the adequate number of distributions of food and nutrition assistance (program adherence)
</narrative></title>
<baseline year="2022" iso-date="2022-07-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-08" />
<period-end iso-date="2025-07-08" />
<target value="70.00">
<comment><narrative>
Targeting activities are being finalized and validated. The actual start-up is underway. The first data can be collected from the second or third quarter of 2024.

Implementation is continuous. Data is collected on a quarterly basis. this data represents second quarter. The data for third quarter id being verified

&amp;nbsp;

&amp;nbsp;
</narrative></comment>
</target>
<actual value="51.72">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2025-12-15" />
<target value="0">
<comment><narrative>
This corporate indicator was introduced recently. As the project is closing in December 2025, every efforts will be made to collect data by the end of the Project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2025-12-15" />
<target value="9,7480">
<comment><narrative>
This corporate indicator was introduced at the corporate level. The data is derived from the project final evaluation report, completed in December 2025
</narrative></comment>
</target>
<actual value="9,7480">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Climate resilient newly or rehabilitated community level projects completed for adaptation and mitigation purposes through labor intensive public works program
</narrative></title>
<baseline year="2022" iso-date="2022-07-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-08" />
<period-end iso-date="2025-07-08" />
<target value="50.00">
<comment><narrative>
The community projects listed here include: stores, weirs, fords, and fish ponds. These constitute the complete set of HIMO (High-Intensity Labour-Based) interventions under the project.
</narrative></comment>
</target>
<actual value="505">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Displaced people and people in host communities provided with services and livelihoods
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2025-12-15" />
<target value="0">
<comment><narrative>
This corporate indicator was introduced recently. As the project is closing in December 2025, every efforts will be made to collect data by the end of the Project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of emergency food and nutritional assistance
</narrative></title>
<baseline year="2022" iso-date="2022-07-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-07" />
<period-end iso-date="2025-12-07" />
<target value="129,734.00">
<comment><narrative>
Field partners are fully operational at field level. This data represents third quarter 2024. This target was revised upwards from 98,490 to 163,745 during restructuring to reflect the additional number of beneficiairies of cash transfer (27 184) and children in schools (37 801). The current  data represents the first quarter of 2025. This indicator will be updated in the third quarter of 2025.
</narrative></comment>
</target>
<actual value="61,182.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of primary production inputs distributed to producers
</narrative></title>
<baseline year="2022" iso-date="2022-07-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-15" />
<period-end iso-date="2025-07-15" />
<target value="20,000.00">
<comment><narrative>
During the project restructuring this indicator has been revised upwards. The targeting of an increased number of beneficiaries of primary production inputs is underway and the volume of inputs increased accordingly. This data represents second quarter 2025 and will be updated in 3rd quarter 2025
</narrative></comment>
</target>
<actual value="22,397">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of emergency food and nutritional assistance
</narrative></title>
<baseline year="2022" iso-date="2022-07-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-07" />
<period-end iso-date="2025-12-07" />
<target value="129,734.00">
<comment><narrative>
Field partners are fully operational at the field level. This target was revised upwards from 98,490 to 163,745 during restructuring to reflect the additional number of beneficiaries of cash transfer (27,184) and children in schools (37,801). The current data represents the third quarter and will be updated with the fourth quarter by the closing date.
</narrative></comment>
</target>
<actual value="102,847">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of grievances received addressed within the stipulated response time
</narrative></title>
<baseline year="2022" iso-date="2022-07-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-15" />
<period-end iso-date="2025-07-15" />
<target value="100.00">
<comment><narrative>
25 complaints were recorded, 20 of which were fully processed, i.e. a rate of 80%
Overall 104 complaints were recorded, 76 of which were fully processed and resolved, i.e. a rate of 73.3%

The e-feedback platform was introduced to the PIU and implementing partners. 12 grievances reported on the online platform are under investigation. Implementing partners' grievance mechanisms have reported more than 1,500 complaints, of which 92% are resolved. Out of the 40 sensitive complaints reported by WFP, 24 are under investigation/treatment, while 16 have been resolved.
</narrative></comment>
</target>
<actual value="89.30">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A national online repository (open source) for food security data and information
</narrative></title>
<baseline year="2022" iso-date="2022-07-08" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-08" />
<period-end iso-date="2025-07-08" />
<target value="Yes">
<comment><narrative>
The recruitment of this consultant to carry out this process is being finalized.

The repository should be available at the end of year 1 and maintained / upgraded during year 2 and year 3.

???????The acquisition of servers is finalized. The repository will be finalized in quarter four of 2025
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women benefiting from communal gardening inputs
</narrative></title>
<baseline year="2022" iso-date="2022-07-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-15" />
<period-end iso-date="2025-07-15" />
<target value="8,000.00">
<comment><narrative>
Data is not yet available to inform this indicator. Activities that could provide information have not yet started.

Implementing partners are reaching out to women groups in targeted communities. Data for quarter four are being collected and will be updated

&amp;nbsp;

&amp;nbsp;
</narrative></comment>
</target>
<actual value="5,463">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Displaced people and people in host communities provided with services and livelihoods – Female
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2025-12-15" />
<target value="0">
<comment><narrative>
This corporate indicator was introduced recently. As the project is closing in December 2025, every efforts will be made to collect data by the end of the Project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of beneficiaries receiving the adequate number of distributions of food and nutrition assistance (program adherence)
</narrative></title>
<baseline year="2022" iso-date="2022-07-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-15" />
<period-end iso-date="2025-07-15" />
<target value="70.00">
<comment><narrative>
Targeting activities are being finalized and validated. The actual start-up is underway. The first data can be collected from the second or third quarter of 2024.

Implementation is continuous. Data is collected on a quarterly basis. this data represents second quarter. The data for third quarter id being verified

&amp;nbsp;

&amp;nbsp;
</narrative></comment>
</target>
<actual value="51.72">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries accessing market information and climate advisories via digital tools
</narrative></title>
<baseline year="2022" iso-date="2022-07-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-14" />
<period-end iso-date="2025-07-14" />
<target value="60,200.00">
<comment><narrative>
This system is currently being implemented. The indicator can only be measured after operational deployment. The related contract is in the process of being awarded
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of beneficiaries receiving the adequate number of distributions of food and nutrition assistance (program adherence)
</narrative></title>
<baseline year="2022" iso-date="2022-07-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-08" />
<period-end iso-date="2025-07-08" />
<target value="70.00">
<comment><narrative>
Implementation is continuous. Data is collected on a quarterly basis. This data represents the third quarter and will be updated with the fourth quarter.
</narrative></comment>
</target>
<actual value="62.9">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Climate resilient newly or rehabilitated community level projects completed for adaptation and mitigation purposes through labor intensive public works program
</narrative></title>
<baseline year="2022" iso-date="2022-07-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-08" />
<period-end iso-date="2025-07-08" />
<target value="50.00">
<comment><narrative>
The community projects listed here include: stores, weirs, fords, and fish ponds. These constitute the complete set of HIMO (High-Intensity Labour-Based) interventions under the project.
</narrative></comment>
</target>
<actual value="505">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women benefiting from communal gardening inputs
</narrative></title>
<baseline year="2022" iso-date="2022-07-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-08" />
<period-end iso-date="2025-07-08" />
<target value="8,000.00">
<comment><narrative>
The target for this indicator has been revised following the mid-term review from 8,000 to 5,000 women.
</narrative></comment>
</target>
<actual value="5,463">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Food insecure household members benefitting from labor-intensive public works
</narrative></title>
<baseline year="2022" iso-date="2022-07-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-07" />
<period-end iso-date="2025-12-07" />
<target value="52,600.00">
<comment><narrative>
The target of this indicator was lowered during restructuring due to the decrease in community infrastructure projects to be built. Resources have been shifted to support flood-affected populations. The additional beneficiaries include those involved in completing the infrastructure that was initiated.
</narrative></comment>
</target>
<actual value="69,150.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional volume of post-harvest storage and processing capacity created
</narrative></title>
<baseline year="2022" iso-date="2022-07-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-08" />
<period-end iso-date="2025-07-08" />
<target value="20,000.00">
<comment><narrative>
This indicator reflects the small community stores constructed by WFP (76 stores of dimensions 8m6m3m completed out of 96). Construction of the large storage stores is ongoing by PULCCA (50 stores of dimensions 11.35m9.1m3.5m completed). Out of the 75 under contract, 50 are ready for handover and 14 are less than 20% complete. This indicator has been updated following the initial provisional handovers.
</narrative></comment>
</target>
<actual value="29,019">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Equipment acquired and distributed to producers
</narrative></title>
<baseline year="2022" iso-date="2022-07-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-08" />
<period-end iso-date="2025-07-08" />
<target value="20,000.00">
<comment><narrative>
This indicator was underestimated. It relates to all agricultural, livestock, and fisheries production materials procured and distributed.
</narrative></comment>
</target>
<actual value="51,177">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Government officials (national and regional) trained in food security planning and monitoring (data and methods)
</narrative></title>
<baseline year="2022" iso-date="2022-07-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-08" />
<period-end iso-date="2025-07-08" />
<target value="510.00">
<comment><narrative>
The data for the year 2024 were obtained following training on food (DESA/MINADER), cereal (DESA/MINADER) and fodder (DPAIE/MINEPIA) assessments and training for Heads of Zootechnical and Veterinary Centers (DEPCS /MINEPIA). These capacity building sessions were carried out respectively from February 21 to 25, 2024, February 16 to 20, 2024, February 19 to 23, 2024 and March 13 to 21, 2024. the values of this indicator are exceeded from 2024. initially 510 civil servants should be trained but in the end 1221 were trained i.e. in 2023 and 1007

the target was exceeded because of the approach used for the training. It consisted in regrouping the participants in low cost sites so as to rationalize costs and have more civil servants trained.
</narrative></comment>
</target>
<actual value="1,007.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of target beneficiaries with rating &quot;satisfied&quot; or above with services provided by the project interventions
</narrative></title>
<baseline year="2022" iso-date="2022-07-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-08" />
<period-end iso-date="2025-07-08" />
<target value="75.00">
<comment><narrative>
This indicator is based on the final report of the satisfaction survey.
</narrative></comment>
</target>
<actual value="75.4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of grievances received addressed within the stipulated response time
</narrative></title>
<baseline year="2022" iso-date="2022-07-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-08" />
<period-end iso-date="2025-07-08" />
<target value="100.00">
<comment><narrative>
Overall the project received 2743 complaints, of which 2709 were resolved. 34 are being resolved before project closing
</narrative></comment>
</target>
<actual value="98">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of primary production inputs distributed to producers
</narrative></title>
<baseline year="2022" iso-date="2022-07-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-07" />
<period-end iso-date="2025-12-07" />
<target value="32,400.00">
<comment><narrative>
This indicator was revised upwards from 20,000 to 22,000. This indicator reflects the total volume of inputs procured and distributed, including seeds, fertilizers, pesticides, animal feed, and fingerlings.
</narrative></comment>
</target>
<actual value="22,423">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of emergency food and nutritional assistance
</narrative></title>
<baseline year="2022" iso-date="2022-07-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-07" />
<period-end iso-date="2025-12-07" />
<target value="129,734.00">
<comment><narrative>
Field partners are fully operational at the field level. This target was revised upwards from 98,490 to 163,745 during restructuring to reflect the additional number of beneficiaries of cash transfer (27,184) and children in schools (37,801). The current data represents the third quarter and will be updated with the fourth quarter by the closing date.
</narrative></comment>
</target>
<actual value="102,847">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A national online repository (open source) for food security data and information
</narrative></title>
<baseline year="2022" iso-date="2022-07-08" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-08" />
<period-end iso-date="2025-07-08" />
<target value="Yes">
<comment><narrative>
The application is functional and online, awaiting the upload of the database.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers reached with agricultural assets or services
</narrative></title>
<baseline year="2022" iso-date="2022-07-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-13" />
<period-end iso-date="2025-07-13" />
<target value="159,000.00">
<comment><narrative>
The distribution of inputs partially began in 2024. The number of additional beneficiaries of 3,722 has been decided for the flood-affected populations (recommendation for restructuring).
The delays observed in the distribution of assets were primarily due to flooding in certain parts of the Far North region, disruptions related to the electoral campaign and post-electoral tensions, as well as the presence of ghost towns in the North-West and South-West regions. Over the fourth quarter of 2025, there has been a boost in distribution and the end target exceeded.
</narrative></comment>
</target>
<actual value="203,236">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers reached with agricultural assets or services
</narrative></title>
<baseline year="2022" iso-date="2022-07-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-15" />
<period-end iso-date="2025-07-15" />
<target value="159,000.00">
<comment><narrative>
The distribution of inputs partially began in 2024. The number of additional beneficiaries of 3,722 has been decided for the flood-affected populations (recommendation for restructuring).
</narrative></comment>
</target>
<actual value="63,681">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers reached with agricultural assets or services
</narrative></title>
<baseline year="2022" iso-date="2022-07-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-13" />
<period-end iso-date="2025-07-13" />
<target value="159,000.00">
<comment><narrative>
The distribution of inputs partially began in 2024. The number of additional beneficiaries of 3,722 has been decided for the flood-affected populations (recommendation for restructuring).
</narrative></comment>
</target>
<actual value="63,681">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers reached with agricultural assets or services
</narrative></title>
<baseline year="2022" iso-date="2022-07-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-13" />
<period-end iso-date="2025-07-13" />
<target value="159,000.00">
<comment><narrative>
The distribution of inputs partially began in 2024. The number of additional beneficiaries of 3,722 has been decided for the flood-affected populations (recommendation for restructuring).
The delays observed in the distribution of assets were primarily due to flooding in certain parts of the Far North region, disruptions related to the electoral campaign and post-electoral tensions, as well as the presence of ghost towns in the North-West and South-West regions. Over the fourth quarter of 2025, there has been a boost in distribution and the end target exceeded.
</narrative></comment>
</target>
<actual value="203,236">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries accessing market information and climate advisories via digital tools
</narrative></title>
<baseline year="2022" iso-date="2022-07-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-14" />
<period-end iso-date="2025-07-14" />
<target value="60,200.00">
<comment><narrative>
The system has been established. Field data collection and operational deployment are ongoing through the Market and Climate Information System (SIMC) and the Integrated Climatic Information System (SIIC).
</narrative></comment>
</target>
<actual value="23,800">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries accessing market information and climate advisories via digital tools
</narrative></title>
<baseline year="2022" iso-date="2022-07-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-15" />
<period-end iso-date="2025-07-15" />
<target value="60,200.00">
<comment><narrative>
This system is currently being implemented. The indicator can only be measured after operational deployment. The related contract is in the process of being awarded
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries accessing market information and climate advisories via digital tools
</narrative></title>
<baseline year="2022" iso-date="2022-07-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-14" />
<period-end iso-date="2025-07-14" />
<target value="60,200.00">
<comment><narrative>
This system is currently being implemented. The indicator can only be measured after operational deployment. The related contract is in the process of being awarded
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries accessing market information and climate advisories via digital tools
</narrative></title>
<baseline year="2022" iso-date="2022-07-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-14" />
<period-end iso-date="2025-07-14" />
<target value="60,200.00">
<comment><narrative>
The system has been established. Field data collection and operational deployment are ongoing through the Market and Climate Information System (SIMC) and the Integrated Climatic Information System (SIIC).
</narrative></comment>
</target>
<actual value="23,800">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of households with food consumption score (FCS) &amp;gt;35 or considered acceptable
</narrative></title>
<baseline year="2022" iso-date="2022-07-14" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-14" />
<period-end iso-date="2025-07-14" />
<target value="60.00">
<comment><narrative>
This indicator was obtained from the results of the Harmonized Framework for the period from October to December 2025, which were produced on 25 October 2025. Although this value has improved, it remains below the national average of 65.5%
</narrative></comment>
</target>
<actual value="61.6">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of households with food consumption score (FCS) &amp;gt;35 or considered acceptable
</narrative></title>
<baseline year="2022" iso-date="2022-07-15" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-15" />
<period-end iso-date="2025-07-15" />
<target value="60.00">
<comment><narrative>
This indicator was obtained from World Food Programme reporting in Dec 2024, indicating progress from June 2024 Food Consumption Score that was 47%. The next measurement carried out in June of year N+1. This indicator will be updated at the end of the project's overall evaluation in quarter four of 2025
</narrative></comment>
</target>
<actual value="63">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of households with food consumption score (FCS) &amp;gt;35 or considered acceptable
</narrative></title>
<baseline year="2022" iso-date="2022-07-14" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-14" />
<period-end iso-date="2025-07-14" />
<target value="60.00">
<comment><narrative>
This indicator was obtained from World Food Programme reporting in Dec 2024, indicating progress from June 2024 Food Consumption Score that was 47%. The next measurement carried out in June of year N+1. This indicator will be updated at the end of the project's overall evaluation in quarter four of 2025
</narrative></comment>
</target>
<actual value="63">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of households with food consumption score (FCS) &amp;gt;35 or considered acceptable
</narrative></title>
<baseline year="2022" iso-date="2022-07-14" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-14" />
<period-end iso-date="2025-07-14" />
<target value="60.00">
<comment><narrative>
This indicator was obtained from the results of the Harmonized Framework for the period from October to December 2025, which were produced on 25 October 2025. Although this value has improved, it remains below the national average of 65.5%
</narrative></comment>
</target>
<actual value="61.6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with strengthened food and nutrition security
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2025-12-15" />
<target value="33,5312">
<comment><narrative>
This corporate indicator was introduced at the corporate level. The data is derived from the project final evaluation report, completed in December 2025
</narrative></comment>
</target>
<actual value="33,5312">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2025-12-15" />
<target value="9,7480">
<comment><narrative>
This corporate indicator was introduced at the corporate level. The data is derived from the project final evaluation report, completed in December 2025
</narrative></comment>
</target>
<actual value="9,7480">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Displaced people and people in host communities provided with services and livelihoods
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2025-12-15" />
<target value="36,3799">
<comment><narrative>
This corporate indicator was introduced at the corporate level. The data is derived from the project final evaluation report, completed in December 2025
</narrative></comment>
</target>
<actual value="36,3799">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of social safety net programs
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2025-12-15" />
<target value="40,4816">
<comment><narrative>
This corporate indicator was introduced at the corporate level. The data is derived from the project final evaluation report, completed in December 2025
</narrative></comment>
</target>
<actual value="40,4816">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of target beneficiaries with rating &quot;satisfied&quot; or above with services provided by the project interventions
</narrative></title>
<baseline year="2022" iso-date="2022-07-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-15" />
<period-end iso-date="2025-07-15" />
<target value="75.00">
<comment><narrative>
This indicator will be filled in at the end of the satisfaction survey which will be held in August 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Climate resilient newly or rehabilitated community level projects completed for adaptation and mitigation purposes through labor intensive public works program
</narrative></title>
<baseline year="2022" iso-date="2022-07-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-15" />
<period-end iso-date="2025-07-15" />
<target value="50.00">
<comment><narrative>
Preparatory implementation activities have started. This indicator could change in the next quarter.

The target has been reached/exceeded because the cost per community project could be reduced to implement more projects

&amp;nbsp;
</narrative></comment>
</target>
<actual value="104.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers reached with agricultural assets or services
</narrative></title>
<baseline year="2022" iso-date="2022-07-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-13" />
<period-end iso-date="2025-07-13" />
<target value="159,000.00">
<comment><narrative>
The distribution of inputs partially began in 2024. The number of additional beneficiaries of 3,722 has been decided for the flood-affected populations (recommendation for restructuring).
The delays observed in the distribution of assets were primarily due to flooding in certain parts of the Far North region, disruptions related to the electoral campaign and post-electoral tensions, as well as the presence of ghost towns in the North-West and South-West regions. Over the fourth quarter of 2025, there has been a boost in distribution and the end target exceeded.
</narrative></comment>
</target>
<actual value="203,236">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers reached with agricultural assets or services
</narrative></title>
<baseline year="2022" iso-date="2022-07-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-15" />
<period-end iso-date="2025-07-15" />
<target value="159,000.00">
<comment><narrative>
The distribution of inputs partially began in 2024. The number of additional beneficiaries of 3,722 has been decided for the flood-affected populations (recommendation for restructuring).
</narrative></comment>
</target>
<actual value="63,681">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers reached with agricultural assets or services
</narrative></title>
<baseline year="2022" iso-date="2022-07-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-13" />
<period-end iso-date="2025-07-13" />
<target value="159,000.00">
<comment><narrative>
The distribution of inputs partially began in 2024. The number of additional beneficiaries of 3,722 has been decided for the flood-affected populations (recommendation for restructuring).
</narrative></comment>
</target>
<actual value="63,681">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers reached with agricultural assets or services
</narrative></title>
<baseline year="2022" iso-date="2022-07-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-13" />
<period-end iso-date="2025-07-13" />
<target value="159,000.00">
<comment><narrative>
The distribution of inputs partially began in 2024. The number of additional beneficiaries of 3,722 has been decided for the flood-affected populations (recommendation for restructuring).
The delays observed in the distribution of assets were primarily due to flooding in certain parts of the Far North region, disruptions related to the electoral campaign and post-electoral tensions, as well as the presence of ghost towns in the North-West and South-West regions. Over the fourth quarter of 2025, there has been a boost in distribution and the end target exceeded.
</narrative></comment>
</target>
<actual value="203,236">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries accessing market information and climate advisories via digital tools
</narrative></title>
<baseline year="2022" iso-date="2022-07-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-14" />
<period-end iso-date="2025-07-14" />
<target value="60,200.00">
<comment><narrative>
The system has been established. Field data collection and operational deployment are ongoing through the Market and Climate Information System (SIMC) and the Integrated Climatic Information System (SIIC).
</narrative></comment>
</target>
<actual value="23,800">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries accessing market information and climate advisories via digital tools
</narrative></title>
<baseline year="2022" iso-date="2022-07-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-15" />
<period-end iso-date="2025-07-15" />
<target value="60,200.00">
<comment><narrative>
This system is currently being implemented. The indicator can only be measured after operational deployment. The related contract is in the process of being awarded
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries accessing market information and climate advisories via digital tools
</narrative></title>
<baseline year="2022" iso-date="2022-07-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-14" />
<period-end iso-date="2025-07-14" />
<target value="60,200.00">
<comment><narrative>
This system is currently being implemented. The indicator can only be measured after operational deployment. The related contract is in the process of being awarded
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries accessing market information and climate advisories via digital tools
</narrative></title>
<baseline year="2022" iso-date="2022-07-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-14" />
<period-end iso-date="2025-07-14" />
<target value="60,200.00">
<comment><narrative>
The system has been established. Field data collection and operational deployment are ongoing through the Market and Climate Information System (SIMC) and the Integrated Climatic Information System (SIIC).
</narrative></comment>
</target>
<actual value="23,800">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of households with food consumption score (FCS) &amp;gt;35 or considered acceptable
</narrative></title>
<baseline year="2022" iso-date="2022-07-14" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-14" />
<period-end iso-date="2025-07-14" />
<target value="60.00">
<comment><narrative>
This indicator was obtained from the results of the Harmonized Framework for the period from October to December 2025, which were produced on 25 October 2025. Although this value has improved, it remains below the national average of 65.5%
</narrative></comment>
</target>
<actual value="61.6">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of households with food consumption score (FCS) &amp;gt;35 or considered acceptable
</narrative></title>
<baseline year="2022" iso-date="2022-07-15" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-15" />
<period-end iso-date="2025-07-15" />
<target value="60.00">
<comment><narrative>
This indicator was obtained from World Food Programme reporting in Dec 2024, indicating progress from June 2024 Food Consumption Score that was 47%. The next measurement carried out in June of year N+1. This indicator will be updated at the end of the project's overall evaluation in quarter four of 2025
</narrative></comment>
</target>
<actual value="63">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of households with food consumption score (FCS) &amp;gt;35 or considered acceptable
</narrative></title>
<baseline year="2022" iso-date="2022-07-14" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-14" />
<period-end iso-date="2025-07-14" />
<target value="60.00">
<comment><narrative>
This indicator was obtained from World Food Programme reporting in Dec 2024, indicating progress from June 2024 Food Consumption Score that was 47%. The next measurement carried out in June of year N+1. This indicator will be updated at the end of the project's overall evaluation in quarter four of 2025
</narrative></comment>
</target>
<actual value="63">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of households with food consumption score (FCS) &amp;gt;35 or considered acceptable
</narrative></title>
<baseline year="2022" iso-date="2022-07-14" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-14" />
<period-end iso-date="2025-07-14" />
<target value="60.00">
<comment><narrative>
This indicator was obtained from the results of the Harmonized Framework for the period from October to December 2025, which were produced on 25 October 2025. Although this value has improved, it remains below the national average of 65.5%
</narrative></comment>
</target>
<actual value="61.6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of grievances received addressed within the stipulated response time
</narrative></title>
<baseline year="2022" iso-date="2022-07-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-08" />
<period-end iso-date="2025-07-08" />
<target value="100.00">
<comment><narrative>
Overall the project received 2743 complaints, of which 2709 were resolved. 34 are being resolved before project closing
</narrative></comment>
</target>
<actual value="98">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women benefiting from communal gardening inputs
</narrative></title>
<baseline year="2022" iso-date="2022-07-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-08" />
<period-end iso-date="2025-07-08" />
<target value="8,000.00">
<comment><narrative>
Data is not yet available to inform this indicator. Activities that could provide information have not yet started.

Implementing partners are reaching out to women groups in targeted communities. Data for quarter four are being collected and will be updated

&amp;nbsp;

&amp;nbsp;
</narrative></comment>
</target>
<actual value="5,463">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Food insecure household members benefitting from labor-intensive public works
</narrative></title>
<baseline year="2022" iso-date="2022-07-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-07" />
<period-end iso-date="2025-12-07" />
<target value="52,600.00">
<comment><narrative>
The target of this indicator was lowered during restructuring due to the decrease in community infrastructure projects to be built. Resources have been shifted to support flood-affected populations. The additional beneficiaries include those involved in completing the infrastructure that was initiated.
</narrative></comment>
</target>
<actual value="69,150.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Climate resilient newly or rehabilitated community level projects completed for adaptation and mitigation purposes through labor intensive public works program
</narrative></title>
<baseline year="2022" iso-date="2022-07-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-08" />
<period-end iso-date="2025-07-08" />
<target value="50.00">
<comment><narrative>
Preparatory implementation activities have started. This indicator could change in the next quarter.

The target has been reached/exceeded because the cost per community project could be reduced to implement more projects

&amp;nbsp;
</narrative></comment>
</target>
<actual value="104.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Food insecure household members benefitting from labor-intensive public works
</narrative></title>
<baseline year="2022" iso-date="2022-07-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-15" />
<period-end iso-date="2025-07-15" />
<target value="167,000.00">
<comment><narrative>
The target of this indicator was lowered during restructuring due to the decrease in community infrastructure projects to be built. Resources have been shifted to support flood-affected populations. The additional beneficiaries include those involved in completing the infrastructure that was initiated.
</narrative></comment>
</target>
<actual value="69,150.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of households with food consumption score (FCS) &amp;gt;35 or considered acceptable
</narrative></title>
<baseline year="2022" iso-date="2022-07-14" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-14" />
<period-end iso-date="2025-07-14" />
<target value="60.00">
<comment><narrative>
This indicator was obtained from World Food Programme reporting in Dec 2024, indicating progress from June 2024 Food Consumption Score that was 47%. The next measurement carried out in June of year N+1. This indicator will be updated at the end of the project's overall evaluation in quarter four of 2025
</narrative></comment>
</target>
<actual value="63">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Displaced people and people in host communities provided with services and livelihoods
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2025-12-15" />
<target value="36,3799">
<comment><narrative>
This corporate indicator was introduced at the corporate level. The data is derived from the project final evaluation report, completed in December 2025
</narrative></comment>
</target>
<actual value="36,3799">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of emergency food and nutritional assistance
</narrative></title>
<baseline year="2022" iso-date="2022-07-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-15" />
<period-end iso-date="2025-07-15" />
<target value="98,490.00">
<comment><narrative>
Field partners are fully operational at field level. This data represents third quarter 2024. This target was revised upwards from 98,490 to 163,745 during restructuring to reflect the additional number of beneficiairies of cash transfer (27 184) and children in schools (37 801). The current  data represents the first quarter of 2025. This indicator will be updated in the third quarter of 2025.
</narrative></comment>
</target>
<actual value="61,182.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional volume of post-harvest storage and processing capacity created
</narrative></title>
<baseline year="2022" iso-date="2022-07-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-15" />
<period-end iso-date="2025-07-15" />
<target value="20,000.00">
<comment><narrative>
Data is not yet available to inform this indicator. Activities that could provide information have not yet started.

This data is produced based on the capacity of the 65 small size warehouses constructed at community level

&amp;nbsp;
</narrative></comment>
</target>
<actual value="5,760.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of primary production inputs distributed to producers
</narrative></title>
<baseline year="2022" iso-date="2022-07-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-07" />
<period-end iso-date="2025-12-07" />
<target value="32,400.00">
<comment><narrative>
This indicator was revised upwards from 20,000 to 22,000. This indicator reflects the total volume of inputs procured and distributed, including seeds, fertilizers, pesticides, animal feed, and fingerlings.
</narrative></comment>
</target>
<actual value="22,423">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers reached with agricultural assets or services
</narrative></title>
<baseline year="2022" iso-date="2022-07-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-15" />
<period-end iso-date="2025-07-15" />
<target value="159,000.00">
<comment><narrative>
The distribution of inputs partially began in 2024. The number of additional beneficiaries of 3,722 has been decided for the flood-affected populations (recommendation for restructuring).
</narrative></comment>
</target>
<actual value="63,681">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Equipment acquired and distributed to producers
</narrative></title>
<baseline year="2022" iso-date="2022-07-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-15" />
<period-end iso-date="2025-07-15" />
<target value="20,000.00">
<comment><narrative>
Data is not yet available to inform this indicator. Activities that could provide information have not yet started.
this data represents a portion of what is effectively distributed and comprised in the kits distributed. The indicator will be disaggregated and updated with third and fourth quarter data

&amp;nbsp;
</narrative></comment>
</target>
<actual value="48,116">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of grievances received addressed within the stipulated response time
</narrative></title>
<baseline year="2022" iso-date="2022-07-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-08" />
<period-end iso-date="2025-07-08" />
<target value="100.00">
<comment><narrative>
25 complaints were recorded, 20 of which were fully processed, i.e. a rate of 80%
Overall 104 complaints were recorded, 76 of which were fully processed and resolved, i.e. a rate of 73.3%

The e-feedback platform was introduced to the PIU and implementing partners. 12 grievances reported on the online platform are under investigation. Implementing partners' grievance mechanisms have reported more than 1,500 complaints, of which 92% are resolved. Out of the 40 sensitive complaints reported by WFP, 24 are under investigation/treatment, while 16 have been resolved.
</narrative></comment>
</target>
<actual value="89.30">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers reached with agricultural assets or services
</narrative></title>
<baseline year="2022" iso-date="2022-07-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-13" />
<period-end iso-date="2025-07-13" />
<target value="159,000.00">
<comment><narrative>
The distribution of inputs partially began in 2024. The number of additional beneficiaries of 3,722 has been decided for the flood-affected populations (recommendation for restructuring).
</narrative></comment>
</target>
<actual value="63,681">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of social safety net programs
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2025-12-15" />
<target value="40,4816">
<comment><narrative>
This corporate indicator was introduced at the corporate level. The data is derived from the project final evaluation report, completed in December 2025
</narrative></comment>
</target>
<actual value="40,4816">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers reached with agricultural assets or services
</narrative></title>
<baseline year="2022" iso-date="2022-07-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-13" />
<period-end iso-date="2025-07-13" />
<target value="159,000.00">
<comment><narrative>
The distribution of inputs partially began in 2024. The number of additional beneficiaries of 3,722 has been decided for the flood-affected populations (recommendation for restructuring).
The delays observed in the distribution of assets were primarily due to flooding in certain parts of the Far North region, disruptions related to the electoral campaign and post-electoral tensions, as well as the presence of ghost towns in the North-West and South-West regions. Over the fourth quarter of 2025, there has been a boost in distribution and the end target exceeded.
</narrative></comment>
</target>
<actual value="203,236">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Food insecure household members benefitting from labor-intensive public works
</narrative></title>
<baseline year="2022" iso-date="2022-07-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-07" />
<period-end iso-date="2025-12-07" />
<target value="52,600.00">
<comment><narrative>
The target of this indicator was lowered during restructuring due to the decrease in community infrastructure projects to be built. Resources have been shifted to support flood-affected populations. The additional beneficiaries include those involved in completing the infrastructure that was initiated.
</narrative></comment>
</target>
<actual value="69,150.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women benefiting from communal gardening inputs
</narrative></title>
<baseline year="2022" iso-date="2022-07-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-08" />
<period-end iso-date="2025-07-08" />
<target value="8,000.00">
<comment><narrative>
The target for this indicator has been revised following the mid-term review from 8,000 to 5,000 women.
</narrative></comment>
</target>
<actual value="5,463">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Displaced people and people in host communities provided with services and livelihoods – Youth
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2025-12-15" />
<target value="0">
<comment><narrative>
This corporate indicator was introduced recently. As the project is closing in December 2025, every efforts will be made to collect data by the end of the Project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries accessing market information and climate advisories via digital tools
</narrative></title>
<baseline year="2022" iso-date="2022-07-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-15" />
<period-end iso-date="2025-07-15" />
<target value="60,200.00">
<comment><narrative>
This system is currently being implemented. The indicator can only be measured after operational deployment. The related contract is in the process of being awarded
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A national online repository (open source) for food security data and information
</narrative></title>
<baseline year="2022" iso-date="2022-07-08" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-08" />
<period-end iso-date="2025-07-08" />
<target value="Yes">
<comment><narrative>
The application is functional and online, awaiting the upload of the database.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional volume of post-harvest storage and processing capacity created
</narrative></title>
<baseline year="2022" iso-date="2022-07-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-08" />
<period-end iso-date="2025-07-08" />
<target value="20,000.00">
<comment><narrative>
Data is not yet available to inform this indicator. Activities that could provide information have not yet started.

This data is produced based on the capacity of the 65 small size warehouses constructed at community level

&amp;nbsp;
</narrative></comment>
</target>
<actual value="5,760.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of target beneficiaries with rating &quot;satisfied&quot; or above with services provided by the project interventions
</narrative></title>
<baseline year="2022" iso-date="2022-07-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-08" />
<period-end iso-date="2025-07-08" />
<target value="75.00">
<comment><narrative>
This indicator is based on the final report of the satisfaction survey.
</narrative></comment>
</target>
<actual value="74.8">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Government officials (national and regional) trained in food security planning and monitoring (data and methods)
</narrative></title>
<baseline year="2022" iso-date="2022-07-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-08" />
<period-end iso-date="2025-07-08" />
<target value="510.00">
<comment><narrative>
The data for the year 2024 were obtained following training on food (DESA/MINADER), cereal (DESA/MINADER) and fodder (DPAIE/MINEPIA) assessments and training for Heads of Zootechnical and Veterinary Centers (DEPCS /MINEPIA). These capacity building sessions were carried out respectively from February 21 to 25, 2024, February 16 to 20, 2024, February 19 to 23, 2024 and March 13 to 21, 2024. the values of this indicator are exceeded from 2024. initially 510 civil servants should be trained but in the end 1221 were trained i.e. in 2023 and 1007

the target was exceeded because of the approach used for the training. It consisted in regrouping the participants in low cost sites so as to rationalize costs and have more civil servants trained.
</narrative></comment>
</target>
<actual value="1,007.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Displaced people and people in host communities provided with services and livelihoods
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2025-12-15" />
<target value="36,3799">
<comment><narrative>
This corporate indicator was introduced recently. As the project is closing in December 2025, every efforts will be made to collect data by the end of the Project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2025-12-15" />
<target value="9,7480">
<comment><narrative>
This corporate indicator was introduced recently. As the project is closing in December 2025, every efforts will be made to collect data by the end of the Project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of households with food consumption score (FCS) &amp;gt;35 or considered acceptable
</narrative></title>
<baseline year="2022" iso-date="2022-07-15" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-15" />
<period-end iso-date="2025-07-15" />
<target value="60.00">
<comment><narrative>
This indicator was obtained from World Food Programme reporting in Dec 2024, indicating progress from June 2024 Food Consumption Score that was 47%. The next measurement carried out in June of year N+1. This indicator will be updated at the end of the project's overall evaluation in quarter four of 2025
</narrative></comment>
</target>
<actual value="63">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P178207</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Enhancing Connectivity and Resilience in the Far North of Cameroon for Inclusiveness Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The proposed Project Development Objective (PDO) is to: (i) enhance connectivity and climate resilience along the MDK road section; and (ii) improve access to basic socioeconomic infrastructure in selected districts of the Far North of Cameroon.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Enhancing Connectivity and Resilience in the Far North of Cameroon for Inclusiveness Project for Cameroon is to: (i) enhance connectivity and climate resilience along the Mora-Dabanga-Kousseri (MDK) road section; and (ii) improve access to basic socioeconomic infrastructure in selected districts of the Far North of Cameroon. The project comprises of four components. The first component, road rehabilitation and maintenance work is designed to support the ongoing efforts to improve transport connectivity in the greater Lake Chad region and the Far North of Cameroon. The second component, improved community infrastructure in selected areas and refugee host communities of the Far North region is designed to integrate local socio-economic content in the main operation with the objective of maximizing the wider economic benefits of the roads to be rehabilitated. The third component, transport sector institutional strengthening will finance capacity building and institutional-strengthening activities of the transport sector, among other things. The fourth component, contingency emergency response component will facilitate access to rapid financing by allowing reallocation of uncommitted project funds in the event of a natural disaster, either by a formal declaration of a national emergency or upon a formal request from the Government of Cameroon.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0051309"><narrative>Ministry of Public Works</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="CM-COA-0051310"><narrative>Ministry of Economy, Planning, and Regional Development</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2023-03-30"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2023-06-20"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2029-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2029-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Vincent Vesin</narrative></person-name><telephone>+1-202-473-1000</telephone><email>vvesin@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002221109" />
            <name><narrative>Waza</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>11.39879 14.57067</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002221489" />
            <name><narrative>Tilde Logone</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.11834 14.75933</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002225991" />
            <name><narrative>Mora</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>11.04611 14.14011</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002226649" />
            <name><narrative>Minawao</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.57702 13.8586</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002228729" />
            <name><narrative>Maltam</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.18198 14.81763</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002228963" />
            <name><narrative>Magdeme</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>11.17389 14.23639</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002229291" />
            <name><narrative>Departement du Logone-et-Chari</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.08333 14.83333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002229413" />
            <name><narrative>Limani</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>11.23306 14.17111</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002229798" />
            <name><narrative>Kousseri</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.07689 15.03063</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002230158" />
            <name><narrative>Kolofata</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>11.1621 14.01151</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002232566" />
            <name><narrative>Double-Alagarno</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>11.17418 14.24522</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002233122" />
            <name><narrative>Departement du Diamare</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.5 14.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0009224949" />
            <name><narrative>Mayo-Sava</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>11.10682 14.2056</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0009224951" />
            <name><narrative>Mayo-Tsanaga</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.58221 13.79351</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002235650" />
            <name><narrative>Am Chide</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>11.23903 14.12624</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="21011" percentage="52" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="48" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TF" percentage="1.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="93.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TZ" percentage="6.00000000" xml:lang="en"><narrative>FY17 - Other Transportation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="93" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="1" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="99" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="100" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="99" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000074" percentage="94" xml:lang="en"><narrative>Road Safety</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="93" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="47" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000533" percentage="100" xml:lang="en"><narrative>Forced Displacement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="100" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="1" xml:lang="en"><narrative>Urban Development</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">3010000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">1740000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">1750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">3510000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">1760000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">1760000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">3540000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">1780000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">1780000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">3580000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">1800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">1800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">3620000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">1820000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">1820000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">3660000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">1840000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">1850000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">3720000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">1880000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">1900000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">3870000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">2010000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">2090000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">4520000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">2460000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">2480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">5430000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">3150000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">3430000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">7500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">3530000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">3640000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">7590000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">3940000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">4040000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">8370000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">4320000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">4390000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">8950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">3890000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">3920000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">7890000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">3960000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">3950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">7850000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">5120000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">4980000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">9420000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">4560000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">4520000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">9000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">4490000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">4490000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">9000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">4500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">4510000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">9030000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">4520000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">4530000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">9080000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">4540000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">13660000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">4560000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">4570000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">9140000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">4580000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">4580000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">9170000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">4590000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">4590000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">7200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">235643872.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">235643872.37</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">111660000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-51310"><narrative>Ministry of Economy, Planning, and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">168340000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-51310"><narrative>Ministry of Economy, Planning, and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">50000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-51310"><narrative>Ministry of Economy, Planning, and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">81000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-51310"><narrative>Ministry of Economy, Planning, and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">14831450</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-51310"><narrative>Ministry of Economy, Planning, and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">972102</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-51310"><narrative>Ministry of Economy, Planning, and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">4151394</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-51310"><narrative>Ministry of Economy, Planning, and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">759892</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-51310"><narrative>Ministry of Economy, Planning, and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">365302</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-51310"><narrative>Ministry of Economy, Planning, and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">811846</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-51310"><narrative>Ministry of Economy, Planning, and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">428042</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-51310"><narrative>Ministry of Economy, Planning, and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">858004</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-51310"><narrative>Ministry of Economy, Planning, and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">2252664</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-51310"><narrative>Ministry of Economy, Planning, and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">51239</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-51310"><narrative>Ministry of Economy, Planning, and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">2484616</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-51310"><narrative>Ministry of Economy, Planning, and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">149481</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-51310"><narrative>Ministry of Economy, Planning, and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">2148898</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-51310"><narrative>Ministry of Economy, Planning, and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">94844</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-51310"><narrative>Ministry of Economy, Planning, and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">13438334</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-51310"><narrative>Ministry of Economy, Planning, and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">30319881</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-51310"><narrative>Ministry of Economy, Planning, and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">17581392</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-51310"><narrative>Ministry of Economy, Planning, and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">130045</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-51310"><narrative>Ministry of Economy, Planning, and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">2151575</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-51310"><narrative>Ministry of Economy, Planning, and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">375130</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-51310"><narrative>Ministry of Economy, Planning, and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-91586</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-51310"><narrative>Ministry of Economy, Planning, and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-192342</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-51310"><narrative>Ministry of Economy, Planning, and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-225012</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-51310"><narrative>Ministry of Economy, Planning, and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-529790</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-51310"><narrative>Ministry of Economy, Planning, and Regional Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P178207"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P178207?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P178207"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of beneficiaries reporting satisfaction with the socio-economic infrastructures
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="85.00">
<comment><narrative>
This indicator measures population reporting satisfaction with road conditions along the Mora-Dabanga-Kousseri road section.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Construction or rehabilitation of community multimedia centers
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="3.00">
<comment><narrative>
Number of community multimedia centers created and equipped with computers, a mini Wi-Fi network, payment terminals; etc.) and training for local communities.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-15" />
<period-end iso-date="2029-06-15" />
<target value="18,6550">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of complaints addressed timely
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="100.00">
<comment><narrative>
Complaints processed according to the project GRM
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of schools along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="41.00">
<comment><narrative>
Number of schools along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of schools constructed or rehabilitated along the MDK road
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="20.00">
<comment><narrative>
Number of  schools constructed or rehabilitated along the MDK road
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of road connecting refugees camps and host communities rehabilitated with safety and climate change resilient features
</narrative></title>
<baseline year="2023" iso-date="2023-07-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-03" />
<period-end iso-date="2029-06-29" />
<target value="150.00">
<comment><narrative>
Number of kilometers of roads connecting refugees camps and host communities, rehabilitated and upgraded to climate change resilient standards
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of students enrolled in the internship Program within the project and MINTP
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="45.00">
<comment><narrative>
This indicator will measure the number of students recruited for the internship program within the MINTP
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Displaced people and people in host communities provided with services and livelihoods – Youth
</narrative></title>
<baseline year="2024" iso-date="2024-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-15" />
<period-end iso-date="2029-06-15" />
<target value="5,5040">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of beneficiaries reporting satisfaction with the socio-economic infrastructures
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="85.00">
<comment><narrative>
This indicator measures population reporting satisfaction with road conditions along the Mora-Dabanga-Kousseri road section.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="20.00">
<comment><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Displaced people and people in host communities provided with services and livelihoods – Youth
</narrative></title>
<baseline year="2024" iso-date="2024-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-15" />
<period-end iso-date="2029-06-15" />
<target value="5,5040">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of bridge rehabilitated
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="180.00">
<comment><narrative>
Length of bridge rehabilitated (Meters)
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of beneficiaries reporting satisfaction with the socio-economic infrastructures
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="85.00">
<comment><narrative>
This indicator measures population reporting satisfaction with road conditions along the Mora-Dabanga-Kousseri road section.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of road connecting refugees camps and host communities rehabilitated with safety and climate change resilient features
</narrative></title>
<baseline year="2023" iso-date="2023-07-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-03" />
<period-end iso-date="2029-06-29" />
<target value="150.00">
<comment><narrative>
Number of kilometers of roads connecting refugees camps and host communities, rehabilitated and upgraded to climate change resilient standards
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of water points constructed or rehabilitated with improved conditions
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="30.00">
<comment><narrative>
Number of water points constructed or rehabilitated with improved conditions
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of road connecting refugees camps and host communities rehabilitated with safety and climate change resilient features
</narrative></title>
<baseline year="2023" iso-date="2023-07-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-03" />
<period-end iso-date="2029-06-29" />
<target value="150.00">
<comment><narrative>
Number of kilometers of roads connecting refugees camps and host communities, rehabilitated and upgraded to climate change resilient standards
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of schools along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="41.00">
<comment><narrative>
Number of schools along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="2024" iso-date="2024-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-15" />
<period-end iso-date="2029-06-15" />
<target value="18,6550">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Storage facilities rehabilitated/constructed reserved/leased for women
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="50.00">
<comment><narrative>
Number of storage facilities constructed or rehabilitated with improved conditions and reserved/lease to women
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of women's groups supported through trainings and equipment provision
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="5.00">
<comment><narrative>
Number of women's groups supported through trainings and equipment. Specific activities aiming at enhancing women's economic empowerment and contributing to closing gender gaps in employment will be included.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Climate change resilient features introduced along the Mora-Dabanga-Kousseri
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="Yes">
<comment><narrative>
As part of works contract, climate change resilient features will be provided along the MDK road section
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Storage facilities rehabilitated/constructed reserved/leased for women
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="50.00">
<comment><narrative>
Number of storage facilities constructed or rehabilitated with improved conditions and reserved/lease to women
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of women's groups supported through trainings and equipment provision
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="5.00">
<comment><narrative>
Number of women's groups supported through trainings and equipment. Specific activities aiming at enhancing women's economic empowerment and contributing to closing gender gaps in employment will be included.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Storage facilities rehabilitated/constructed reserved/leased for women
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="50.00">
<comment><narrative>
Number of storage facilities constructed or rehabilitated with improved conditions and reserved/lease to women
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health centers constructed or rehabilitated along the MDK road
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="12.00">
<comment><narrative>
Number of health centers constructed or rehabilitated
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of complaints addressed timely
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="100.00">
<comment><narrative>
Complaints processed according to the project GRM
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Road safety audits conducted
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="Yes">
<comment><narrative>
Road safety audits carried out on MDK and a selected sample of rural roads
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Displaced people and people in host communities provided with services and livelihoods – Female
</narrative></title>
<baseline year="2024" iso-date="2024-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-15" />
<period-end iso-date="2029-06-15" />
<target value="5,5040">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="2024" iso-date="2024-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-15" />
<period-end iso-date="2029-06-15" />
<target value="18,6550">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of schools along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="41.00">
<comment><narrative>
Number of schools along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Displaced people and people in host communities provided with services and livelihoods – Female
</narrative></title>
<baseline year="2024" iso-date="2024-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-15" />
<period-end iso-date="2029-06-15" />
<target value="5,5040">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of students enrolled in the internship Program within the project and MINTP
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="45.00">
<comment><narrative>
This indicator will measure the number of students recruited for the internship program within the MINTP
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of students enrolled in the internship Program within the project and MINTP
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="45.00">
<comment><narrative>
This indicator will measure the number of students recruited for the internship program within the MINTP
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-15" />
<period-end iso-date="2029-06-15" />
<target value="18,6550">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of road connecting refugees camps and host communities rehabilitated with safety and climate change resilient features
</narrative></title>
<baseline year="2023" iso-date="2023-07-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-03" />
<period-end iso-date="2029-06-29" />
<target value="150.00">
<comment><narrative>
Number of kilometers of roads connecting refugees camps and host communities, rehabilitated and upgraded to climate change resilient standards
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of cattle markets constructed or rehabilitated along the MDK and roads connecting refugees camps and host communities
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="5.00">
<comment><narrative>
Construction or rehabilitation of cattle markets along the MDK road and roads connecting refugees camps
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of road rehabilitated with safety and climate change resilient features along the MDK road section
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="212.00">
<comment><narrative>
Number of Kilometers of MDK road section rehabilitated and upgraded to climate change resilient standards.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Storage facilities rehabilitated/constructed reserved/leased for women
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="50.00">
<comment><narrative>
Number of storage facilities constructed or rehabilitated with improved conditions and reserved/lease to women
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Displaced people and people in host communities provided with services and livelihoods
</narrative></title>
<baseline year="2024" iso-date="2024-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-15" />
<period-end iso-date="2029-06-15" />
<target value="12,8000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of cattle markets constructed or rehabilitated along the MDK and roads connecting refugees camps and host communities
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="5.00">
<comment><narrative>
Construction or rehabilitation of cattle markets along the MDK road and roads connecting refugees camps
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Kilometer of communal and regional roads maintained and rehabilitated with safety and climate change resilient features along the MDK
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="50.00">
<comment><narrative>
Number of kilometers of regional and communal roads rehabilitated and maintained to climate change resilient standards.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="20.00">
<comment><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Institutional capacity of the decentralized PIUs of MINTP and MINEPAT (PSRDREN) improved
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="Yes">
<comment><narrative>
Institutional capacity of the decentralized PIUs of MINTP and MINEPAT (PSRDREN) improved
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Institutional capacity of the decentralized PIUs of MINTP and MINEPAT (PSRDREN) improved
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="Yes">
<comment><narrative>
Institutional capacity of the decentralized PIUs of MINTP and MINEPAT (PSRDREN) improved
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of schools along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="41.00">
<comment><narrative>
Number of schools along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Road safety measures introduced along the Mora-Dabanga-Kousseri
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="Yes">
<comment><narrative>
As part of works contract, road safety features will be provided for urban centers and populated zones to segregate pedestrians from vehicle traffic.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-15" />
<period-end iso-date="2029-06-15" />
<target value="18,6550">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Road safety measures introduced along the Mora-Dabanga-Kousseri
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="Yes">
<comment><narrative>
As part of works contract, road safety features will be provided for urban centers and populated zones to segregate pedestrians from vehicle traffic.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Climate change resilient features introduced along the Mora-Dabanga-Kousseri
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="Yes">
<comment><narrative>
As part of works contract, climate change resilient features will be provided along the MDK road section
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of MDK road vulnerable to identified climate change hazards (floods and heat).
</narrative></title>
<baseline year="2023" iso-date="2023-04-17" value="205.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-17" />
<period-end iso-date="2028-12-29" />
<target value="0.00">
<comment><narrative>
Measures the length of the MDK road corridor that is at risk of flooding and extreme heat, which are projected to increase in frequency and intensity with climate change.
</narrative></comment>
</target>
<actual value="205.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Institutional capacity of the decentralized PIUs of MINTP and MINEPAT (PSRDREN) improved
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="Yes">
<comment><narrative>
Institutional capacity of the decentralized PIUs of MINTP and MINEPAT (PSRDREN) improved
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of bridge rehabilitated
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="180.00">
<comment><narrative>
Length of bridge rehabilitated (Meters)
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average travel time between Mora and KoussEri
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="8.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="3.00">
<comment><narrative>
This indicator measures vehicles travel time between Mora and Kousseri.
</narrative></comment>
</target>
<actual value="8.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with strengthened food and nutrition security
</narrative></title>
<baseline year="2024" iso-date="2024-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-15" />
<period-end iso-date="2029-06-15" />
<target value="12,8000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="20.00">
<comment><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of road rehabilitated with safety and climate change resilient features along the MDK road section
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="212.00">
<comment><narrative>
Number of Kilometers of MDK road section rehabilitated and upgraded to climate change resilient standards.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of cattle markets constructed or rehabilitated along the MDK and roads connecting refugees camps and host communities
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="5.00">
<comment><narrative>
Construction or rehabilitation of cattle markets along the MDK road and roads connecting refugees camps
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average travel time between Mora and KoussEri
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="8.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="3.00">
<comment><narrative>
This indicator measures vehicles travel time between Mora and Kousseri.
</narrative></comment>
</target>
<actual value="8.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="2024" iso-date="2024-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-15" />
<period-end iso-date="2029-06-15" />
<target value="18,6550">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of markets along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="6.00">
<comment><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of MDK road vulnerable to identified climate change hazards (floods and heat).
</narrative></title>
<baseline year="2023" iso-date="2023-04-17" value="205.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-17" />
<period-end iso-date="2028-12-29" />
<target value="0.00">
<comment><narrative>
Measures the length of the MDK road corridor that is at risk of flooding and extreme heat, which are projected to increase in frequency and intensity with climate change.
</narrative></comment>
</target>
<actual value="205.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of markets along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="6.00">
<comment><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with strengthened food and nutrition security
</narrative></title>
<baseline year="2024" iso-date="2024-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-15" />
<period-end iso-date="2029-06-15" />
<target value="12,8000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of cattle markets constructed or rehabilitated along the MDK and roads connecting refugees camps and host communities
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="5.00">
<comment><narrative>
Construction or rehabilitation of cattle markets along the MDK road and roads connecting refugees camps
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2029-06-15" />
<target value="92,5000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Kilometer of communal and regional roads maintained and rehabilitated with safety and climate change resilient features along the MDK
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="50.00">
<comment><narrative>
Number of kilometers of regional and communal roads rehabilitated and maintained to climate change resilient standards.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Displaced people and people in host communities provided with services and livelihoods
</narrative></title>
<baseline year="2024" iso-date="2024-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-15" />
<period-end iso-date="2029-06-15" />
<target value="12,8000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Kilometer of communal and regional roads maintained and rehabilitated with safety and climate change resilient features along the MDK
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="50.00">
<comment><narrative>
Number of kilometers of regional and communal roads rehabilitated and maintained to climate change resilient standards.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Road safety audits conducted
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="Yes">
<comment><narrative>
Road safety audits carried out on MDK and a selected sample of rural roads
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Displaced people and people in host communities provided with services and livelihoods
</narrative></title>
<baseline year="2024" iso-date="2024-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-15" />
<period-end iso-date="2029-06-15" />
<target value="12,8000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of MDK road vulnerable to identified climate change hazards (floods and heat).
</narrative></title>
<baseline year="2023" iso-date="2023-04-17" value="205.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-17" />
<period-end iso-date="2028-12-29" />
<target value="0.00">
<comment><narrative>
Measures the length of the MDK road corridor that is at risk of flooding and extreme heat, which are projected to increase in frequency and intensity with climate change.
</narrative></comment>
</target>
<actual value="205.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Road safety measures introduced along the Mora-Dabanga-Kousseri
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="Yes">
<comment><narrative>
As part of works contract, road safety features will be provided for urban centers and populated zones to segregate pedestrians from vehicle traffic.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Road safety audits conducted
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="Yes">
<comment><narrative>
Road safety audits carried out on MDK and a selected sample of rural roads
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Climate change resilient features introduced along the Mora-Dabanga-Kousseri
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="Yes">
<comment><narrative>
As part of works contract, climate change resilient features will be provided along the MDK road section
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of beneficiaries reporting satisfaction with the socio-economic infrastructures
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="85.00">
<comment><narrative>
This indicator measures population reporting satisfaction with road conditions along the Mora-Dabanga-Kousseri road section.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="2024" iso-date="2024-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-15" />
<period-end iso-date="2029-06-15" />
<target value="18,6550">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Kilometer of communal and regional roads maintained and rehabilitated with safety and climate change resilient features along the MDK
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="50.00">
<comment><narrative>
Number of kilometers of regional and communal roads rehabilitated and maintained to climate change resilient standards.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of bridge rehabilitated
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="180.00">
<comment><narrative>
Length of bridge rehabilitated (Meters)
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Climate change resilient features introduced along the Mora-Dabanga-Kousseri
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="Yes">
<comment><narrative>
As part of works contract, climate change resilient features will be provided along the MDK road section
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Road safety measures introduced along the Mora-Dabanga-Kousseri
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="Yes">
<comment><narrative>
As part of works contract, road safety features will be provided for urban centers and populated zones to segregate pedestrians from vehicle traffic.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Kilometer of communal and regional roads maintained and rehabilitated with safety and climate change resilient features along the MDK
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="50.00">
<comment><narrative>
Number of kilometers of regional and communal roads rehabilitated and maintained to climate change resilient standards.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
The share of people with access to an all-weather passable road within five kilometers of the MDK road section (modified road access index).
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="80.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="91.00">
<comment><narrative>
This indicator measures the number of beneficiaries with improved access to an all-weather passable road within five kilometers of the MDK road section. Climate change impacts are expected to affect road passability during the rainy season.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-15" />
<period-end iso-date="2029-06-15" />
<target value="18,6550">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of women's groups supported through trainings and equipment provision
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="5.00">
<comment><narrative>
Number of women's groups supported through trainings and equipment. Specific activities aiming at enhancing women's economic empowerment and contributing to closing gender gaps in employment will be included.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of markets along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="6.00">
<comment><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Road safety audits conducted
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="Yes">
<comment><narrative>
Road safety audits carried out on MDK and a selected sample of rural roads
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health centers constructed or rehabilitated along the MDK road
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="12.00">
<comment><narrative>
Number of health centers constructed or rehabilitated
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of road rehabilitated with safety and climate change resilient features along the MDK road section
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="212.00">
<comment><narrative>
Number of Kilometers of MDK road section rehabilitated and upgraded to climate change resilient standards.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Climate change resilient features introduced along the Mora-Dabanga-Kousseri
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="Yes">
<comment><narrative>
As part of works contract, climate change resilient features will be provided along the MDK road section
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of complaints addressed timely
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="100.00">
<comment><narrative>
Complaints processed according to the project GRM
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of students enrolled in the internship Program within the project and MINTP
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="45.00">
<comment><narrative>
This indicator will measure the number of students recruited for the internship program within the MINTP
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Institutional capacity of the decentralized PIUs of MINTP and MINEPAT (PSRDREN) improved
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="Yes">
<comment><narrative>
Institutional capacity of the decentralized PIUs of MINTP and MINEPAT (PSRDREN) improved
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of water points constructed or rehabilitated with improved conditions
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="30.00">
<comment><narrative>
Number of water points constructed or rehabilitated with improved conditions
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="20.00">
<comment><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of women's groups supported through trainings and equipment provision
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="5.00">
<comment><narrative>
Number of women's groups supported through trainings and equipment. Specific activities aiming at enhancing women's economic empowerment and contributing to closing gender gaps in employment will be included.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health centers constructed or rehabilitated along the MDK road
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="12.00">
<comment><narrative>
Number of health centers constructed or rehabilitated
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of road rehabilitated with safety and climate change resilient features along the MDK road section
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="212.00">
<comment><narrative>
Number of Kilometers of MDK road section rehabilitated and upgraded to climate change resilient standards.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Construction or rehabilitation of community multimedia centers
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="3.00">
<comment><narrative>
Number of community multimedia centers created and equipped with computers, a mini Wi-Fi network, payment terminals; etc.) and training for local communities.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of water points constructed or rehabilitated with improved conditions
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="30.00">
<comment><narrative>
Number of water points constructed or rehabilitated with improved conditions
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
The share of people with access to an all-weather passable road within five kilometers of the MDK road section (modified road access index).
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="80.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="91.00">
<comment><narrative>
This indicator measures the number of beneficiaries with improved access to an all-weather passable road within five kilometers of the MDK road section. Climate change impacts are expected to affect road passability during the rainy season.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of beneficiaries reporting satisfaction with the socio-economic infrastructures
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="85.00">
<comment><narrative>
This indicator measures population reporting satisfaction with road conditions along the Mora-Dabanga-Kousseri road section.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of water points constructed or rehabilitated with improved conditions
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="30.00">
<comment><narrative>
Number of water points constructed or rehabilitated with improved conditions
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Storage facilities rehabilitated/constructed reserved/leased for women
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="50.00">
<comment><narrative>
Number of storage facilities constructed or rehabilitated with improved conditions and reserved/lease to women
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of cattle markets constructed or rehabilitated along the MDK and roads connecting refugees camps and host communities
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="5.00">
<comment><narrative>
Construction or rehabilitation of cattle markets along the MDK road and roads connecting refugees camps
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of bridge rehabilitated
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="180.00">
<comment><narrative>
Length of bridge rehabilitated (Meters)
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of schools constructed or rehabilitated along the MDK road
</narrative></title>
<baseline year="2023" iso-date="2023-06-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-14" />
<period-end iso-date="2029-06-14" />
<target value="20.00">
<comment><narrative>
Number of  schools constructed or rehabilitated along the MDK road
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of schools constructed or rehabilitated along the MDK road
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="20.00">
<comment><narrative>
Number of  schools constructed or rehabilitated along the MDK road
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of MDK road vulnerable to identified climate change hazards (floods and heat).
</narrative></title>
<baseline year="2023" iso-date="2023-04-17" value="205.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-17" />
<period-end iso-date="2028-12-29" />
<target value="0.00">
<comment><narrative>
Measures the length of the MDK road corridor that is at risk of flooding and extreme heat, which are projected to increase in frequency and intensity with climate change.
</narrative></comment>
</target>
<actual value="205.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of road connecting refugees camps and host communities rehabilitated with safety and climate change resilient features
</narrative></title>
<baseline year="2023" iso-date="2023-07-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-03" />
<period-end iso-date="2029-06-29" />
<target value="150.00">
<comment><narrative>
Number of kilometers of roads connecting refugees camps and host communities, rehabilitated and upgraded to climate change resilient standards
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Construction or rehabilitation of community multimedia centers
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="3.00">
<comment><narrative>
Number of community multimedia centers created and equipped with computers, a mini Wi-Fi network, payment terminals; etc.) and training for local communities.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of road rehabilitated with safety and climate change resilient features along the MDK road section
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="212.00">
<comment><narrative>
Number of Kilometers of MDK road section rehabilitated and upgraded to climate change resilient standards.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="20.00">
<comment><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
The share of people with access to an all-weather passable road within five kilometers of the MDK road section (modified road access index).
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="80.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="91.00">
<comment><narrative>
This indicator measures the number of beneficiaries with improved access to an all-weather passable road within five kilometers of the MDK road section. Climate change impacts are expected to affect road passability during the rainy season.
</narrative></comment>
</target>
<actual value="80.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with strengthened food and nutrition security
</narrative></title>
<baseline year="2024" iso-date="2024-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-15" />
<period-end iso-date="2029-06-15" />
<target value="12,8000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of beneficiaries reporting satisfaction with the socio-economic infrastructures
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="85.00">
<comment><narrative>
This indicator measures population reporting satisfaction with road conditions along the Mora-Dabanga-Kousseri road section.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of beneficiaries reporting satisfaction with the socio-economic infrastructures
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="85.00">
<comment><narrative>
This indicator measures population reporting satisfaction with road conditions along the Mora-Dabanga-Kousseri road section.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of beneficiaries reporting satisfaction with the socio-economic infrastructures
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="85.00">
<comment><narrative>
This indicator measures population reporting satisfaction with road conditions along the Mora-Dabanga-Kousseri road section.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of beneficiaries reporting satisfaction with the socio-economic infrastructures
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="85.00">
<comment><narrative>
This indicator measures population reporting satisfaction with road conditions along the Mora-Dabanga-Kousseri road section.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of complaints addressed timely
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="100.00">
<comment><narrative>
Complaints processed according to the project GRM
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of beneficiaries reporting satisfaction with the socio-economic infrastructures
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="85.00">
<comment><narrative>
This indicator measures population reporting satisfaction with road conditions along the Mora-Dabanga-Kousseri road section.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of markets along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="6.00">
<comment><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of markets along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="6.00">
<comment><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of markets along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="6.00">
<comment><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of markets along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="6.00">
<comment><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of markets along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="6.00">
<comment><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of beneficiaries reporting satisfaction with the socio-economic infrastructures
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="85.00">
<comment><narrative>
This indicator measures population reporting satisfaction with road conditions along the Mora-Dabanga-Kousseri road section.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of beneficiaries reporting satisfaction with the socio-economic infrastructures
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="85.00">
<comment><narrative>
This indicator measures population reporting satisfaction with road conditions along the Mora-Dabanga-Kousseri road section.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of beneficiaries reporting satisfaction with the socio-economic infrastructures
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="85.00">
<comment><narrative>
This indicator measures population reporting satisfaction with road conditions along the Mora-Dabanga-Kousseri road section.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of beneficiaries reporting satisfaction with the socio-economic infrastructures
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="85.00">
<comment><narrative>
This indicator measures population reporting satisfaction with road conditions along the Mora-Dabanga-Kousseri road section.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of beneficiaries reporting satisfaction with the socio-economic infrastructures
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="85.00">
<comment><narrative>
This indicator measures population reporting satisfaction with road conditions along the Mora-Dabanga-Kousseri road section.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="20.00">
<comment><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="20.00">
<comment><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of markets along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="6.00">
<comment><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of markets along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="6.00">
<comment><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of markets along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="6.00">
<comment><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of markets along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="6.00">
<comment><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of markets along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="6.00">
<comment><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="20.00">
<comment><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="20.00">
<comment><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="20.00">
<comment><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
The share of people with access to an all-weather passable road within five kilometers of the MDK road section (modified road access index).
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="80.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="91.00">
<comment><narrative>
This indicator measures the number of beneficiaries with improved access to an all-weather passable road within five kilometers of the MDK road section. Climate change impacts are expected to affect road passability during the rainy season.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
The share of people with access to an all-weather passable road within five kilometers of the MDK road section (modified road access index).
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="80.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="91.00">
<comment><narrative>
This indicator measures the number of beneficiaries with improved access to an all-weather passable road within five kilometers of the MDK road section. Climate change impacts are expected to affect road passability during the rainy season.
</narrative></comment>
</target>
<actual value="80.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
The share of people with access to an all-weather passable road within five kilometers of the MDK road section (modified road access index).
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="80.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="91.00">
<comment><narrative>
This indicator measures the number of beneficiaries with improved access to an all-weather passable road within five kilometers of the MDK road section. Climate change impacts are expected to affect road passability during the rainy season.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
The share of people with access to an all-weather passable road within five kilometers of the MDK road section (modified road access index).
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="80.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="91.00">
<comment><narrative>
This indicator measures the number of beneficiaries with improved access to an all-weather passable road within five kilometers of the MDK road section. Climate change impacts are expected to affect road passability during the rainy season.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of MDK road vulnerable to identified climate change hazards (floods and heat).
</narrative></title>
<baseline year="2023" iso-date="2023-04-17" value="205.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-17" />
<period-end iso-date="2028-12-29" />
<target value="0.00">
<comment><narrative>
Measures the length of the MDK road corridor that is at risk of flooding and extreme heat, which are projected to increase in frequency and intensity with climate change.
</narrative></comment>
</target>
<actual value="205.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="20.00">
<comment><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="20.00">
<comment><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="20.00">
<comment><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="20.00">
<comment><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="20.00">
<comment><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of MDK road vulnerable to identified climate change hazards (floods and heat).
</narrative></title>
<baseline year="2023" iso-date="2023-04-17" value="205.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-17" />
<period-end iso-date="2028-12-29" />
<target value="0.00">
<comment><narrative>
Measures the length of the MDK road corridor that is at risk of flooding and extreme heat, which are projected to increase in frequency and intensity with climate change.
</narrative></comment>
</target>
<actual value="205.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of MDK road vulnerable to identified climate change hazards (floods and heat).
</narrative></title>
<baseline year="2023" iso-date="2023-04-17" value="205.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-17" />
<period-end iso-date="2028-12-29" />
<target value="0.00">
<comment><narrative>
Measures the length of the MDK road corridor that is at risk of flooding and extreme heat, which are projected to increase in frequency and intensity with climate change.
</narrative></comment>
</target>
<actual value="205.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of MDK road vulnerable to identified climate change hazards (floods and heat).
</narrative></title>
<baseline year="2023" iso-date="2023-04-17" value="205.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-17" />
<period-end iso-date="2028-12-29" />
<target value="0.00">
<comment><narrative>
Measures the length of the MDK road corridor that is at risk of flooding and extreme heat, which are projected to increase in frequency and intensity with climate change.
</narrative></comment>
</target>
<actual value="205.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of MDK road vulnerable to identified climate change hazards (floods and heat).
</narrative></title>
<baseline year="2023" iso-date="2023-04-17" value="205.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-17" />
<period-end iso-date="2028-12-29" />
<target value="0.00">
<comment><narrative>
Measures the length of the MDK road corridor that is at risk of flooding and extreme heat, which are projected to increase in frequency and intensity with climate change.
</narrative></comment>
</target>
<actual value="205.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of schools along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="41.00">
<comment><narrative>
Number of schools along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of schools along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="41.00">
<comment><narrative>
Number of schools along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of schools along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="41.00">
<comment><narrative>
Number of schools along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
The share of people with access to an all-weather passable road within five kilometers of the MDK road section (modified road access index).
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="80.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="91.00">
<comment><narrative>
This indicator measures the number of beneficiaries with improved access to an all-weather passable road within five kilometers of the MDK road section. Climate change impacts are expected to affect road passability during the rainy season.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
The share of people with access to an all-weather passable road within five kilometers of the MDK road section (modified road access index).
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="80.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="91.00">
<comment><narrative>
This indicator measures the number of beneficiaries with improved access to an all-weather passable road within five kilometers of the MDK road section. Climate change impacts are expected to affect road passability during the rainy season.
</narrative></comment>
</target>
<actual value="80.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
The share of people with access to an all-weather passable road within five kilometers of the MDK road section (modified road access index).
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="80.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="91.00">
<comment><narrative>
This indicator measures the number of beneficiaries with improved access to an all-weather passable road within five kilometers of the MDK road section. Climate change impacts are expected to affect road passability during the rainy season.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
The share of people with access to an all-weather passable road within five kilometers of the MDK road section (modified road access index).
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="80.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="91.00">
<comment><narrative>
This indicator measures the number of beneficiaries with improved access to an all-weather passable road within five kilometers of the MDK road section. Climate change impacts are expected to affect road passability during the rainy season.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of schools along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="41.00">
<comment><narrative>
Number of schools along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of schools along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="41.00">
<comment><narrative>
Number of schools along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average travel time between Mora and KoussEri
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="8.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="3.00">
<comment><narrative>
This indicator measures vehicles travel time between Mora and Kousseri.
</narrative></comment>
</target>
<actual value="8.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average travel time between Mora and KoussEri
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="8.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="3.00">
<comment><narrative>
This indicator measures vehicles travel time between Mora and Kousseri.
</narrative></comment>
</target>
<actual value="8.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average travel time between Mora and KoussEri
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="8.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="3.00">
<comment><narrative>
This indicator measures vehicles travel time between Mora and Kousseri.
</narrative></comment>
</target>
<actual value="8.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average travel time between Mora and KoussEri
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="8.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="3.00">
<comment><narrative>
This indicator measures vehicles travel time between Mora and Kousseri.
</narrative></comment>
</target>
<actual value="8.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average travel time between Mora and KoussEri
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="8.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="3.00">
<comment><narrative>
This indicator measures vehicles travel time between Mora and Kousseri.
</narrative></comment>
</target>
<actual value="8.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of MDK road vulnerable to identified climate change hazards (floods and heat).
</narrative></title>
<baseline year="2023" iso-date="2023-04-17" value="205.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-17" />
<period-end iso-date="2028-12-29" />
<target value="0.00">
<comment><narrative>
Measures the length of the MDK road corridor that is at risk of flooding and extreme heat, which are projected to increase in frequency and intensity with climate change.
</narrative></comment>
</target>
<actual value="205.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of MDK road vulnerable to identified climate change hazards (floods and heat).
</narrative></title>
<baseline year="2023" iso-date="2023-04-17" value="205.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-17" />
<period-end iso-date="2028-12-29" />
<target value="0.00">
<comment><narrative>
Measures the length of the MDK road corridor that is at risk of flooding and extreme heat, which are projected to increase in frequency and intensity with climate change.
</narrative></comment>
</target>
<actual value="205.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of MDK road vulnerable to identified climate change hazards (floods and heat).
</narrative></title>
<baseline year="2023" iso-date="2023-04-17" value="205.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-17" />
<period-end iso-date="2028-12-29" />
<target value="0.00">
<comment><narrative>
Measures the length of the MDK road corridor that is at risk of flooding and extreme heat, which are projected to increase in frequency and intensity with climate change.
</narrative></comment>
</target>
<actual value="205.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of MDK road vulnerable to identified climate change hazards (floods and heat).
</narrative></title>
<baseline year="2023" iso-date="2023-04-17" value="205.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-17" />
<period-end iso-date="2028-12-29" />
<target value="0.00">
<comment><narrative>
Measures the length of the MDK road corridor that is at risk of flooding and extreme heat, which are projected to increase in frequency and intensity with climate change.
</narrative></comment>
</target>
<actual value="205.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2029-06-15" />
<target value="92,5000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of MDK road vulnerable to identified climate change hazards (floods and heat).
</narrative></title>
<baseline year="2023" iso-date="2023-04-17" value="205.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-17" />
<period-end iso-date="2028-12-29" />
<target value="0.00">
<comment><narrative>
Measures the length of the MDK road corridor that is at risk of flooding and extreme heat, which are projected to increase in frequency and intensity with climate change.
</narrative></comment>
</target>
<actual value="205.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of schools along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="41.00">
<comment><narrative>
Number of schools along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of schools along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="41.00">
<comment><narrative>
Number of schools along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of schools along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="41.00">
<comment><narrative>
Number of schools along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of schools along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="41.00">
<comment><narrative>
Number of schools along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of schools along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="41.00">
<comment><narrative>
Number of schools along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average travel time between Mora and KoussEri
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="8.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="3.00">
<comment><narrative>
This indicator measures vehicles travel time between Mora and Kousseri.
</narrative></comment>
</target>
<actual value="8.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average travel time between Mora and KoussEri
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="8.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="3.00">
<comment><narrative>
This indicator measures vehicles travel time between Mora and Kousseri.
</narrative></comment>
</target>
<actual value="8.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average travel time between Mora and KoussEri
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="8.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="3.00">
<comment><narrative>
This indicator measures vehicles travel time between Mora and Kousseri.
</narrative></comment>
</target>
<actual value="8.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average travel time between Mora and KoussEri
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="8.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="3.00">
<comment><narrative>
This indicator measures vehicles travel time between Mora and Kousseri.
</narrative></comment>
</target>
<actual value="8.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average travel time between Mora and KoussEri
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="8.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="3.00">
<comment><narrative>
This indicator measures vehicles travel time between Mora and Kousseri.
</narrative></comment>
</target>
<actual value="8.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2029-06-15" />
<target value="92,5000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of schools constructed or rehabilitated along the MDK road
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="20.00">
<comment><narrative>
Number of  schools constructed or rehabilitated along the MDK road
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health centers constructed or rehabilitated along the MDK road
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="12.00">
<comment><narrative>
Number of health centers constructed or rehabilitated
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with strengthened food and nutrition security
</narrative></title>
<baseline year="2024" iso-date="2024-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-15" />
<period-end iso-date="2029-06-15" />
<target value="12,8000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of water points constructed or rehabilitated with improved conditions
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="30.00">
<comment><narrative>
Number of water points constructed or rehabilitated with improved conditions
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of bridge rehabilitated
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="180.00">
<comment><narrative>
Length of bridge rehabilitated (Meters)
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
The share of people with access to an all-weather passable road within five kilometers of the MDK road section (modified road access index).
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="80.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="91.00">
<comment><narrative>
This indicator measures the number of beneficiaries with improved access to an all-weather passable road within five kilometers of the MDK road section. Climate change impacts are expected to affect road passability during the rainy season.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of markets along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="6.00">
<comment><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Road safety audits conducted
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="Yes">
<comment><narrative>
Road safety audits carried out on MDK and a selected sample of rural roads
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of students enrolled in the internship Program within the project and MINTP
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="45.00">
<comment><narrative>
This indicator will measure the number of students recruited for the internship program within the MINTP
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average travel time between Mora and KoussEri
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="8.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="3.00">
<comment><narrative>
This indicator measures vehicles travel time between Mora and Kousseri.
</narrative></comment>
</target>
<actual value="8.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of MDK road vulnerable to identified climate change hazards (floods and heat).
</narrative></title>
<baseline year="2023" iso-date="2023-04-17" value="205.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-17" />
<period-end iso-date="2028-12-29" />
<target value="0.00">
<comment><narrative>
Measures the length of the MDK road corridor that is at risk of flooding and extreme heat, which are projected to increase in frequency and intensity with climate change.
</narrative></comment>
</target>
<actual value="205.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Institutional capacity of the decentralized PIUs of MINTP and MINEPAT (PSRDREN) improved
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="Yes">
<comment><narrative>
Institutional capacity of the decentralized PIUs of MINTP and MINEPAT (PSRDREN) improved
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Road safety measures introduced along the Mora-Dabanga-Kousseri
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="Yes">
<comment><narrative>
As part of works contract, road safety features will be provided for urban centers and populated zones to segregate pedestrians from vehicle traffic.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Construction or rehabilitation of community multimedia centers
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="3.00">
<comment><narrative>
Number of community multimedia centers created and equipped with computers, a mini Wi-Fi network, payment terminals; etc.) and training for local communities.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of markets along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="6.00">
<comment><narrative>
Number of health centers along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of complaints addressed timely
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="100.00">
<comment><narrative>
Complaints processed according to the project GRM
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average travel time between Mora and KoussEri
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="8.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="3.00">
<comment><narrative>
This indicator measures vehicles travel time between Mora and Kousseri.
</narrative></comment>
</target>
<actual value="8.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Construction or rehabilitation of community multimedia centers
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="3.00">
<comment><narrative>
Number of community multimedia centers created and equipped with computers, a mini Wi-Fi network, payment terminals; etc.) and training for local communities.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Displaced people and people in host communities provided with services and livelihoods
</narrative></title>
<baseline year="2024" iso-date="2024-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-15" />
<period-end iso-date="2029-06-15" />
<target value="12,8000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of women's groups supported through trainings and equipment provision
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="5.00">
<comment><narrative>
Number of women's groups supported through trainings and equipment. Specific activities aiming at enhancing women's economic empowerment and contributing to closing gender gaps in employment will be included.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health centers constructed or rehabilitated along the MDK road
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="12.00">
<comment><narrative>
Number of health centers constructed or rehabilitated
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of schools along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="41.00">
<comment><narrative>
Number of schools along the Mora–Dabanga–KoussEri road section with improved road access
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average travel time between Mora and KoussEri
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="8.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="3.00">
<comment><narrative>
This indicator measures vehicles travel time between Mora and Kousseri.
</narrative></comment>
</target>
<actual value="8.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of schools constructed or rehabilitated along the MDK road
</narrative></title>
<baseline year="2023" iso-date="2023-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-30" />
<period-end iso-date="2029-06-29" />
<target value="20.00">
<comment><narrative>
Number of  schools constructed or rehabilitated along the MDK road
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P144637</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Community Development Program Support Project-Phase III</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[ The development objective of phase 3 (PNDP III) is to strengthen local public finance management and participatory development processes in communes for the delivery of quality and sustainable social and economic infrastructure. ]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Third Phase of the Community Development Program Support Project for Cameroon is to strengthen local public finance management and participatory development processes in communes for the delivery of quality and sustainable social and economic infrastructure. The project comprises of three components. The first component, local development support will ensure equity, the project authorities will allocate funds to communes annually, using criteria agreed upon beforehand and only investments not supported by other projects and programs will be eligible for project financing. It consists of following two sub-components: (i) local development investments for communes; and (ii) targeted investments for the poorest and vulnerable populations in the Adamaoua, North, far north and eastern regions. The second component, support to the decentralization process will seek to facilitate the sustainability of the programme national de dEveloppement participatif (national community development program) (PNDP's) benefits and strengthen the capacity of institutions that support the decentralization process. It consists of following three sub-components: (i) institutional support to the decentralization process; (ii) capacity building; and (iii) local public financial management system. The third component, project coordination, management, monitoring and evaluation, and communication will finance project coordination, administrative, technical, and financial management of the project, monitoring and evaluation (M and E), and communication and dissemination activities.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0013463"><narrative>REPUBLIC OF CAMEROON</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="CM-COA-0013464"><narrative>Republic of Cameroon</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2014-04-10"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2015-09-29"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2024-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2024-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Abderrahim Fraiji</narrative></person-name><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002221788" />
            <name><narrative>South-West Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.1999998 9.3000002</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002221789" />
            <name><narrative>South Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>2.75 11.58333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002222934" />
            <name><narrative>West Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.5 10.66667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002223602" />
            <name><narrative>North-West Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.3666701 10.36667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002223603" />
            <name><narrative>North Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.5 14</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002229336" />
            <name><narrative>Littoral Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.2666702 10.13333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002231755" />
            <name><narrative>Far North Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>11 14.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002231835" />
            <name><narrative>East Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.8333299 14.16667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002233376" />
            <name><narrative>Centre Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.75 11.83333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002234988" />
            <name><narrative>Departement de Bamboutos</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.6333299 10.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002236015" />
            <name><narrative>Adamaoua Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.8333302 13.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0009224964" />
            <name><narrative>Koung-Khi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.33848 10.47453</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="43042" percentage="38" xml:lang="en"/><sector vocabulary="1" code="16050" percentage="38" xml:lang="en"/><sector vocabulary="1" code="15129" percentage="24" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="55.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="45.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000723" percentage="35" xml:lang="en"><narrative>Rural Infrastructure and service delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="35" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000511" percentage="5" xml:lang="en"><narrative>Indigenous People and Ethnic Minorities</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="6" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="40" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="25" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="34" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">2333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">7000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">7000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">7000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">8366666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">8366666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">8366666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">2333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">14141359.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">1036144.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">362691.73</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">2158395.48</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">1236001.58</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">1993706.71</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">825874.51</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">1568675.86</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">2559666.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">532139.96</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">1168876.04</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">1261550.41</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">2258317.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">1479997.47</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">646709.03</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">1211024.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">70000000</value><description xml:lang="en"><narrative>Total Commitment in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">8000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">40000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-9398299</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-1328888</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-770042</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-3853292</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">14141360</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">1036144</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">362692</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">2158395</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">1236002</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">1993707</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">825875</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">1568676</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">2559666</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">532140</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">1168876</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">1261550</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">2258318</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">1479997</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">646709</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">1211024</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">1534424</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">1168993</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">1141178</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">409418</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">6754572</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">8230902</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">2015127</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">6590520</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">2025594</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-88730</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">2061147</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">1821804</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">582335</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">327420</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">754564</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">2707898</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">398746</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">1094201</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">1080137</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">265250</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">547065</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">761665</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">5127974</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">1491981</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">2919112</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">2908397</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">1418902</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">561796</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">3960350</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">74711</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">179170</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">579705</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">1793806</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">1398002</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-16432</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-930</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-3872</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-96943</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-160110</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-248668</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-334149</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-442701</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-530994</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-619586</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-609552</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-652776</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-619512</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-668342</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-617397</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-583571</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-619452</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-548307</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-615257</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-569162</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-24324</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-583342</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-21192</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-565795</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-20526</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-556806</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-20163</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-1173650</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-1170628</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-1141406</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-1060125</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-1113972</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-1092296</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-1098003</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-354322</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-1104058</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-1098417</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-123536</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-44452</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-1085279</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-125121</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-1126331</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-127859</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-13464"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P144637"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P144637?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P144637"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct Project beneficiary (refugees)
</narrative></title>
<baseline year="2018" iso-date="2018-02-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-02-28" />
<period-end iso-date="2022-06-30" />
<target value="250,000.00">
<comment><narrative>
The value reported stems from project records. However, project records do not allow disaggregating the number of unique beneficiaries, discounting those who benefitted from more than one subproject. In addition, the estimate of the number of beneficiaries among refugees is based on the total number of refugees in the town/locality where each investment was made, rather than on the number of individuals who are reasonably expected to make systematic or repeated use of the investment. An analysis of the estimated number of refugees in the villages that received project investments suggests that the actual number of refugees that benefitted from these investments is at most 232,900.
</narrative></comment>
</target>
<actual value="515,327.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered related to delivery of project benefits addressed (%)
</narrative></title>
<baseline year="2015" iso-date="2015-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-30" />
<period-end iso-date="2022-06-30" />
<target value="90.00">
<comment><narrative>
Project records indicate that a total of 3,765 grievances were received, of which 3,632 were addressed.
</narrative></comment>
</target>
<actual value="96.47">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Subprojects that have implemented the required environmental and social risk mitigation measures and are functional
</narrative></title>
<baseline year="2015" iso-date="2015-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-30" />
<period-end iso-date="2022-06-30" />
<target value="100.00">
<comment><narrative>
Of the 2,786 subproject investments, 1,803 had implemented the required environmental and social risk mitigation measures, and were functional by project closure.
</narrative></comment>
</target>
<actual value="64.72">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of beneficiaries trained
</narrative></title>
<baseline year="2015" iso-date="2015-06-30" value="1,720.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-30" />
<period-end iso-date="2022-06-30" />
<target value="4,200.00">
<comment><narrative>
Project records indicate that 25,273 individuals benefitted from trainings. However, this value in inflated as it does not discount individuals who benefitted from more than one training.
</narrative></comment>
</target>
<actual value="25,273.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of Decentralized Public Investment Budget projects derived from Local Development Plans
</narrative></title>
<baseline year="2016" iso-date="2016-03-01" value="58.80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-03-01" />
<period-end iso-date="2022-06-30" />
<target value="50.00">

</target>
<actual value="87.21">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Communes benefiting from the project grant
</narrative></title>
<baseline year="2015" iso-date="2015-06-30" value="328.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-30" />
<period-end iso-date="2022-06-30" />
<target value="360.00">
<comment><narrative>
Project records indicate that 256 communes befitted from subproject grants, and that 164 communes benefitted from CDP preparation grants, 122 of which were finalized and validated by the Prefect (the last step of the process), and 42 of which were finalized but lacked the validation by the Prefect at project closure. 109 communes benefitted from both types of grants. An additional 31 communes were targeted for CDP preparation grants but the process either did not start, or was not finalized by project closure; these 31 communes are therefore not considered to have benefitted from the project grant.
</narrative></comment>
</target>
<actual value="311.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improved community water points constructed or rehabilitated under the project
</narrative></title>
<baseline year="2015" iso-date="2015-06-30" value="1,721.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-30" />
<period-end iso-date="2022-06-30" />
<target value="4,519.00">
<comment><narrative>
A review of project records shows that the project financed the construction and/or rehabilitation of approx. 797 improved water points, including boreholes and wells. Due to errors in the way water points financed by the project were previously accounted, ISRs reported higher levels of achievement for this indicator. These errors also explain the revision to the target at the time of the AF.
</narrative></comment>
</target>
<actual value="797.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rural markets constructed under the project
</narrative></title>
<baseline year="2015" iso-date="2015-06-30" value="12.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-30" />
<period-end iso-date="2022-06-30" />
<target value="97.00">
<comment><narrative>
Project records indicate that 99 rural markets benefited from project financing. Due to errors in the accounting of the monitoring data, ISRs reported higher levels of achievement for this indicator.
</narrative></comment>
</target>
<actual value="99.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries that feel project investments reflected their needs (percentage)
</narrative></title>
<baseline year="2015" iso-date="2015-09-29" value="91.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-09-29" />
<period-end iso-date="2022-06-30" />
<target value="80.00">
<comment><narrative>
The measurement of beneficiaries satisfaction with project investments was carried out through a mid-term survey of stakeholders engaged in project implementation. The survey did not target the direct project beneficiaries (i.e. residents of communities) as indicated in the description of the indicator. Survey respondents included instead: representatives of communal councils and of Village Development Committees, civil society organizations contracted to lead the preparation of CDPs and develop the project's communication materials; the contractors in charge of infrastructure works for subprojects; and representatives of sector ministries.
</narrative></comment>
</target>
<actual value="87.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Communes with a public information and citizen control mechanism on service delivery (citizens scorecards)
</narrative></title>
<baseline year="2015" iso-date="2015-06-30" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-30" />
<period-end iso-date="2022-06-30" />
<target value="360.00">
<comment><narrative>
Communes did not put in place a citizen scorecard mechanism. The reporting on this indicator concerns satisfaction surveys conducted by the PIU, which covered 153 communes in 2017, and another 188 communes in 2022. Results from the surveys led to the development of Action Plans for improvements in service delivery that communes were expected to implement.
</narrative></comment>
</target>
<actual value="341.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehabilitated, Rural
</narrative></title>
<baseline year="2015" iso-date="2015-06-30" value="465.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-30" />
<period-end iso-date="2022-06-30" />
<target value="1,063.00">
<comment><narrative>
Project records indicate that approx. 117.58 km of rural roads were rehabilitated with project financing. Due to errors in the accounting of the monitoring data, ISRs reported higher levels of achievement for this indicator. These errors also explain the revision of the target for the indicator at the time of the AF.
</narrative></comment>
</target>
<actual value="117.58">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of communes having obtained at least the mid-point score in the Guichet Performance
</narrative></title>
<baseline year="2017" iso-date="2017-06-01" value="24.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-01" />
<period-end iso-date="2022-06-30" />
<target value="70.00">
<comment><narrative>
Of the 343 communes that participated in the Guichet Performance competition in 2019, 143 achieved at least the mid-point score (i.e. 50/100 points).
</narrative></comment>
</target>
<actual value="42.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Community storage facilities constructed under the project
</narrative></title>
<baseline year="2015" iso-date="2015-06-30" value="34.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-30" />
<period-end iso-date="2022-06-30" />
<target value="97.00">
<comment><narrative>
Project records indicate that 33 community storage facilities benefited from project financing. Due to errors in the accounting of the monitoring data, ISRs reported higher levels of achievement for this indicator. These errors also explain the revision to the target of the indicator at the time of the AF.
</narrative></comment>
</target>
<actual value="33.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health facilities constructed, renovated or equipped
</narrative></title>
<baseline year="2015" iso-date="2015-06-30" value="38.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-30" />
<period-end iso-date="2022-06-30" />
<target value="211.00">
<comment><narrative>
Project records indicate that 76 health facilities were built, renovated, or equipped with project financing. Due to errors in the accounting of monitoring data, ISRs reported higher levels of achievement for this indicator. The same errors explain the revision to the target of the indicator at the time of the AF.
</narrative></comment>
</target>
<actual value="76.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of communes with at least 30% villages having implemented endogenous solutions
</narrative></title>
<baseline year="2018" iso-date="2018-02-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-02-28" />
<period-end iso-date="2022-06-30" />
<target value="50.00">

</target>
<actual value="34.56">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Classrooms built and/or rehabilitated
</narrative></title>
<baseline year="2015" iso-date="2015-06-30" value="971.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-30" />
<period-end iso-date="2022-06-30" />
<target value="2,525.00">
<comment><narrative>
Project records indicate that approx. 1,014 classrooms were built or rehabilitated with project financing. Due to errors in the accounting of monitoring data, ISRs reported higher levels of achievement for this indicator. These errors also explain the revision to the target of the indicator at the time of the AF.
</narrative></comment>
</target>
<actual value="1,014.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Village Development Committee of host villages with at least one refugee represented in the comittee/bureau
</narrative></title>
<baseline year="2018" iso-date="2018-02-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-02-28" />
<period-end iso-date="2022-06-30" />
<target value="95.00">

</target>
<actual value="7.16">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries (non refugees)
</narrative></title>
<baseline year="2015" iso-date="2015-09-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-09-29" />
<period-end iso-date="2022-06-30" />
<target value="1,300,000.00">
<comment><narrative>
The value reported stems from project records. However, project records do not allow disaggregating the number of unique beneficiaries, discounting those who benefitted from more than one subproject. The actual number of beneficiaries is therefore less than reported. An analysis of the estimated number of beneficiaries in each of the villages that received project investments suggests that the actual number of project beneficiaries is at most 2,961,000.
</narrative></comment>
</target>
<actual value="4,532,649.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P122153</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Cameroon Mining Sector Technical Assistance Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The PDO is to improve (i) the efficiency and transparency of mining sector management and (ii) the frameworks for sustainable mining development.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Mining Sector Capacity Building Project for Cameroon is to improve (i) the efficiency and transparency of mining sector management; and (ii) the frameworks for sustainable mining development. There are three components to the project, the first component being access to mineral resources and governance of mining operations. This component will address existing constraints to proper management of up-stream functions of the EI value-chain, focusing particularly on access to resources (EI value chain link1), monitoring of mining operations (link 2) and transparency and accountability mechanisms (mainly referring to link 3). The second component is the integration of mining into local and regional development. This component will contribute to improve the integration of current exploration and future exploitation activities into local and regional development (link 5). The third component is the Management and monitoring and evaluation (M&amp;E). this component will support project coordination and management of procurement, financial management, and disbursement as well as monitoring and evaluation of project implementation.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0004523"><narrative>Ministry of Economy, Planning, and Regional Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0004524"><narrative>MINMIDT</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0004525"><narrative>MINMIDT</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="CM-COA-0004526"><narrative>MINMIDT</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2011-07-12"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2011-12-15"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2021-12-01"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2021-12-01"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Martin Lokanc</narrative></person-name><telephone>+1-202-473-1000</telephone><email>mlokanc@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002233376" />
            <name><narrative>Centre</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.75 11.83333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="32210" percentage="78" xml:lang="en"/><sector vocabulary="1" code="32220" percentage="22" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LM" percentage="50.0000000" xml:lang="en"><narrative>FY17 - Mining</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LP" percentage="50.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Energy and Extractives</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="17" xml:lang="en"><narrative>Air quality management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000725" percentage="10" xml:lang="en"><narrative>Land Administration and Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="51" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="20" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000084" percentage="10" xml:lang="en"><narrative>Environmental policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="20" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000725" percentage="10" xml:lang="en"><narrative>Land Administration and Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="51" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">55555.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">55555.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">55555.55</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">55555.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">55555.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">55555.55</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">55555.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">55555.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">55555.55</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">55555.56</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">55555.56</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">55555.55</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">55555.56</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">55555.56</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">55555.55</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">55555.56</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">55555.56</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">55555.55</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">166666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">166666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">166666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">166666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">625000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">625000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">625000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">625000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">625000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">625000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">625000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">625000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">625000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">625000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">625000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">625000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">833333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">833333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">833333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">833333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-01"/>
<value currency="USD" value-date="2021-12-01">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-01"/>
<value currency="USD" value-date="2021-12-01">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">30000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">21000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">5900000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-1913445</value><description xml:lang="en"><narrative>Total Commitment Cancellations in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-428456</value><description xml:lang="en"><narrative>Total Commitment Cancellations in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-6980902</value><description xml:lang="en"><narrative>Total Commitment Cancellations in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">830100</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-01-31"/><value value-date="2013-01-31">71308</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">699105</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">200337</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">553098</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">-79625</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-07-31"/><value value-date="2013-07-31">108104</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">211797</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">74010</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">210485</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">157886</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">835153</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">1226196</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">758672</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">585938</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">928664</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">309756</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">620233</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">858249</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">608018</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">268656</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">426743</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">304314</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">278263</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">88418</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">138899</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">392473</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">47245</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">33691</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">352338</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">113316</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">379757</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">246685</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">68703</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">289166</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">316218</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">26578</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">1594500</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">197297</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">109692</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">165848</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">204607</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">251821</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">68051</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">70764</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">173381</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">37749</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">104795</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">79005</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">118861</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">100867</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">1285576</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">141935</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">81731</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">1646081</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">130590</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">423293</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">279806</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">123667</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">1236973</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">217352</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">1421310</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">499878</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">204741</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">1063337</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">1279863</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">425098</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">96925</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">290776</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">136028</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">99867</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">72797</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">299601</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">264535</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">88178</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">732197</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">141945</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">425836</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">42142</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">14047</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">82601</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">61208</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">295436</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">34115</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">2275760</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">52091</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">116398</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">917877</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">455082</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">101038</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">3884482</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">1294827</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">42988</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">42573</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">127719</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">1460442</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">492409</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">13297</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">23104</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">111704</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">37235</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">18882</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">27972</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">83916</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">126251</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">42084</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">1993005</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">9570</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">28709</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">45490</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">32523</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">15163</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">53015</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">17672</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">25080</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">75240</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">78739</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">26246</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">19457</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">58371</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">1488895</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">494135</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-431102</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">145286</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">48113</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">10928</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">346402</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">1039205</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-470953</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-949924</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-451400</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">-1493</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">-9012</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">-9863</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">-21469</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">-33407</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">-41361</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">-42875</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">-46000</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">-52238</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">-57593</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-63626</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-841</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-70237</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">-100</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-77614</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-86647</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-12756</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-1782</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-37177</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-8299</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-91775</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-275</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-93999</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-25350</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-101499</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-35070</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-100316</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-131366</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-35356</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-102345</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-131969</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-143230</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-38947</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-95092</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-87194</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-34919</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-128115</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-102690</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-147586</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-40263</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-92189</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-35998</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-132301</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-87688</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-125885</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-34221</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-35743</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-131248</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-93601</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-125064</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-86622</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-33184</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-92181</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-126856</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-34855</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-118808</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-32276</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-84655</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-266211</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-251274</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-94521</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-332971</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-254334</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-65489</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-226248</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-224993</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-252924</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-65126</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-223384</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-251115</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-64660</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-226844</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-65661</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-255004</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-5440</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-1541</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-5296</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-243558</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-216535</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-62537</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-2636</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-229237</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-260665</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-67119</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-5280</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-5201</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-1503</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-224235</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-252795</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-64931</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-4526"><narrative>MINMIDT</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P122153"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P122153?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P122153"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Changes to project activities as a result of citizen feedback
</narrative></title>
<baseline year="2017" iso-date="2017-01-31" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-01-31" />
<period-end iso-date="2020-12-01" />
<target value="Y">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Not achieved&lt;/strong&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="N">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of consultations of the geodatabase by potential investors
</narrative></title>
<baseline year="2017" iso-date="2017-01-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-01-17" />
<period-end iso-date="2021-12-01" />
<target value="12.00">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Partially Achieved. &lt;/strong&amp;gt;The original indicator was dropped in 2016 restructuring. The geodata system (SIGM) is functional, the data exists, but is not yet accessible by investors or public.&amp;nbsp; Geodata access remains solely with the state mining company SOMINES. The policy defining the rules and modalities of access to geodata by third parties was extensively discussed under the Project but not approved at the time of Project closing (not approved at the ICR writing).&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Industrial minerals market analysis
</narrative></title>
<baseline year="2017" iso-date="2017-01-17" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-01-17" />
<period-end iso-date="2019-03-29" />
<target value="Y">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Not achieved&lt;/strong&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="N">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Production of geological maps
</narrative></title>
<baseline year="2017" iso-date="2017-01-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-01-17" />
<period-end iso-date="2019-06-20" />
<target value="20.00">

</target>
<actual value="30.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Positive feedback from artisanal miners on training and awareness raising
</narrative></title>
<baseline year="2017" iso-date="2017-01-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-01-26" />
<period-end iso-date="2021-12-01" />
<target value="80.00">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Not achieved. &lt;/strong&amp;gt;This data was not available at ICR. Several ASM related activities, including public awareness campaign which was expected to build feedback mechanism, were dropped by the Government.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Environmental and social impact assessment of mining investments toolkit for Government produced
</narrative></title>
<baseline year="2017" iso-date="2017-01-17" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-01-17" />
<period-end iso-date="2019-03-29" />
<target value="Y">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Not achieved&lt;/strong&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="N">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved capacities for monitoring of mining operations
</narrative></title>
<baseline year="2011" iso-date="2011-11-17" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-11-17" />
<period-end iso-date="2019-02-11" />
<target value="Y">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Partially achieved.&lt;/strong&amp;gt;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Geo-data management center providing online access
</narrative></title>
<baseline year="2011" iso-date="2011-11-17" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-11-17" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Partially achieved:&lt;/strong&amp;gt; The GIS is online but the policy on access to geodata has not been issued.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="N">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time taken to issue mineral rights
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="9.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2019-03-29" />
<target value="3.00">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Not Achieved.&lt;/strong&amp;gt; The mining cadastre system was designed and successfully started its operation in 2015 (at that time this indicator was considered &amp;ldquo;fully achieved&amp;rdquo;). However, further operation of the mining cadastre was disrupted by the issuance of the instruction from the Presidency of the Republic dated May 8, 2018, which required a prior visa (approval) from the Presidency for the issue of any new permit. Issuance of mining licenses largely stopped at that time.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of public service personnel trained in sector relevant fields (with breakdownby gender)
</narrative></title>
<baseline year="2016" iso-date="2016-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-07-01" />
<period-end iso-date="2021-12-01" />
<target value="150.00">

</target>
<actual value="157.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Modern computerized mining cadastre in use
</narrative></title>
<baseline year="2011" iso-date="2011-11-17" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-11-17" />
<period-end iso-date="2019-03-29" />
<target value="Y">
<comment><narrative>
&lt;p&amp;gt;&lt;strong&amp;gt;Partially achieved&lt;/strong&amp;gt;: achieved in 2015 but not in use since 2018.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Frameworks and tools for sustainable mining development agreed
</narrative></title>
<baseline year="2011" iso-date="2011-11-17" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-11-17" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The Strategic Environmental and Social Assessment (SESA) action plan included the first two frameworks as activities.&amp;nbsp; The delivery of the SESA has been achieved with wide consultations. The activity to delivery a guide on good practices for artisanal miners was cancelled and is no longer applicable.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P168772</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Valorization of Investments in the Valley of the Logone</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To improve irrigation and drainage services and agricultural production in the irrigated areas of the Logone Valley]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Valorization of Investments in the Valley of the Logone Project for Cameroon is to improve irrigation and drainage services and agricultural production in the irrigated areas of the Logone valley. The project comprises of four components. The first component, improvement of infrastructure and water management goal is to contribute to more sustainable and equitable regional water resources management in addition to an improved irrigation development in the Logone valley, building upon the work done within the recently closed emergency Flood Emergency Project (PULCI) Project. It consists of following sub-components: (i) security and operation of main hydraulic infrastructures; (ii) irrigation and drainage infrastructure, and resettlement action plans (RAP) and environmental and social impact assessment (ESIA) activities; and (iii) irrigation and drainage management. The second component, production and support to agriculture services will focus on progressively promoting a prominent private sector role to improve production, markets, and support services with an emphasis on improving efficiency along the value chain. It consists of following sub-components: (i) e-vouchers for re-launching production in the irrigation perimeters; (ii) matching grants for production and agribusiness in the valley; and (iii) organizational management support centers. The third component, support to sector development and implementation consists of following sub-components: (i) institutional strengthening of public institutions; (ii) innovation and agricultural training; and (iii) project implementation and monitoring and evaluation (M and E) support. The fourth component, contingent emergency response will draw from the uncommitted credit resources under the project from other project components to cover the emergency response.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0039094"><narrative>Republic of Cameroon</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0039094"><narrative>Republic of Cameroon</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="CM-COA-0039092"><narrative>SociEtE d’Expansion et Modernisation de la Riziculture de Yagoua (SEMRY)</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2021-11-30"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2021-11-30"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2029-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2029-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Pierre Jacques Lorillou</narrative></person-name><telephone>+1-202-473-1000</telephone><email>plorillou@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002221248" />
            <name><narrative>Vata</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.41667 15.2</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002222471" />
            <name><narrative>Pouss</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.8472 15.05557</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002223204" />
            <name><narrative>Okoukouda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.01667 11.45</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002230857" />
            <name><narrative>Guirvidig</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.88047 14.83441</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002232608" />
            <name><narrative>Doriessou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.53839 15.1335</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002233387" />
            <name><narrative>Republic of Cameroon</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6 12.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002233654" />
            <name><narrative>Bongora</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.83333 14.35</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002230567" />
            <name><narrative>Kalak</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.65166 15.10414</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006759948" />
            <name><narrative>Tekele</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.0191 13.84092</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="74020" percentage="40" xml:lang="en"/><sector vocabulary="1" code="14010" percentage="40" xml:lang="en"/><sector vocabulary="1" code="31191" percentage="8" xml:lang="en"/><sector vocabulary="1" code="31140" percentage="8" xml:lang="en"/><sector vocabulary="1" code="31150" percentage="4" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="2.00000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YA" percentage="4.00000000" xml:lang="en"><narrative>FY17 - Agricultural markets, commercialization and agri-business</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AI" percentage="77.0000000" xml:lang="en"><narrative>FY17 - Irrigation and Drainage</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AB" percentage="2.00000000" xml:lang="en"><narrative>FY17 - Agricultural Extension, Research, and Other Support Activities</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AK" percentage="15.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Agriculture, Fishing &amp; Forestry</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="44" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="99" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="89" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="90" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="19" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="89" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="19" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="26" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="89" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="85" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000626" percentage="90" xml:lang="en"><narrative>Pandemic Response</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="10" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000753" percentage="10" xml:lang="en"><narrative>Disaster Preparedness</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="23" xml:lang="en"><narrative>Rural Markets</narrative></sector><humanitarian-scope type="1" vocabulary="1-2" code="EP-2020-000012-001"> </humanitarian-scope><humanitarian-scope type="2" vocabulary="2-1" code="HCOVD20"> </humanitarian-scope><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">416666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">2083333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">4166666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">3333333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">3333333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">1666666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">833333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">833333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">101038356.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">101038356.33</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">200000000</value><description xml:lang="en"><narrative>Total Commitment in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-39093"><narrative>Ministry of Agriculture and Rural Development (MINADER); SociEtE d’Expansion et Modernisation de la Riziculture de Yagoua (SEMRY)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">4004702</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-39093"><narrative>Ministry of Agriculture and Rural Development (MINADER); SociEtE d’Expansion et Modernisation de la Riziculture de Yagoua (SEMRY)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">5762294</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-39093"><narrative>Ministry of Agriculture and Rural Development (MINADER); SociEtE d’Expansion et Modernisation de la Riziculture de Yagoua (SEMRY)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">699650</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-39093"><narrative>Ministry of Agriculture and Rural Development (MINADER); SociEtE d’Expansion et Modernisation de la Riziculture de Yagoua (SEMRY)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">214156</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-39093"><narrative>Ministry of Agriculture and Rural Development (MINADER); SociEtE d’Expansion et Modernisation de la Riziculture de Yagoua (SEMRY)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">735857</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-39093"><narrative>Ministry of Agriculture and Rural Development (MINADER); SociEtE d’Expansion et Modernisation de la Riziculture de Yagoua (SEMRY)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">300938</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-39093"><narrative>Ministry of Agriculture and Rural Development (MINADER); SociEtE d’Expansion et Modernisation de la Riziculture de Yagoua (SEMRY)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">265874</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-39093"><narrative>Ministry of Agriculture and Rural Development (MINADER); SociEtE d’Expansion et Modernisation de la Riziculture de Yagoua (SEMRY)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">221623</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-39093"><narrative>Ministry of Agriculture and Rural Development (MINADER); SociEtE d’Expansion et Modernisation de la Riziculture de Yagoua (SEMRY)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">252823</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-39093"><narrative>Ministry of Agriculture and Rural Development (MINADER); SociEtE d’Expansion et Modernisation de la Riziculture de Yagoua (SEMRY)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">396443</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-39093"><narrative>Ministry of Agriculture and Rural Development (MINADER); SociEtE d’Expansion et Modernisation de la Riziculture de Yagoua (SEMRY)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">320512</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-39093"><narrative>Ministry of Agriculture and Rural Development (MINADER); SociEtE d’Expansion et Modernisation de la Riziculture de Yagoua (SEMRY)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">279350</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-39093"><narrative>Ministry of Agriculture and Rural Development (MINADER); SociEtE d’Expansion et Modernisation de la Riziculture de Yagoua (SEMRY)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">29040197</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-39093"><narrative>Ministry of Agriculture and Rural Development (MINADER); SociEtE d’Expansion et Modernisation de la Riziculture de Yagoua (SEMRY)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">1415951</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-39093"><narrative>Ministry of Agriculture and Rural Development (MINADER); SociEtE d’Expansion et Modernisation de la Riziculture de Yagoua (SEMRY)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">701135</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-39093"><narrative>Ministry of Agriculture and Rural Development (MINADER); SociEtE d’Expansion et Modernisation de la Riziculture de Yagoua (SEMRY)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">299174</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-39093"><narrative>Ministry of Agriculture and Rural Development (MINADER); SociEtE d’Expansion et Modernisation de la Riziculture de Yagoua (SEMRY)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">144816</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-39093"><narrative>Ministry of Agriculture and Rural Development (MINADER); SociEtE d’Expansion et Modernisation de la Riziculture de Yagoua (SEMRY)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">2409645</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-39093"><narrative>Ministry of Agriculture and Rural Development (MINADER); SociEtE d’Expansion et Modernisation de la Riziculture de Yagoua (SEMRY)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">769149</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-39093"><narrative>Ministry of Agriculture and Rural Development (MINADER); SociEtE d’Expansion et Modernisation de la Riziculture de Yagoua (SEMRY)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">359063</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-39093"><narrative>Ministry of Agriculture and Rural Development (MINADER); SociEtE d’Expansion et Modernisation de la Riziculture de Yagoua (SEMRY)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">2950722</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-39093"><narrative>Ministry of Agriculture and Rural Development (MINADER); SociEtE d’Expansion et Modernisation de la Riziculture de Yagoua (SEMRY)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">3801186</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-39093"><narrative>Ministry of Agriculture and Rural Development (MINADER); SociEtE d’Expansion et Modernisation de la Riziculture de Yagoua (SEMRY)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">5062239</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-39093"><narrative>Ministry of Agriculture and Rural Development (MINADER); SociEtE d’Expansion et Modernisation de la Riziculture de Yagoua (SEMRY)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">4945776</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-39093"><narrative>Ministry of Agriculture and Rural Development (MINADER); SociEtE d’Expansion et Modernisation de la Riziculture de Yagoua (SEMRY)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">1654246</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-39093"><narrative>Ministry of Agriculture and Rural Development (MINADER); SociEtE d’Expansion et Modernisation de la Riziculture de Yagoua (SEMRY)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">2458817</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-39093"><narrative>Ministry of Agriculture and Rural Development (MINADER); SociEtE d’Expansion et Modernisation de la Riziculture de Yagoua (SEMRY)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">1127055</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-39093"><narrative>Ministry of Agriculture and Rural Development (MINADER); SociEtE d’Expansion et Modernisation de la Riziculture de Yagoua (SEMRY)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">2513259</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-39093"><narrative>Ministry of Agriculture and Rural Development (MINADER); SociEtE d’Expansion et Modernisation de la Riziculture de Yagoua (SEMRY)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">1380152</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-39093"><narrative>Ministry of Agriculture and Rural Development (MINADER); SociEtE d’Expansion et Modernisation de la Riziculture de Yagoua (SEMRY)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">6801378</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-39093"><narrative>Ministry of Agriculture and Rural Development (MINADER); SociEtE d’Expansion et Modernisation de la Riziculture de Yagoua (SEMRY)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">1631247</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-39093"><narrative>Ministry of Agriculture and Rural Development (MINADER); SociEtE d’Expansion et Modernisation de la Riziculture de Yagoua (SEMRY)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">5970768</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-39093"><narrative>Ministry of Agriculture and Rural Development (MINADER); SociEtE d’Expansion et Modernisation de la Riziculture de Yagoua (SEMRY)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">3795495</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-39093"><narrative>Ministry of Agriculture and Rural Development (MINADER); SociEtE d’Expansion et Modernisation de la Riziculture de Yagoua (SEMRY)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">3570378</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-39093"><narrative>Ministry of Agriculture and Rural Development (MINADER); SociEtE d’Expansion et Modernisation de la Riziculture de Yagoua (SEMRY)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">2705575</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-39093"><narrative>Ministry of Agriculture and Rural Development (MINADER); SociEtE d’Expansion et Modernisation de la Riziculture de Yagoua (SEMRY)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-64012</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-39093"><narrative>Ministry of Agriculture and Rural Development (MINADER); SociEtE d’Expansion et Modernisation de la Riziculture de Yagoua (SEMRY)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-61548</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-39093"><narrative>Ministry of Agriculture and Rural Development (MINADER); SociEtE d’Expansion et Modernisation de la Riziculture de Yagoua (SEMRY)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-76114</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-39093"><narrative>Ministry of Agriculture and Rural Development (MINADER); SociEtE d’Expansion et Modernisation de la Riziculture de Yagoua (SEMRY)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-291400</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-39093"><narrative>Ministry of Agriculture and Rural Development (MINADER); SociEtE d’Expansion et Modernisation de la Riziculture de Yagoua (SEMRY)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-320177</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-39093"><narrative>Ministry of Agriculture and Rural Development (MINADER); SociEtE d’Expansion et Modernisation de la Riziculture de Yagoua (SEMRY)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-407319</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-39093"><narrative>Ministry of Agriculture and Rural Development (MINADER); SociEtE d’Expansion et Modernisation de la Riziculture de Yagoua (SEMRY)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P168772"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P168772?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P168772"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area provided with improved irrigation and drainage services (hectares); (core indicator)
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="12,210.00">
<comment><narrative>
Up to now more than  4400 hectares have been rehabilitated.
</narrative></comment>
</target>
<actual value="4400.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Citizen engagement indicator: Stakeholder and citizen participation in the Steering Committee and Regional Technical Group
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="4.00">
<comment><narrative>
Steering Committee and Regional Technical Group (Number) have started theirs sessions in 2023, citizen engagement has been considered progressively during the sessions. To date, 3 representatives of rice famers are participating in the work of the steering committee.
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Irrigation scheme management transferred to water user associations (hectares)
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="12,210.00">
<comment><narrative>
This will be assessed after two cropping campaigns on rehabilitated plots during the second semester of 2026, covering both the dry-season (DS) and wet-season (WS) rice campaigns. While some plots have already been handed back to farmers, the existing Water Users Associations (WUAs) are still undergoing capacity strengthening to ensure effective scheme management.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with strengthened food and nutrition security
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2029-06-06" />
<target value="3,0000">
<comment><narrative>
This indicator result will be collected once the rehabilitated irrigated plots are transferred WUAs and the agricultural production increased.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Agricultural production (rice) in the area (tons per year)
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="50,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="115,000.00">
<comment><narrative>
This indicator will be collected after the first cropping campaign (rainy and dry) on the rehabilitated plots in the second semester of 2026.
</narrative></comment>
</target>
<actual value="50,000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Agricultural production (rice) in the area (tons per year)
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="50,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="115,000.00">
<comment><narrative>
This indicator will be collected after the first cropping campaign (rainy and dry) on the rehabilitated plots in the second semester of 2026.
</narrative></comment>
</target>
<actual value="50,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Business plans financed
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="2,490.00">
<comment><narrative>
The Technical Assistance (TA) supporting this activity has identified the beneficiaries of e-vouchers and is preparing to open accounts in micro-finances. The first round of Business plans has been distributed.
</narrative></comment>
</target>
<actual value="745">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries having received training
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="2,050.00">
<comment><narrative>
Convention with vocational and higher institutions have been signed shortly. Innovation Training Centers are being putting in place. Training would start this year.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2029-06-05" />
<target value="3,0000">
<comment><narrative>
The final report of the additional hydrological and hydraulic study on sediment transport, aimed at securing the Maga Dam and the dikes along the Logone, has been completed.
The beneficiary figures will be updated in the next ISR following further analysis and validation.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with strengthened food and nutrition security
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2029-06-06" />
<target value="3,0000">
<comment><narrative>
This indicator will be carried once the rehabilitated irrigated plots are transferred WUAs and the agricultural production  increaissed.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total amount of business plans financed (US$ million)
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="5.20">
<comment><narrative>
The Technical Assistance (TA) supporting this activity has identified the beneficiaries of e-vouchers and is preparing to open accounts in micro-finances. The first round of Business plans has been distributed.
</narrative></comment>
</target>
<actual value="0.53">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cropping intensity of developed perimeters (hectares harvested per year/hectares equipped for irrigation)
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="0.80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="1.80">
<comment><narrative>
To date, approximately 4,428 of the targeted 12,000 hectares have been rehabilitated. The first cropping campaign on these rehabilitated areas has started in July 2025. Only a partial reference period is currently available. As a result, a credible estimate of the increase in cropping intensity can only be produced after the first 12-month campaign period is completed and validated. This information should be available in the fall of 2026.
</narrative></comment>
</target>
<actual value="0.80">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers reached with e-voucher program
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="24,420.00">
<comment><narrative>
The Technical Assistance (TA) supporting this activity has identified the beneficiaries of e-vouchers and is preparing to open accounts in micro-finances.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Amounts of total vouchers (US$ million) of which females at least 30 percent
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="8.40">
<comment><narrative>
The Technical Assistance (TA) supporting this activity has identified the beneficiaries of e-vouchers and is preparing to open accounts in micro-finances.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances received and addressed within the specified GRM timeframe
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="90.00">
<comment><narrative>
A Third Party Monitoring (OSC) has being recruited to support the implementation of the GRM on the field.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct beneficiaries (number)
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="30,000.00">
<comment><narrative>
This indicator measures the number of beneficiaries, including those benefiting from rehabilitated irrigation and drainage services, for which progress is in line with the cumulative hectares rehabilitated, and the individuals who have received compensation for economic losses.
As of now, ~4,428 ha have been rehabilitated, benefiting around 8,800 farmers.
</narrative></comment>
</target>
<actual value="8800">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances received and addressed within the specified GRM timeframe
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="90.00">
<comment><narrative>
A Third Party Monitoring (OSC) has being recruited to support the implementation of the GRM on the field.
</narrative></comment>
</target>
<actual value="81%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Irrigation area diversified (hectares)
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="1,000.00">
<comment><narrative>
Irrigation area diversified will start at the end of 2026, once an important number of rehabilitated plots will have been delivered
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Operational WUAs
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="8.00">
<comment><narrative>
04 WUAs from Maga and 04 WUAs from Yagoua are operational. While some plots have already been handed back to farmers, the existing Water Users Associations (WUAs) are still undergoing capacity strengthening to ensure effective scheme management.
</narrative></comment>
</target>
<actual value="8">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries having received training
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="2,050.00">
<comment><narrative>
Convention with vocational and higher institutions have been signed shortly. Innovation Training Centers are being putting in place. Training would start this year.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers reached with e-voucher program
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="24,420.00">
<comment><narrative>
The Technical Assistance (TA) supporting this activity has identified the beneficiaries of e-vouchers and is preparing to open accounts in micro-finances. The first round of e-vouchers has been distributed.
</narrative></comment>
</target>
<actual value="2861">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area prepared by (harrowed/ploughed) by the farmers or a private provider (ha/year)
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="700.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="17,500.00">
<comment><narrative>
This indicator will be collected after the first cropping campaign (rainy and dry) on the rehabilitated plots in the second semester of 2026.
</narrative></comment>
</target>
<actual value="700.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A &quot;new SEMRY&quot; operational based on the implementation of the transformational plan (based on PBCs)
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="New SEMRY not operational"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2027-04-26" />
<target value="New SEMRY fully operational">
<comment><narrative>
Because SEMRY's statute remains pending, it is difficult to implement the intended governance and O&amp;M reforms in practice; therefore, the Government is developing alternative institutional and operational options to secure infrastructure maintenance and sustainability. A proposal—including financing and accountability mechanisms—is expected to be received and discussed during the MTR mission in April 2026. In parallel, the Bank is escalating the dialogue to senior levels (CMU/RVP), given that the resolution of this issue goes beyond the project and has implications for the overall implementation pace in the coming years.
</narrative></comment>
</target>
<actual value="New SEMRY not operational as the decree dealing with its transformation is still pending presidential approval">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area prepared by (harrowed/ploughed) by the farmers or a private provider (ha/year)
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="700.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="17,500.00">
<comment><narrative>
A distribution of plowing services was made in which the private sector committed to plowing 2286.00 ha. The result for this indicator will be updated after the first cropping campaign (rainy and dry) on the rehabilitated plots in the second semester of 2026. Although 4,428 hectares have been rehabilitated, several key activities have been completed or are underway, including plowing and leveling of rehabilitated plots, rehabilitation of drainage and irrigation networks, and complementary dry-season works such as upgrading pumping systems and lining primary canals to ensure effective water delivery. These works are being commissioned progressively by the end of the dry season, in parallel with the operationalization of the plots.
</narrative></comment>
</target>
<actual value="2286">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cropping intensity of developed perimeters (hectares harvested per year/hectares equipped for irrigation)
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="0.80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="1.80">
<comment><narrative>
This indicator depends on the rehabilitation works which are still ongoing. More than 4400 hectares on 12 000 have been rehabilitated but the first cropping campaign on these rehabilitated plots has just started in July 2025. This doesn't allow measuring the increase of cropping intensity at this stage.
</narrative></comment>
</target>
<actual value="0.80">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Amounts of total vouchers (US$ million) of which females at least 30 percent
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="8.40">
<comment><narrative>
The Technical Assistance (TA) supporting this activity has identified the beneficiaries of e-vouchers and is preparing to open accounts in micro-finances. The first round of e-vouchers has been distributed.
</narrative></comment>
</target>
<actual value="0.55">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in linear corridor flood alert system (km)
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="70.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="300.00">
<comment><narrative>
The hydrological and hydraulic studies have been completed, and a warning system has been set up. The coverage area now extends to Kousseri.
</narrative></comment>
</target>
<actual value="300">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
SEMRY has approved the transfer of processing and commercialization activities to the private sector.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This PBC intends to support the transfer of the commercialization/processing aspects of SEMRY to the private sector. The project intends to support the PPP process (an O&amp;amp;M--Operation &amp;amp; maintenance-- contract, a concession contract, a subcontracting agrement or a leasing contract ) of the facilities (rice mill) of SEMRY. A PPP contract has been signed between SEMRY and a private company to transfer SEMRY&amp;rsquo;s commercial activities, under terms and conditions as described in the PIM.
</narrative></comment>
</target>
<actual value="Not yet implemented, as the decree dealing with SEMRY's statute is still not approved by the president. Proposals for alternative solutions to the adoption of SEMRY's statute for infrastructure maintenance are under development.">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
SEMRY has approved the transfer of processing and commercialization activities to the private sector.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This PBC intends to support the transfer of the commercialization/processing aspects of SEMRY to the private sector. The project intends to support the PPP process (an O&amp;amp;M--Operation &amp;amp; maintenance-- contract, a concession contract, a subcontracting agrement or a leasing contract ) of the facilities (rice mill) of SEMRY. A PPP contract has been signed between SEMRY and a private company to transfer SEMRY&amp;rsquo;s commercial activities, under terms and conditions as described in the PIM.
</narrative></comment>
</target>
<actual value="Not yet implemented, as the decree dealing with SEMRY's statute is still not approved by the president.">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of SEMRY's Social plan
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This PBC intends to evaluate the percentage of implementation of the social plan. An amount corresponding to US$62,500 per phase implementation of social plan of SEMRY under terms and conditions described in the PIM may be made available for withdrawal by theecipient, up to the total amount allocated to the PBC#7 (US$500,000)
</narrative></comment>
</target>
<actual value="Not yet implemented, as the decree dealing with SEMRY's statute is still not approved by the president.">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of SEMRY's Social plan
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This PBC intends to evaluate the percentage of implementation of the social plan. An amount corresponding to US$62,500 per phase implementation of social plan of SEMRY under terms and conditions described in the PIM may be made available for withdrawal by theecipient, up to the total amount allocated to the PBC#7 (US$500,000)
</narrative></comment>
</target>
<actual value="Not yet implemented, as the decree dealing with SEMRY's statute is still not approved by the president.">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Developed and conducted Annual performance evaluation on the implementation of the Scheme Management Code in the 8 rehabilitated irrigation schemes
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="Not implemented"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This PBC rates the satisfaction in the implementation of the &amp;ldquo;Scheme management Code&amp;rdquo; on each of the 8 irrigation schemes. Annual surveys on the degree of satisfaction, complaints and irrigation service delivery will be elaborated.
</narrative></comment>
</target>
<actual value="The process has started and is following the pace of rehabilitation of the plots.">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Developed and conducted Annual performance evaluation on the implementation of the Scheme Management Code in the 8 rehabilitated irrigation schemes
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="Not implemented"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This PBC rates the satisfaction in the implementation of the &amp;ldquo;Scheme management Code&amp;rdquo; on each of the 8 irrigation schemes. Annual surveys on the degree of satisfaction, complaints and irrigation service delivery will be elaborated.
</narrative></comment>
</target>
<actual value="The process has started and is following the pace of rehabilitation of the plots.">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Effective transfer of the management of the 8 rehabilitated irrigation schemes, between SEMRY and each of the 8 WUA
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No transfer exists. Irrigation &amp; Drainage Management done by SEMRY."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This indicator measures the finalization of the transfer of irrigation management process from SEMRY to the WUA . The process is done in two stages: (i) upon project effectiveness, co-management period, WUAs will take responsibility of the tertiaries canals. (i) upon rehabilitation work completion, a Transfer Agreements have been signed between SEMRY and each WUA for each of the eight (8) irrigation schemes rehabilitated under component 1.2 of Schedule 1, under terms and conditions described in the PIM.
</narrative></comment>
</target>
<actual value="The process has started.">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Effective transfer of the management of the 8 rehabilitated irrigation schemes, between SEMRY and each of the 8 WUA
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No transfer exists. Irrigation &amp; Drainage Management done by SEMRY."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This indicator measures the finalization of the transfer of irrigation management process from SEMRY to the WUA . The process is done in two stages: (i) upon project effectiveness, co-management period, WUAs will take responsibility of the tertiaries canals. (i) upon rehabilitation work completion, a Transfer Agreements have been signed between SEMRY and each WUA for each of the eight (8) irrigation schemes rehabilitated under component 1.2 of Schedule 1, under terms and conditions described in the PIM.
</narrative></comment>
</target>
<actual value="The process has started.">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Each of the 8 WUAs collects irrigation service fees.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This PCB describes the amount of irrigation service fee recovered by the WUA. This is support to each of the 8 WUAs (not to SEMRY) for their gradual uptake and stimulation of fee recovery.
</narrative></comment>
</target>
<actual value="At this stage, 8 WUAs have been established, but the collection of the fees by the WUA is still not effective.">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Each of the 8 WUAs collects irrigation service fees.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This PCB describes the amount of irrigation service fee recovered by the WUA. This is support to each of the 8 WUAs (not to SEMRY) for their gradual uptake and stimulation of fee recovery.
</narrative></comment>
</target>
<actual value="At this stage, 4 WUAs have been established, but the collection of the fees by the WUA is still not effective.">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
SEMRY implements the decision adopted under PBC#3 and improves collection rate of their fees
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="1,500,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This PBC refers to the fee collected by SEMRY (part of their support to farmers and land). It (i) encourages SEMRY as their fee diminishes in the process (from 52.500 FCFA per ha before project, to 18.000 FCFA/ha in the co-management period and 5.000 FCFA per ha after transfer) and (ii) promotes increasing collection rate by supporting their fee recovery on a gradual decreasing basis over 5 years.
</narrative></comment>
</target>
<actual value="The improvement of collection of the fees will start with the delivery of the rehabilitated plots and with the first yields by the end of 2026.">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
SEMRY implements the decision adopted under PBC#3 and improves collection rate of their fees
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="1,500,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This PBC refers to the fee collected by SEMRY (part of their support to farmers and land). It (i) encourages SEMRY as their fee diminishes in the process (from 52.500 FCFA per ha before project, to 18.000 FCFA/ha in the co-management period and 5.000 FCFA per ha after transfer) and (ii) promotes increasing collection rate by supporting their fee recovery on a gradual decreasing basis over 5 years.
</narrative></comment>
</target>
<actual value="the improvement of collection of the fees will start with the delivery of the rehabilitated plots and with the first yields by the end of 2026.">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Land preparation services, irrigation service fees, and SEMRY's fees are separated effectively.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="All fees (irrigation service, land preparation, and training &amp; support) are merged into 1 creating confusion."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
SEMRY has adopted a decision approving that SEMRY will no longer collect Land Preparation Fees and that the remaining fees to be collected are separated as follows: (i) an annual training and support fee to be collected by SEMRY, and (ii) an irrigation and dranage fee to be collected by each WUA, all under terms and conditions described in the PIM. Farmers will be able to choose how to do land preparation services.
</narrative></comment>
</target>
<actual value="The process has started. It follows the delivery of the rehabilitated plots.">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regularization and update of the SEMRY's land tenure titles.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="Land title of SEMRY is outdated (1980s)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
SEMRY does not have a formal title relating to the land in the irrigation schemes and other land under its control. The land was transferred into the private domain of the State in on the basis of a declaration of public utility (DUP) dated 15 January 1971. Hoever, the next necessary step in the process, the issuance of a land title was never completed. Logically therefore as SEMRY does not have a clear legal title to the land which means in turn that it could not and still cannot confer any kind of clear legal rights (in the form say of a usufruct right) upon the farmers. Moreover, the DUP pre-dates the current legal framework for land tenure inameroon which is essentially contained in two Ordinances adopted in 1974. This means that the land tenure legislation applicable in 1971 was the former colonial legislation then still in force. The next step is for SEMRY to complete the process begun in 1971 by aquiring a formal land title. Land title&amp;nbsp;will be issued based on the national legislation.
</narrative></comment>
</target>
<actual value="The process of Land titles is ongoing and should be finalized end of 2026">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regularization and update of the SEMRY's land tenure titles.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="Land title of SEMRY is outdated (1980s)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
SEMRY does not have a formal title relating to the land in the irrigation schemes and other land under its control. The land was transferred into the private domain of the State in on the basis of a declaration of public utility (DUP) dated 15 January 1971. Hoever, the next necessary step in the process, the issuance of a land title was never completed. Logically therefore as SEMRY does not have a clear legal title to the land which means in turn that it could not and still cannot confer any kind of clear legal rights (in the form say of a usufruct right) upon the farmers. Moreover, the DUP pre-dates the current legal framework for land tenure inameroon which is essentially contained in two Ordinances adopted in 1974. This means that the land tenure legislation applicable in 1971 was the former colonial legislation then still in force. The next step is for SEMRY to complete the process begun in 1971 by aquiring a formal land title. Land title&amp;nbsp;will be issued based on the national legislation.
</narrative></comment>
</target>
<actual value="The process of Land titles is ongoing and should be finalized end of 2026">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Land preparation services, irrigation service fees, and SEMRY's fees are separated effectively.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="All fees (irrigation service, land preparation, and training &amp; support) are merged into 1 creating confusion."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
SEMRY has adopted a decision approving that SEMRY will no longer collect Land Preparation Fees and that the remaining fees to be collected are separated as follows: (i) an annual training and support fee to be collected by SEMRY, and (ii) an irrigation and dranage fee to be collected by each WUA, all under terms and conditions described in the PIM. Farmers will be able to choose how to do land preparation services.
</narrative></comment>
</target>
<actual value="The process has started. It follows the delivery of the rehabilitated plots.">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
SEMRY approves the amendments of its Statute.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="Inadequate SEMRY organizational and governance structure"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
To support (i) the setting up of sound governance arrangements that foster accountability and professionalism on the part of SEMRY and (ii) the application of the new approaches (transfer of irrigation management to WUAs and promotion of private sector participation for land preparation and rice commercialization/transformation), this PBC will disburse the set amount upon verification that the new Statute that has been revised and approve. It is anticipated that this will: (i) ensure the adoption of the new Statue of SMRY under the terms and conditions approved by the Project Implementation Manual (PIM). This will be done in three stages: (i) Board of Semry send new Statue to MINADER (ii) MINADER sends the new Statute to the Prime Minister&amp;#39;s Office; and (ii) President approves new Statute.
</narrative></comment>
</target>
<actual value="Alternative solutions to the adoption of SEMRY's statute for infrastructure maintenance are under development and proposals are planned to be discussed at the Mid Term Review.">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
SEMRY approves the amendments of its Statute.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="Inadequate SEMRY organizational and governance structure"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
To support (i) the setting up of sound governance arrangements that foster accountability and professionalism on the part of SEMRY and (ii) the application of the new approaches (transfer of irrigation management to WUAs and promotion of private sector participation for land preparation and rice commercialization/transformation), this PBC will disburse the set amount upon verification that the new Statute that has been revised and approve. It is anticipated that this will: (i) ensure the adoption of the new Statue of SMRY under the terms and conditions approved by the Project Implementation Manual (PIM). This will be done in three stages: (i) Board of Semry send new Statue to MINADER (ii) MINADER sends the new Statute to the Prime Minister&amp;#39;s Office; and (ii) President approves new Statute.
</narrative></comment>
</target>
<actual value="Amendments on SEMRY's Statute finalized and still waiting for Presidential approval.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct beneficiaries (number)
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="30,000.00">
<comment><narrative>
This indicator measures the number of beneficiaries, including those benefiting from rehabilitated irrigation and drainage services, for which progress is in line with the cumulative hectares rehabilitated, and the individuals who have received compensation for economic losses.
As of now, ~4,428 ha have been rehabilitated, benefiting around 8,800 farmers.
</narrative></comment>
</target>
<actual value="8800">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct beneficiaries (number)
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="30,000.00">
<comment><narrative>
This indicator evolves with the number of hectares rehabilitated. At this stage 4400 hectares have been rehabilitated and delivered to 8800 farmers and their families.
</narrative></comment>
</target>
<actual value="8800.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Agricultural production (rice) in the area (tons per year)
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="50,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="115,000.00">
<comment><narrative>
This indicator will be collected after the first cropping campaign (rainy and dry) on the rehabilitated plots in the second semester of 2026.
</narrative></comment>
</target>
<actual value="50,000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Agricultural production (rice) in the area (tons per year)
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="50,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="115,000.00">
<comment><narrative>
This indicator will be collected after the first cropping campaign (rainy and dry) on the rehabilitated plots in the second semester of 2026.
</narrative></comment>
</target>
<actual value="50,000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area prepared by (harrowed/ploughed) by the farmers or a private provider (ha/year)
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="700.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="17,500.00">
<comment><narrative>
A distribution of plowing services was made in which the private sector committed to plowing 2286.00 ha. The result for this indicator will be updated after the first cropping campaign (rainy and dry) on the rehabilitated plots in the second semester of 2026. Although 4,428 hectares have been rehabilitated, several key activities have been completed or are underway, including plowing and leveling of rehabilitated plots, rehabilitation of drainage and irrigation networks, and complementary dry-season works such as upgrading pumping systems and lining primary canals to ensure effective water delivery. These works are being commissioned progressively by the end of the dry season, in parallel with the operationalization of the plots.
</narrative></comment>
</target>
<actual value="2286">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area prepared by (harrowed/ploughed) by the farmers or a private provider (ha/year)
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="700.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="17,500.00">
<comment><narrative>
This indicator will be collected after the first cropping campaign (rainy and dry) on the rehabilitated plots in the second semester of 2026.
</narrative></comment>
</target>
<actual value="700.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area provided with improved irrigation and drainage services (hectares); (core indicator)
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="12,210.00">
<comment><narrative>
Up to now, more than 4,428 hectares have been rehabilitated. Rehabilitated plots are commissioned in blocks and handed back to farmers. Although there were delays in making some blocks (SP1–2 and OP1) available for the dry-season campaign for several reasons, the PIU has committed to delivering the OP3–4 and SP1–2 plots to farmers for the next rainy-season campaign. This will result in a significant increase of approximately 5,000 hectares in the area under cultivation.
</narrative></comment>
</target>
<actual value="4428.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area provided with improved irrigation and drainage services (hectares); (core indicator)
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="12,210.00">
<comment><narrative>
Up to now more than  4400 hectares have been rehabilitated.
</narrative></comment>
</target>
<actual value="4400.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cropping intensity of developed perimeters (hectares harvested per year/hectares equipped for irrigation)
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="0.80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="1.80">
<comment><narrative>
To date, approximately 4,428 of the targeted 12,000 hectares have been rehabilitated. The first cropping campaign on these rehabilitated areas has started in July 2025. Only a partial reference period is currently available. As a result, a credible estimate of the increase in cropping intensity can only be produced after the first 12-month campaign period is completed and validated. This information should be available in the fall of 2026.
</narrative></comment>
</target>
<actual value="0.80">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cropping intensity of developed perimeters (hectares harvested per year/hectares equipped for irrigation)
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="0.80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="1.80">
<comment><narrative>
This indicator depends on the rehabilitation works which are still ongoing. More than 4400 hectares on 12 000 have been rehabilitated but the first cropping campaign on these rehabilitated plots has just started in July 2025. This doesn't allow measuring the increase of cropping intensity at this stage.
</narrative></comment>
</target>
<actual value="0.80">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct beneficiaries (number)
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="30,000.00">
<comment><narrative>
This indicator evolves with the number of hectares rehabilitated. At this stage 4400 hectares have been rehabilitated and delivered to 8800 farmers and their families.
</narrative></comment>
</target>
<actual value="8800.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Business plans financed
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="2,490.00">
<comment><narrative>
The Technical Assistance (TA) supporting this activity has identified the beneficiaries of e-vouchers and is preparing to open accounts in micro-finances.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A &quot;new SEMRY&quot; operational based on the implementation of the transformational plan (based on PBCs)
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="New SEMRY not operational"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2027-04-26" />
<target value="New SEMRY fully operational">
<comment><narrative>
The TA in charge of the PBCs has started SEMRY's transformation plan. The New SEMRY statute is at the President of the Republic office for approval.
</narrative></comment>
</target>
<actual value="New SEMRY not operational as the decree dealing with its transformation is still pending presidential approval">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Operational WUAs
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="8.00">
<comment><narrative>
04 WUAs from Maga are operational.
</narrative></comment>
</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women in decision-making positions in WUAs
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="20.00">
<comment><narrative>
06 women out of 24 members are in decision-making positions in the 04 WUA of Maga.
</narrative></comment>
</target>
<actual value="6">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area provided with improved irrigation and drainage services (hectares); (core indicator)
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="12,210.00">
<comment><narrative>
Up to now, more than 4,428 hectares have been rehabilitated. Rehabilitated plots are commissioned in blocks and handed back to farmers. Although there were delays in making some blocks (SP1–2 and OP1) available for the dry-season campaign for several reasons, the PIU has committed to delivering the OP3–4 and SP1–2 plots to farmers for the next rainy-season campaign. This will result in a significant increase of approximately 5,000 hectares in the area under cultivation.
</narrative></comment>
</target>
<actual value="4428.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total amount of business plans financed (US$ million)
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="5.20">
<comment><narrative>
The Technical Assistance (TA) supporting this activity has identified the beneficiaries of e-vouchers and is preparing to open accounts in micro-finances.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Organizations subscribed to the CGER
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="50.00">
<comment><narrative>
The TA supporting CGER has preparing tool for trainings and sensitization.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Irrigation area diversified (hectares)
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="1,000.00">
<comment><narrative>
Irrigation area diversified will start at the end of 2026, once a significant number of rehabilitated plots have been delivered.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Organizations subscribed to the CGER
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="50.00">
<comment><narrative>
The TA supporting CGER has prepared tools and materials to support trainings and sensitization.
</narrative></comment>
</target>
<actual value="42">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Irrigation scheme management transferred to water user associations (hectares)
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="12,210.00">
<comment><narrative>
This will be assessed at the end of two cropping campaigns in rehabilitated plots in the second semester of 2026
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hydromet stations functioning improving climate change monitoring
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="3.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="10.00">
<comment><narrative>
14 hydrometric stations, 12 meteorological stations, and 5 hydrogeological stations have been installed and are operational.
</narrative></comment>
</target>
<actual value="31">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct beneficiaries (number)
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="30,000.00">
<comment><narrative>
This indicator measures the number of beneficiaries, including those benefiting from rehabilitated irrigation and drainage services, for which progress is in line with the cumulative hectares rehabilitated, and the individuals who have received compensation for economic losses.
As of now, ~4,428 ha have been rehabilitated, benefiting around 8,800 farmers.
</narrative></comment>
</target>
<actual value="8800">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct beneficiaries (number)
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="30,000.00">
<comment><narrative>
This indicator evolves with the number of hectares rehabilitated. At this stage 4400 hectares have been rehabilitated and delivered to 8800 farmers and their families.
</narrative></comment>
</target>
<actual value="8800.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Agricultural production (rice) in the area (tons per year)
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="50,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="115,000.00">
<comment><narrative>
This indicator will be collected after the first cropping campaign (rainy and dry) on the rehabilitated plots in the second semester of 2026.
</narrative></comment>
</target>
<actual value="50,000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Agricultural production (rice) in the area (tons per year)
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="50,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="115,000.00">
<comment><narrative>
This indicator will be collected after the first cropping campaign (rainy and dry) on the rehabilitated plots in the second semester of 2026.
</narrative></comment>
</target>
<actual value="50,000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area prepared by (harrowed/ploughed) by the farmers or a private provider (ha/year)
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="700.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="17,500.00">
<comment><narrative>
A distribution of plowing services was made in which the private sector committed to plowing 2286.00 ha. The result for this indicator will be updated after the first cropping campaign (rainy and dry) on the rehabilitated plots in the second semester of 2026. Although 4,428 hectares have been rehabilitated, several key activities have been completed or are underway, including plowing and leveling of rehabilitated plots, rehabilitation of drainage and irrigation networks, and complementary dry-season works such as upgrading pumping systems and lining primary canals to ensure effective water delivery. These works are being commissioned progressively by the end of the dry season, in parallel with the operationalization of the plots.
</narrative></comment>
</target>
<actual value="2286">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area prepared by (harrowed/ploughed) by the farmers or a private provider (ha/year)
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="700.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="17,500.00">
<comment><narrative>
This indicator will be collected after the first cropping campaign (rainy and dry) on the rehabilitated plots in the second semester of 2026.
</narrative></comment>
</target>
<actual value="700.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area provided with improved irrigation and drainage services (hectares); (core indicator)
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="12,210.00">
<comment><narrative>
Up to now, more than 4,428 hectares have been rehabilitated. Rehabilitated plots are commissioned in blocks and handed back to farmers. Although there were delays in making some blocks (SP1–2 and OP1) available for the dry-season campaign for several reasons, the PIU has committed to delivering the OP3–4 and SP1–2 plots to farmers for the next rainy-season campaign. This will result in a significant increase of approximately 5,000 hectares in the area under cultivation.
</narrative></comment>
</target>
<actual value="4428.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area provided with improved irrigation and drainage services (hectares); (core indicator)
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="12,210.00">
<comment><narrative>
Up to now more than  4400 hectares have been rehabilitated.
</narrative></comment>
</target>
<actual value="4400.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cropping intensity of developed perimeters (hectares harvested per year/hectares equipped for irrigation)
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="0.80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="1.80">
<comment><narrative>
To date, approximately 4,428 of the targeted 12,000 hectares have been rehabilitated. The first cropping campaign on these rehabilitated areas has started in July 2025. Only a partial reference period is currently available. As a result, a credible estimate of the increase in cropping intensity can only be produced after the first 12-month campaign period is completed and validated. This information should be available in the fall of 2026.
</narrative></comment>
</target>
<actual value="0.80">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cropping intensity of developed perimeters (hectares harvested per year/hectares equipped for irrigation)
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="0.80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="1.80">
<comment><narrative>
This indicator depends on the rehabilitation works which are still ongoing. More than 4400 hectares on 12 000 have been rehabilitated but the first cropping campaign on these rehabilitated plots has just started in July 2025. This doesn't allow measuring the increase of cropping intensity at this stage.
</narrative></comment>
</target>
<actual value="0.80">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in linear corridor flood alert system (km)
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="70.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="300.00">
<comment><narrative>
A warning system will be set up once the hydrological and hydraulic studies are completed by the end of 2025.
</narrative></comment>
</target>
<actual value="70.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Citizen engagement indicator: Stakeholder and citizen participation in the Steering Committee and Regional Technical Group
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="4.00">
<comment><narrative>
Steering Committee and Regional Technical Group (Number) have started theirs sessions in 2023, citizen engagement has been considered progressively during the sessions.
</narrative></comment>
</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hydromet stations functioning improving climate change monitoring
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="3.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="10.00">
<comment><narrative>
Existing hydrometric stations are regularly being maintained before and after rainy seasons. Data can be available directly online.
</narrative></comment>
</target>
<actual value="7.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women in decision-making positions in WUAs
</narrative></title>
<baseline year="2022" iso-date="2022-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-28" />
<period-end iso-date="2029-06-29" />
<target value="20.00">
<comment><narrative>
Across the eight (08) Water Users Associations (WUAs) in Maga and Yagoua, women hold 13 out of 71 decision-making positions, representing 18 percent of all leadership positions.
</narrative></comment>
</target>
<actual value="13">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2029-06-05" />
<target value="3,0000">
<comment><narrative>
Additional Hydrological and hydraulic studies including sediments transportation have been launched to secure Maga's dam and the dykes along the Logone. The results of these additional studies will be available by the end of 2025.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P180321</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Cameroon Water Security Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[Strengthen institutional capacity to implement IWRM and increase access to water and sanitation services in selected areas of Cameroon]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[Cameroon has, in general, abundant water resources but they are geographically unevenly distributed and the poor implementation of IWRM is hampering their sustainability. In addition, the delivery of water and sanitation services is not satisfactory both in terms of delivery rate and quality of service, in urban areas and even more in rural areas. The three Northern regions selected for the project (Far North, North and Adamawa) represent 29% of national population  and the majority of the poorest (56%).  They are also most affected by climate change and are the most exposed to Fragility, Conflict and Violence (FCV). Water scarcity, even during the rainy season, and pollution are negatively affecting these regions socio economic development. Climate change brings droughts and floods which exacerbate the situation, adding conflicts and displacements. Despite recent institutional progress in the latest years (2019 decentralization law, 2022 NWP, ongoing update of the 1998 water law), there are still shortcomings to build a sustainable/resilient water sector. This is why the Government requested financial support from the World Bank to support ongoing institutional reforms; strengthen capacity of MINEE, CAMWATER, and local institutions; help operationalize IWRM in selected areas; and provide improved access to WSS services in peri-urban and rural areas. The Government and the Bank agreed to focus the Project on the Far North, North and Adamawa regions. These regions cover the portion of the Benue River basin located in Cameroon, the rural and peri-urban areas where access to water and sanitation is most critical and areas where internal and cross-borders migration and FCV situations take place. Focusing the proposed Project activities on both IWRM and WSS on these three regions. In addition the project will deliver 20 000 new drinking water connection in Yaounde and Douala to provide drinking water to 225 000 new beneficiaries.  The project also aims at achieving greater and noticeable impacts, which could then be replicated and /or scaled up in other areas through future supports. Considering the foregoing, Project activities will capitalize on and promote synergy with existing WB-funded VIVA Benue and VIVA Logone projects.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0055223"><narrative>Republic of Cameroon</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0055223"><narrative>Republic of Cameroon</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="CM-COA-00008635"><narrative>CAMWATER</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2025-05-07"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2025-05-07"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2030-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2030-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Pierre Jacques Lorillou</narrative></person-name><telephone>+1-202-473-1000</telephone><email>plorillou@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>




<contact-info type="2">
<mailing-address><narrative>
PO  BOX 524 , Douala

</narrative></mailing-address></contact-info>
<contact-info type="2">
<mailing-address><narrative>
PO  BOX 524 , Douala

</narrative></mailing-address></contact-info>

<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2220957" />
                <name><narrative>Yaounde</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>3.86667 11.51667</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="14030" percentage="82" xml:lang="en"/><sector vocabulary="1" code="14015" percentage="9" xml:lang="en"/><sector vocabulary="1" code="14020" percentage="8" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="1" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WWA" percentage="45.0000000" xml:lang="en"><narrative>Sanitation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WWC" percentage="45.0000000" xml:lang="en"><narrative>Water Supply</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WWW" percentage="6.00000000" xml:lang="en"><narrative>Water Resources</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WWF" percentage="4.00000000" xml:lang="en"><narrative>Public Administration - Water, Sanitation, and Solid Waste Management </narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="0" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000861" percentage="0" xml:lang="en"><narrative>Energy Efficiency</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="0" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="0" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="0" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="0" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="0" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="0" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="0" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="0" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000724" percentage="0" xml:lang="en"><narrative>Rural Water and Sanitation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000086" percentage="0" xml:lang="en"><narrative>Energy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="0" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="0" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000861" percentage="0" xml:lang="en"><narrative>Energy Efficiency</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">1029999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">1030001.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">1043332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">1043332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">1043332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">1043332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">1043332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">1043332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">1043332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">1043332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">1043332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">1043332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">1043332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">1043344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">1782499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">1782499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">1782499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">1782499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">1782499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1782499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">1782499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">1782499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">1782499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">1782499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">1782499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">1782511.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">2609999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">2609999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">2609999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">2609999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">2609999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">2609999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">2609999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">2609999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">2609999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">2609999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">2609999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">2610011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">5132499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">5132499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">5132499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">5132499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">5132499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">5132499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">5132499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">5132499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">5132499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">5132499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">5132499.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">5132511.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">5208332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">5208332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">5208332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">5208332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">5208332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">5208332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">5208332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">5208332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">5208332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">5208332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">5208332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">5208344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">1436665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">1436665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">1436665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">1436665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">1436665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">1436671.65</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">1029999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">1030001.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">1043332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">1043332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">1043332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">1043332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">1043332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">1043332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">1043332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">1043332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">1043332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">1043332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">1043332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">1043344.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">1782499.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">1782499.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">1782499.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">1782499.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">1782499.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1782499.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">1782499.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">1782499.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">1782499.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">1782499.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">1782499.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">1782511.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">2609999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">2609999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">2609999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">2609999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">2609999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">2609999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">2609999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">2609999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">2609999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">2609999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">2609999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">2610011.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">5132499.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">5132499.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">5132499.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">5132499.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">5132499.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">5132499.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">5132499.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">5132499.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">5132499.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">5132499.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">5132499.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">5132511.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">5208332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">5208332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">5208332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">5208332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">5208332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">5208332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">5208332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">5208332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">5208332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">5208332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">5208332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">5208344.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">1436665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">1436665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">1436665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">1436665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">1436665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">1436671.65</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">196213513.43</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">196213513.43</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">200000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-8635"><narrative>CAMWATER; MINEE - ministEre de l'Eau et de l'Energie (Ministry of Water and Energy)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">3786487</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-8635"><narrative>CAMWATER; MINEE - ministEre de l'Eau et de l'Energie (Ministry of Water and Energy)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P180321"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P180321?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P180321"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional standpipes built and connected to the drinking water network in Douala and Yaounde
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2030-12-13" />
<target value="100">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to basic water in peri-urban and rural areas in the three northern regions (disaggregated by female, rural, peri-urban...)
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2030-12-13" />
<target value="650,000">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Management Information System (MIS) for Network Diagnostic, Asset Management and GIS operational
</narrative></title>
<baseline year="2025" iso-date="2025-05-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-11" />
<period-end iso-date="2030-12-13" />
<target value="Yes">
<comment><narrative>
The project became effective on March 13, 2026.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Mid-term satisfaction survey conducted, results published and reported to sub-basin committees
</narrative></title>
<baseline year="2025" iso-date="2025-05-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-03" />
<period-end iso-date="2027-07-27" />
<target value="1">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
MINEE staff trained to use the national water resources information system with at least 30% women
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2030-12-13" />
<target value="500">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Climate-resilient public latrines installed in peri-urban and rural areas in the three northern regions
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2030-12-13" />
<target value="2900">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Citizens engaged in the decision making process of the two sub-basin management plans, of which at 30% of women
</narrative></title>
<baseline year="2025" iso-date="2025-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-11" />
<period-end iso-date="2030-12-11" />
<target value="20">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Institutions with strengthened capacity on WRM
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2030-12-13" />
<target value="5">
<comment><narrative>
The project became effective on March 13, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Technical and computer hardware/software procured and installed for operational use.
</narrative></title>
<baseline year="2025" iso-date="2025-05-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-04" />
<period-end iso-date="2030-12-13" />
<target value="Yes">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="no">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
MINEE staff trained to use the national water resources information system with at least 30% women
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2030-12-13" />
<target value="500">
<comment><narrative>
The project became effective on March 13, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Climate-resilient public latrines installed in peri-urban and rural areas in the three northern regions
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2030-12-13" />
<target value="2900">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Standpipes installed in peri-urban and rural areas of the three northern regions
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2030-12-13" />
<target value="2200">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to basic water in peri-urban and rural areas in the three northern regions (disaggregated by female, rural, peri-urban...)
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2030-12-13" />
<target value="650,000">
<comment><narrative>
The project became effective on March 13, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Network maintenance equipment procured and deployed for field operations.
</narrative></title>
<baseline year="2025" iso-date="2025-05-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-04" />
<period-end iso-date="2030-12-13" />
<target value="Yes">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with access to limited sanitation
</narrative></title>
<baseline year="2025" iso-date="2025-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-11" />
<period-end iso-date="2030-12-11" />
<target value="400,000">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Management Information System (MIS) for Network Diagnostic, Asset Management and GIS operational
</narrative></title>
<baseline year="2025" iso-date="2025-05-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-11" />
<period-end iso-date="2030-12-13" />
<target value="Yes">
<comment><narrative>
effectiveness expected in November 2025
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Water Resources Information System in the Benoue River basin is developed and operational
</narrative></title>
<baseline year="2025" iso-date="2025-05-08" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-08" />
<period-end iso-date="2030-12-08" />
<target value="Yes">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Water Resources Information System in the Benoue River basin is developed and operational
</narrative></title>
<baseline year="2025" iso-date="2025-05-08" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-08" />
<period-end iso-date="2030-12-08" />
<target value="Yes">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sub-basins of the Benoue river basin with IWRM plans adopted and under implementation
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2030-12-15" />
<target value="2">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CAMWATER staff trained in non-revenue water reduction with at least 30% women
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2030-12-13" />
<target value="500">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional people provided with safely managed water  in Douala and Yaounde
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2030-12-13" />
<target value="225,000">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Network maintenance equipment procured and deployed for field operations.
</narrative></title>
<baseline year="2025" iso-date="2025-05-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-04" />
<period-end iso-date="2030-12-13" />
<target value="Yes">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Concession contracts between CAMWATER and municipalities
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2030-12-13" />
<target value="5">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage increase in women holding intermediate management positions in CAMWATER
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="30%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2030-12-13" />
<target value="45%">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="30%">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with at least basic water
</narrative></title>
<baseline year="2025" iso-date="2025-05-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-07" />
<period-end iso-date="2030-12-07" />
<target value="650,000">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sub-basins of the Benoue river basin with IWRM plans adopted and under implementation
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2030-12-15" />
<target value="2">
<comment><narrative>
The project became effective on March 13, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Ministerial &quot;ArrêtEs&quot; adopted and signed by the Minister in charge of water
</narrative></title>
<baseline year="2025" iso-date="2025-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-11" />
<period-end iso-date="2028-05-11" />
<target value="8">
<comment><narrative>
The project became effective on March 13, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional people provided with safely managed water  in Douala and Yaounde
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2030-12-13" />
<target value="225,000">
<comment><narrative>
The project became effective on March 13, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New connections to the water distribution network installed in Douala and Yaounde
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2030-12-13" />
<target value="40,000">
<comment><narrative>
The project became effective on March 13, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Climate-resilient public latrines installed in peri-urban and rural areas in the three northern regions
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2030-12-13" />
<target value="2900">
<comment><narrative>
The project became effective on March 13, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with access to limited sanitation
</narrative></title>
<baseline year="2025" iso-date="2025-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-11" />
<period-end iso-date="2030-12-11" />
<target value="400,000">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Mid-term satisfaction survey conducted, results published and reported to sub-basin committees
</narrative></title>
<baseline year="2025" iso-date="2025-05-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-03" />
<period-end iso-date="2027-07-27" />
<target value="1">
<comment><narrative>
The project became effective on March 13, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inter-Ministerial &quot;ArrêtEs&quot; adopted and signed by the Minister in charge of water
</narrative></title>
<baseline year="2025" iso-date="2025-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-12" />
<period-end iso-date="2029-05-13" />
<target value="9">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Technical and computer hardware/software procured and installed for operational use.
</narrative></title>
<baseline year="2025" iso-date="2025-05-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-04" />
<period-end iso-date="2030-12-13" />
<target value="Yes">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="no">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Citizens engaged in the decision making process of the two sub-basin management plans, of which at 30% of women
</narrative></title>
<baseline year="2025" iso-date="2025-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-11" />
<period-end iso-date="2030-12-11" />
<target value="20">
<comment><narrative>
The project became effective on March 13, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Application decrees adopted and signed by the Recipient's competent authorities
</narrative></title>
<baseline year="2025" iso-date="2025-05-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-10" />
<period-end iso-date="2030-12-10" />
<target value="13">
<comment><narrative>
The project became effective on March 13, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Standpipes installed in peri-urban and rural areas of the three northern regions
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2030-12-13" />
<target value="2200">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with safely managed water
</narrative></title>
<baseline year="2025" iso-date="2025-05-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-07" />
<period-end iso-date="2030-12-07" />
<target value="225,000">
<comment><narrative>
The project became effective on March 13, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage increase in women holding intermediate management positions in CAMWATER
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="30%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2030-12-13" />
<target value="45%">
<comment><narrative>
The project became effective on March 13, 2026.
</narrative></comment>
</target>
<actual value="30%">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inter-Ministerial &quot;ArrêtEs&quot; adopted and signed by the Minister in charge of water
</narrative></title>
<baseline year="2025" iso-date="2025-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-12" />
<period-end iso-date="2029-05-13" />
<target value="9">
<comment><narrative>
The project became effective on March 13, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Concession contracts between CAMWATER and municipalities
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2030-12-13" />
<target value="5">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Application decrees adopted and signed by the Recipient's competent authorities
</narrative></title>
<baseline year="2025" iso-date="2025-05-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-10" />
<period-end iso-date="2030-12-10" />
<target value="13">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Ministerial &quot;ArrêtEs&quot; adopted and signed by the Minister in charge of water
</narrative></title>
<baseline year="2025" iso-date="2025-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-11" />
<period-end iso-date="2028-05-11" />
<target value="8">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional R100 and R160 mechanical meters installed
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2030-12-13" />
<target value="40000">
<comment><narrative>
The project became effective on March 13, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with at least basic water
</narrative></title>
<baseline year="2025" iso-date="2025-05-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-07" />
<period-end iso-date="2030-12-07" />
<target value="650,000">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional R100 and R160 mechanical meters installed
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2030-12-13" />
<target value="40000">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Standpipes installed in peri-urban and rural areas of the three northern regions
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2030-12-13" />
<target value="2200">
<comment><narrative>
The project became effective on March 13, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inter-Ministerial &quot;ArrêtEs&quot; adopted and signed by the Minister in charge of water
</narrative></title>
<baseline year="2025" iso-date="2025-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-12" />
<period-end iso-date="2029-05-13" />
<target value="9">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with safely managed water
</narrative></title>
<baseline year="2025" iso-date="2025-05-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-07" />
<period-end iso-date="2030-12-07" />
<target value="225,000">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional standpipes built and connected to the drinking water network in Douala and Yaounde
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2030-12-13" />
<target value="100">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage increase in women holding intermediate management positions in CAMWATER
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="30%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2030-12-13" />
<target value="45%">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="30%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with access to limited sanitation
</narrative></title>
<baseline year="2025" iso-date="2025-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-11" />
<period-end iso-date="2030-12-11" />
<target value="400,000">
<comment><narrative>
The project became effective on March 13, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Management Information System (MIS) for Network Diagnostic, Asset Management and GIS operational
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Management Information System (MIS) for Network Diagnostic, Asset Management and GIS operational
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Management Information System (MIS) for Network Diagnostic, Asset Management and GIS operational
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sub-basins of the Benoue river basin with IWRM plans adopted and under implementation
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2030-12-15" />
<target value="2">
<comment><narrative>
The project became effective on March 13, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sub-basins of the Benoue river basin with IWRM plans adopted and under implementation
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2030-12-15" />
<target value="2">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sub-basins of the Benoue river basin with IWRM plans adopted and under implementation
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2030-12-15" />
<target value="2">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inter-Ministerial &quot;ArrêtEs&quot; adopted and signed by the Minister in charge of water
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inter-Ministerial &quot;ArrêtEs&quot; adopted and signed by the Minister in charge of water
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inter-Ministerial &quot;ArrêtEs&quot; adopted and signed by the Minister in charge of water
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inter-Ministerial &quot;ArrêtEs&quot; adopted and signed by the Minister in charge of water
</narrative></title>
<baseline year="2025" iso-date="2025-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-12" />
<period-end iso-date="2029-05-13" />
<target value="9">
<comment><narrative>
The project became effective on March 13, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inter-Ministerial &quot;ArrêtEs&quot; adopted and signed by the Minister in charge of water
</narrative></title>
<baseline year="2025" iso-date="2025-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-12" />
<period-end iso-date="2029-05-13" />
<target value="9">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inter-Ministerial &quot;ArrêtEs&quot; adopted and signed by the Minister in charge of water
</narrative></title>
<baseline year="2025" iso-date="2025-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-12" />
<period-end iso-date="2029-05-13" />
<target value="9">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Ministerial &quot;ArrêtEs&quot; adopted and signed by the Minister in charge of water
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Ministerial &quot;ArrêtEs&quot; adopted and signed by the Minister in charge of water
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Ministerial &quot;ArrêtEs&quot; adopted and signed by the Minister in charge of water
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Ministerial &quot;ArrêtEs&quot; adopted and signed by the Minister in charge of water
</narrative></title>
<baseline year="2025" iso-date="2025-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-11" />
<period-end iso-date="2028-05-11" />
<target value="8">
<comment><narrative>
The project became effective on March 13, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Ministerial &quot;ArrêtEs&quot; adopted and signed by the Minister in charge of water
</narrative></title>
<baseline year="2025" iso-date="2025-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-11" />
<period-end iso-date="2028-05-11" />
<target value="8">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Ministerial &quot;ArrêtEs&quot; adopted and signed by the Minister in charge of water
</narrative></title>
<baseline year="2025" iso-date="2025-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-11" />
<period-end iso-date="2028-05-11" />
<target value="8">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Application decrees adopted and signed by the Recipient's competent authorities
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Application decrees adopted and signed by the Recipient's competent authorities
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Application decrees adopted and signed by the Recipient's competent authorities
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Application decrees adopted and signed by the Recipient's competent authorities
</narrative></title>
<baseline year="2025" iso-date="2025-05-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-10" />
<period-end iso-date="2030-12-10" />
<target value="13">
<comment><narrative>
The project became effective on March 13, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Application decrees adopted and signed by the Recipient's competent authorities
</narrative></title>
<baseline year="2025" iso-date="2025-05-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-10" />
<period-end iso-date="2030-12-10" />
<target value="13">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Application decrees adopted and signed by the Recipient's competent authorities
</narrative></title>
<baseline year="2025" iso-date="2025-05-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-10" />
<period-end iso-date="2030-12-10" />
<target value="13">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of additional R100 and R160 mechanical meters installed
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of additional R100 and R160 mechanical meters installed
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of additional R100 and R160 mechanical meters installed
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with safely managed water
</narrative></title>
<baseline year="2025" iso-date="2025-05-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-07" />
<period-end iso-date="2030-12-07" />
<target value="225,000">
<comment><narrative>
The project became effective on March 13, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with safely managed water
</narrative></title>
<baseline year="2025" iso-date="2025-05-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-07" />
<period-end iso-date="2030-12-07" />
<target value="225,000">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with safely managed water
</narrative></title>
<baseline year="2025" iso-date="2025-05-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-07" />
<period-end iso-date="2030-12-07" />
<target value="225,000">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with at least basic water
</narrative></title>
<baseline year="2025" iso-date="2025-05-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-07" />
<period-end iso-date="2030-12-07" />
<target value="650,000">
<comment><narrative>
The project became effective on March 13, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with at least basic water
</narrative></title>
<baseline year="2025" iso-date="2025-05-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-07" />
<period-end iso-date="2030-12-07" />
<target value="650,000">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with at least basic water
</narrative></title>
<baseline year="2025" iso-date="2025-05-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-07" />
<period-end iso-date="2030-12-07" />
<target value="650,000">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Institutions with strengthened capacity on WRM
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2030-12-13" />
<target value="5">
<comment><narrative>
The project became effective on March 13, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Institutions with strengthened capacity on WRM
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2030-12-13" />
<target value="5">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Institutions with strengthened capacity on WRM
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2030-12-13" />
<target value="5">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional R100 and R160 mechanical meters installed
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2030-12-13" />
<target value="40000">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New connections to the water distribution network installed in Douala and Yaounde
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2030-12-13" />
<target value="40,000">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Concession contracts between CAMWATER and municipalities
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2030-12-13" />
<target value="5">
<comment><narrative>
The project became effective on March 13, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Application decrees adopted and signed by the Recipient's competent authorities
</narrative></title>
<baseline year="2025" iso-date="2025-05-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-10" />
<period-end iso-date="2030-12-10" />
<target value="13">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Institutions with strengthened capacity on WRM
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2030-12-13" />
<target value="5">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Water Resources Information System in the Benoue River basin is developed and operational
</narrative></title>
<baseline year="2025" iso-date="2025-05-08" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-08" />
<period-end iso-date="2030-12-08" />
<target value="Yes">
<comment><narrative>
The project became effective on March 13, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Mid-term satisfaction survey conducted, results published and reported to sub-basin committees
</narrative></title>
<baseline year="2025" iso-date="2025-05-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-03" />
<period-end iso-date="2027-07-27" />
<target value="1">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New connections to the water distribution network installed in Douala and Yaounde
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2030-12-13" />
<target value="40,000">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
MINEE staff trained to use the national water resources information system with at least 30% women
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2030-12-13" />
<target value="500">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to basic water in peri-urban and rural areas in the three northern regions (disaggregated by female, rural, peri-urban...)
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2030-12-13" />
<target value="650,000">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Technical and computer hardware/software procured and installed for operational use.
</narrative></title>
<baseline year="2025" iso-date="2025-05-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-04" />
<period-end iso-date="2030-12-13" />
<target value="Yes">
<comment><narrative>
The project became effective on March 13, 2026.
</narrative></comment>
</target>
<actual value="no">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CAMWATER staff trained in non-revenue water reduction with at least 30% women
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2030-12-13" />
<target value="500">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Citizens engaged in the decision making process of the two sub-basin management plans, of which at 30% of women
</narrative></title>
<baseline year="2025" iso-date="2025-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-11" />
<period-end iso-date="2030-12-11" />
<target value="20">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sub-basins of the Benoue river basin with IWRM plans adopted and under implementation
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2030-12-15" />
<target value="2">
<comment><narrative>
The project became effective on March 13, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sub-basins of the Benoue river basin with IWRM plans adopted and under implementation
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2030-12-15" />
<target value="2">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sub-basins of the Benoue river basin with IWRM plans adopted and under implementation
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2030-12-15" />
<target value="2">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inter-Ministerial &quot;ArrêtEs&quot; adopted and signed by the Minister in charge of water
</narrative></title>
<baseline year="2025" iso-date="2025-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-12" />
<period-end iso-date="2029-05-13" />
<target value="9">
<comment><narrative>
The project became effective on March 13, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inter-Ministerial &quot;ArrêtEs&quot; adopted and signed by the Minister in charge of water
</narrative></title>
<baseline year="2025" iso-date="2025-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-12" />
<period-end iso-date="2029-05-13" />
<target value="9">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inter-Ministerial &quot;ArrêtEs&quot; adopted and signed by the Minister in charge of water
</narrative></title>
<baseline year="2025" iso-date="2025-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-12" />
<period-end iso-date="2029-05-13" />
<target value="9">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Ministerial &quot;ArrêtEs&quot; adopted and signed by the Minister in charge of water
</narrative></title>
<baseline year="2025" iso-date="2025-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-11" />
<period-end iso-date="2028-05-11" />
<target value="8">
<comment><narrative>
The project became effective on March 13, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Ministerial &quot;ArrêtEs&quot; adopted and signed by the Minister in charge of water
</narrative></title>
<baseline year="2025" iso-date="2025-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-11" />
<period-end iso-date="2028-05-11" />
<target value="8">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Ministerial &quot;ArrêtEs&quot; adopted and signed by the Minister in charge of water
</narrative></title>
<baseline year="2025" iso-date="2025-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-11" />
<period-end iso-date="2028-05-11" />
<target value="8">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Application decrees adopted and signed by the Recipient's competent authorities
</narrative></title>
<baseline year="2025" iso-date="2025-05-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-10" />
<period-end iso-date="2030-12-10" />
<target value="13">
<comment><narrative>
The project became effective on March 13, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Application decrees adopted and signed by the Recipient's competent authorities
</narrative></title>
<baseline year="2025" iso-date="2025-05-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-10" />
<period-end iso-date="2030-12-10" />
<target value="13">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Application decrees adopted and signed by the Recipient's competent authorities
</narrative></title>
<baseline year="2025" iso-date="2025-05-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-10" />
<period-end iso-date="2030-12-10" />
<target value="13">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with safely managed water
</narrative></title>
<baseline year="2025" iso-date="2025-05-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-07" />
<period-end iso-date="2030-12-07" />
<target value="225,000">
<comment><narrative>
The project became effective on March 13, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with safely managed water
</narrative></title>
<baseline year="2025" iso-date="2025-05-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-07" />
<period-end iso-date="2030-12-07" />
<target value="225,000">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with safely managed water
</narrative></title>
<baseline year="2025" iso-date="2025-05-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-07" />
<period-end iso-date="2030-12-07" />
<target value="225,000">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Management Information System (MIS) for Network Diagnostic, Asset Management and GIS operational
</narrative></title>
<baseline year="2025" iso-date="2025-05-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-11" />
<period-end iso-date="2030-12-13" />
<target value="Yes">
<comment><narrative>
effectiveness expected in November 2025
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with at least basic water
</narrative></title>
<baseline year="2025" iso-date="2025-05-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-07" />
<period-end iso-date="2030-12-07" />
<target value="650,000">
<comment><narrative>
The project became effective on March 13, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with at least basic water
</narrative></title>
<baseline year="2025" iso-date="2025-05-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-07" />
<period-end iso-date="2030-12-07" />
<target value="650,000">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with at least basic water
</narrative></title>
<baseline year="2025" iso-date="2025-05-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-07" />
<period-end iso-date="2030-12-07" />
<target value="650,000">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Institutions with strengthened capacity on WRM
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2030-12-13" />
<target value="5">
<comment><narrative>
The project became effective on March 13, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Institutions with strengthened capacity on WRM
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2030-12-13" />
<target value="5">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Institutions with strengthened capacity on WRM
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2030-12-13" />
<target value="5">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Network maintenance equipment procured and deployed for field operations.
</narrative></title>
<baseline year="2025" iso-date="2025-05-04" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-04" />
<period-end iso-date="2030-12-13" />
<target value="Yes">
<comment><narrative>
The project became effective on March 13, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with safely managed water
</narrative></title>
<baseline year="2025" iso-date="2025-05-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-07" />
<period-end iso-date="2030-12-07" />
<target value="225,000">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional standpipes built and connected to the drinking water network in Douala and Yaounde
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2030-12-13" />
<target value="100">
<comment><narrative>
The project became effective on March 13, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Institutions with strengthened capacity on WRM
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2030-12-13" />
<target value="5">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with at least basic water
</narrative></title>
<baseline year="2025" iso-date="2025-05-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-07" />
<period-end iso-date="2030-12-07" />
<target value="650,000">
<comment><narrative>
The project became effective on March 13, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sub-basins of the Benoue river basin with IWRM plans adopted and under implementation
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2030-12-15" />
<target value="2">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Ministerial &quot;ArrêtEs&quot; adopted and signed by the Minister in charge of water
</narrative></title>
<baseline year="2025" iso-date="2025-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-11" />
<period-end iso-date="2028-05-11" />
<target value="8">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CAMWATER staff trained in non-revenue water reduction with at least 30% women
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2030-12-13" />
<target value="500">
<comment><narrative>
The project became effective on March 13, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional people provided with safely managed water  in Douala and Yaounde
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2030-12-13" />
<target value="225,000">
<comment><narrative>
effectiveness expected in November  2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P175846</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Local Governance and Resilient Communities Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The project's development objective is to increase community access to climate resilient infrastructure and strengthen local capacity to manage resources and deliver services.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Local Governance and Resilient Communities Project for Cameroon is to increase community access to climate resilient infrastructure and strengthen local capacity to manage resources and deliver services. The project has four components. (1) Improved community infrastructures and basic services component will support the implementation of activities to support community-led development with an emphasis on the most marginalized and vulnerable communities in conflict-affected and socioeconomically disadvantaged municipalities amongst regions of Far North, North, Adamawa, East, SW, and NW. (2) Improving Multi-level Governance Framework and the capacity of decentralized entities to deliver services. This component will: (i) provide technical assistance to central and local entities to further operationalize the decentralization agenda at the institutional and policy levels; and (ii) build and strengthen the capacity of the decentralized local authorities to manage resources and to exercise their competencies more effectively and in a participatory and inclusive manner. (3)  Knowledge management will support the periodic assessment of lessons learned during project implementation: achievement of objectives; suitability of implementing modalities; adequacy and impact of the project interventions; data collection and utilization status; operation of implementing partners; coordination among stakeholders; implementation obstacles; emerging conflicts etc. Lessons learned will be documented and applied to introduce improvements to project implementation. (4) Contingent Emergency Response Component (CERC) (US$0 million) will establish an emergency contingency fund that can be triggered in the event of a man-made crisis, public health crisis, or natural disaster, through formal declaration of a national emergency, or upon a formal request from one of the GoC.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0048130"><narrative>Republic of Cameroon</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0048130"><narrative>Republic of Cameroon</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="CM-COA-0048131"><narrative>Ministry of Decentralization and Local Development</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2021-12-15"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2022-09-28"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2027-09-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2027-09-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Chifundo Patience Chilera</narrative></person-name><telephone>+1-202-473-1000</telephone><email>cchilera@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002221788" />
            <name><narrative>South-West Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.2 9.3</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002221789" />
            <name><narrative>South Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>2.75 11.58333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002222934" />
            <name><narrative>West Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.5 10.66667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002223602" />
            <name><narrative>North-West Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.36667 10.36667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002223603" />
            <name><narrative>North Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.5 14</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002229336" />
            <name><narrative>Littoral Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.26667 10.13333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002231755" />
            <name><narrative>Far North Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>11 14.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002231835" />
            <name><narrative>East Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.83333 14.16667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002233376" />
            <name><narrative>Centre Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.75 11.83333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002236015" />
            <name><narrative>Adamaoua Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.83333 13.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="15185" percentage="81" xml:lang="en"/><sector vocabulary="1" code="15185" percentage="81" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="19" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="19" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="100.000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="20" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="20" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000115" percentage="15" xml:lang="en"><narrative>Subnational Fiscal Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="40" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="10" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000714" percentage="15" xml:lang="en"><narrative>Urban Planning</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="10" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000115" percentage="15" xml:lang="en"><narrative>Subnational Fiscal Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="75" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="17" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="50" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="10" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000011" percentage="15" xml:lang="en"><narrative>Fiscal Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="58" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="30" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="50" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="58" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="50" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000715" percentage="20" xml:lang="en"><narrative>Municipal Finance</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">140000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">1820000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">1830000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">3690000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">1860000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">1870000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">3780000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">1910000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">1920000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">3870000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">1950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">1960000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">3940000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">1980000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">1990000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">3990000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">3990000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">1980000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">1960000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">3850000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">1890000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">1900000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">4220000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">2550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">5020000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">2530000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">2560000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">5260000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">2680000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">2630000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">5360000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">2730000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">5560000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">2840000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">2880000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">5910000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">3030000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">3090000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">6000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">3020000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">3020000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">5940000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">2880000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">2810000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">8020000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">4540000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">4570000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">8870000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">4300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">4240000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">8370000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">4150000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">8290000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">4140000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">4150000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">8320000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">4170000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">4180000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">8400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">4220000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">4240000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">8520000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">4280000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">4300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">12980000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">4360000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">8770000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">4410000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">14120000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">227739466.08</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">227739466.08</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">300000000</value><description xml:lang="en"><narrative>Total Commitment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-48131"><narrative>Ministry of Decentralization and Local Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">630011</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-48131"><narrative>Ministry of Decentralization and Local Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">8278244</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-48131"><narrative>Ministry of Decentralization and Local Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">334398</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-48131"><narrative>Ministry of Decentralization and Local Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">53278</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-48131"><narrative>Ministry of Decentralization and Local Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">16307475</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-48131"><narrative>Ministry of Decentralization and Local Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">409702</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-48131"><narrative>Ministry of Decentralization and Local Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">181171</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-48131"><narrative>Ministry of Decentralization and Local Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">208241</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-48131"><narrative>Ministry of Decentralization and Local Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">476199</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-48131"><narrative>Ministry of Decentralization and Local Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">1812216</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-48131"><narrative>Ministry of Decentralization and Local Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">871912</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-48131"><narrative>Ministry of Decentralization and Local Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">17177338</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-48131"><narrative>Ministry of Decentralization and Local Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">3480916</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-48131"><narrative>Ministry of Decentralization and Local Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">22039434</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-48131"><narrative>Ministry of Decentralization and Local Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-34491</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-48131"><narrative>Ministry of Decentralization and Local Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-73211</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-48131"><narrative>Ministry of Decentralization and Local Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-226170</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-48131"><narrative>Ministry of Decentralization and Local Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-245482</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-48131"><narrative>Ministry of Decentralization and Local Development</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P175846"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P175846?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P175846"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Community members reporting that local public investments reflect their needs
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-06-30" />
<target value="70.00">
<comment><narrative>
This indicator will utilize baseline, midline and endline surveys to capture positive perception amongst project support community members on local public investments reflecting their needs.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Displaced people and people in host communities provided with services and livelihoods
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2027-06-14" />
<target value="0">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Local public officials trained in core identified functions
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="760.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-06-30" />
<target value="3,000.00">
<comment><narrative>
This tracks the number of regional and municipal employees who have received training in core  public sector management and governance areas such as Public Investment Management, Financial Management  Procurement, Human Resources Management, M&amp;E, participatory climate risk assessment, conflict resolution and grievance redress, etc..
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Community Action Plans that are integrated into the Commune Development Plan
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-06-30" />
<target value="264.00">
<comment><narrative>
This indicator will look at Communal Development Plans (CDPs) of each municipality in project supported areas to calculate the number of project supported Community Actions Plans (CAPs) that became integrated into CDPs.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Community members employed in public works financed by the project
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-06-30" />
<target value="30,000.00">
<comment><narrative>
This indicator tracks the number of project support community members who were given employment opportunities to deliver community infrastructures financed by Component 1 of the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Community members reporting an improvement in their individual and community resilience to climate and disaster impacts as a result of infrastructure financed by the Component 1
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-06-30" />
<target value="70.00">
<comment><narrative>
This indicator measures shifting perception of project supported community members on community resilience to climate
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Regions and municipalities that have produced and published budget execution reports
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-06-30" />
<target value="70.00">
<comment><narrative>
This indicator tracks the number of CTDs (regions and muncipalities) targeted under the project preparing and publishing budget transfers and expenditures reports to monitor the effective transfer of central funds and trace budget expenditures at the local level.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries with improved access to climate resilient social and economic infrastructure
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-06-30" />
<target value="1,500,000.00">
<comment><narrative>
This indicator will capture direct beneficiaries who benefit from climate resilient social and economic community infrastructures and services financed by the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Regions and municipalities in targeted regions that have prepared their Regional Development Plans and Commune Development Plans, respectively, in a participatory manner
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-06-30" />
<target value="80.00">
<comment><narrative>
This indicator tracks the share of decentralized entities (regions for the RDPs and municipalities for the CDPs) that have prepared their development plans with the involvement of  non-governmental organizations and communities during the concertation phase.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Notification of budget allocations and transfers amounts to regions and municipalities by the central government by December of the previous fiscal year
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="Yes">
<comment><narrative>
This indicator assesses whether for a given year decentralized entities were notified of the central budget allocations and transfers they are to receive by December 31. This data will be available FY27, Q2
</narrative></comment>
</target>
<actual value="not yet">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Regions and municipalities that have produced and published budget execution reports
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-06-30" />
<target value="70.00">
<comment><narrative>
This indicator tracks the number of CTDs (regions and muncipalities) targeted under the project preparing and publishing budget transfers and expenditures reports to monitor the effective transfer of central funds and trace budget expenditures at the local level. This data will be available FY27, Q2
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Community Action Plans that are integrated into the Commune Development Plan
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-06-30" />
<target value="264.00">
<comment><narrative>
This indicator will look at Communal Development Plans (CDPs) of each municipality in project supported areas to calculate the number of project supported Community Actions Plans (CAPs) that became integrated into CDPs. The CDP activity has not yet started due to the uncertainty of the electoral calendar for the mayoral elections in the past. However, the project now proposed to have this activity by FY27 Q3
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increased share of projects selected by VCs included in their respective municipalities Operations and Management budget
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-06-30" />
<target value="75.00">
<comment><narrative>
This indicator measures the percentage of community projects financed under the Project for which O&amp;M costs were included in their respective CTD's annual budgets. This data is not available. This data will be available FY27, Q2
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Regions and municipalities in the targeted regions involving citizens in budget consultations (orientation debates)
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-06-30" />
<target value="100.00">
<comment><narrative>
This indicator measures the share of CTDs (regions and municipalities) that track, document and report the attendance of citizens during the annual period of budgetary orientation debates. This data will be available FY27, Q2
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Community members employed in public works financed by the project
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-06-30" />
<target value="30,000.00">
<comment><narrative>
This indicator tracks the number of project support community members who were given employment opportunities to deliver community infrastructures financed by Component 1 of the project.
</narrative></comment>
</target>
<actual value="3547">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Community members satisfied with the quality of service provided under the project
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-06-30" />
<target value="70.00">
<comment><narrative>
Will be included in satisfaction survey which is planned for FY27 Q1
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Local public officials trained in core identified functions
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="760.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-06-30" />
<target value="3,000.00">
<comment><narrative>
This tracks the number of regional and municipal employees who have received training in core  public sector management and governance areas such as Public Investment Management, Financial Management  Procurement, Human Resources Management, M&amp;E, participatory climate risk assessment, conflict resolution and grievance redress, etc..
</narrative></comment>
</target>
<actual value="1758">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Regions and municipalities in the targeted regions involving citizens in budget consultations (orientation debates)
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-06-30" />
<target value="100.00">
<comment><narrative>
This indicator masures the share of CTDs (regions and municipalities) that track, document and report the attendance of citizens during the annual period of budgetary orientation debates.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Regions and municipalities in targeted regions that have prepared their Regional Development Plans and Commune Development Plans, respectively, in a participatory manner
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-06-30" />
<target value="80.00">
<comment><narrative>
This indicator tracks the share of decentralized entities (regions for the RDPs and municipalities for the CDPs) that have prepared their development plans with the involvement of  non-governmental organizations and communities during the concertation phase. This activity was impacted by the uncertainty in the local government elections which remain in suspense. The project will pilot the activity regardless, and results are expected FY27 Q2
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Female members in newly established Village Committees
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-06-30" />
<target value="40.00">
<comment><narrative>
This indicator tracks the share of women membership amongst newly established Village Committees (VCs) in the project area.
</narrative></comment>
</target>
<actual value="30">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="2026" iso-date="2026-02-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-15" />
<period-end iso-date="2027-06-12" />
<target value="15,000,00">
<comment><narrative>
This data is based on total number of beneficiaries of completed subprojects which consist of climate resilient infrastructure and services. The target mirrors the target of PDO indicator 1 on number of direct beneficiaries of climate resilient infrastructure and services delivered through the project
</narrative></comment>
</target>
<actual value="23,6225">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Displaced people and people in host communities provided with services and livelihoods
</narrative></title>
<baseline year="2026" iso-date="2026-02-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-15" />
<period-end iso-date="2027-06-14" />
<target value="0">
<comment><narrative>
This number reflects the number of total beneficiaries of the services and livelihoods provided under the project. A target has not been set at this stage as the number of beneficiaries depends on the selection and completion of demand-driven subprojects, which cannot be reliably estimated at this stage. The target will be set once subproject selection is further advanced.
</narrative></comment>
</target>
<actual value="23,6225">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Community members reporting an improvement in their individual and community resilience to climate and disaster impacts as a result of infrastructure financed by the Component 1
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-06-30" />
<target value="70.00">
<comment><narrative>
This indicator has not yet been reported due to timing, which allowed activities to be realized substantially before a survey could meaningfully be conducted. It is now forseen for FY27 Q1
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Community members reporting an improvement in their individual and community resilience to climate and disaster impacts as a result of infrastructure financed by the Component 1
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-06-30" />
<target value="70.00">
<comment><narrative>
This indicator measures shifting perception of project supported community members on community resilience to climate
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Community and intercommunal infrastructure that are constructed or upgraded following climate and disaster resilience standards
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-06-30" />
<target value="100.00">
<comment><narrative>
This is a dynamic indicator. Based on the 144 completed subprojects, all have met the climate and disaster resilience standards
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Community and intercommunal infrastructure that are constructed or upgraded following climate and disaster resilience standards
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-06-30" />
<target value="100.00">
<comment><narrative>
This indicator measures the share of communal and intercommunal infrastructures financed by Component 1 of the project that meet the climate and disaster resilient standards.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Community members reporting that local public investments reflect their needs
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-06-30" />
<target value="70.00">
<comment><narrative>
This indicator will utilize surveys to capture positive perception amongst project support community members on local public investments reflecting their needs. Given that a substantial number of subprojects are now being realized, a survey is planned and results expected FY27 Q1. The lack of indicators at this stage is due to timing and activity evolution
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Community members reporting that local public investments reflect their needs
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-06-30" />
<target value="70.00">
<comment><narrative>
This indicator will utilize baseline, midline and endline surveys to capture positive perception amongst project support community members on local public investments reflecting their needs.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Decentralized entities (regions and municipalities) meeting service delivery performance targets set under the PBGs
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2027-06-30" />
<target value="50.00">
<comment><narrative>
This indicator evaluates the number of CTDs (regions and municipalities) in the targeted regions that meet in a given year the target set under the service delivery performance criteria of the project's Performance-Based Grants mechanisms. This is a dynamic indicator, based on each evaluation round
</narrative></comment>
</target>
<actual value="56.68">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Decentralized entities (regions and municipalities) meeting service delivery performance targets set under the PBGs
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2027-06-30" />
<target value="50.00">
<comment><narrative>
This indicator evaluates the number of CTDs (regions and municipalities) in the targeted regions that meet in a given year the target set under the service delivery performance criteria of the project's Performance-Based Grants mechanisms.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increased execution rate of the decentralized public investment budget of regions and municipalities in the targeted regions
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="69.10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="90.00">
<comment><narrative>
This is a dynamic indicator. It was previously 0 as data was not available. It measures the annual rate of execution of the Public Investment Budget managed by the decentralized entities (regions and municipalities) in the six regions of focus of the project, on the basis of authorized expenditures and payments (ordonnancement).
</narrative></comment>
</target>
<actual value="64.15">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increased execution rate of the decentralized public investment budget of regions and municipalities in the targeted regions
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="69.10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="90.00">
<comment><narrative>
This indicator measures the annual rate of execution of the Public Invesment Budget managed by the decentralizaed entities (regions and municipalities) in the six regions of focus of the project, on the basis of authorized expenditures and payments (ordonnancemen).
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries with improved access to climate resilient social and economic infrastructure
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-06-30" />
<target value="1,500,000.00">
<comment><narrative>
This indicator was previously 0. The indicator measures the number of direct beneficiaries of climate resilient infrastructure completed under the project. The current value represents the direct beneficiaries of the 177  completed subprojects out of the 546 subprojects in the first cycle of communal, regional and performance based grants. which include school and hospital blocks, solar lighting, water supply, markets, bridges, among others.
</narrative></comment>
</target>
<actual value="236,225">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries with improved access to climate resilient social and economic infrastructure
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-06-30" />
<target value="1,500,000.00">
<comment><narrative>
This indicator will capture direct beneficiaries who benefit from climate resilient social and economic community infrastructures and services financed by the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Community and intercommunal infrastructure that are constructed or upgraded following climate and disaster resilience standards
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-06-30" />
<target value="100.00">
<comment><narrative>
This indicator measures the share of communal and intercommunal infrastructures financed by Component 1 of the project that meet the climate and disaster resilient standards.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Female members in newly established Village Committees
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-06-30" />
<target value="40.00">
<comment><narrative>
This indicator tracks the share of women membership amongst newly established Village Committees (VCs) in the project area.
</narrative></comment>
</target>
<actual value="40%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Community members satisfied with the quality of service provided under the project
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-06-30" />
<target value="70.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2027-06-12" />
<target value="0">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Decentralized entities (regions and municipalities) meeting service delivery performance targets set under the PBGs
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2027-06-30" />
<target value="50.00">
<comment><narrative>
This indicator evaluates the number of CTDs (regions and municipalities) in the targeted regions that meet in a given year the target set under the service delivery performance criteria of the project's Performance-Based Grants mechanisms.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Community members reporting an improvement in their individual and community resilience to climate and disaster impacts as a result of infrastructure financed by the Component 1
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-06-30" />
<target value="70.00">
<comment><narrative>
This indicator has not yet been reported due to timing, which allowed activities to be realized substantially before a survey could meaningfully be conducted. It is now forseen for FY27 Q1
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Community members reporting an improvement in their individual and community resilience to climate and disaster impacts as a result of infrastructure financed by the Component 1
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-06-30" />
<target value="70.00">
<comment><narrative>
This indicator measures shifting perception of project supported community members on community resilience to climate
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Community and intercommunal infrastructure that are constructed or upgraded following climate and disaster resilience standards
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-06-30" />
<target value="100.00">
<comment><narrative>
This is a dynamic indicator. Based on the 144 completed subprojects, all have met the climate and disaster resilience standards
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Community and intercommunal infrastructure that are constructed or upgraded following climate and disaster resilience standards
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-06-30" />
<target value="100.00">
<comment><narrative>
This indicator measures the share of communal and intercommunal infrastructures financed by Component 1 of the project that meet the climate and disaster resilient standards.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Community members reporting that local public investments reflect their needs
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-06-30" />
<target value="70.00">
<comment><narrative>
This indicator will utilize surveys to capture positive perception amongst project support community members on local public investments reflecting their needs. Given that a substantial number of subprojects are now being realized, a survey is planned and results expected FY27 Q1. The lack of indicators at this stage is due to timing and activity evolution
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Community members reporting that local public investments reflect their needs
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-06-30" />
<target value="70.00">
<comment><narrative>
This indicator will utilize baseline, midline and endline surveys to capture positive perception amongst project support community members on local public investments reflecting their needs.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Decentralized entities (regions and municipalities) meeting service delivery performance targets set under the PBGs
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2027-06-30" />
<target value="50.00">
<comment><narrative>
This indicator evaluates the number of CTDs (regions and municipalities) in the targeted regions that meet in a given year the target set under the service delivery performance criteria of the project's Performance-Based Grants mechanisms. This is a dynamic indicator, based on each evaluation round
</narrative></comment>
</target>
<actual value="56.68">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Decentralized entities (regions and municipalities) meeting service delivery performance targets set under the PBGs
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2027-06-30" />
<target value="50.00">
<comment><narrative>
This indicator evaluates the number of CTDs (regions and municipalities) in the targeted regions that meet in a given year the target set under the service delivery performance criteria of the project's Performance-Based Grants mechanisms.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increased execution rate of the decentralized public investment budget of regions and municipalities in the targeted regions
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="69.10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="90.00">
<comment><narrative>
This is a dynamic indicator. It was previously 0 as data was not available. It measures the annual rate of execution of the Public Investment Budget managed by the decentralized entities (regions and municipalities) in the six regions of focus of the project, on the basis of authorized expenditures and payments (ordonnancement).
</narrative></comment>
</target>
<actual value="64.15">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increased execution rate of the decentralized public investment budget of regions and municipalities in the targeted regions
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="69.10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="90.00">
<comment><narrative>
This indicator measures the annual rate of execution of the Public Invesment Budget managed by the decentralizaed entities (regions and municipalities) in the six regions of focus of the project, on the basis of authorized expenditures and payments (ordonnancemen).
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries with improved access to climate resilient social and economic infrastructure
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-06-30" />
<target value="1,500,000.00">
<comment><narrative>
This indicator was previously 0. The indicator measures the number of direct beneficiaries of climate resilient infrastructure completed under the project. The current value represents the direct beneficiaries of the 177  completed subprojects out of the 546 subprojects in the first cycle of communal, regional and performance based grants. which include school and hospital blocks, solar lighting, water supply, markets, bridges, among others.
</narrative></comment>
</target>
<actual value="236,225">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries with improved access to climate resilient social and economic infrastructure
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-06-30" />
<target value="1,500,000.00">
<comment><narrative>
This indicator will capture direct beneficiaries who benefit from climate resilient social and economic community infrastructures and services financed by the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increased execution rate of the decentralized public investment budget of regions and municipalities in the targeted regions
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="69.10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="90.00">
<comment><narrative>
This indicator measures the annual rate of execution of the Public Invesment Budget managed by the decentralizaed entities (regions and municipalities) in the six regions of focus of the project, on the basis of authorized expenditures and payments (ordonnancemen).
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Notification of budget allocations and transfers amounts to regions and municipalities by the central government by December of the previous fiscal year
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="Yes">
<comment><narrative>
This indicator assesses whether for a given year decentralized entities were notified of the central budget allocations and transfers they are to receive by December 31.
</narrative></comment>
</target>
<actual value="not yet">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increased share of projects selected by VCs included in their respective municipalities Operations and Management budget
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-06-30" />
<target value="75.00">
<comment><narrative>
This indicator measures the percentage of community projects financed under the Project for which O&amp;M costs were included in their respective CTD's annual budgets.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P170561</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Secondary Education and Skills Development Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[Increase equitable access to quality general secondary education and market-relevant skills development programs, with a focus on girls]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Secondary Education and Skills Development Project for Cameroon is to increase equitable access to quality general secondary education and market-relevant skills development programs, with a focus on girls. The Project has four components. 1. Support to general secondary education sector component will focus on systemwide interventions and those that are focused on a selected number of targeted schools. 1.1. Improving the quality of the learning environment in general secondary education subcomponent will support Ministry of Secondary Education (MINESEC) to promote and monitor standards critical for improving the learning environment in key thematic areas. 1.2. Strengthening the capacity of head teachers and new teachers subcomponent t will support the Government to (a) reinforce head teachers capacity to become instructional leaders and coaches at the school level and (b) introduce an innovative on-boarding program for new teachers. 2. Support to skills development sector component has the following subcomponents. 2.1. Improving the quality and relevance of skills development programs subcomponent will incentivize the Government to use a new approach in training program development and to involve employers throughout the chain of training programs development and delivery. 2.2. Expanding access to market-relevant skills development programs subcomponent will finance the implementation of a competitive skills development fund (SDF). The SDF will have three windows, catering to different target groups. 2.3. Strengthening the institutional capacity of the skills development system subcomponent will support the Government in implementing critical reforms in management of the skills development sector. 3. Project management and technical assistance component has the following subcomponents. 3.1. Project coordination and V (M and E) subcomponent will support the Project Coordination Unit (PCU), M and E activities, and capacity building activities associated with the implementation of the project. 3.2. Technical assistance subcomponent will cover specific TA and capacity-building needs for project implementation, and M and E. 4. Contingent emergency response component (CERC) will allow for rapid reallocation of project proceeds in the event of a future natural or man-made disaster or crisis that has caused or is imminently likely to cause a major adverse economic and/or social impact.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0040940"><narrative>The Republic of Cameroon</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0040940"><narrative>The Republic of Cameroon</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="CM-COA-0040938"><narrative>Ministry of Secondary Education (MINESEC)</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2020-07-14"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2020-07-16"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2026-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2026-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Tanya June Savrimootoo</narrative></person-name><telephone>+1-202-473-1000</telephone><email>tsavrimootoo@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002229336" />
            <name><narrative>Littoral Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.26667 10.13333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002231755" />
            <name><narrative>Far North Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>11 14.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002233387" />
            <name><narrative>Republic of Cameroon</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6 12.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002236015" />
            <name><narrative>Adamaoua Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.83333 13.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007109607" />
            <name><narrative>Wang</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.43947 10.25699</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002595105" />
            <name><narrative>Peng</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.736 9.629</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="11330" percentage="63" xml:lang="en"/><sector vocabulary="1" code="11320" percentage="37" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="ES" percentage="32.0000000" xml:lang="en"><narrative>FY17 - Secondary Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EW" percentage="51.0000000" xml:lang="en"><narrative>FY17 - Workforce Development and Vocational Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EF" percentage="9.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="ET" percentage="8.00000000" xml:lang="en"><narrative>FY17 - Tertiary Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000662" percentage="49" xml:lang="en"><narrative>Labor Market Institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="6" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="60" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000652" percentage="41" xml:lang="en"><narrative>Education Financing</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="60" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="9" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="60" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000652" percentage="41" xml:lang="en"><narrative>Education Financing</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="49" xml:lang="en"><narrative>Education</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">630000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">1010000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">1010000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">1010000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">2040000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">1020000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">1030000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">1030000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">2070000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">1040000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">1040000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">1040000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">1050000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">2100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">1050000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">1050000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">1050000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">2100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">1050000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">1040000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">1040000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">2050000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">1030000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">1080000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">1190000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">2880000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">1470000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">1440000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">1410000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">1380000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">2680000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">1310000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">1320000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">1320000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">2620000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">1300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">1300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">1290000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">2580000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">1290000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">1290000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">1300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">2660000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">1320000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">1310000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">1310000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">1310000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">2610000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">1390000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">1530000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">1580000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">3110000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">1510000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">1480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">1460000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">2890000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">1430000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">1430000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">1420000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">2840000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">1420000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">2830000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">1410000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">4250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">1420000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">1420000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">2840000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">1430000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">1430000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">1430000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">2870000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">1440000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1440000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">1450000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">2900000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">1430000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">1430000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">1430000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">2870000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">1440000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1440000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">1450000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">2900000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">52072285.29</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">52072285.29</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">125000000</value><description xml:lang="en"><narrative>Total Commitment in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">1327321</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">10713488</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-2</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">208207</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">79438</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">8071</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">531317</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">4365099</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">114690</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">304673</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">10627354</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">30929</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">58586</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">214460</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">199499</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">142311</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">68723</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">1832622</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">255722</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">21091603</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">701143</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">17010</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">386022</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">170667</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">150783</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">521356</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">14354067</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">366260</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">98409</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">206379</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">437513</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">170796</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">1799366</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">519865</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">591191</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">262777</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-5993</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-59185</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-89653</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-158282</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-175938</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-284126</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-337963</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-425316</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-446077</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-2156622</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-2160145</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-40939"><narrative>Ministry of Employment and Vocational Training (MINEFOP); Ministry of Secondary Education (MINESEC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P170561"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P170561?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P170561"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Mid-Term Review Completed (Yes/No)
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="Yes">
<comment><narrative>
Target achieved.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of secondary schools affected by the presence of additional students supported by the project
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="30.00">
<comment><narrative>
Target exceeded. To date, 48 secondary schools in host communities have been supported by the Project.
</narrative></comment>
</target>
<actual value="48">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Teachers and staff trained on the new CBT packages approved by MINEFOP
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="Teachers 0 Staff 0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="Teachers 900 Staff 90">
<comment><narrative>
600 teachers and 200 staff members trained to date. Target is expected to be achieved by project close.
</narrative></comment>
</target>
<actual value="600 Teachers &amp; 200 Staff">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Teachers and staff trained on the new CBT packages approved by MINEFOP
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="Teachers 0 Staff 0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="Teachers 900 Staff 90">
<comment><narrative>
600 teachers and 200 staff members trained to date. Target is expected to be achieved by project close.
</narrative></comment>
</target>
<actual value="600 Teachers &amp; 200 Staff">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students completing new CBT courses in private centers supported by SDF Window 1
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="560.00">
<comment><narrative>
Revision to this activity are underway. Student vouchers will be provided in specific courses. The POM will be amended to reflect the changes in the definition of how this indicator is being measured.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
SGBV sensitization kit available for SDF stakehodlers
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="Yes">
<comment><narrative>
The kits are developed and available.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Companies/enterprises benefiting from SDF Window 2
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="100.00">
<comment><narrative>
There are currently 213 beneficiaries who are in the first cohort. Activities under Window 2 are underway- it is expected that training will be completed by December 2025
</narrative></comment>
</target>
<actual value="213.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trainees completing training supported by SDF Window 3
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="6,000.00">
<comment><narrative>
Trainings are underway. Based on a preliminary assessment, this indicator is expected to be achieved since Window 3 is expected to support 141 organizations and 7,361 trainees.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students completing new CBT courses approved by MINEFOP in public centers supported by SDF Window 1
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="790.00">
<comment><narrative>
The number of students enrolled in these courses to date. Extrapolations will be done to assess completion by new project close.
</narrative></comment>
</target>
<actual value="2226">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of secondary education and TVET institutions that developed their school project or an SDF proposal using a community-empowered approach
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="310.00">
<comment><narrative>
Target exceeded.
</narrative></comment>
</target>
<actual value="441.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strengthened information system and skills development sector monitoring
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="(a) Information about training centers is incomplete and not up to date (b) No available tool to monitor labor market outcomes"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="(a) Updated version of website and app available (b) Results of the final tracer study published">
<comment><narrative>
DLI # 7.  

DLI 7a: all targets achieved and disbursed.

DLI 7b: target for year 1 has been achieved, and year 2 is on track to be achieved by November 2025. A final study is expected in 2026 which will serve as the endline assessment.
</narrative></comment>
</target>
<actual value="All DLRs for 7a, related to updated version of Skills platform and related application available, have been achieved. For DLI 7b, DLRs for Year 1 has been achieved and DLR for year 2 (baseline graduate tracer study) is expected for November 2025. DLR for year 4 (midline graduate study) is not measurable within the remaining project life. This DLR will be canceled and reallocated to the achievement of the end line graduate tracer study in 2026.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trainees completing training supported by SDF Window 2, by gender
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2025-12-31" />
<target value="1,600.00">
<comment><narrative>
Beneficiaries for Window 2 have been identified and training activities are underway. Based on a preliminary assessment, this indicator is likely to be achieved since Window 2 has an estimated 2,266 potential trainees.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students benefiting from direct interventions to enhance learning- Adult Basic and Continuing Education, total (CRI sub-indicator)
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="7,600.00">
<comment><narrative>
Students benefiting from Windows 2 and 3 of the SDF. Training under both windows are underway and final numbers will be updated by December 2025. Target is expected to be exceeded by the Project's closing date.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students benefiting from direct interventions to enhance learning- Workforce Development/Vocational Education (TVET), total (CRI sub-indicator)
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="4,300.00">
<comment><narrative>
This measures the students where the new CBT packages have been rolled out. Targets exceeded
</narrative></comment>
</target>
<actual value="30,546">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trainees completing training supported by SDF Window 3
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2025-12-31" />
<target value="6,000.00">
<comment><narrative>
Trainings are underway. Based on a preliminary assessment, this indicator is expected to be achieved since Window 3 is expected to support 141 organizations and 7,361 trainees.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New CBT packages developed, validated, approved and available at MINEFOP
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2025-12-31" />
<target value="45.00">
<comment><narrative>
45 new CBT packages have been developed, validated, and made available on the MINEFOP website. All 45 have been verified by the IVA- disbursement on the verification of the last 15 was approved in June 2025.
</narrative></comment>
</target>
<actual value="45">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
SDF Evaluation report
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
The SDF Evaluation Report will be completed once SDF-supported activities are implemented.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Inclusion of gender specific content in each CBT package and in each teacher training module
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="Yes">
<comment><narrative>
Target achieved.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of students enrolled in targeted general secondary schools meeting standards critical for learning environment
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="415,000.00">
<comment><narrative>
The end of project target of 300,000 has been exceeded. The enrollment data has been updated based on the last verification mission which indicated that 311 schools out of 350 schools had met the standards (verified by IVA as per verification protocol). Enrollment in the 350 schools has increased to 408,162.
</narrative></comment>
</target>
<actual value="408,162">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students benefiting from direct interventions to enhance learning
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="1575682.00">
<comment><narrative>
Reported figure includes all students in public general education benefiting from Component 1 (350 schools),  and all beneficiaries under Windows 1, 2, and 3 of the SDF as well as student beneficiaries under subcomponent 2.1. Targets exceeded.
</narrative></comment>
</target>
<actual value="1,733,879">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Set of continous professional development materials for general secondary education teachers developed
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
Target achieved.
</narrative></comment>
</target>
<actual value="Yes as per verification report">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Set of continous professional development materials for general secondary education teachers developed
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="Yes">
<comment><narrative>
Target achieved.
</narrative></comment>
</target>
<actual value="Yes as per verification report">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased percentage of graduates who are employed or self-employed  6 months after training completion
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="Not available"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2025-12-31" />
<target value="Baseline +15 percentage points">
<comment><narrative>
The baseline survey has been completed and the first draft of the report is expected in August 2025. The second graduate tracer study is expected in August 2026.
</narrative></comment>
</target>
<actual value="Not available">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Teachers and staff trained on the new CBT packages approved by MINESEC
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="Teachers 0 Staff 0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2025-12-31" />
<target value="Teachers 400 Staff 60">
<comment><narrative>
Target achieved. Training has been completed. Figures have been updated based on IVA report.
</narrative></comment>
</target>
<actual value="Teachers 410 Staff 68">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Completion of impact evaluation on girls' empowerment activities
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="ToRs available for the impact evaluation"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2025-12-31" />
<target value="Final impact evaluation available">
<comment><narrative>
A first study has been conducted to capture the initial effects and further iterations/updates are under preparation
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of secondary education and TVET institutions that developed their school project or an SDF proposal using a community-empowered approach
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2025-12-31" />
<target value="310.00">
<comment><narrative>
Target exceeded.
</narrative></comment>
</target>
<actual value="441.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students enrolled in new CBT courses in centers supported by SDF Window 1
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2025-12-31" />
<target value="4,300.00">
<comment><narrative>
The activity is ongoing. The target for this indicator is expected to be reached by the end of 2025 once all the centers begin offering the new CBT courses.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
SGBV sensitization kit available for SDF stakehodlers
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
The kits are developed and available.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased percentage of graduates who are employed or self-employed  6 months after training completion
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="Not available"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="Baseline +15 percentage points">
<comment><narrative>
The baseline survey has been completed and the first draft of the report is expected in August 2025. The second graduate tracer study is expected in August 2026.
</narrative></comment>
</target>
<actual value="Not available">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Completion rate in lower secondary in targeted secondary  schools
</narrative></title>
<baseline year="2020" iso-date="2020-05-14" value="49.10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-05-14" />
<period-end iso-date="2025-12-31" />
<target value="59.10">
<comment><narrative>
This indicator was deleted in the restructuring-- the portal will be updated to reflect the amendment letter is signed and uploaded to the portal to complete the process.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of students enrolled in targeted general secondary schools meeting standards critical for learning environment
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2025-12-31" />
<target value="300,000.00">
<comment><narrative>
The end of project target of 300,000 has been exceeded. The enrollment data has been updated based on the last verification mission which indicated that 311 schools out of 350 schools had met the standards (verified by IVA as per verification protocol). Enrollment in the 350 schools has increased to 408,162.
</narrative></comment>
</target>
<actual value="408,162">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students benefiting from direct interventions to enhance learning
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2025-12-31" />
<target value="1575682.00">
<comment><narrative>
Reported figure includes all students in public general education benefiting from Component 1 (350 schools),  and all beneficiaries under Windows 1, 2, and 3 of the SDF as well as student beneficiaries under subcomponent 2.1. Targets are expected to be achieved by project close.
</narrative></comment>
</target>
<actual value="918,946">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of targeted general secondary schools that comply with standards critical for learning environment and equity
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="80.00">
<comment><narrative>
These results have been independently verified. Targets for Years 2, 3 and 4 have been reached, while target for Year 5 remains achievable by the end of the Project.
</narrative></comment>
</target>
<actual value="84">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students benefiting from direct interventions to enhance learning- Workforce Development/Vocational Education (TVET), total (CRI sub-indicator)
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2025-12-31" />
<target value="4,300.00">
<comment><narrative>
This measures the students where the new CBT packages have been rolled out. Targets are expected to be achieved by project close
</narrative></comment>
</target>
<actual value="2226.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trainees benefiting from apprenticeships
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="500.00">
<comment><narrative>
SDF Window 2. The apprenticeship program is currently being developed and is expected to be rolled out in the second half of 2025. Once implemented, the end-of-project target is expected to be exceeded.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of head teachers and deputy head teachers of general secondary schools trained and accredited
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2025-12-31" />
<target value="3,350.00">
<comment><narrative>
The first round of training for head teachers and deputy head teachers has been completed, including 354 women. Target is expected to be achieved by project close.
</narrative></comment>
</target>
<actual value="1712">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Completion of impact evaluation on girls' empowerment activities
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="ToRs available for the impact evaluation"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="Final impact evaluation available">
<comment><narrative>
A first study has been conducted to capture the initial effects and further iterations/updates are under preparation
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of girls in general secondary schools in disadvantaged areas  individually supported by project
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="15,000.00">
<comment><narrative>
The end-target of 10,000 female students has been exceeded. The Ministry has committed itself to reaching 15,000 female students through the subvention program.
</narrative></comment>
</target>
<actual value="13,392">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of students enrolled in targeted general secondary schools meeting standards critical for learning environment
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="415,000.00">
<comment><narrative>
The original end of project target of 300,000 has been exceeded. The enrollment data has been updated based on the last verification mission which indicated that 311 schools out of 350 schools had met the standards (verified by IVA as per verification protocol). Enrollment in the 350 schools has increased to 408,162. During restructuring, the end of project target was raised to 415,000.
</narrative></comment>
</target>
<actual value="408,162">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students completing new CBT courses approved by MINEFOP in public centers supported by SDF Window 1
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="790.00">
<comment><narrative>
The number of students enrolled in these courses will be updated by December 2025. Extrapolations will be done to assess completion by new project close.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students completing new CBT courses approved by MINESEC in public centers supported by SDF Window 1
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="450.00">
<comment><narrative>
The number of students enrolled in these courses will be updated by January 2026. Extrapolations will be done to assess completion by new project close.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students benefiting from internships
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="750.00">
<comment><narrative>
This includes students participating in internships from centers from Window 1. Subventions to centers under W1 are expected to be sent to the centers by the beginning January 2026.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students enrolled in new CBT courses in centers supported by SDF Window 1
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="4,300.00">
<comment><narrative>
The activity is ongoing. The target for this indicator is expected to be reached by the end of 2025 once all the centers begin offering the new CBT courses.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students completing new CBT courses in private centers supported by SDF Window 1
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2025-12-31" />
<target value="560.00">
<comment><narrative>
Revision to this activity are underway. Student vouchers will be provided in specific courses. The POM will be amended to reflect the changes in the definition of how this indicator is being measured.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students benefiting from direct interventions to enhance learning- Adult Basic and Continuing Education, total (CRI sub-indicator)
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2025-12-31" />
<target value="7,600.00">
<comment><narrative>
Students benefiting from Windows 2 and 3 of the SDF. Training under both windows are underway and final numbers will be updated by December 2025. Target is expected to be exceeded by the Project's closing date.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Intermediation platform for access to employment is available
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="Job intermediation platform for access to employment has limited effectiveness"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="Updated job intermediation platform for access to employment is operational">
<comment><narrative>
Recruitment of TA is being finalized to create the platform and develop an application to facilitate the job intermediation
</narrative></comment>
</target>
<actual value="Job intermediation platform for access to employment has limited effectiveness">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Mid-Term Review Completed (Yes/No)
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="Yes">
<comment><narrative>
Target achieved.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
SGBV sensitization kit available for SDF stakehodlers
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="Yes">
<comment><narrative>
The kits are developed and available.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Teachers and staff trained on the new CBT packages approved by MINEFOP
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="Teachers 0 Staff 0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2025-12-31" />
<target value="Teachers 900 Staff 90">
<comment><narrative>
600 teachers and 200 staff members trained to date. Target is expected to be achieved by project close.
</narrative></comment>
</target>
<actual value="600 Teachers &amp; 200 Staff">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of targeted general secondary schools that comply with standards critical for learning environment and equity
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2025-12-31" />
<target value="80.00">
<comment><narrative>
These results have been independently verified. Targets for Years 2, 3 and 4 have been reached, while target for Year 5 remains achievable by the end of the Project.
</narrative></comment>
</target>
<actual value="84">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of girls in general secondary schools in disadvantaged areas  individually supported by project
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="15,000.00">
<comment><narrative>
The end-target of 10,000 female students has been exceeded. The Ministry has committed itself to reaching 15,000 female students through the subvention program.
</narrative></comment>
</target>
<actual value="13,392">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Inclusion of gender specific content in each CBT package and in each teacher training module
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="Yes">
<comment><narrative>
Target achieved.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trainees benefiting from apprenticeships
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="500.00">
<comment><narrative>
SDF Window 2. The apprenticeship program is currently being developed and is expected to be rolled out in the second half of 2025. Once implemented, the end-of-project target is expected to be exceeded.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students benefiting from internships
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2025-12-31" />
<target value="750.00">
<comment><narrative>
This includes students participating in internships from centers from Window 1. Subventions to centers under W1 are expected to be sent to the centers by the beginning of the new school year in September 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students benefiting from direct interventions to enhance learning- Workforce Development/Vocational Education (TVET), total (CRI sub-indicator)
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="4,300.00">
<comment><narrative>
This measures the students where the new CBT packages have been rolled out. Targets are expected to be achieved by project close
</narrative></comment>
</target>
<actual value="2226.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trainees completing training supported by SDF Window 2, by gender
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="1,600.00">
<comment><narrative>
Beneficiaries for Window 2 have been identified and training activities are underway. Based on a preliminary assessment, this indicator is likely to be achieved since Window 2 has an estimated 2,266 potential trainees.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trainees completing training supported by SDF Window 3
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="6,000.00">
<comment><narrative>
Trainings are underway. Based on a preliminary assessment, this indicator is expected to be achieved since Window 3 is expected to support 141 organizations and 7,361 trainees.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trainees completing training supported by SDF Window 3
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2025-12-31" />
<target value="6,000.00">
<comment><narrative>
Trainings are underway. Based on a preliminary assessment, this indicator is expected to be achieved since Window 3 is expected to support 141 organizations and 7,361 trainees.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trainees completing training supported by SDF Window 3
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="6,000.00">
<comment><narrative>
Trainings are underway. Based on a preliminary assessment, this indicator is expected to be achieved since Window 3 is expected to support 141 organizations and 7,361 trainees.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New CBT packages developed, validated, approved and available at MINESEC
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2025-12-31" />
<target value="19.00">
<comment><narrative>
19 new CBT packages have been developed, validated, and made available at MINESEC. All 19 have been verified by the IVA. The regulatory text to implement these new CBT packages is still pending.
</narrative></comment>
</target>
<actual value="19.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students enrolled in new CBT courses in centers supported by SDF Window 1
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="4,300.00">
<comment><narrative>
This indicator captures students enrolled in centers that offer the new CBT courses. Expected to reach target by end of FY26
</narrative></comment>
</target>
<actual value="2226">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trainees completing training supported by SDF Window 2, by gender
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="1,600.00">
<comment><narrative>
Beneficiaries for Window 2 have been identified and training activities are underway. Based on a preliminary assessment, this indicator is likely to be achieved since Window 2 has an estimated 2,266 potential trainees.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trainees completing training supported by SDF Window 2, by gender
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2025-12-31" />
<target value="1,600.00">
<comment><narrative>
Beneficiaries for Window 2 have been identified and training activities are underway. Based on a preliminary assessment, this indicator is likely to be achieved since Window 2 has an estimated 2,266 potential trainees.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trainees completing training supported by SDF Window 2, by gender
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="1,600.00">
<comment><narrative>
Beneficiaries for Window 2 have been identified and training activities are underway. Based on a preliminary assessment, this indicator is likely to be achieved since Window 2 has an estimated 2,266 potential trainees.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of girls in general secondary schools in disadvantaged areas  individually supported by project
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="15,000.00">
<comment><narrative>
The end-target of 10,000 female students has been exceeded. The Ministry has committed itself to reaching 15,000 female students through the subvention program.
</narrative></comment>
</target>
<actual value="13,392">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of girls in general secondary schools in disadvantaged areas  individually supported by project
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2025-12-31" />
<target value="10,000.00">
<comment><narrative>
The end-target of 10,000 female students has been exceeded. The Ministry has committed itself to reaching 15,000 female students through the subvention program.
</narrative></comment>
</target>
<actual value="13,392">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of girls in general secondary schools in disadvantaged areas  individually supported by project
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="15,000.00">
<comment><narrative>
The end-target of 10,000 female students has been exceeded. The Ministry has committed itself to reaching 15,000 female students through the subvention program.
</narrative></comment>
</target>
<actual value="13,392">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strengthened information system and skills development sector monitoring
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="(a) Information about training centers is incomplete and not up to date (b) No available tool to monitor labor market outcomes"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="(a) Updated version of website and app available (b) Results of the final tracer study published">
<comment><narrative>
DLI # 7.  

DLI 7a: all targets achieved and disbursed.

DLI 7b: target for year 1 has been achieved, and year 2 is on track to be achieved and verified by January 2026. A final study is expected in 2026 which will serve as the endline assessment.
</narrative></comment>
</target>
<actual value="All DLRs for 7a, related to updated version of Skills platform and related application available, have been achieved. For DLI 7b, DLRs for Year 1 has been achieved and DLR for year 2 (baseline graduate tracer study) is expected to be verified in January 2026. The last DLR will be achieved  with the end line graduate tracer study in August 2026.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased percentage of graduates who are employed or self-employed  6 months after training completion
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="Not available"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="Baseline +15 percentage points">
<comment><narrative>
The baseline survey has been completed and the first draft of the report was shared for review. This RF is reporting the preliminary results. The data captures the baseline information on cohorts of graduates prior to between 2020 and 2023. The second graduate tracer study is expected in August 2026.
</narrative></comment>
</target>
<actual value="44">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased percentage of graduates who are employed or self-employed  6 months after training completion
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="Not available"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2025-12-31" />
<target value="Baseline +15 percentage points">
<comment><narrative>
The baseline survey has been completed and the first draft of the report is expected in August 2025. The second graduate tracer study is expected in August 2026.
</narrative></comment>
</target>
<actual value="Not available">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased percentage of graduates who are employed or self-employed  6 months after training completion
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="Not available"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="Baseline +15 percentage points">
<comment><narrative>
The baseline survey has been completed and the first draft of the report is expected in August 2025. The second graduate tracer study is expected in August 2026.
</narrative></comment>
</target>
<actual value="Not available">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of students enrolled in targeted general secondary schools meeting standards critical for learning environment
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="415,000.00">
<comment><narrative>
The original end of project target of 300,000 has been exceeded. The enrollment data has been updated based on the last verification mission which indicated that 311 schools out of 350 schools had met the standards (verified by IVA as per verification protocol). Enrollment in the 350 schools has increased to 408,162. During restructuring, the end of project target was raised to 415,000.
</narrative></comment>
</target>
<actual value="408,162">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of students enrolled in targeted general secondary schools meeting standards critical for learning environment
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2025-12-31" />
<target value="300,000.00">
<comment><narrative>
The end of project target of 300,000 has been exceeded. The enrollment data has been updated based on the last verification mission which indicated that 311 schools out of 350 schools had met the standards (verified by IVA as per verification protocol). Enrollment in the 350 schools has increased to 408,162.
</narrative></comment>
</target>
<actual value="408,162">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trainees completing training supported by SDF Window 2, by gender
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="1,600.00">
<comment><narrative>
Beneficiaries for Window 2 have been identified and training activities are underway. Based on a preliminary assessment, this indicator is likely to be achieved since Window 2 has an estimated 2,266 potential trainees.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of students enrolled in targeted general secondary schools meeting standards critical for learning environment
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="415,000.00">
<comment><narrative>
The end of project target of 300,000 has been exceeded. The enrollment data has been updated based on the last verification mission which indicated that 311 schools out of 350 schools had met the standards (verified by IVA as per verification protocol). Enrollment in the 350 schools has increased to 408,162.
</narrative></comment>
</target>
<actual value="408,162">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Completion of impact evaluation on girls' empowerment activities
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="ToRs available for the impact evaluation"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="Final impact evaluation available">
<comment><narrative>
A first study has been conducted to capture the initial effects and further iterations/updates are under preparation
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Intermediation platform for access to employment is available
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="Job intermediation platform for access to employment has limited effectiveness"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="Updated job intermediation platform for access to employment is operational">
<comment><narrative>
ToRs are being finalized to create the platform and develop an application to facilitate the job intermediation
</narrative></comment>
</target>
<actual value="Job intermediation platform for access to employment has limited effectiveness">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of head teachers and deputy head teachers of general secondary schools trained and accredited
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="3,350.00">
<comment><narrative>
The first round of training for head teachers and deputy head teachers has been completed, including 354 women. Target is expected to be achieved by project close.
</narrative></comment>
</target>
<actual value="1712">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Teachers recruited or trained
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2025-12-31" />
<target value="10000.00">
<comment><narrative>
Training of subsequent cohorts is expected to be launched in late 2025 to achieve target of 10,000.
</narrative></comment>
</target>
<actual value="6079">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Teachers and staff trained on the new CBT packages approved by MINESEC
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="Teachers 0 Staff 0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="Teachers 400 Staff 60">
<comment><narrative>
Target achieved. Training has been completed. Figures have been updated based on IVA report.
</narrative></comment>
</target>
<actual value="Teachers 410 Staff 68">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of secondary schools affected by the presence of additional students supported by the project
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2025-12-31" />
<target value="30.00">
<comment><narrative>
Target exceeded. To date, 48 secondary schools in host communities have been supported by the Project.
</narrative></comment>
</target>
<actual value="48">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
SDF Evaluation report
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="Yes">
<comment><narrative>
The SDF Evaluation Report will be completed once SDF-supported activities are implemented.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Teachers recruited or trained
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="10000.00">
<comment><narrative>
Training of subsequent cohorts is expected to start in December 2025 to achieve target of 10,000.
</narrative></comment>
</target>
<actual value="6079">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New CBT packages developed, validated, approved and available at MINESEC
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="19.00">
<comment><narrative>
19 new CBT packages have been developed, validated, and made available at MINESEC. All 19 have been verified by the IVA. The regulatory text to implement these new CBT packages is still pending.
</narrative></comment>
</target>
<actual value="19.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students benefiting from direct interventions to enhance learning- Adult Basic and Continuing Education, total (CRI sub-indicator)
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="7,600.00">
<comment><narrative>
Students benefiting from Windows 2 and 3 of the SDF. Training under both windows are underway and final numbers will be updated by January 2025. Target is expected to be exceeded by the Project's closing date.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of girls in general secondary schools in disadvantaged areas  individually supported by project
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2025-12-31" />
<target value="10,000.00">
<comment><narrative>
The end-target of 10,000 female students has been exceeded. The Ministry has committed itself to reaching 15,000 female students through the subvention program.
</narrative></comment>
</target>
<actual value="13,392">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of secondary schools affected by the presence of additional students supported by the project
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="30.00">
<comment><narrative>
Target exceeded. To date, 48 secondary schools in host communities have been supported by the Project.
</narrative></comment>
</target>
<actual value="48">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved strategic planning and management
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="(a) Education Sector Strategy available but no national skills development strategy and plan (b) No national qualification and certification framework (NQCF) exists"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="(a) Mid-term evaluation of NSDS published, and updated action plan available(b) National and sectorial qualification frameworks for technical education and training have been finalized and approved by MINEFOP for each of the selected economic sectors">
<comment><narrative>
DLI # 6.

The sectoral QCFs in ICT and Energy are expected to be verified in January 2026. The mid term evaluation of the strategy is planned for 2026. This indicator is on track to be achieved by new closing date.
</narrative></comment>
</target>
<actual value="NSDS and costed action plan available NQCF is available. The sectoral QCF in agriculture and construction has been completed (as verified by IVA). The QCF for energy and ICT will be verified in January">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of targeted general secondary schools that comply with standards critical for learning environment and equity
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="80.00">
<comment><narrative>
These results have been independently verified. Targets for Years 2, 3 and 4 have been reached, while target for Year 5 remains achievable by the end of the Project.
</narrative></comment>
</target>
<actual value="84">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students completing new CBT courses in private centers supported by SDF Window 1
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="560.00">
<comment><narrative>
Revision to this activity are underway. Student vouchers will be provided in specific courses. The POM will be amended to reflect the changes in the definition of how this indicator is being measured.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New CBT packages developed, validated, approved and available at MINESEC
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="19.00">
<comment><narrative>
19 new CBT packages have been developed, validated, and made available at MINESEC. All 19 have been verified by the IVA. The regulatory text has been signed and implementation in the 26 centers has been launched.
</narrative></comment>
</target>
<actual value="19.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of head teachers and deputy head teachers of general secondary schools trained and accredited
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="3,350.00">
<comment><narrative>
The first round of training for head teachers and deputy head teachers has been completed, including 354 women. Target is expected to be achieved by project close.
</narrative></comment>
</target>
<actual value="1712">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
SDF Evaluation report
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="Yes">
<comment><narrative>
The SDF Evaluation Report will be completed once SDF-supported activities are implemented.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New CBT packages developed, validated, approved and available at MINEFOP
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="45.00">
<comment><narrative>
45 new CBT packages have been developed, validated, and made available on the MINEFOP website. All 45 have been verified by the IVA- disbursement on the verification of the last 15 was approved in June 2025.
</narrative></comment>
</target>
<actual value="45">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students benefiting from direct interventions to enhance learning
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="1575682.00">
<comment><narrative>
Reported figure includes all students in public general education benefiting from Component 1 (350 schools),  and all beneficiaries under Windows 1, 2, and 3 of the SDF as well as student beneficiaries under subcomponent 2.1. Targets are expected to be achieved by project close.
</narrative></comment>
</target>
<actual value="918,946">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Intermediation platform for access to employment is available
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="Job intermediation platform for access to employment has limited effectiveness"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2025-12-31" />
<target value="Updated job intermediation platform for access to employment is operational">
<comment><narrative>
ToRs are being finalized to create the platform and develop an application to facilitate the job intermediation
</narrative></comment>
</target>
<actual value="Job intermediation platform for access to employment has limited effectiveness">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Companies/enterprises benefiting from SDF Window 2
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="100.00">
<comment><narrative>
There are currently 213 beneficiaries who are in the first cohort. Activities under Window 2 are underway- it is expected that training will be completed by May 2026.
</narrative></comment>
</target>
<actual value="213.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Inclusion of gender specific content in each CBT package and in each teacher training module
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
Target achieved.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Companies/enterprises benefiting from SDF Window 2
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2025-12-31" />
<target value="100.00">
<comment><narrative>
There are currently 213 beneficiaries who are in the first cohort. Activities under Window 2 are underway- it is expected that training will be completed by December 2025
</narrative></comment>
</target>
<actual value="213.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Mid-Term Review Completed (Yes/No)
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2025-12-31" />
<target value="Yes">
<comment><narrative>
Target achieved.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students benefiting from internships
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="750.00">
<comment><narrative>
This includes students participating in internships from centers from Window 1. Subventions to centers under W1 are expected to be sent to the centers by the beginning of the new school year in September 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New CBT packages developed, validated, approved and available at MINEFOP
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="45.00">
<comment><narrative>
45 new CBT packages have been developed, validated, and made available on the MINEFOP website. All 45 have been verified by the IVA- disbursement on the verification of the last 15 was approved in June 2025.
</narrative></comment>
</target>
<actual value="45">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trainees benefiting from apprenticeships
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2025-12-31" />
<target value="500.00">
<comment><narrative>
SDF Window 2. The apprenticeship program is currently being developed and is expected to be rolled out in the second half of 2025. Once implemented, the end-of-project target is expected to be exceeded.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Teachers and staff trained on the new CBT packages approved by MINESEC
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="Teachers 0 Staff 0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="Teachers 400 Staff 60">
<comment><narrative>
Target achieved. Training has been completed. Figures have been updated based on IVA report.
</narrative></comment>
</target>
<actual value="Teachers 410 Staff 68">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved strategic planning and management
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="(a) Education Sector Strategy available but no national skills development strategy and plan (b) No national qualification and certification framework (NQCF) exists"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="(a) Mid-term evaluation of NSDS published, and updated action plan available(b) National and sectorial qualification frameworks for technical education and training have been finalized and approved by MINEFOP for each of the selected economic sectors">
<comment><narrative>
DLI # 6.

The sectoral QCFs in ICT and Energy are planned for later in 2025. The mid term evaluation of the strategy is planned for 2026. This indicator is on track to be achieved by new closing date.
</narrative></comment>
</target>
<actual value="NSDS and costed action plan available NQCF is available. The sectoral QCF in agriculture and construction has been completed (as verified by IVA).">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strengthened information system and skills development sector monitoring
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="(a) Information about training centers is incomplete and not up to date (b) No available tool to monitor labor market outcomes"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2025-12-31" />
<target value="(a) Updated version of website and app available (b) Results of the final tracer study published">
<comment><narrative>
DLI # 7.  

DLI 7a: all targets achieved and disbursed.

DLI 7b: target for year 1 has been achieved, and year 2 is on track to be achieved by November 2025. A final study is expected in 2026 which will serve as the endline assessment.
</narrative></comment>
</target>
<actual value="All DLRs for 7a, related to updated version of Skills platform and related application available, have been achieved. For DLI 7b, DLRs for Year 1 has been achieved and DLR for year 2 (baseline graduate tracer study) is expected for November 2025. DLR for year 4 (midline graduate study) is not measurable within the remaining project life. This DLR will be canceled and reallocated to the achievement of the end line graduate tracer study in 2026.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Teachers recruited or trained
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="10000.00">
<comment><narrative>
Training of subsequent cohorts is expected to be launched in late 2025 to achieve target of 10,000.
</narrative></comment>
</target>
<actual value="6079">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strengthened information system and skills development sector monitoring
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="(a) Information about training centers is incomplete and not up to date (b) No available tool to monitor labor market outcomes"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Year 1-4 of part a has been achieved. Year 1 of part b is achieved. Year 2 of part b is expected for January 2026. DLRs for year 4 and 5 is to be revised into one DLR to be achieved in 2026.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strengthened information system and skills development sector monitoring
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="(a) Information about training centers is incomplete and not up to date (b) No available tool to monitor labor market outcomes"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Year 1-4 of part a has been achieved. Year 1 of part b is achieved. Year 2 of part b is expected for later this year. DLRs for year 4 and 5 is to be revised into one DLR to be achieved in 2026.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strengthened information system and skills development sector monitoring
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="(a) Information about training centers is incomplete and not up to date (b) No available tool to monitor labor market outcomes"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Year 1-4 of part a has been achieved. Year 1 of part b is achieved. Year 2 of part b is expected for later this year. DLRs for year 4 and 5 is to be revised into one DLR to be achieved in 2026.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved strategic planning and management
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="(a) Education Sector Strategy available but no national skills development strategy and plan (b) No national qualification and certification framework (NQCF) exists"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="(a) NSDS endorsed by Government and costed action plan available (b) The NQCF has been finalized and approved by MINEFOP">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved strategic planning and management
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="(a) Education Sector Strategy available but no national skills development strategy and plan (b) No national qualification and certification framework (NQCF) exists"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="(a) NSDS endorsed by Government and costed action plan available (b) The NQCF has been finalized and approved by MINEFOP">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved strategic planning and management
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="(a) Education Sector Strategy available but no national skills development strategy and plan (b) No national qualification and certification framework (NQCF) exists"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="(a) NSDS endorsed by Government and costed action plan available (b) The NQCF has been finalized and approved by MINEFOP">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Teachers and staff trained on the new CBT packages approved by MINEFOP
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="Teachers 0 Staff 0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Year 1,2 and 3 have been achieved on part a and part b.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Teachers and staff trained on the new CBT packages approved by MINEFOP
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="Teachers 0 Staff 0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Year 1,2 and 3 have been achieved on part a and part b.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Teachers and staff trained on the new CBT packages approved by MINEFOP
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="Teachers 0 Staff 0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Year 1,2 and 3 have been achieved on part a and part b.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New CBT packages developed, validated, approved and available at MINEFOP
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Year 1,2,3 and 4 have been achieved for Part a and Year 1, 2 are achieved for part b">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New CBT packages developed, validated, approved and available at MINEFOP
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Year 1,2,3 and 4 have been achieved for Part a and Year 1, 2 are achieved for part b">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New CBT packages developed, validated, approved and available at MINEFOP
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Year 1,2,3 and 4 have been achieved for Part a and Year 1, 2 are achieved for part b">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Teachers recruited or trained
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="6079 trained. DLRs for Years 1, 2 and 3 achieved">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Teachers recruited or trained
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="6079 trained. DLRs for Years 1, 2 and 3 achieved">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Teachers recruited or trained
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="6079 trained. DLRs for Years 1, 2 and 3 achieved">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of head teachers and deputy head teachers of general secondary schools trained and accredited
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Year 1 and 2 results have been achieved">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of head teachers and deputy head teachers of general secondary schools trained and accredited
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Year 1 and 2 results have been achieved">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of head teachers and deputy head teachers of general secondary schools trained and accredited
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Year 1 and 2 results have been achieved">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of targeted general secondary schools that comply with standards critical for learning environment and equity
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="84.2%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of targeted general secondary schools that comply with standards critical for learning environment and equity
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="84.2%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of targeted general secondary schools that comply with standards critical for learning environment and equity
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="84.2%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of secondary education and TVET institutions that developed their school project or an SDF proposal using a community-empowered approach
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="310.00">
<comment><narrative>
Target exceeded.
</narrative></comment>
</target>
<actual value="441.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased percentage of graduates who are employed or self-employed  6 months after training completion
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="Not available"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="Baseline +15 percentage points">
<comment><narrative>
The baseline survey has been completed and the first draft of the report was shared for review. This RF is reporting the preliminary results. The data captures the baseline information on cohorts of graduates prior to between 2020 and 2023. The second graduate tracer study is expected in August 2026.
</narrative></comment>
</target>
<actual value="44">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students completing new CBT courses approved by MINESEC in public centers supported by SDF Window 1
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2025-12-31" />
<target value="450.00">
<comment><narrative>
The number of students enrolled in these courses will be updated by December 2025. Extrapolations will be done to assess completion by new project close.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trainees completing training supported by SDF Window 3
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="6,000.00">
<comment><narrative>
Trainings are underway. Based on a preliminary assessment, this indicator is expected to be achieved since Window 3 is expected to support 141 organizations and 7,361 trainees.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trainees completing training supported by SDF Window 3
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="6,000.00">
<comment><narrative>
Trainings are underway. Based on a preliminary assessment, this indicator is expected to be achieved since Window 3 is expected to support 141 organizations and 7,361 trainees.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trainees completing training supported by SDF Window 3
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2025-12-31" />
<target value="6,000.00">
<comment><narrative>
Trainings are underway. Based on a preliminary assessment, this indicator is expected to be achieved since Window 3 is expected to support 141 organizations and 7,361 trainees.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Set of continous professional development materials for general secondary education teachers developed
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="Yes">
<comment><narrative>
Target achieved.
</narrative></comment>
</target>
<actual value="Yes as per verification report">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trainees completing training supported by SDF Window 3
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="6,000.00">
<comment><narrative>
Trainings are underway. Based on a preliminary assessment, this indicator is expected to be achieved since Window 3 is expected to support 141 organizations and 7,361 trainees.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trainees completing training supported by SDF Window 2, by gender
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="1,600.00">
<comment><narrative>
Beneficiaries for Window 2 have been identified and training activities are underway. Based on a preliminary assessment, this indicator is likely to be achieved since Window 2 has an estimated 2,266 potential trainees.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trainees completing training supported by SDF Window 2, by gender
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2025-12-31" />
<target value="1,600.00">
<comment><narrative>
Beneficiaries for Window 2 have been identified and training activities are underway. Based on a preliminary assessment, this indicator is likely to be achieved since Window 2 has an estimated 2,266 potential trainees.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trainees completing training supported by SDF Window 2, by gender
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="1,600.00">
<comment><narrative>
Beneficiaries for Window 2 have been identified and training activities are underway. Based on a preliminary assessment, this indicator is likely to be achieved since Window 2 has an estimated 2,266 potential trainees.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of girls in general secondary schools in disadvantaged areas  individually supported by project
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="15,000.00">
<comment><narrative>
The end-target of 10,000 female students has been exceeded. The Ministry has committed itself to reaching 15,000 female students through the subvention program.
</narrative></comment>
</target>
<actual value="13,392">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of girls in general secondary schools in disadvantaged areas  individually supported by project
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2025-12-31" />
<target value="10,000.00">
<comment><narrative>
The end-target of 10,000 female students has been exceeded. The Ministry has committed itself to reaching 15,000 female students through the subvention program.
</narrative></comment>
</target>
<actual value="13,392">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of girls in general secondary schools in disadvantaged areas  individually supported by project
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="15,000.00">
<comment><narrative>
The end-target of 10,000 female students has been exceeded. The Ministry has committed itself to reaching 15,000 female students through the subvention program.
</narrative></comment>
</target>
<actual value="13,392">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased percentage of graduates who are employed or self-employed  6 months after training completion
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="Not available"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="Baseline +15 percentage points">
<comment><narrative>
The baseline survey has been completed and the first draft of the report was shared for review. This RF is reporting the preliminary results. The data captures the baseline information on cohorts of graduates prior to between 2020 and 2023. The second graduate tracer study is expected in August 2026.
</narrative></comment>
</target>
<actual value="44">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased percentage of graduates who are employed or self-employed  6 months after training completion
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="Not available"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2025-12-31" />
<target value="Baseline +15 percentage points">
<comment><narrative>
The baseline survey has been completed and the first draft of the report is expected in August 2025. The second graduate tracer study is expected in August 2026.
</narrative></comment>
</target>
<actual value="Not available">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased percentage of graduates who are employed or self-employed  6 months after training completion
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="Not available"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="Baseline +15 percentage points">
<comment><narrative>
The baseline survey has been completed and the first draft of the report is expected in August 2025. The second graduate tracer study is expected in August 2026.
</narrative></comment>
</target>
<actual value="Not available">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of students enrolled in targeted general secondary schools meeting standards critical for learning environment
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="415,000.00">
<comment><narrative>
The original end of project target of 300,000 has been exceeded. The enrollment data has been updated based on the last verification mission which indicated that 311 schools out of 350 schools had met the standards (verified by IVA as per verification protocol). Enrollment in the 350 schools has increased to 408,162. During restructuring, the end of project target was raised to 415,000.
</narrative></comment>
</target>
<actual value="408,162">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of students enrolled in targeted general secondary schools meeting standards critical for learning environment
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2025-12-31" />
<target value="300,000.00">
<comment><narrative>
The end of project target of 300,000 has been exceeded. The enrollment data has been updated based on the last verification mission which indicated that 311 schools out of 350 schools had met the standards (verified by IVA as per verification protocol). Enrollment in the 350 schools has increased to 408,162.
</narrative></comment>
</target>
<actual value="408,162">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of students enrolled in targeted general secondary schools meeting standards critical for learning environment
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="415,000.00">
<comment><narrative>
The end of project target of 300,000 has been exceeded. The enrollment data has been updated based on the last verification mission which indicated that 311 schools out of 350 schools had met the standards (verified by IVA as per verification protocol). Enrollment in the 350 schools has increased to 408,162.
</narrative></comment>
</target>
<actual value="408,162">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students completing new CBT courses approved by MINEFOP in public centers supported by SDF Window 1
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2025-12-31" />
<target value="790.00">
<comment><narrative>
The number of students enrolled in these courses will be updated by December 2025. Extrapolations will be done to assess completion by new project close.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students completing new CBT courses approved by MINESEC in public centers supported by SDF Window 1
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2026-12-15" />
<target value="450.00">
<comment><narrative>
The number of students enrolled in these courses will be updated by December 2025. Extrapolations will be done to assess completion by new project close.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved strategic planning and management
</narrative></title>
<baseline year="2020" iso-date="2020-03-09" value="(a) Education Sector Strategy available but no national skills development strategy and plan (b) No national qualification and certification framework (NQCF) exists"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-09" />
<period-end iso-date="2025-12-31" />
<target value="(a) Mid-term evaluation of NSDS published, and updated action plan available(b) National and sectorial qualification frameworks for technical education and training have been finalized and approved by MINEFOP for each of the selected economic sectors">
<comment><narrative>
DLI # 6.

The sectoral QCFs in ICT and Energy are planned for later in 2025. The mid term evaluation of the strategy is planned for 2026. This indicator is on track to be achieved by new closing date.
</narrative></comment>
</target>
<actual value="NSDS and costed action plan available NQCF is available. The sectoral QCF in agriculture and construction has been completed (as verified by IVA).">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P180017</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Cameroon Second Fiscal Sustainability, Inclusive and Sustainable Growth Development Policy Financing</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The development objective is to (i) improve fiscal sustainability, governance, and public sector management; (ii) improve inclusion by ensuring equitable access to Services and empowering women and girls; and (iii) lay foundations for sustainable infrastructure development.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development of objective of the Second Fiscal Sustainability, Inclusive, and Sustainable Growth Development Policy Financing Program for Cameroon is to: (i) improve fiscal sustainability, governance, and public sector management; (ii) improve inclusion by ensuring equitable access to services and empowering women and girls; and (iii) lay foundations for sustainable infrastructure development. Cameroon's Vision 2035 aims to achieve upper-middle-income status by 2035, focusing on poverty reduction, industrialization, and consolidating democracy and national unity. The National Development Strategy 2020-2030 (SND30) adopted in November 2020 supports this vision by promoting economic growth, improving social services, strengthening climate resilience, and enhancing governance. SND30's four pillars: (1) structural economic transformation; (2) human capital development; (3) job creation and economic inclusion; and (4) governance, decentralization, and strategic state management. Pillars 2 and 3 emphasize social inclusion, while Pillar 4 seeks to address various drivers of conflict through: (i) advancing decentralization and local development; (ii) strengthening rule of law and the security of people and property reduction; (iii) enhancing public services; (iv) strengthening economic and financial governance by rigorously fighting corruption, embezzlement, and conflicts of interest; and (v) improving regional planning.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0054415"><narrative>Republic of Cameroon</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="CM-COA-0054414"><narrative>Republic of Cameroon</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2025-03-14"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2025-03-14"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2026-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2026-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Samba Ba</narrative></person-name><telephone>+1-202-473-1000</telephone><email>sba3@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2220957" />
                <name><narrative>Yaounde</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>3.86667 11.51667</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="15128" percentage="25" xml:lang="en"/><sector vocabulary="1" code="15155" percentage="13" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="13" xml:lang="en"/><sector vocabulary="1" code="22040" percentage="13" xml:lang="en"/><sector vocabulary="1" code="11220" percentage="12" xml:lang="en"/><sector vocabulary="1" code="15185" percentage="12" xml:lang="en"/><sector vocabulary="1" code="14010" percentage="12" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EEF" percentage="13.0000000" xml:lang="en"><narrative>Public Administration - Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BBH" percentage="25.0000000" xml:lang="en"><narrative>Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WWW" percentage="12.0000000" xml:lang="en"><narrative>Water Resources</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SSA" percentage="13.0000000" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BBC" percentage="25.0000000" xml:lang="en"><narrative>Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="DDS" percentage="12.0000000" xml:lang="en"><narrative>Digital Social Sectors</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="0" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="0" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="0" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="0" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000086" percentage="0" xml:lang="en"><narrative>Energy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000862" percentage="0" xml:lang="en"><narrative>Energy Policies &amp; Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="0" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="0" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">200000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">200000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">200000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-54414"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">214697282</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-54414"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-511309</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-54414"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-4266262</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-54414"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-3548201</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-54414"><narrative>Republic of Cameroon</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P180017"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P180017?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P180017"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
SOEs (including the 10 largest SOEs) publishing their annual audited financial statements online no later than two (2) months following the legal deadline for approval of accounts by General Assemblie
</narrative></title>
<baseline year="2020" iso-date="2020-11-23" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-23" />
<period-end iso-date="2026-12-09" />
<target value="= 50">

</target>
<actual value="38">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Non-oil revenue to GDP ratio
</narrative></title>
<baseline year="2020" iso-date="2020-11-23" value="11.7"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-23" />
<period-end iso-date="2026-12-09" />
<target value="14.4">

</target>
<actual value="13.3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Vulnerable households registered in the social registry
</narrative></title>
<baseline year="2020" iso-date="2020-12-06" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-06" />
<period-end iso-date="2026-12-09" />
<target value="300000">

</target>
<actual value="113495">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Clearance of the arrears  from the government (incl. SOEs) to ENEO (Power utility) (billion XAF)
</narrative></title>
<baseline year="2024" iso-date="2024-12-11" value="99"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-11" />
<period-end iso-date="2026-12-11" />
<target value="&lt; 5">
<comment><narrative>
These estimates are based on ENEO's financials and correspond to values at the end of each calendar year. They do not include arrears claimed by ENEO regarding the (i) application of the tariff compensation methodology (~FCFA 189 billion as of December 2024) and public lighting invoices (~FCFA 80 billion as of December 2024). These amounts are not recognized by the GoC, although discussions are still underway between the two parties to resolve their misalignment. Additionaly, the baseline figure is for December 2023 rather than December 2024.
</narrative></comment>
</target>
<actual value="103">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Irrigated area (in ha) in the Northern regions transferred to WUA
</narrative></title>
<baseline year="2020" iso-date="2020-12-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-11" />
<period-end iso-date="2026-12-11" />
<target value="10,000">

</target>
<actual value="4400">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Paved national trunk roads in good condition, expressed as an International Roughness Index (IRI) of less than 3.5 m/km
</narrative></title>
<baseline year="2020" iso-date="2020-12-11" value="12"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-11" />
<period-end iso-date="2026-12-11" />
<target value="25">
<comment><narrative>
Data is currently unavailable because the project aimed at expanding the use of modern techniques for assessing road quality is in progress. At present, road quality is evaluated through visual inspection.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Population eligible to receive birth certificates from CR centers outside their places of birth
</narrative></title>
<baseline year="2020" iso-date="2020-12-06" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-06" />
<period-end iso-date="2026-12-10" />
<target value="75">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Vulnerable households registered in the social registry
</narrative></title>
<baseline year="2020" iso-date="2020-12-06" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-06" />
<period-end iso-date="2026-12-09" />
<target value="300000">

</target>
<actual value="113495">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Decrease of the dropout rate of pregnant girls in targeted primary schools of the Northern regions
</narrative></title>
<baseline year="2020" iso-date="2020-11-23" value="90"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-23" />
<period-end iso-date="2026-12-09" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public primary schools enrolling more than 100 pupils with at least 3 state-paid teachers (especially in priority education zones)
</narrative></title>
<baseline year="2020" iso-date="2020-11-23" value="52 (41)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-23" />
<period-end iso-date="2026-12-09" />
<target value="90 (75)">

</target>
<actual value="86">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction of cash payment rate made by Treasury
</narrative></title>
<baseline year="2020" iso-date="2020-11-23" value="22.4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-23" />
<period-end iso-date="2026-12-09" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Non-oil revenue to GDP ratio
</narrative></title>
<baseline year="2020" iso-date="2020-11-23" value="11.7"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-23" />
<period-end iso-date="2026-12-09" />
<target value="14.4">

</target>
<actual value="13.3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
SOEs (including the 10 largest SOEs) publishing their annual audited financial statements online no later than two (2) months following the legal deadline for approval of accounts by General Assemblie
</narrative></title>
<baseline year="2020" iso-date="2020-11-23" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-23" />
<period-end iso-date="2026-12-09" />
<target value="= 50">

</target>
<actual value="38">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of central budgetary transfers under the General Decentralization Grant (DGD) to Decentralized Territorial Units (CTDs)
</narrative></title>
<baseline year="2020" iso-date="2020-11-11" value="1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-11" />
<period-end iso-date="2026-12-11" />
<target value="10">
<comment><narrative>
The data from 2020 to 2023 included is from the settlement laws. This reflect sharp budgetary cuts in the recurrent budget in the course of the year (DGD volet fonctionnement). For 2024 and 2025, the settlement law is not yet available therefore we considered the amount as reflected in the revised finance law. Additionally, the DPF2 program document approved by the Board sets the result indicator target at 7, not 10 as shown in this table.
</narrative></comment>
</target>
<actual value="2.4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Decrease of the dropout rate of pregnant girls in targeted primary schools of the Northern regions
</narrative></title>
<baseline year="2020" iso-date="2020-11-23" value="90"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-23" />
<period-end iso-date="2026-12-09" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Population eligible to receive birth certificates from CR centers outside their places of birth
</narrative></title>
<baseline year="2020" iso-date="2020-12-06" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-06" />
<period-end iso-date="2026-12-10" />
<target value="75">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Irrigated area (in ha) in the Northern regions transferred to WUA
</narrative></title>
<baseline year="2020" iso-date="2020-12-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-11" />
<period-end iso-date="2026-12-11" />
<target value="10,000">

</target>
<actual value="4400">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction of cash payment rate made by Treasury
</narrative></title>
<baseline year="2020" iso-date="2020-11-23" value="22.4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-23" />
<period-end iso-date="2026-12-09" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public primary schools enrolling more than 100 pupils with at least 3 state-paid teachers (especially in priority education zones)
</narrative></title>
<baseline year="2020" iso-date="2020-11-23" value="52 (41)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-23" />
<period-end iso-date="2026-12-09" />
<target value="90 (75)">

</target>
<actual value="86">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Clearance of the arrears  from the government (incl. SOEs) to ENEO (Power utility) (billion XAF)
</narrative></title>
<baseline year="2024" iso-date="2024-12-11" value="99"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-11" />
<period-end iso-date="2026-12-11" />
<target value="&lt; 5">
<comment><narrative>
These estimates are based on ENEO's financials and correspond to values at the end of each calendar year. They do not include arrears claimed by ENEO regarding the (i) application of the tariff compensation methodology (~FCFA 189 billion as of December 2024) and public lighting invoices (~FCFA 80 billion as of December 2024). These amounts are not recognized by the GoC, although discussions are still underway between the two parties to resolve their misalignment. Additionaly, the baseline figure is for December 2023 rather than December 2024.
</narrative></comment>
</target>
<actual value="103">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Clearance of the arrears  from the government (incl. SOEs) to ENEO (Power utility) (billion XAF)
</narrative></title>
<baseline year="2024" iso-date="2024-12-11" value="99"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-11" />
<period-end iso-date="2026-12-11" />
<target value="&lt; 5">
<comment><narrative>
These estimates are based on ENEO's financials and correspond to values at the end of each calendar year. They do not include arrears claimed by ENEO regarding the (i) application of the tariff compensation methodology (~FCFA 189 billion as of December 2024) and public lighting invoices (~FCFA 80 billion as of December 2024). These amounts are not recognized by the GoC, although discussions are still underway between the two parties to resolve their misalignment. Additionaly, the baseline figure is for December 2023 rather than December 2024.
</narrative></comment>
</target>
<actual value="103">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Irrigated area (in ha) in the Northern regions transferred to WUA
</narrative></title>
<baseline year="2020" iso-date="2020-12-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-11" />
<period-end iso-date="2026-12-11" />
<target value="10,000">

</target>
<actual value="4400">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Paved national trunk roads in good condition, expressed as an International Roughness Index (IRI) of less than 3.5 m/km
</narrative></title>
<baseline year="2020" iso-date="2020-12-11" value="12"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-11" />
<period-end iso-date="2026-12-11" />
<target value="25">
<comment><narrative>
Data is currently unavailable because the project aimed at expanding the use of modern techniques for assessing road quality is in progress. At present, road quality is evaluated through visual inspection.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Population eligible to receive birth certificates from CR centers outside their places of birth
</narrative></title>
<baseline year="2020" iso-date="2020-12-06" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-06" />
<period-end iso-date="2026-12-10" />
<target value="75">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Vulnerable households registered in the social registry
</narrative></title>
<baseline year="2020" iso-date="2020-12-06" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-06" />
<period-end iso-date="2026-12-09" />
<target value="300000">

</target>
<actual value="113495">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Decrease of the dropout rate of pregnant girls in targeted primary schools of the Northern regions
</narrative></title>
<baseline year="2020" iso-date="2020-11-23" value="90"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-23" />
<period-end iso-date="2026-12-09" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public primary schools enrolling more than 100 pupils with at least 3 state-paid teachers (especially in priority education zones)
</narrative></title>
<baseline year="2020" iso-date="2020-11-23" value="52 (41)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-23" />
<period-end iso-date="2026-12-09" />
<target value="90 (75)">

</target>
<actual value="86">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction of cash payment rate made by Treasury
</narrative></title>
<baseline year="2020" iso-date="2020-11-23" value="22.4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-23" />
<period-end iso-date="2026-12-09" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Non-oil revenue to GDP ratio
</narrative></title>
<baseline year="2020" iso-date="2020-11-23" value="11.7"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-23" />
<period-end iso-date="2026-12-09" />
<target value="14.4">

</target>
<actual value="13.3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
SOEs (including the 10 largest SOEs) publishing their annual audited financial statements online no later than two (2) months following the legal deadline for approval of accounts by General Assemblie
</narrative></title>
<baseline year="2020" iso-date="2020-11-23" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-23" />
<period-end iso-date="2026-12-09" />
<target value="= 50">

</target>
<actual value="38">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of central budgetary transfers under the General Decentralization Grant (DGD) to Decentralized Territorial Units (CTDs)
</narrative></title>
<baseline year="2020" iso-date="2020-11-11" value="1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-11" />
<period-end iso-date="2026-12-11" />
<target value="10">
<comment><narrative>
The data from 2020 to 2023 included is from the settlement laws. This reflect sharp budgetary cuts in the recurrent budget in the course of the year (DGD volet fonctionnement). For 2024 and 2025, the settlement law is not yet available therefore we considered the amount as reflected in the revised finance law. Additionally, the DPF2 program document approved by the Board sets the result indicator target at 7, not 10 as shown in this table.
</narrative></comment>
</target>
<actual value="2.4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Paved national trunk roads in good condition, expressed as an International Roughness Index (IRI) of less than 3.5 m/km
</narrative></title>
<baseline year="2020" iso-date="2020-12-11" value="12"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-11" />
<period-end iso-date="2026-12-11" />
<target value="25">
<comment><narrative>
Data is currently unavailable because the project aimed at expanding the use of modern techniques for assessing road quality is in progress. At present, road quality is evaluated through visual inspection.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of central budgetary transfers under the General Decentralization Grant (DGD) to Decentralized Territorial Units (CTDs)
</narrative></title>
<baseline year="2020" iso-date="2020-11-11" value="1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-11-11" />
<period-end iso-date="2026-12-11" />
<target value="10">
<comment><narrative>
The data from 2020 to 2023 included is from the settlement laws. This reflect sharp budgetary cuts in the recurrent budget in the course of the year (DGD volet fonctionnement). For 2024 and 2025, the settlement law is not yet available therefore we considered the amount as reflected in the revised finance law. Additionally, the DPF2 program document approved by the Board sets the result indicator target at 7, not 10 as shown in this table.
</narrative></comment>
</target>
<actual value="2.4">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P178136</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Cameroon Power Sector Reform Program</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Program's Development Objective is to improve financial performance and transparency of the electricity sector, and increase access to electricity in Cameroon.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[Component 1: Technical Assistance. The technical assistance component will support the implementation of the program and capacity building of sector agencies with key roles in the execution of activities supported by the PforR. Using the World Bank's procedures for procurement and fiduciary management under the IPF component will allow the GoC to attract world-class consultancy services including the services of an Independent Verification Agency which will conduct the verification of the achievement of DLIs and manage the verification process as well as an Owner's Engineer who will support implementing agencies in the preparation of technical bidding documents. This component will also support the creation of a lean Program Implementation Unit that will provide overall coordination support for the implementation of the PforR activities and be the secretariat of the Inter-ministerial Committee.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0051226"><narrative>Republic of Cameroon</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="CM-COA-0051225"><narrative>Ministry of Water Resources and Energy (MINEE)</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2023-02-23"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2023-08-03"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2028-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2028-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Ahmed Ousman Abani</narrative></person-name><telephone>+1-202-473-1000</telephone><email>aousmanabani@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2220957" />
                <name><narrative>Yaounde</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>3.86667 11.51667</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="23631" percentage="48" xml:lang="en"/><sector vocabulary="1" code="23111" percentage="33" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="19" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LP" percentage="36.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Energy and Extractives</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LT" percentage="64.0000000" xml:lang="en"><narrative>FY17 - Energy Transmission and Distribution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000862" percentage="78" xml:lang="en"><narrative>Energy Policies &amp; Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000863" percentage="71" xml:lang="en"><narrative>Access to Energy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000861" percentage="24" xml:lang="en"><narrative>Energy Efficiency</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000086" percentage="100" xml:lang="en"><narrative>Energy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000861" percentage="24" xml:lang="en"><narrative>Energy Efficiency</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="58" xml:lang="en"><narrative>Climate change</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">4666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">4666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">4666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">4666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">4666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">4666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">4666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">4666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">4666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">4666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">4666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">4666666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">3333333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">6666666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">6333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">6333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">6333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">6333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">6333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">6333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">6333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">6333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">6333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">6333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">6333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">6333333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">4800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">4800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">4800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">4800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">4800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">4800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">4800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">4800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">4800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">4800000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">4666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">4666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">4666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">4666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">4666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">4666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">4666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">4666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">4666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">4666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">4666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">4666666.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">3333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">3333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">3333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">3333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">3333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">3333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">3333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">3333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">3333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">3333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">3333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">3333333.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">6666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">6666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">6666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">6666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">6666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">6666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">6666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">6666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">6666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">6666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">6666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">6666666.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">6333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">6333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">6333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">6333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">6333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">6333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">6333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">6333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">6333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">6333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">6333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">6333333.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">4800000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">4800000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">4800000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">4800000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">4800000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">4800000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">4800000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">4800000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">4800000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">4800000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">242983587.26</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">242983587.26</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">300000000</value><description xml:lang="en"><narrative>Total Commitment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-51225"><narrative>Ministry of Water Resources and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">965385</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-51225"><narrative>Ministry of Water Resources and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">52300333</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-51225"><narrative>Ministry of Water Resources and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">210415</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-51225"><narrative>Ministry of Water Resources and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">901829</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-51225"><narrative>Ministry of Water Resources and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">2638451</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-51225"><narrative>Ministry of Water Resources and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-4203</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-51225"><narrative>Ministry of Water Resources and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-437409</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-51225"><narrative>Ministry of Water Resources and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-456858</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-51225"><narrative>Ministry of Water Resources and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-457922</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-51225"><narrative>Ministry of Water Resources and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P178136"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P178136?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P178136"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public lamps with metered consumption
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="150,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women accessing energy sector jobs/promotion following internship
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="20.00">

</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Smart meters installed and put in service to record consumption of public facilities
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="15,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in renewable electricity supply to grid-connected and mini-grid consumers
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="44.60">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
ARSEL has  issued an annual resolution setting  MAR of ENEO and SONATREL
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="Lack of systematic issuance of resolution setting MAR of SONATREL for the following year"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="ARSEL has issued an annual resolution setting MAR of ENEO and SONATREL for following year">

</target>
<actual value="Lack of systematic issuance of resolution setting MAR of SONATREL for the following year">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public lamps with metered consumption
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="150,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net greenhouse gas (GHG) emissions
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="168,000.00">
<comment><narrative>
Project net greenhouse gas (GHG) emissions are calculated as an annual average of the difference between project gross (absolute) emissions aggregated over the economic lifetime of the project and the emissions of a baseline (counterfactual) scenario aggregated over the same time horizon.  They are reported in metric tons of carbon dioxide equivalent per year.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual compensation amount estimated and included into National Budget Law
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="Non-regular inclusion of compensation amount in Annual Budget Law"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="ARSEL has communicated timely to MINFI the estimated value of compensation for 2028 to be included in National Budget Law.">

</target>
<actual value="ARSEL has issued a resolution establishing a procedure to estimate the tariff deficit to be included in the National Budget Law and has timely reported to MINFI the resulting value for 2024.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Smart meters installed and put in service to record consumption of public facilities
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="15,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Public facilities with functioning smart meters and public lighting with functioning meters
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This DLI incentivizes timely payments for electricity consumption and public lighting. The preparation and execution of a Billing Improvement Plan (BIP) to install smart meters will be led by MINEE. It will allow ENEO to issue accurate bills for actual consumption, and GoC to assess on its own accuracy of those bills by monitoring consumption remotely. As regards public lighting, the installation of smart meters will replace current billing based on consumption estimates, which are inherently inaccurate. Besides, GoC will have the option to activate the pre-paid function in the installed smart meters in some of its facilities, as needed.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Timely payments of public administration's electricity consumption and annual compensation by Ministry of Finance to ENEO, as per applicable regulatory framework
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="Irregular payments of annual compensation and electricity bills of public facilities"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
The purpose of this DLI is to improve the financial performance of the sector by enabling regular payments to ENEO of fully accurate and auditable bills for electricity consumption of facilities of Central Government and public lighting, as well as of annual amounts of compensation to cover tariff shortfalls.
</narrative></comment>
</target>
<actual value="Irregular payments of annual compensation and electricity bills of public facilities">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Timely payments of public administration's electricity consumption and annual compensation by Ministry of Finance to ENEO, as per applicable regulatory framework
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="Irregular payments of annual compensation and electricity bills of public facilities"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
The purpose of this DLI is to improve the financial performance of the sector by enabling regular payments to ENEO of fully accurate and auditable bills for electricity consumption of facilities of Central Government and public lighting, as well as of annual amounts of compensation to cover tariff shortfalls.
</narrative></comment>
</target>
<actual value="Irregular payments of annual compensation and electricity bills of public facilities">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Timely payments of public administration's electricity consumption and annual compensation by Ministry of Finance to ENEO, as per applicable regulatory framework
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="Irregular payments of annual compensation and electricity bills of public facilities"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
The purpose of this DLI is to improve the financial performance of the sector by enabling regular payments to ENEO of fully accurate and auditable bills for electricity consumption of facilities of Central Government and public lighting, as well as of annual amounts of compensation to cover tariff shortfalls.
</narrative></comment>
</target>
<actual value="Irregular payments of annual compensation and electricity bills of public facilities">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction of annual revenue gap (RG) between maximum allowed revenues (MAR) and tariff revenues (TR), expressed as a percentage of MAR.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="9.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
MAR= maximum allowed revenues of the sector to carry out operations, determined every year by ARSEL. 

TR = annual tariff revenues of ENEO resulting from sales to customers at applicable tariff rates for the year, determined by ARSEL. 

C= annual value of compensation = MAR-TR, determined by ARSEL  

In the first half of each year, the regulator ARSEL will issue a resolution setting the final value of MAR and C for the previous year, based on ex-post values of sales, costs in each segment of the value chain.
</narrative></comment>
</target>
<actual value="9.50">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction of annual revenue gap (RG) between maximum allowed revenues (MAR) and tariff revenues (TR), expressed as a percentage of MAR.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="9.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
MAR= maximum allowed revenues of the sector to carry out operations, determined every year by ARSEL. 

TR = annual tariff revenues of ENEO resulting from sales to customers at applicable tariff rates for the year, determined by ARSEL. 

C= annual value of compensation = MAR-TR, determined by ARSEL  

In the first half of each year, the regulator ARSEL will issue a resolution setting the final value of MAR and C for the previous year, based on ex-post values of sales, costs in each segment of the value chain.
</narrative></comment>
</target>
<actual value="9.50">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction of annual revenue gap (RG) between maximum allowed revenues (MAR) and tariff revenues (TR), expressed as a percentage of MAR.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="9.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
MAR= maximum allowed revenues of the sector to carry out operations, determined every year by ARSEL. 

TR = annual tariff revenues of ENEO resulting from sales to customers at applicable tariff rates for the year, determined by ARSEL. 

C= annual value of compensation = MAR-TR, determined by ARSEL  

In the first half of each year, the regulator ARSEL will issue a resolution setting the final value of MAR and C for the previous year, based on ex-post values of sales, costs in each segment of the value chain.
</narrative></comment>
</target>
<actual value="9.50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net greenhouse gas (GHG) emissions
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="168,000.00">
<comment><narrative>
Project net greenhouse gas (GHG) emissions are calculated as an annual average of the difference between project gross (absolute) emissions aggregated over the economic lifetime of the project and the emissions of a baseline (counterfactual) scenario aggregated over the same time horizon.  They are reported in metric tons of carbon dioxide equivalent per year.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net greenhouse gas (GHG) emissions
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="168,000.00">
<comment><narrative>
Project net greenhouse gas (GHG) emissions are calculated as an annual average of the difference between project gross (absolute) emissions aggregated over the economic lifetime of the project and the emissions of a baseline (counterfactual) scenario aggregated over the same time horizon.  They are reported in metric tons of carbon dioxide equivalent per year.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net greenhouse gas (GHG) emissions
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="168,000.00">
<comment><narrative>
Project net greenhouse gas (GHG) emissions are calculated as an annual average of the difference between project gross (absolute) emissions aggregated over the economic lifetime of the project and the emissions of a baseline (counterfactual) scenario aggregated over the same time horizon.  They are reported in metric tons of carbon dioxide equivalent per year.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public lamps with metered consumption
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="150,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public lamps with metered consumption
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="150,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public lamps with metered consumption
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="150,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in transformation capacity in transmission system
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="2,898,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="3,136,900.00">

</target>
<actual value="3,084,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in transformation capacity in transmission system
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="2,898,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="3,136,900.00">
<comment><narrative>
Confirmation of result to be provided by IVA by end of March 2026
</narrative></comment>
</target>
<actual value="2,898,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in transformation capacity in transmission system
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="2,898,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="3,136,900.00">

</target>
<actual value="2,898,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered and addressed within the GRM timeframe
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="100.00">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered and addressed within the GRM timeframe
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="100.00">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered and addressed within the GRM timeframe
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="100.00">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Smart meters installed and put in service to record consumption of public facilities
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="15,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Smart meters installed and put in service to record consumption of public facilities
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="15,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Smart meters installed and put in service to record consumption of public facilities
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="15,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in renewable electricity supply to grid-connected and mini-grid consumers
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="44.60">

</target>
<actual value="2.5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in renewable electricity supply to grid-connected and mini-grid consumers
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="44.60">
<comment><narrative>
Confirmation of result to be provided by IVA by end of March 2026
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in renewable electricity supply to grid-connected and mini-grid consumers
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="44.60">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women accessing energy sector jobs/promotion following internship
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="20.00">

</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women accessing energy sector jobs/promotion following internship
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="20.00">

</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women accessing energy sector jobs/promotion following internship
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="20.00">

</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual compensation amount estimated and included into National Budget Law
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="Non-regular inclusion of compensation amount in Annual Budget Law"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="ARSEL has communicated timely to MINFI the estimated value of compensation for 2028 to be included in National Budget Law.">

</target>
<actual value="The projected amount of 2026 tariff compensation estimated by ARSEL has been included in the National Budget Law.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual compensation amount estimated and included into National Budget Law
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="Non-regular inclusion of compensation amount in Annual Budget Law"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="ARSEL has communicated timely to MINFI the estimated value of compensation for 2028 to be included in National Budget Law.">

</target>
<actual value="ARSEL is finalizing its resolution establishing the projected tariff deficit for 2026">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual compensation amount estimated and included into National Budget Law
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="Non-regular inclusion of compensation amount in Annual Budget Law"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="ARSEL has communicated timely to MINFI the estimated value of compensation for 2028 to be included in National Budget Law.">

</target>
<actual value="ARSEL has issued a resolution establishing a procedure to estimate the tariff deficit to be included in the National Budget Law and has timely reported to MINFI the resulting value for 2024.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households provided with new electricity service
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="211,000.00">

</target>
<actual value="4138">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households provided with new electricity service
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="211,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households provided with new electricity service
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="211,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women interns in technical internships
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="15.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="30.00">

</target>
<actual value="15.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women interns in technical internships
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="15.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="30.00">

</target>
<actual value="15.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women interns in technical internships
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="15.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="30.00">

</target>
<actual value="15.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
ARSEL has  issued an annual resolution setting  MAR of ENEO and SONATREL
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="Lack of systematic issuance of resolution setting MAR of SONATREL for the following year"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="ARSEL has issued an annual resolution setting MAR of ENEO and SONATREL for following year">

</target>
<actual value="In late December 2025, ARSEL issued resolutions setting projected 2026 MAR for ENEO (now SOCADEL) and SONATREL.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
ARSEL has  issued an annual resolution setting  MAR of ENEO and SONATREL
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="Lack of systematic issuance of resolution setting MAR of SONATREL for the following year"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="ARSEL has issued an annual resolution setting MAR of ENEO and SONATREL for following year">

</target>
<actual value="Lack of systematic issuance of resolution setting MAR of SONATREL for the following year">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
ARSEL has  issued an annual resolution setting  MAR of ENEO and SONATREL
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="Lack of systematic issuance of resolution setting MAR of SONATREL for the following year"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="ARSEL has issued an annual resolution setting MAR of ENEO and SONATREL for following year">

</target>
<actual value="Lack of systematic issuance of resolution setting MAR of SONATREL for the following year">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Timely payments of public administration's electricity consumption and annual compensation
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="Irregular payments of annual compensation and electricity bills of public facilities"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-03-31" />
<target value="(a) 100% of the budgeted amount of tariff compensation as estimated by ARSEL for calendar year 2027 has been paid by MINFI in quarterly disbursements made no later than three months after the end of each quarter; (b) (i) 100% of the budgeted amount for public lighting bills estimated by ARSEL for calendar year 2027, and (ii) 100% of the budgeted amount for central government's electricity bills estimated by ARSEL for year 2027 have been paid by the end of the first quarter of 2028.">

</target>
<actual value="Irregular payments of annual compensation and electricity bills of public facilities">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Timely payments of public administration's electricity consumption and annual compensation
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="Irregular payments of annual compensation and electricity bills of public facilities"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-03-31" />
<target value="(a) 100% of the budgeted amount of tariff compensation as estimated by ARSEL for calendar year 2027 has been paid by MINFI in quarterly disbursements made no later than three months after the end of each quarter; (b) (i) 100% of the budgeted amount for public lighting bills estimated by ARSEL for calendar year 2027, and (ii) 100% of the budgeted amount for central government's electricity bills estimated by ARSEL for year 2027 have been paid by the end of the first quarter of 2028.">

</target>
<actual value="Irregular payments of annual compensation and electricity bills of public facilities">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Timely payments of public administration's electricity consumption and annual compensation
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="Irregular payments of annual compensation and electricity bills of public facilities"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-03-31" />
<target value="(a) 100% of the budgeted amount of tariff compensation as estimated by ARSEL for calendar year 2027 has been paid by MINFI in quarterly disbursements made no later than three months after the end of each quarter; (b) (i) 100% of the budgeted amount for public lighting bills estimated by ARSEL for calendar year 2027, and (ii) 100% of the budgeted amount for central government's electricity bills estimated by ARSEL for year 2027 have been paid by the end of the first quarter of 2028.">
<comment><narrative>
The PCU has indicated that this target has mostly been met for 2024, but formal confirmation of will be provided once the IVA is recruited.
</narrative></comment>
</target>
<actual value="Irregular payments of annual compensation and electricity bills of public facilities">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-12-31" />
<target value="1,055,000.00">

</target>
<actual value="20690">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-12-31" />
<target value="1,055,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-12-31" />
<target value="1,055,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Public disclosure of annual audits of ENEO and SONATREL performance reports
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="Absence of systematic regulatory audit of performance of ENEO and SONATREL"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-12-31" />
<target value="ARSEL has published a report on technical audit of performance of ENEO and SONATREL in previous year.">

</target>
<actual value="Absence of systematic regulatory audit of performance of ENEO and SONATREL">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Public disclosure of annual audits of ENEO and SONATREL performance reports
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="Absence of systematic regulatory audit of performance of ENEO and SONATREL"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-12-31" />
<target value="ARSEL has published a report on technical audit of performance of ENEO and SONATREL in previous year.">

</target>
<actual value="Absence of systematic regulatory audit of performance of ENEO and SONATREL">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Public disclosure of annual audits of ENEO and SONATREL performance reports
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="Absence of systematic regulatory audit of performance of ENEO and SONATREL"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-12-31" />
<target value="ARSEL has published a report on technical audit of performance of ENEO and SONATREL in previous year.">

</target>
<actual value="Absence of systematic regulatory audit of performance of ENEO and SONATREL">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction of annual revenue gap between maximum allowed revenues and tariff revenues
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="9.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-12-31" />
<target value="5.00">

</target>
<actual value="9.50">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction of annual revenue gap between maximum allowed revenues and tariff revenues
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="9.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-12-31" />
<target value="5.00">

</target>
<actual value="9.50">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction of annual revenue gap between maximum allowed revenues and tariff revenues
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="9.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-12-31" />
<target value="5.00">

</target>
<actual value="9.50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to electricity
</narrative></title>
<baseline year="2022" iso-date="2022-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-15" />
<period-end iso-date="2027-12-15" />
<target value="1,055,000">

</target>
<actual value="2,0690">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to electricity
</narrative></title>
<baseline year="2022" iso-date="2022-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-15" />
<period-end iso-date="2027-12-15" />
<target value="1,055,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to electricity
</narrative></title>
<baseline year="2022" iso-date="2022-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-15" />
<period-end iso-date="2027-12-15" />
<target value="1,055,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled
</narrative></title>
<baseline year="2022" iso-date="2022-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-15" />
<period-end iso-date="2027-12-15" />
<target value="22">

</target>
<actual value="5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled
</narrative></title>
<baseline year="2022" iso-date="2022-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-15" />
<period-end iso-date="2027-12-15" />
<target value="22">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled
</narrative></title>
<baseline year="2022" iso-date="2022-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-15" />
<period-end iso-date="2027-12-15" />
<target value="22">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled
</narrative></title>
<baseline year="2022" iso-date="2022-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-15" />
<period-end iso-date="2027-12-15" />
<target value="22">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered and addressed within the GRM timeframe
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="100.00">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net greenhouse gas (GHG) emissions
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="168,000.00">
<comment><narrative>
Project net greenhouse gas (GHG) emissions are calculated as an annual average of the difference between project gross (absolute) emissions aggregated over the economic lifetime of the project and the emissions of a baseline (counterfactual) scenario aggregated over the same time horizon.  They are reported in metric tons of carbon dioxide equivalent per year.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-12-31" />
<target value="1,055,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled
</narrative></title>
<baseline year="2022" iso-date="2022-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-15" />
<period-end iso-date="2027-12-15" />
<target value="22">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in transformation capacity in transmission system
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="2,898,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="3,136,900.00">
<comment><narrative>
Confirmation of result to be provided by IVA by end of March 2026
</narrative></comment>
</target>
<actual value="2,898,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to electricity
</narrative></title>
<baseline year="2022" iso-date="2022-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-15" />
<period-end iso-date="2027-12-15" />
<target value="1,055,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Timely payments of public administration's electricity consumption and annual compensation
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="Irregular payments of annual compensation and electricity bills of public facilities"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-03-31" />
<target value="(a) 100% of the budgeted amount of tariff compensation as estimated by ARSEL for calendar year 2027 has been paid by MINFI in quarterly disbursements made no later than three months after the end of each quarter; (b) (i) 100% of the budgeted amount for public lighting bills estimated by ARSEL for calendar year 2027, and (ii) 100% of the budgeted amount for central government's electricity bills estimated by ARSEL for year 2027 have been paid by the end of the first quarter of 2028.">
<comment><narrative>
The PCU has indicated that this target has mostly been met for 2024, but formal confirmation of will be provided once the IVA is recruited.
</narrative></comment>
</target>
<actual value="Irregular payments of annual compensation and electricity bills of public facilities">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to electricity
</narrative></title>
<baseline year="2022" iso-date="2022-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-15" />
<period-end iso-date="2027-12-15" />
<target value="1,055,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households provided with new electricity service
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="211,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women accessing energy sector jobs/promotion following internship
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="20.00">

</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction of annual revenue gap between maximum allowed revenues and tariff revenues
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="9.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-12-31" />
<target value="5.00">

</target>
<actual value="9.50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered and addressed within the GRM timeframe
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="100.00">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
ARSEL has  issued an annual resolution setting  MAR of ENEO and SONATREL
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="Lack of systematic issuance of resolution setting MAR of SONATREL for the following year"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="ARSEL has issued an annual resolution setting MAR of ENEO and SONATREL for following year">

</target>
<actual value="Lack of systematic issuance of resolution setting MAR of SONATREL for the following year">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Public disclosure of annual audits of ENEO and SONATREL performance reports
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="Absence of systematic regulatory audit of performance of ENEO and SONATREL"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-12-31" />
<target value="ARSEL has published a report on technical audit of performance of ENEO and SONATREL in previous year.">

</target>
<actual value="Absence of systematic regulatory audit of performance of ENEO and SONATREL">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in renewable electricity supply to grid-connected and mini-grid consumers
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="44.60">
<comment><narrative>
Confirmation of result to be provided by IVA by end of March 2026
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women interns in technical internships
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="15.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="30.00">

</target>
<actual value="15.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in transformation capacity in transmission system
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="2,898,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="3,136,900.00">

</target>
<actual value="2,898,000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Public disclosure of annual audits of ENEO and SONATREL performance reports
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="Absence of systematic regulatory audit of performance of ENEO and SONATREL"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-12-31" />
<target value="ARSEL has published a report on technical audit of performance of ENEO and SONATREL in previous year.">

</target>
<actual value="Absence of systematic regulatory audit of performance of ENEO and SONATREL">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-12-31" />
<target value="1,055,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Timely payments of public administration's electricity consumption and annual compensation
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="Irregular payments of annual compensation and electricity bills of public facilities"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-03-31" />
<target value="(a) 100% of the budgeted amount of tariff compensation as estimated by ARSEL for calendar year 2027 has been paid by MINFI in quarterly disbursements made no later than three months after the end of each quarter; (b) (i) 100% of the budgeted amount for public lighting bills estimated by ARSEL for calendar year 2027, and (ii) 100% of the budgeted amount for central government's electricity bills estimated by ARSEL for year 2027 have been paid by the end of the first quarter of 2028.">

</target>
<actual value="Irregular payments of annual compensation and electricity bills of public facilities">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual compensation amount estimated and included into National Budget Law
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="Non-regular inclusion of compensation amount in Annual Budget Law"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="ARSEL has communicated timely to MINFI the estimated value of compensation for 2028 to be included in National Budget Law.">

</target>
<actual value="ARSEL is finalizing its resolution establishing the projected tariff deficit for 2026">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women interns in technical internships
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="15.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="30.00">

</target>
<actual value="15.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households provided with new electricity service
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="211,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net greenhouse gas (GHG) emissions
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="168,000.00">
<comment><narrative>
Project net greenhouse gas (GHG) emissions are calculated as an annual average of the difference between project gross (absolute) emissions aggregated over the economic lifetime of the project and the emissions of a baseline (counterfactual) scenario aggregated over the same time horizon.  They are reported in metric tons of carbon dioxide equivalent per year.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net greenhouse gas (GHG) emissions
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="168,000.00">
<comment><narrative>
Project net greenhouse gas (GHG) emissions are calculated as an annual average of the difference between project gross (absolute) emissions aggregated over the economic lifetime of the project and the emissions of a baseline (counterfactual) scenario aggregated over the same time horizon.  They are reported in metric tons of carbon dioxide equivalent per year.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net greenhouse gas (GHG) emissions
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="168,000.00">
<comment><narrative>
Project net greenhouse gas (GHG) emissions are calculated as an annual average of the difference between project gross (absolute) emissions aggregated over the economic lifetime of the project and the emissions of a baseline (counterfactual) scenario aggregated over the same time horizon.  They are reported in metric tons of carbon dioxide equivalent per year.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public lamps with metered consumption
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="150,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public lamps with metered consumption
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="150,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public lamps with metered consumption
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="150,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in transformation capacity in transmission system
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="2,898,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="3,136,900.00">

</target>
<actual value="3,084,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in transformation capacity in transmission system
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="2,898,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="3,136,900.00">
<comment><narrative>
Confirmation of result to be provided by IVA by end of March 2026
</narrative></comment>
</target>
<actual value="2,898,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in transformation capacity in transmission system
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="2,898,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="3,136,900.00">

</target>
<actual value="2,898,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered and addressed within the GRM timeframe
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="100.00">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered and addressed within the GRM timeframe
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="100.00">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered and addressed within the GRM timeframe
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="100.00">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Smart meters installed and put in service to record consumption of public facilities
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="15,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Smart meters installed and put in service to record consumption of public facilities
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="15,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Smart meters installed and put in service to record consumption of public facilities
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="15,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction of annual revenue gap between maximum allowed revenues and tariff revenues
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="9.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-12-31" />
<target value="5.00">

</target>
<actual value="9.50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in renewable electricity supply to grid-connected and mini-grid consumers
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="44.60">

</target>
<actual value="2.5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in renewable electricity supply to grid-connected and mini-grid consumers
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="44.60">
<comment><narrative>
Confirmation of result to be provided by IVA by end of March 2026
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in renewable electricity supply to grid-connected and mini-grid consumers
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="44.60">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women accessing energy sector jobs/promotion following internship
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="20.00">

</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women accessing energy sector jobs/promotion following internship
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="20.00">

</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women accessing energy sector jobs/promotion following internship
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="20.00">

</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual compensation amount estimated and included into National Budget Law
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="Non-regular inclusion of compensation amount in Annual Budget Law"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="ARSEL has communicated timely to MINFI the estimated value of compensation for 2028 to be included in National Budget Law.">

</target>
<actual value="The projected amount of 2026 tariff compensation estimated by ARSEL has been included in the National Budget Law.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual compensation amount estimated and included into National Budget Law
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="Non-regular inclusion of compensation amount in Annual Budget Law"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="ARSEL has communicated timely to MINFI the estimated value of compensation for 2028 to be included in National Budget Law.">

</target>
<actual value="ARSEL is finalizing its resolution establishing the projected tariff deficit for 2026">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual compensation amount estimated and included into National Budget Law
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="Non-regular inclusion of compensation amount in Annual Budget Law"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="ARSEL has communicated timely to MINFI the estimated value of compensation for 2028 to be included in National Budget Law.">

</target>
<actual value="ARSEL has issued a resolution establishing a procedure to estimate the tariff deficit to be included in the National Budget Law and has timely reported to MINFI the resulting value for 2024.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households provided with new electricity service
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="211,000.00">

</target>
<actual value="4138">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households provided with new electricity service
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="211,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households provided with new electricity service
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="211,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women interns in technical internships
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="15.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="30.00">

</target>
<actual value="15.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women interns in technical internships
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="15.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="30.00">

</target>
<actual value="15.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women interns in technical internships
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="15.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="30.00">

</target>
<actual value="15.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
ARSEL has  issued an annual resolution setting  MAR of ENEO and SONATREL
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="Lack of systematic issuance of resolution setting MAR of SONATREL for the following year"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="ARSEL has issued an annual resolution setting MAR of ENEO and SONATREL for following year">

</target>
<actual value="In late December 2025, ARSEL issued resolutions setting projected 2026 MAR for ENEO (now SOCADEL) and SONATREL.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
ARSEL has  issued an annual resolution setting  MAR of ENEO and SONATREL
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="Lack of systematic issuance of resolution setting MAR of SONATREL for the following year"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="ARSEL has issued an annual resolution setting MAR of ENEO and SONATREL for following year">

</target>
<actual value="Lack of systematic issuance of resolution setting MAR of SONATREL for the following year">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
ARSEL has  issued an annual resolution setting  MAR of ENEO and SONATREL
</narrative></title>
<baseline year="2023" iso-date="2023-01-06" value="Lack of systematic issuance of resolution setting MAR of SONATREL for the following year"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-06" />
<period-end iso-date="2027-12-31" />
<target value="ARSEL has issued an annual resolution setting MAR of ENEO and SONATREL for following year">

</target>
<actual value="Lack of systematic issuance of resolution setting MAR of SONATREL for the following year">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Timely payments of public administration's electricity consumption and annual compensation
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="Irregular payments of annual compensation and electricity bills of public facilities"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-03-31" />
<target value="(a) 100% of the budgeted amount of tariff compensation as estimated by ARSEL for calendar year 2027 has been paid by MINFI in quarterly disbursements made no later than three months after the end of each quarter; (b) (i) 100% of the budgeted amount for public lighting bills estimated by ARSEL for calendar year 2027, and (ii) 100% of the budgeted amount for central government's electricity bills estimated by ARSEL for year 2027 have been paid by the end of the first quarter of 2028.">

</target>
<actual value="Irregular payments of annual compensation and electricity bills of public facilities">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Timely payments of public administration's electricity consumption and annual compensation
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="Irregular payments of annual compensation and electricity bills of public facilities"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-03-31" />
<target value="(a) 100% of the budgeted amount of tariff compensation as estimated by ARSEL for calendar year 2027 has been paid by MINFI in quarterly disbursements made no later than three months after the end of each quarter; (b) (i) 100% of the budgeted amount for public lighting bills estimated by ARSEL for calendar year 2027, and (ii) 100% of the budgeted amount for central government's electricity bills estimated by ARSEL for year 2027 have been paid by the end of the first quarter of 2028.">

</target>
<actual value="Irregular payments of annual compensation and electricity bills of public facilities">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Timely payments of public administration's electricity consumption and annual compensation
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="Irregular payments of annual compensation and electricity bills of public facilities"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2028-03-31" />
<target value="(a) 100% of the budgeted amount of tariff compensation as estimated by ARSEL for calendar year 2027 has been paid by MINFI in quarterly disbursements made no later than three months after the end of each quarter; (b) (i) 100% of the budgeted amount for public lighting bills estimated by ARSEL for calendar year 2027, and (ii) 100% of the budgeted amount for central government's electricity bills estimated by ARSEL for year 2027 have been paid by the end of the first quarter of 2028.">
<comment><narrative>
The PCU has indicated that this target has mostly been met for 2024, but formal confirmation of will be provided once the IVA is recruited.
</narrative></comment>
</target>
<actual value="Irregular payments of annual compensation and electricity bills of public facilities">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-12-31" />
<target value="1,055,000.00">

</target>
<actual value="20690">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-12-31" />
<target value="1,055,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-12-31" />
<target value="1,055,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Public disclosure of annual audits of ENEO and SONATREL performance reports
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="Absence of systematic regulatory audit of performance of ENEO and SONATREL"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-12-31" />
<target value="ARSEL has published a report on technical audit of performance of ENEO and SONATREL in previous year.">

</target>
<actual value="Absence of systematic regulatory audit of performance of ENEO and SONATREL">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Public disclosure of annual audits of ENEO and SONATREL performance reports
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="Absence of systematic regulatory audit of performance of ENEO and SONATREL"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-12-31" />
<target value="ARSEL has published a report on technical audit of performance of ENEO and SONATREL in previous year.">

</target>
<actual value="Absence of systematic regulatory audit of performance of ENEO and SONATREL">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Public disclosure of annual audits of ENEO and SONATREL performance reports
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="Absence of systematic regulatory audit of performance of ENEO and SONATREL"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-12-31" />
<target value="ARSEL has published a report on technical audit of performance of ENEO and SONATREL in previous year.">

</target>
<actual value="Absence of systematic regulatory audit of performance of ENEO and SONATREL">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction of annual revenue gap between maximum allowed revenues and tariff revenues
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="9.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-12-31" />
<target value="5.00">

</target>
<actual value="9.50">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction of annual revenue gap between maximum allowed revenues and tariff revenues
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="9.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-12-31" />
<target value="5.00">

</target>
<actual value="9.50">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction of annual revenue gap between maximum allowed revenues and tariff revenues
</narrative></title>
<baseline year="2022" iso-date="2022-07-01" value="9.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-01" />
<period-end iso-date="2027-12-31" />
<target value="5.00">

</target>
<actual value="9.50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to electricity
</narrative></title>
<baseline year="2022" iso-date="2022-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-15" />
<period-end iso-date="2027-12-15" />
<target value="1,055,000">

</target>
<actual value="2,0690">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to electricity
</narrative></title>
<baseline year="2022" iso-date="2022-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-15" />
<period-end iso-date="2027-12-15" />
<target value="1,055,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to electricity
</narrative></title>
<baseline year="2022" iso-date="2022-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-15" />
<period-end iso-date="2027-12-15" />
<target value="1,055,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled
</narrative></title>
<baseline year="2022" iso-date="2022-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-15" />
<period-end iso-date="2027-12-15" />
<target value="22">

</target>
<actual value="5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled
</narrative></title>
<baseline year="2022" iso-date="2022-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-15" />
<period-end iso-date="2027-12-15" />
<target value="22">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled
</narrative></title>
<baseline year="2022" iso-date="2022-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-15" />
<period-end iso-date="2027-12-15" />
<target value="22">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in available transformation capacity in transmission substations operated by SONATREL
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="2,898 MVA"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
The purpose of this DLI is to achieve the elimination of bottlenecks and other issues in the existing transmission infrastructure operated by SONATREL created by several years of systematic underinvestment in the segment, which affect the quality and reliability of transmission services, and limit the electricity consumption of large users and demand growth in general, despite sufficient generation capacity is available.
</narrative></comment>
</target>
<actual value="3,084 MVA">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in available transformation capacity in transmission substations operated by SONATREL
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="2,898 MVA"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
The purpose of this DLI is to achieve the elimination of bottlenecks and other issues in the existing transmission infrastructure operated by SONATREL created by several years of systematic underinvestment in the segment, which affect the quality and reliability of transmission services, and limit the electricity consumption of large users and demand growth in general, despite sufficient generation capacity is available.
</narrative></comment>
</target>
<actual value="2,898 MVA">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in available transformation capacity in transmission substations operated by SONATREL
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="2,898 MVA"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
The purpose of this DLI is to achieve the elimination of bottlenecks and other issues in the existing transmission infrastructure operated by SONATREL created by several years of systematic underinvestment in the segment, which affect the quality and reliability of transmission services, and limit the electricity consumption of large users and demand growth in general, despite sufficient generation capacity is available.
</narrative></comment>
</target>
<actual value="2,898 MVA">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in renewable electricity supply to grid-connected and off-grid consumers
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This DLI tracks progress in increasing the share of renewable energy in the electricity generation mix, by hybridizing existing thermal plants in systems where this is the main primary resource with solar PV to reduce heavily subsidized fuel consumption and lower related greenhouse gases emissions and operating costs. This action is part of the least cost generation and transmission expansion plan, which calls for a significant reduction in use of imported oil products for thermal generation, replacing them by generationased on renewable resources to the largest extent compatible with security of supply criteria. 
44.66 GWh of solar PV power generation is expected to be supplied in the 2025-2027 period through the hybridization of isolated systems currently running on diesel thermal generation with public and/or private financing.
</narrative></comment>
</target>
<actual value="2.5 GWh">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in renewable electricity supply to grid-connected and off-grid consumers
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This DLI tracks progress in increasing the share of renewable energy in the electricity generation mix, by hybridizing existing thermal plants in systems where this is the main primary resource with solar PV to reduce heavily subsidized fuel consumption and lower related greenhouse gases emissions and operating costs. This action is part of the least cost generation and transmission expansion plan, which calls for a significant reduction in use of imported oil products for thermal generation, replacing them by generationased on renewable resources to the largest extent compatible with security of supply criteria. 
44.66 GWh of solar PV power generation is expected to be supplied in the 2025-2027 period through the hybridization of isolated systems currently running on diesel thermal generation with public and/or private financing.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in renewable electricity supply to grid-connected and off-grid consumers
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This DLI tracks progress in increasing the share of renewable energy in the electricity generation mix, by hybridizing existing thermal plants in systems where this is the main primary resource with solar PV to reduce heavily subsidized fuel consumption and lower related greenhouse gases emissions and operating costs. This action is part of the least cost generation and transmission expansion plan, which calls for a significant reduction in use of imported oil products for thermal generation, replacing them by generationased on renewable resources to the largest extent compatible with security of supply criteria. 
44.66 GWh of solar PV power generation is expected to be supplied in the 2025-2027 period through the hybridization of isolated systems currently running on diesel thermal generation with public and/or private financing.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Households provided with new electricity service
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
The purpose of this DLI is to track improvements in the quality of electricity service provided to existing consumers and connection of new users through grid densification (construction of 15 kV and lower voltage networks and service connections) to increase overall electrification rate and foster systematic least-cost generation and transmission and electrification planning (as key enablers of sector sustainable development), through the approval of a National Electrification Master Plan (NEMP) and of the process to bedopted for the systematic update of the Generation,Transmission and Distribution Master Plan.
</narrative></comment>
</target>
<actual value="4,138">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Households provided with new electricity service
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
The purpose of this DLI is to track improvements in the quality of electricity service provided to existing consumers and connection of new users through grid densification (construction of 15 kV and lower voltage networks and service connections) to increase overall electrification rate and foster systematic least-cost generation and transmission and electrification planning (as key enablers of sector sustainable development), through the approval of a National Electrification Master Plan (NEMP) and of the process to bedopted for the systematic update of the Generation,Transmission and Distribution Master Plan.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Households provided with new electricity service
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
The purpose of this DLI is to track improvements in the quality of electricity service provided to existing consumers and connection of new users through grid densification (construction of 15 kV and lower voltage networks and service connections) to increase overall electrification rate and foster systematic least-cost generation and transmission and electrification planning (as key enablers of sector sustainable development), through the approval of a National Electrification Master Plan (NEMP) and of the process to bedopted for the systematic update of the Generation,Transmission and Distribution Master Plan.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reports on regulatory audits of performance of ENEO and SONATREL are completed and published annually
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="Absence of systematic regulatory audit of the performance of ENEO and SONATREL"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
The purpose of this DLI is to track systematic compliance by ARSEL with its core regulatory duty to monitor the performance of ENEO as prescribed in the concession contract, and, if needed, adopt corrective action as per contract provisions to enforce achievement of KPIs on performance (losses, new connections, quality of service, etc.) agreed for the extension of the concession contract unti 2031. The DLI also aims to strengthen ARSEL's monitoring capacity of SONATREL's performance as per its concession contract with the Government of Cameroon.
</narrative></comment>
</target>
<actual value="Absence of systematic regulatory audit of the performance of ENEO and SONATREL">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reports on regulatory audits of performance of ENEO and SONATREL are completed and published annually
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="Absence of systematic regulatory audit of the performance of ENEO and SONATREL"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
The purpose of this DLI is to track systematic compliance by ARSEL with its core regulatory duty to monitor the performance of ENEO as prescribed in the concession contract, and, if needed, adopt corrective action as per contract provisions to enforce achievement of KPIs on performance (losses, new connections, quality of service, etc.) agreed for the extension of the concession contract unti 2031. The DLI also aims to strengthen ARSEL's monitoring capacity of SONATREL's performance as per its concession contract with the Government of Cameroon.
</narrative></comment>
</target>
<actual value="Absence of systematic regulatory audit of the performance of ENEO and SONATREL">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reports on regulatory audits of performance of ENEO and SONATREL are completed and published annually
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="Absence of systematic regulatory audit of the performance of ENEO and SONATREL"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
The purpose of this DLI is to track systematic compliance by ARSEL with its core regulatory duty to monitor the performance of ENEO as prescribed in the concession contract, and, if needed, adopt corrective action as per contract provisions to enforce achievement of KPIs on performance (losses, new connections, quality of service, etc.) agreed for the extension of the concession contract unti 2031. The DLI also aims to strengthen ARSEL's monitoring capacity of SONATREL's performance as per its concession contract with the Government of Cameroon.
</narrative></comment>
</target>
<actual value="Absence of systematic regulatory audit of the performance of ENEO and SONATREL">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Public facilities with functioning smart meters and public lighting with functioning meters
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This DLI incentivizes timely payments for electricity consumption and public lighting. The preparation and execution of a Billing Improvement Plan (BIP) to install smart meters will be led by MINEE. It will allow ENEO to issue accurate bills for actual consumption, and GoC to assess on its own accuracy of those bills by monitoring consumption remotely. As regards public lighting, the installation of smart meters will replace current billing based on consumption estimates, which are inherently inaccurate. Besides, GoC will have the option to activate the pre-paid function in the installed smart meters in some of its facilities, as needed.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Public facilities with functioning smart meters and public lighting with functioning meters
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This DLI incentivizes timely payments for electricity consumption and public lighting. The preparation and execution of a Billing Improvement Plan (BIP) to install smart meters will be led by MINEE. It will allow ENEO to issue accurate bills for actual consumption, and GoC to assess on its own accuracy of those bills by monitoring consumption remotely. As regards public lighting, the installation of smart meters will replace current billing based on consumption estimates, which are inherently inaccurate. Besides, GoC will have the option to activate the pre-paid function in the installed smart meters in some of its facilities, as needed.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P143940</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Flood Emergency Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The PDO is to rehabilitate key hydraulic infrastructure and improve disaster-preparedness in target areas in the Far North Region of Cameroon.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0012872"><narrative>MINEPAT</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0012872"><narrative>MINEPAT</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="CM-COA-0012871"><narrative>SEMRY</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2013-05-30"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2013-06-11"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2020-05-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2020-05-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Jose Jorge Trevino Paredes</narrative></person-name><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002221030" />
            <name><narrative>Yagoua</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.34107 15.23288</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="31140" percentage="59" xml:lang="en"/><sector vocabulary="1" code="14040" percentage="38" xml:lang="en"/><sector vocabulary="1" code="14015" percentage="3" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TZ" percentage="8.00000000" xml:lang="en"><narrative>FY17 - Other Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="8.00000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WF" percentage="5.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Water, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="39.0000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AI" percentage="40.0000000" xml:lang="en"><narrative>FY17 - Irrigation and Drainage</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="42" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="4" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="42" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="12" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="42" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="42" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="64" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000331" percentage="4" xml:lang="en"><narrative>Disaster Risk Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="64" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000753" percentage="4" xml:lang="en"><narrative>Disaster Preparedness</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000751" percentage="4" xml:lang="en"><narrative>Disaster Response and Recovery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="64" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="4" xml:lang="en"><narrative>Finance for Development</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">1558659.21</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">1558659.21</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">1558659.21</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">1558659.21</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">1558659.21</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">1558659.21</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">1558659.21</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">1558659.21</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">1558659.21</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">1558659.21</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">1558659.21</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">1558659.27</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">4625698.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">4625698.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">4625698.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">4625698.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">4625698.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">4625698.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">4625698.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">4625698.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">4625698.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">4625698.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">4625698.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">4625698.27</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">4851955.31</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">4851955.31</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">4851955.31</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">4851955.31</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">4851955.31</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">4851955.31</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">4851955.31</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">4851955.31</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">4851955.31</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">4851955.31</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">4851955.31</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">4851955.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">2539106.14</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">2539106.14</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">2539106.14</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">2539106.14</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">2539106.14</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">2539106.14</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">2539106.14</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">2539106.14</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">2539106.14</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">2539106.14</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">2539106.14</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">2539106.20</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">7875286.09</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">7875286.09</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">108000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-479525</value><description xml:lang="en"><narrative>Total Commitment Cancellations in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">5423672</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">33371</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">31922</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">43466</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">95056</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">316327</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">229364</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">11526895</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">332999</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">729712</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">159364</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">6587423</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">774043</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">328822</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">2141021</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">296242</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">601668</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">5318487</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">2740209</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">7187365</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">2049417</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">7727001</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">3947238</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">882619</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">3215657</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">2008722</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">15572119</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">8436885</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">4906838</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">3202130</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-7094</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">3341136</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">85793</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-141175</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">-24405</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">-18052</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">-19890</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">-20699</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">-66465</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">-99439</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">-136217</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-221221</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-4136</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-234890</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-334982</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-331802</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-359356</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-1379</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-374534</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-384443</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-378230</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-367750</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-343131</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-367297</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-356043</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-339687</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-363108</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-335865</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-358291</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-334901</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-949438</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-942646</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-959599</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-15234</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-918927</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-981783</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-24700</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-947881</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12871"><narrative>SEMRY</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P143940"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P143940?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P143940"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Flood protection infrastructure rehabilitated
</narrative></title>
<baseline year="2013" iso-date="2013-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-08-15" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="97.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2013" iso-date="2013-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-08-15" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="103615.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Kilometers of Maga Dam rehabilitated
</narrative></title>
<baseline year="2013" iso-date="2013-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-08-15" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="27.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area provided with irrigation and drainage services
</narrative></title>
<baseline year="2013" iso-date="2013-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-08-15" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="7500.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Kilometers of Logone River embankment rehabilitated
</narrative></title>
<baseline year="2013" iso-date="2013-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-08-15" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="70.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Contingency Plan approved and disseminated
</narrative></title>
<baseline year="2013" iso-date="2013-08-15" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-08-15" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People trained in disaster preparedness and emergency management (contingency plan) for key hydraulic infrastructure
</narrative></title>
<baseline year="2013" iso-date="2013-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-08-15" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="145.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hydro-meteorological monitoring system for key hydraulic infrastructure operational
</narrative></title>
<baseline year="2013" iso-date="2013-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-08-15" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="150.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Operation and maintenance plan for key hydraulic infrastructure developed and disseminated
</narrative></title>
<baseline year="2013" iso-date="2013-08-15" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-08-15" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P173240</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Acceleration of the Digital Transformation of Cameroon Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objectives (PDO) are to increase digital inclusion and the use of digital agricultural solutions by selected agricultural value chain actors.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0044523"><narrative>Republic of Cameroon</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0044523"><narrative>Republic of Cameroon</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="CM-COA-0044524"><narrative>Ministry of Posts and Telecommunications (MINPOSTEL)</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2021-02-15"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2021-09-28"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2027-03-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2027-03-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Xavier Stephane Decoster</narrative></person-name><telephone>+1-202-473-1000</telephone><email>xdecoster@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>









<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002233387" />
            <name><narrative>Republic of Cameroon</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6 12.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="22040" percentage="69" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="19" xml:lang="en"/><sector vocabulary="1" code="22011" percentage="7" xml:lang="en"/><sector vocabulary="1" code="22020" percentage="5" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CS" percentage="20.0000000" xml:lang="en"><narrative>FY17 - ICT Services</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CF" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Information and Communications Technologies</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CI" percentage="70.0000000" xml:lang="en"><narrative>FY17 - ICT Infrastructure</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="27" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="29" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000262" percentage="22" xml:lang="en"><narrative>ICT Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="45" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000441" percentage="29" xml:lang="en"><narrative>Data production, accessibility and use</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="10" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="29" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000441" percentage="29" xml:lang="en"><narrative>Data production, accessibility and use</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000261" percentage="92" xml:lang="en"><narrative>ICT Solutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="29" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000626" percentage="45" xml:lang="en"><narrative>Pandemic Response</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="15" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000753" percentage="18" xml:lang="en"><narrative>Disaster Preparedness</narrative></sector><humanitarian-scope type="1" vocabulary="1-2" code="EP-2020-000012-001"> </humanitarian-scope><humanitarian-scope type="2" vocabulary="2-1" code="HCOVD20"> </humanitarian-scope><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">970000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">970000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">490000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">490000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">980000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">490000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">980000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">490000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">980000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">490000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">490000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">990000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">510000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">510000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">1060000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">560000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">1280000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">720000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">1590000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">850000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">880000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">1800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">810000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">1650000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">840000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">1710000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">880000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">900000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">1880000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">990000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">1920000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">920000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">1900000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">990000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">1010000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">2110000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">1610000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">3720000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">1820000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">3390000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">1620000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">1590000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">3130000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">1560000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">3110000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">1550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">3110000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">1560000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">1560000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">3140000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">1570000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">3160000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">1590000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">3180000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1600000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">1600000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">3210000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">1610000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">3230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">1620000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">3320000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">66036970.93</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">66036970.93</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">100000000</value><description xml:lang="en"><narrative>Total Commitment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-44526"><narrative>Ministry of Agriculture and Rural Development (MINADER); Ministry of Livestock, Fisheries and Animal Industries (MINEPIA); Ministry of Posts and Telecommunications (MINPOSTEL)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-16330920</value><description xml:lang="en"><narrative>Total Commitment Cancellations in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-44526"><narrative>Ministry of Agriculture and Rural Development (MINADER); Ministry of Livestock, Fisheries and Animal Industries (MINEPIA); Ministry of Posts and Telecommunications (MINPOSTEL)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">1978299</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-44526"><narrative>Ministry of Agriculture and Rural Development (MINADER); Ministry of Livestock, Fisheries and Animal Industries (MINEPIA); Ministry of Posts and Telecommunications (MINPOSTEL)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">936887</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-44526"><narrative>Ministry of Agriculture and Rural Development (MINADER); Ministry of Livestock, Fisheries and Animal Industries (MINEPIA); Ministry of Posts and Telecommunications (MINPOSTEL)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">82081</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-44526"><narrative>Ministry of Agriculture and Rural Development (MINADER); Ministry of Livestock, Fisheries and Animal Industries (MINEPIA); Ministry of Posts and Telecommunications (MINPOSTEL)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">92115</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-44526"><narrative>Ministry of Agriculture and Rural Development (MINADER); Ministry of Livestock, Fisheries and Animal Industries (MINEPIA); Ministry of Posts and Telecommunications (MINPOSTEL)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">552591</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-44526"><narrative>Ministry of Agriculture and Rural Development (MINADER); Ministry of Livestock, Fisheries and Animal Industries (MINEPIA); Ministry of Posts and Telecommunications (MINPOSTEL)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">9789742</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-44526"><narrative>Ministry of Agriculture and Rural Development (MINADER); Ministry of Livestock, Fisheries and Animal Industries (MINEPIA); Ministry of Posts and Telecommunications (MINPOSTEL)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">30486</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-44526"><narrative>Ministry of Agriculture and Rural Development (MINADER); Ministry of Livestock, Fisheries and Animal Industries (MINEPIA); Ministry of Posts and Telecommunications (MINPOSTEL)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">1937791</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-44526"><narrative>Ministry of Agriculture and Rural Development (MINADER); Ministry of Livestock, Fisheries and Animal Industries (MINEPIA); Ministry of Posts and Telecommunications (MINPOSTEL)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">132091</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-44526"><narrative>Ministry of Agriculture and Rural Development (MINADER); Ministry of Livestock, Fisheries and Animal Industries (MINEPIA); Ministry of Posts and Telecommunications (MINPOSTEL)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">3703935</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-44526"><narrative>Ministry of Agriculture and Rural Development (MINADER); Ministry of Livestock, Fisheries and Animal Industries (MINEPIA); Ministry of Posts and Telecommunications (MINPOSTEL)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">350968</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-44526"><narrative>Ministry of Agriculture and Rural Development (MINADER); Ministry of Livestock, Fisheries and Animal Industries (MINEPIA); Ministry of Posts and Telecommunications (MINPOSTEL)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">14376043</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-44526"><narrative>Ministry of Agriculture and Rural Development (MINADER); Ministry of Livestock, Fisheries and Animal Industries (MINEPIA); Ministry of Posts and Telecommunications (MINPOSTEL)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-16206</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-44526"><narrative>Ministry of Agriculture and Rural Development (MINADER); Ministry of Livestock, Fisheries and Animal Industries (MINEPIA); Ministry of Posts and Telecommunications (MINPOSTEL)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-16789</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-44526"><narrative>Ministry of Agriculture and Rural Development (MINADER); Ministry of Livestock, Fisheries and Animal Industries (MINEPIA); Ministry of Posts and Telecommunications (MINPOSTEL)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-81435</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-44526"><narrative>Ministry of Agriculture and Rural Development (MINADER); Ministry of Livestock, Fisheries and Animal Industries (MINEPIA); Ministry of Posts and Telecommunications (MINPOSTEL)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-73139</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-44526"><narrative>Ministry of Agriculture and Rural Development (MINADER); Ministry of Livestock, Fisheries and Animal Industries (MINEPIA); Ministry of Posts and Telecommunications (MINPOSTEL)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-87729</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-44526"><narrative>Ministry of Agriculture and Rural Development (MINADER); Ministry of Livestock, Fisheries and Animal Industries (MINEPIA); Ministry of Posts and Telecommunications (MINPOSTEL)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-96870</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-44526"><narrative>Ministry of Agriculture and Rural Development (MINADER); Ministry of Livestock, Fisheries and Animal Industries (MINEPIA); Ministry of Posts and Telecommunications (MINPOSTEL)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P173240"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P173240?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P173240"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Users of digital agritech solutions delivered by agritech entrepreneurs
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="45,000.00">
<comment><narrative>
This indicator assesses the level of digital agritech adoption by farmers and other agricultural stakeholders
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet – Youth
</narrative></title>
<baseline year="2024" iso-date="2024-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-15" />
<period-end iso-date="2027-03-15" />
<target value="14,5000">
<comment><narrative>
.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet
</narrative></title>
<baseline year="2024" iso-date="2024-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-15" />
<period-end iso-date="2027-03-15" />
<target value="337,500">
<comment><narrative>
Activity has not started yet.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Feedback received that is addressed and responded to within 30 days
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="80.00">
<comment><narrative>
This indicator measures the number of grievances and complaints received under the GRM, and calculates the percentage of those that are addressed and responded to within a timeline that has been specified and publicly communicated by the project (30 days). Givenhe nature of the GRM, the collection and compilation of feedback will be on a monthly basis, so that the project can ensure that the 30-day timeline to address and respond to GRM users is being fulfilled.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Users of climate smart digital agriculture solutions
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="10,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services
</narrative></title>
<baseline year="2024" iso-date="2024-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-15" />
<period-end iso-date="2027-03-15" />
<target value="3,5125">
<comment><narrative>
Beneficiaries who have adopted digital agriculture solutions.
</narrative></comment>
</target>
<actual value="3,692">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of mobile sites deployed by the Project
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2027-03-15" />
<target value="120">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Mobile broadband geographic coverage in target areas
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="70.00">
<comment><narrative>
This indicator measures the percentage of rural areas that are covered by a mobile broadband infrastructure, i.e., the number of rural km2 covered by a mobile broadband infrastructure divided by the total km2 in all rural regions combined.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Yields of (MT/ha) of selected commodities (cassava, rice, and coffee) for the e-voucher participating households
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="1.60">
<comment><narrative>
This indicator assesses the effectiveness of e-voucher activities at increasing agricultural productivity (mostly due to increased inputs use) (disaggregated per commodity)
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="2024" iso-date="2024-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-15" />
<period-end iso-date="2027-03-15" />
<target value="0">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet
</narrative></title>
<baseline year="2024" iso-date="2024-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-15" />
<period-end iso-date="2027-03-15" />
<target value="337,500">
<comment><narrative>
Activity has not started yet.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Participating farmers using e-vouchers for agricultural inputs
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="35,000.00">
<comment><narrative>
This indicator assesses the adoption of electronic vouchers by targeted farmers.
</narrative></comment>
</target>
<actual value="4 636">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Participating farmers using e-vouchers for agricultural inputs
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="35,000.00">
<comment><narrative>
This indicator assesses the adoption of electronic vouchers by targeted farmers.
</narrative></comment>
</target>
<actual value="3,692">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Price of a 2GB mobile broadband basket, measured as a percentage of the Gross National Income per capita
</narrative></title>
<baseline year="2020" iso-date="2020-12-15" value="6.4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-15" />
<period-end iso-date="2027-03-15" />
<target value="3">
<comment><narrative>
progress toward improving broadband affordability is being supported through advances in the enabling environment, including the preparation of key regulatory reforms and studies on infrastructure sharing and market structure that aim to increase competition and efficiency in the telecom sector. In parallel, procurement processes for major connectivity investments—particularly rural mobile connectivity and bandwidth for public institutions—are underway and expected to expand network supply, which should contribute to lowering broadband costs once deployment begins.
</narrative></comment>
</target>
<actual value="3.3">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Broadband penetration (number of broadband subscribers per 100 people) in project areas
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="25.00">
<comment><narrative>
This indicator measures the number of people (per 100) who pay for access to broadband Internet.
More substantive progress toward PDO indicator is expected under Component 2 once key connectivity and infrastructure contracts are signed (potentially in the coming months) and implementation begins at scale before end of June 2026.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services
</narrative></title>
<baseline year="2024" iso-date="2024-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-15" />
<period-end iso-date="2027-03-15" />
<target value="3,5125">
<comment><narrative>
Beneficiaries who have adopted digital agriculture solutions.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of draft laws prepared and submitted to the Prime Minister's office
</narrative></title>
<baseline year="2020" iso-date="2020-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-15" />
<period-end iso-date="2027-03-15" />
<target value="3">
<comment><narrative>
Three preliminary draft laws have been submitted to the Prime Minister's Office in Cameroon: electronic communications, cybersecurity and cybercrime, and the protection of personal data. The first two are under review, and the personal data protection law was enacted in December 2024.
</narrative></comment>
</target>
<actual value="3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of draft laws prepared and submitted to the Prime Minister's office
</narrative></title>
<baseline year="2020" iso-date="2020-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-15" />
<period-end iso-date="2027-03-15" />
<target value="3">

</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries of digital skills training reporting satisfaction with the trainings
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="60.00">
<comment><narrative>
Based on a feedback survey of beneficiaries receiving training, this indicator will measure the percentage that record a &quot;satisfied&quot; or &quot;very satisfied&quot; score. The implementing agency will adopt and share with the WB a time-bound action plan based on inputs provided by survey respondents, and this action plan will outline how feedback will be incorporated
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries of digital skills training reporting satisfaction with the trainings
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="60.00">
<comment><narrative>
Based on a feedback survey of beneficiaries receiving training, this indicator will measure the percentage that record a &quot;satisfied&quot; or &quot;very satisfied&quot; score. The implementing agency will adopt and share with the WB a time-bound action plan based on inputs provided by survey respondents, and this action plan will outline how feedback will be incorporated
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Participating farmers using e-vouchers for agricultural inputs
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="35,000.00">
<comment><narrative>
This indicator assesses the adoption of electronic vouchers by targeted farmers.
</narrative></comment>
</target>
<actual value="3,692">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of mobile sites deployed by the Project
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2027-03-15" />
<target value="120">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average monthly price (USD) of a wholesale international E1 link
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="300.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="200.00">
<comment><narrative>
This indicator measures the average monthly price (USD) of a wholesale international E1 (2 Mbps) link.
</narrative></comment>
</target>
<actual value="493.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries who have adopted digital agriculture solutions
</narrative></title>
<baseline year="2020" iso-date="2020-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-15" />
<period-end iso-date="2027-03-15" />
<target value="35,125.00">

</target>
<actual value="3692">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Feedback received that is addressed and responded to within 30 days
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="80.00">
<comment><narrative>
This indicator measures the number of grievances and complaints received under the GRM, and calculates the percentage of those that are addressed and responded to within a timeline that has been specified and publicly communicated by the project (30 days). Givenhe nature of the GRM, the collection and compilation of feedback will be on a monthly basis, so that the project can ensure that the 30-day timeline to address and respond to GRM users is being fulfilled.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Broadband penetration (number of broadband subscribers per 100 people) in project areas
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="25.00">
<comment><narrative>
This indicator measures the number of people (per 100) who pay for access to broadband Internet.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Broadband penetration (number of broadband subscribers per 100 people) in project areas
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="25.00">
<comment><narrative>
This indicator measures the number of people (per 100) who pay for access to broadband Internet.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries who have adopted digital agriculture solutions to improve their access to agricultural markets
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="35,125.00">
<comment><narrative>
This indicator measures the adoption of digital agricultural solutions by beneficiary farmers.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Productive partnerships established between agritech entrepreneurs and farmer groups, professional and inter-professional associations, and individual farmers
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2027-03-31" />
<target value="200.00">
<comment><narrative>
This indicator measures the level of committed use of digital agritech solutions by farmers and farmer groups.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries who have adopted digital agriculture solutions
</narrative></title>
<baseline year="2020" iso-date="2020-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-15" />
<period-end iso-date="2027-03-15" />
<target value="35,125.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet – Female
</narrative></title>
<baseline year="2024" iso-date="2024-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-15" />
<period-end iso-date="2027-03-15" />
<target value="16,8000">
<comment><narrative>
50% female.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Productive partnerships established between agritech entrepreneurs and farmer groups, professional and inter-professional associations, and individual farmers
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2027-03-31" />
<target value="200.00">
<comment><narrative>
This indicator measures the level of committed use of digital agritech solutions by farmers and farmer groups.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
End users and public servants reached through targeted trainings on digital services
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="75,000.00">
<comment><narrative>
This indicator measures the number of end users and public servants who have benefited from targeted trainings on digital services
</narrative></comment>
</target>
<actual value="181.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Price of a 2GB mobile broadband basket, measured as a percentage of the Gross National Income per capita
</narrative></title>
<baseline year="2020" iso-date="2020-12-15" value="6.4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-15" />
<period-end iso-date="2027-03-15" />
<target value="3">

</target>
<actual value="3.3">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average monthly retail price (XAF) of mobile broadband services
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="1,667.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="1,200.00">
<comment><narrative>
This indicator measures the average monthly price (in XAF), inclusive of taxes, paid by retail subscribers for 1GB of mobile broadband.
</narrative></comment>
</target>
<actual value="1,667.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
End users and public servants reached through targeted trainings on digital services
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="75,000.00">
<comment><narrative>
This indicator measures the number of end users and public servants who have benefited from targeted trainings on digital services.
Additional training activities are planned in the coming months, which will contribute toward progress on PDO indicator.
</narrative></comment>
</target>
<actual value="3873">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public stakeholder consultations held
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="5.00">
<comment><narrative>
This indicator measures the number of public consultations held under the auspices of the project. Actions should subsequently be taken to respond to concerns raised by stakeholders.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services
</narrative></title>
<baseline year="2024" iso-date="2024-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-15" />
<period-end iso-date="2027-03-15" />
<target value="3,5125">
<comment><narrative>
Beneficiaries who have adopted digital agriculture solutions.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Broadband connections to key public entities established through the project
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="200.00">
<comment><narrative>
This indicator measures the number of broadband connections to key public entities (such as hospitals, schools, governmental offices, and agricultural centers) established through the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries of digital skills training reporting satisfaction with the trainings
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="60.00">
<comment><narrative>
Based on a feedback survey of beneficiaries receiving training, this indicator will measure the percentage that record a &quot;satisfied&quot; or &quot;very satisfied&quot; score. The implementing agency will adopt and share with the WB a time-bound action plan based on inputs provided by survey respondents, and this action plan will outline how feedback will be incorporated
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
End users and public servants reached through targeted trainings on digital services
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="75,000.00">
<comment><narrative>
This indicator measures the number of end users and public servants who have benefited from targeted trainings on digital services
</narrative></comment>
</target>
<actual value="181.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public stakeholder consultations held
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="5.00">
<comment><narrative>
This indicator measures the number of public consultations held under the auspices of the project. Actions should subsequently be taken to respond to concerns raised by stakeholders.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Productive partnerships established between agritech entrepreneurs and farmer groups, professional and inter-professional associations, and individual farmers
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2027-03-31" />
<target value="200.00">
<comment><narrative>
This indicator measures the level of committed use of digital agritech solutions by farmers and farmer groups.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Users of digital agritech solutions delivered by agritech entrepreneurs
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="45,000.00">
<comment><narrative>
This indicator assesses the level of digital agritech adoption by farmers and other agricultural stakeholders
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public stakeholder consultations held
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="5.00">
<comment><narrative>
This indicator measures the number of public consultations held under the auspices of the project. Actions should subsequently be taken to respond to concerns raised by stakeholders.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Broadband connections to key public entities established through the project
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="200.00">
<comment><narrative>
This indicator measures the number of broadband connections to key public entities (such as hospitals, schools, governmental offices, and agricultural centers) established through the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Users of digital agritech solutions delivered by agritech entrepreneurs
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="45,000.00">
<comment><narrative>
This indicator assesses the level of digital agritech adoption by farmers and other agricultural stakeholders.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Broadband connections to key public entities established through the project
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="200.00">
<comment><narrative>
This indicator measures the number of broadband connections to key public entities (such as hospitals, schools, governmental offices, and agricultural centers) established through the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Optimizing of the use of existing public digital infrastructure
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="Not achieved"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
PBCT 3. ART has adopted wholesale regulations that consist at the minimum in the regulation of the national connectivity market and the regulation of the international connectivity market, covering issues of access, transparency and price conditions.

PBCT 4. The Board of CAMTEL has adopted a strategy for the strategic repositioning of CAMTEL, approved by MINPOSTEL. The definitions of the PBCTs will be expanded in the PIM.
</narrative></comment>
</target>
<actual value="Not achieved">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Facilitating private investments in digital connectivity (supply) and adoption (demand) of digital services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="Not achieved"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
PBCT 1. The Recipient has issued a report containing a comprehensive mapping of the supply and demand for digital connectivity, including existing and planned private investments.

PBCT 2. The Recipient has adopted new policies and regulations to modernize the telecom regulatory framework, including online trust regulations and a cross-sectoral investment strategy (for example, roads and electricity transmission lines).

This PBC is not scalable, so to access PBC funds, the policies and regulations will at minimum cover issues of (a) the licensing framework; (b) the online trust, data protection and cybersecurity regulations; (c) the policy framework for public rights-of-way to help ensure fiber optic deployment, (d) an action plan to improve the resilience of digital networks and digital services to support post-disaster recovery and emergency communications, and (e) a cross-sectoral (for example, roads and electricity transmission lines) investment strategy. The definitions of the PBCTs will be expanded in the PIM.
</narrative></comment>
</target>
<actual value="Not achieved">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
End users and public servants reached through targeted trainings on digital services
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="75,000.00">
<comment><narrative>
This indicator measures the number of end users and public servants who have benefited from targeted trainings on digital services.
Additional training activities are planned in the coming months, which will contribute toward progress on PDO indicator.
</narrative></comment>
</target>
<actual value="3873">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
End users and public servants reached through targeted trainings on digital services
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="75,000.00">
<comment><narrative>
This indicator measures the number of end users and public servants who have benefited from targeted trainings on digital services
</narrative></comment>
</target>
<actual value="181.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
End users and public servants reached through targeted trainings on digital services
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="75,000.00">
<comment><narrative>
This indicator measures the number of end users and public servants who have benefited from targeted trainings on digital services
</narrative></comment>
</target>
<actual value="181.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Price of a 2GB mobile broadband basket, measured as a percentage of the Gross National Income per capita
</narrative></title>
<baseline year="2020" iso-date="2020-12-15" value="6.4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-15" />
<period-end iso-date="2027-03-15" />
<target value="3">
<comment><narrative>
progress toward improving broadband affordability is being supported through advances in the enabling environment, including the preparation of key regulatory reforms and studies on infrastructure sharing and market structure that aim to increase competition and efficiency in the telecom sector. In parallel, procurement processes for major connectivity investments—particularly rural mobile connectivity and bandwidth for public institutions—are underway and expected to expand network supply, which should contribute to lowering broadband costs once deployment begins.
</narrative></comment>
</target>
<actual value="3.3">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average monthly retail price (XAF) of mobile broadband services
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="1,667.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="1,200.00">
<comment><narrative>
This indicator measures the average monthly price (in XAF), inclusive of taxes, paid by retail subscribers for 1GB of mobile broadband.
</narrative></comment>
</target>
<actual value="1,667.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Price of a 2GB mobile broadband basket, measured as a percentage of the Gross National Income per capita
</narrative></title>
<baseline year="2020" iso-date="2020-12-15" value="6.4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-15" />
<period-end iso-date="2027-03-15" />
<target value="3">

</target>
<actual value="3.3">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Productive partnerships established between agritech entrepreneurs and farmer groups, professional and inter-professional associations, and individual farmers
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2027-03-31" />
<target value="200.00">
<comment><narrative>
This indicator measures the level of committed use of digital agritech solutions by farmers and farmer groups.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Productive partnerships established between agritech entrepreneurs and farmer groups, professional and inter-professional associations, and individual farmers
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2027-03-31" />
<target value="200.00">
<comment><narrative>
This indicator measures the level of committed use of digital agritech solutions by farmers and farmer groups.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Productive partnerships established between agritech entrepreneurs and farmer groups, professional and inter-professional associations, and individual farmers
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2027-03-31" />
<target value="200.00">
<comment><narrative>
This indicator measures the level of committed use of digital agritech solutions by farmers and farmer groups.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries who have adopted digital agriculture solutions
</narrative></title>
<baseline year="2020" iso-date="2020-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-15" />
<period-end iso-date="2027-03-15" />
<target value="35,125.00">

</target>
<actual value="3692">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries who have adopted digital agriculture solutions to improve their access to agricultural markets
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="35,125.00">
<comment><narrative>
This indicator measures the adoption of digital agricultural solutions by beneficiary farmers.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries who have adopted digital agriculture solutions
</narrative></title>
<baseline year="2020" iso-date="2020-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-15" />
<period-end iso-date="2027-03-15" />
<target value="35,125.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Broadband penetration (number of broadband subscribers per 100 people) in project areas
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="25.00">
<comment><narrative>
This indicator measures the number of people (per 100) who pay for access to broadband Internet.
More substantive progress toward PDO indicator is expected under Component 2 once key connectivity and infrastructure contracts are signed (potentially in the coming months) and implementation begins at scale before end of June 2026.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Broadband penetration (number of broadband subscribers per 100 people) in project areas
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="25.00">
<comment><narrative>
This indicator measures the number of people (per 100) who pay for access to broadband Internet.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Broadband penetration (number of broadband subscribers per 100 people) in project areas
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="25.00">
<comment><narrative>
This indicator measures the number of people (per 100) who pay for access to broadband Internet.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet
</narrative></title>
<baseline year="2024" iso-date="2024-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-15" />
<period-end iso-date="2027-03-15" />
<target value="337,500">
<comment><narrative>
Activity has not started yet.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
End users and public servants reached through targeted trainings on digital services
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="75,000.00">
<comment><narrative>
This indicator measures the number of end users and public servants who have benefited from targeted trainings on digital services.
Additional training activities are planned in the coming months, which will contribute toward progress on PDO indicator.
</narrative></comment>
</target>
<actual value="3873">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
End users and public servants reached through targeted trainings on digital services
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="75,000.00">
<comment><narrative>
This indicator measures the number of end users and public servants who have benefited from targeted trainings on digital services
</narrative></comment>
</target>
<actual value="181.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
End users and public servants reached through targeted trainings on digital services
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="75,000.00">
<comment><narrative>
This indicator measures the number of end users and public servants who have benefited from targeted trainings on digital services
</narrative></comment>
</target>
<actual value="181.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Feedback received that is addressed and responded to within 30 days
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="80.00">
<comment><narrative>
This indicator measures the number of grievances and complaints received under the GRM, and calculates the percentage of those that are addressed and responded to within a timeline that has been specified and publicly communicated by the project (30 days). Givenhe nature of the GRM, the collection and compilation of feedback will be on a monthly basis, so that the project can ensure that the 30-day timeline to address and respond to GRM users is being fulfilled.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Price of a 2GB mobile broadband basket, measured as a percentage of the Gross National Income per capita
</narrative></title>
<baseline year="2020" iso-date="2020-12-15" value="6.4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-15" />
<period-end iso-date="2027-03-15" />
<target value="3">
<comment><narrative>
progress toward improving broadband affordability is being supported through advances in the enabling environment, including the preparation of key regulatory reforms and studies on infrastructure sharing and market structure that aim to increase competition and efficiency in the telecom sector. In parallel, procurement processes for major connectivity investments—particularly rural mobile connectivity and bandwidth for public institutions—are underway and expected to expand network supply, which should contribute to lowering broadband costs once deployment begins.
</narrative></comment>
</target>
<actual value="3.3">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average monthly retail price (XAF) of mobile broadband services
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="1,667.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="1,200.00">
<comment><narrative>
This indicator measures the average monthly price (in XAF), inclusive of taxes, paid by retail subscribers for 1GB of mobile broadband.
</narrative></comment>
</target>
<actual value="1,667.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Price of a 2GB mobile broadband basket, measured as a percentage of the Gross National Income per capita
</narrative></title>
<baseline year="2020" iso-date="2020-12-15" value="6.4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-15" />
<period-end iso-date="2027-03-15" />
<target value="3">

</target>
<actual value="3.3">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Productive partnerships established between agritech entrepreneurs and farmer groups, professional and inter-professional associations, and individual farmers
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2027-03-31" />
<target value="200.00">
<comment><narrative>
This indicator measures the level of committed use of digital agritech solutions by farmers and farmer groups.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Productive partnerships established between agritech entrepreneurs and farmer groups, professional and inter-professional associations, and individual farmers
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2027-03-31" />
<target value="200.00">
<comment><narrative>
This indicator measures the level of committed use of digital agritech solutions by farmers and farmer groups.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Productive partnerships established between agritech entrepreneurs and farmer groups, professional and inter-professional associations, and individual farmers
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2027-03-31" />
<target value="200.00">
<comment><narrative>
This indicator measures the level of committed use of digital agritech solutions by farmers and farmer groups.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of timely national digital agricultural reports produced through national digital agriculture information systems (soil, agropastoral, and animal health).
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="100.00">
<comment><narrative>
This indicator monitors the efficiency of the use of digital agricultural information systems.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries who have adopted digital agriculture solutions
</narrative></title>
<baseline year="2020" iso-date="2020-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-15" />
<period-end iso-date="2027-03-15" />
<target value="35,125.00">

</target>
<actual value="3692">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries who have adopted digital agriculture solutions to improve their access to agricultural markets
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="35,125.00">
<comment><narrative>
This indicator measures the adoption of digital agricultural solutions by beneficiary farmers.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries who have adopted digital agriculture solutions
</narrative></title>
<baseline year="2020" iso-date="2020-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-15" />
<period-end iso-date="2027-03-15" />
<target value="35,125.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Broadband penetration (number of broadband subscribers per 100 people) in project areas
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="25.00">
<comment><narrative>
This indicator measures the number of people (per 100) who pay for access to broadband Internet.
More substantive progress toward PDO indicator is expected under Component 2 once key connectivity and infrastructure contracts are signed (potentially in the coming months) and implementation begins at scale before end of June 2026.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Broadband penetration (number of broadband subscribers per 100 people) in project areas
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="25.00">
<comment><narrative>
This indicator measures the number of people (per 100) who pay for access to broadband Internet.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Broadband penetration (number of broadband subscribers per 100 people) in project areas
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="25.00">
<comment><narrative>
This indicator measures the number of people (per 100) who pay for access to broadband Internet.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average monthly price (USD) of a wholesale 100 Mbps link between regional capitals
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="500.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2027-03-31" />
<target value="250.00">
<comment><narrative>
This indicator measures the average monthly wholesale price (USD) for national broadband services
</narrative></comment>
</target>
<actual value="500.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P112975</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Cameroon - Competitive Value Chains</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The PDO is to contribute to the growth of the wood transformation and tourism industries.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Competitive Value Chains Project is to contribute to the growth of the wood and tourism value chains in Cameroon by improving their competitiveness and the investment climate. The project will support specialized infrastructure investments, vocational training, policy reforms and direct support to firms through an innovation grant. There are four components to the project. The first component of the project is sustainable wood processing. The objective of this component is to increase, sustainably, the economic value added of the wood value chain in Cameroon (second and third 'stage processing). The project will support a critical mass of interventions in the wood value chain to trigger productive private investments and job creation. Although the project will promote wood products, the net environmental impact should be positive because it will promote the use of certified wood (coming from sustainable forestry exploitations), productive cutting techniques (allowing much more wood to be used from a given tree), secondary species (left abandoned today) and drying techniques (allowing the wood products to have a much longer shelf life). The second component of the project is ecotourism. This component, together with the third component tackling the cross-cutting investment climate issues, aims at addressing a critical mass of the constraints preventing the growth of the tourism industry in Cameroon. The core of the tourism development strategy is to focus on Cameroon's world class touristic assets to constitute a few and compelling touristic packages. The third component of the project is cross-cutting interventions to support competitiveness and investment. This component includes the following two subcomponents: (i) support to investment climate reforms; and ii) an innovation grant to help increase the competitiveness of small and medium enterprises in the wood and tourism value chains. The fourth component of the project is project coordination, monitoring and evaluation (M&amp;E). The component will support the establishment, equipment and operations of a dedicated team (to be hired competitively by a specialized firm also selected competitively) within the Ministry of Economy, Planning and Regional Development (MINEPAT) reporting to a high level steering committee. The team will be responsible for overall project implementation, procurement, financial management, and M&amp;E.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0002538"><narrative>Ministry of Economic Affairs, Programming and Regional Development</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="CM-COA-0002539"><narrative>Project Coordination Unit</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2009-12-17"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2010-06-22"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2017-03-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2017-03-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Amadou Dem</narrative></person-name><telephone>+1-202-473-1000</telephone><email>adem1@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002220957" />
            <name><narrative>Yaounde</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.8666699 11.51667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002222934" />
            <name><narrative>West Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.5 10.66667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002223602" />
            <name><narrative>North-West Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.3666701 10.36667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002229229" />
            <name><narrative>Longji</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.0748701 9.9739599</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002233386" />
            <name><narrative>Cameroon Mountain</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.21734 9.1727304</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002234974" />
            <name><narrative>Bamenda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.9597001 10.14597</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007669329" />
            <name><narrative>Campo Ma'an</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>2.3452899 9.99123</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002231506" />
            <name><narrative>Foumban</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.7266202 10.89865</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002233012" />
            <name><narrative>Dipikar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>2.25 9.9166698</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002232990" />
            <name><narrative>Reserve du Dja</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.1510601 13.00146</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002222378" />
            <name><narrative>Roumsiki</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.51398 13.58626</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002229761" />
            <name><narrative>Kribi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>2.9372499 9.90765</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002235189" />
            <name><narrative>Bafoussam</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.4777498 10.41759</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="32110" percentage="25" xml:lang="en"/><sector vocabulary="1" code="32130" percentage="25" xml:lang="en"/><sector vocabulary="1" code="32162" percentage="25" xml:lang="en"/><sector vocabulary="1" code="33120" percentage="25" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YF" percentage="23.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Industry, Trade and Services</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YZ" percentage="77.0000000" xml:lang="en"><narrative>FY17 - Other Industry, Trade and Services</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000141" percentage="100" xml:lang="en"><narrative>Trade Facilitation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000014" percentage="100" xml:lang="en"><narrative>Trade</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">663333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">663333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">663333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">663333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">663333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">663333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">583333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">583333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">583333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">583333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">83333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">83333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">83333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">83333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">5623276.08</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">5623276.08</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2010-06-30"/><value value-date="2010-06-30">30000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-3936672</value><description xml:lang="en"><narrative>Total Commitment Cancellations in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">-490349</value><description xml:lang="en"><narrative>Total Commitment Cancellations in January Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">2914512</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-07-31"/><value value-date="2011-07-31">1748407</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">367989</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">211193</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">133761</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">159979</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">-375069</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">260672</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">157521</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">86951</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">290000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-01-31"/><value value-date="2013-01-31">124422</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">130036</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">310819</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">150436</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">241985</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">130348</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">56914</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">63402</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">180639</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">383056</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">281641</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">192122</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">537076</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">223776</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">336482</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">529089</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">102429</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">269377</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">436107</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">309820</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">416243</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">215676</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">363619</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">257734</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">83168</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">213473</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">266064</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">445523</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">510033</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">311108</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">210603</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">380965</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">631181</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">1079949</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">628927</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">271357</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">586914</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">1633566</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">776143</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">630529</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">40415</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">340818</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">299129</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">576179</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">995836</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">368050</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-540235</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">582704</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">870434</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-15271</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">-10355</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">-17726</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">-18727</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">-20431</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">-24116</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">-27521</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-32989</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-34871</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-45186</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-49408</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-61902</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-73795</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-86230</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-90290</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-86807</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-86820</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-86274</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-84532</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-89092</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-82446</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-88920</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-81831</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-80845</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-80092</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-70231</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-83140</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-74519</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-78684</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-76003</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-75480</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-234286</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-236021</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-235402</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-229525</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-212994</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-224009</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-219650</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-220798</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-221477</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-220881</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-7918</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-219253</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-226494</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2539"><narrative>Project Coordination Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P112975"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P112975?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P112975"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of hits on the e-tourism platform
</narrative></title>
<baseline year="2010" iso-date="2010-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-27" />
<period-end iso-date="2017-03-31" />
<target value="100000.00">

</target>
<actual value="2770.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Financial Monitoring Reports (FMR) are submitted on time and are satisfactory to the World Bank.
</narrative></title>
<baseline year="2013" iso-date="2013-10-02" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-10-02" />
<period-end iso-date="2016-03-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of visitors to the sites supported
</narrative></title>
<baseline year="2010" iso-date="2010-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-27" />
<period-end iso-date="2017-03-31" />
<target value="31400.00">

</target>
<actual value="13038.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Financial audit report is submitted on time and is unqualified
</narrative></title>
<baseline year="2013" iso-date="2013-10-02" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-10-02" />
<period-end iso-date="2016-03-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of workers trained in the tourism value chain by programs supported by the project
</narrative></title>
<baseline year="2010" iso-date="2010-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-27" />
<period-end iso-date="2017-03-31" />
<target value="1000.00">

</target>
<actual value="2280.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Arrangement to ensure use of legal wood by beneficiaries adopted and enforced
</narrative></title>
<baseline year="2010" iso-date="2010-05-27" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-27" />
<period-end iso-date="2017-03-31" />
<target value="2">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of artisans and SMEs using project financed equipment to transform wood (% of women)
</narrative></title>
<baseline year="2010" iso-date="2010-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-27" />
<period-end iso-date="2017-03-31" />
<target value="3000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of workers trained in the wood value chain
</narrative></title>
<baseline year="2010" iso-date="2010-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-27" />
<period-end iso-date="2017-03-31" />
<target value="2,000.00">

</target>
<actual value="1,952.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new reforms in the tourism sector
</narrative></title>
<baseline year="2010" iso-date="2010-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-27" />
<period-end iso-date="2016-03-31" />
<target value="2.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of visitors to the sites supported
</narrative></title>
<baseline year="2010" iso-date="2010-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-27" />
<period-end iso-date="2017-03-31" />
<target value="31,400.00">

</target>
<actual value="13,038.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of visitors to the sites supported
</narrative></title>
<baseline year="2010" iso-date="2010-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-27" />
<period-end iso-date="2017-03-31" />
<target value="31400.00">

</target>
<actual value="13038.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries(workers, firms) satisfied with project supported training
</narrative></title>
<baseline year="2016" iso-date="2016-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-27" />
<period-end iso-date="2017-03-31" />
<target value="5000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries(workers, firms) satisfied with project supported training
</narrative></title>
<baseline year="2016" iso-date="2016-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-27" />
<period-end iso-date="2017-03-31" />
<target value="5000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
At least 80% of beneficiaries (bagyeli population) are satisfied with the activities from the IPP implemented with support from theproject
</narrative></title>
<baseline year="2010" iso-date="2010-05-27" value="na"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-27" />
<period-end iso-date="2017-03-31" />
<target value="yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of wood drying units established
</narrative></title>
<baseline year="2010" iso-date="2010-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-27" />
<period-end iso-date="2017-03-31" />
<target value="17.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
At least 80% of beneficiaries (bagyeli population) are satisfied with the activities from the IPP implemented with support from theproject
</narrative></title>
<baseline year="2010" iso-date="2010-05-27" value="na"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-27" />
<period-end iso-date="2017-03-31" />
<target value="yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Financial audit report is submitted on time and is unqualified
</narrative></title>
<baseline year="2013" iso-date="2013-10-02" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-10-02" />
<period-end iso-date="2016-03-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of workers trained in the tourism value chain by programs supported by the project
</narrative></title>
<baseline year="2010" iso-date="2010-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-27" />
<period-end iso-date="2017-03-31" />
<target value="1000.00">

</target>
<actual value="400.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new and rehabilitated tourist sites.
</narrative></title>
<baseline year="2010" iso-date="2010-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-27" />
<period-end iso-date="2017-03-31" />
<target value="13.00">

</target>
<actual value="8.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of wood drying units established
</narrative></title>
<baseline year="2010" iso-date="2010-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-27" />
<period-end iso-date="2017-03-31" />
<target value="17.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Arrangement to ensure use of legal wood by beneficiaries adopted and enforced
</narrative></title>
<baseline year="2010" iso-date="2010-05-27" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-27" />
<period-end iso-date="2017-03-31" />
<target value="2">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new reforms in the tourism sector
</narrative></title>
<baseline year="2010" iso-date="2010-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-27" />
<period-end iso-date="2016-03-31" />
<target value="2.00">

</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new and rehabilitated tourist sites.
</narrative></title>
<baseline year="2010" iso-date="2010-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-27" />
<period-end iso-date="2017-03-31" />
<target value="13.00">

</target>
<actual value="8.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new reforms in the wood sector
</narrative></title>
<baseline year="2010" iso-date="2010-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-27" />
<period-end iso-date="2017-03-31" />
<target value="2.00">

</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new reforms in the tourism sector
</narrative></title>
<baseline year="2010" iso-date="2010-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-27" />
<period-end iso-date="2016-03-31" />
<target value="2.00">

</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Financial Monitoring Reports (FMR) are submitted on time and are satisfactory to the World Bank.
</narrative></title>
<baseline year="2013" iso-date="2013-10-02" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-10-02" />
<period-end iso-date="2016-03-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of hits on the e-tourism platform
</narrative></title>
<baseline year="2010" iso-date="2010-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-27" />
<period-end iso-date="2017-03-31" />
<target value="100000.00">

</target>
<actual value="2770.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries(workers, firms) satisfied with project supported training
</narrative></title>
<baseline year="2016" iso-date="2016-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-05-27" />
<period-end iso-date="2017-03-31" />
<target value="5,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Financial audit report is submitted on time and is unqualified
</narrative></title>
<baseline year="2013" iso-date="2013-10-02" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-10-02" />
<period-end iso-date="2016-03-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Financial Monitoring Reports (FMR) are submitted on time and are satisfactory to the World Bank.
</narrative></title>
<baseline year="2013" iso-date="2013-10-02" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-10-02" />
<period-end iso-date="2016-03-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
At least 80% of beneficiaries (bagyeli population) are satisfied with the activities from the IPP implemented with support from the project
</narrative></title>
<baseline year="2010" iso-date="2010-05-27" value="na"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-27" />
<period-end iso-date="2017-03-31" />
<target value="yes">

</target>
<actual value="na">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of workers trained in the wood value chain
</narrative></title>
<baseline year="2010" iso-date="2010-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-27" />
<period-end iso-date="2017-03-31" />
<target value="2000.00">

</target>
<actual value="1952.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Arrangement to ensure use of legal wood by beneficiaries adopted and enforced
</narrative></title>
<baseline year="2010" iso-date="2010-05-27" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-27" />
<period-end iso-date="2017-03-31" />
<target value="2">

</target>
<actual value="3">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new and rehabilitated tourist sites.
</narrative></title>
<baseline year="2010" iso-date="2010-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-27" />
<period-end iso-date="2017-03-31" />
<target value="13.00">

</target>
<actual value="8.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of workers trained in the wood value chain
</narrative></title>
<baseline year="2010" iso-date="2010-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-27" />
<period-end iso-date="2017-03-31" />
<target value="2000.00">

</target>
<actual value="1751.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of artisans and SMEs using project financed equipment to transform wood (% of women)
</narrative></title>
<baseline year="2010" iso-date="2010-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-27" />
<period-end iso-date="2017-03-31" />
<target value="3000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of hits on the e-tourism platform
</narrative></title>
<baseline year="2010" iso-date="2010-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-27" />
<period-end iso-date="2017-03-31" />
<target value="100,000.00">

</target>
<actual value="2,770.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new reforms in the wood sector
</narrative></title>
<baseline year="2010" iso-date="2010-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-27" />
<period-end iso-date="2017-03-31" />
<target value="2.00">

</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of artisans and SMEs using project financed equipment to transform wood (% of women)
</narrative></title>
<baseline year="2010" iso-date="2010-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-27" />
<period-end iso-date="2017-03-31" />
<target value="3,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new reforms in the wood sector
</narrative></title>
<baseline year="2010" iso-date="2010-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-27" />
<period-end iso-date="2017-03-31" />
<target value="2.00">

</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of wood drying units established
</narrative></title>
<baseline year="2010" iso-date="2010-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-27" />
<period-end iso-date="2017-03-31" />
<target value="17.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of workers trained in the tourism value chain by programs supported by the project
</narrative></title>
<baseline year="2010" iso-date="2010-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-27" />
<period-end iso-date="2017-03-31" />
<target value="1,000.00">

</target>
<actual value="2,280.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P084160</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Transparency and Accountability Capacity Building Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The project development objective (PDO) is to contribute (i) to enhance transparency and efficiency in public financial management, and (ii) to strengthen accountability in the use of public resource. The project will play a key role in Cameroon in accelerating the pace toward a more orderly and open PFM and thus more efficient service delivery.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The project development objective (PDO) of the Transparency and Accountability Capacity Development Project for Cameroon is to contribute: (i) to enhance transparency and efficiency in the public finance management (PFM) of Cameroon; and (ii) to strengthen accountability in the use of public resource in Cameroon. The project will play a key role in Cameroon's acceleration of the pace toward a more transparent and orderly PFM and, in addition, more efficient public service delivery. The PDO will be achieved through the following four project components: the first component of the project is improving budget management including procurement. In this component, focus will be mostly on giving support to revision of processes, methods and regulations for budget programming, budget execution including procurement, budget monitoring and controls, and treasury accounting in the context of the new budget Organic Law, in order to primarily address deficiencies in capital budget management and limitation in the execution of investment projects. The second component of the project is integration and development of the Financial Management Information System (FMIS) including the Human Resources Management (HRM) and Payroll Management Systems. This component consists of two sub-components related respectively to the development and integration of the FM Information applications and to upgrading of the HRM and Payroll systems. The third component of the project is strengthening external oversight and monitoring and evaluation (M&amp;E). The objective of this component will be to enhance external oversight, communication, and M&amp;E, because these are necessary to allow national stakeholders to carry out the effective management and use of public resources, and fight corruption, while enabling the legislature and citizens the ability to exercise scrutiny and increase their demand for more accountability. The fourth and the final component of the project is support to the project focal point for PFM reforms coordination. The main objective of this component will be to support capacity building activities for Minisfere des Finances (Ministry of Finance) (MINFI) and the PFM reforms structures to properly carry out their coordination, monitoring, and leadership roles in PFM reforms in line with Paris Declaration objectives.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><activity-status code="3" /><activity-date type="1" iso-date="2006-02-10"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2008-06-24"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2012-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2012-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Alexandre Arrobbio</narrative></person-name><telephone>+1-202-473-1000</telephone><email>aarrobbio@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002220957" />
            <name><narrative>Yaounde</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.8666699 11.51667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="15126" percentage="44" xml:lang="en"/><sector vocabulary="1" code="15117" percentage="56" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="15.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="85.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="25" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="50" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="75" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="25" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="25" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="25" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">93000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">93000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">93000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">93000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">93000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">93000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">93000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">93000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">93000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">93000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">93000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">93000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">266666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">266666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">266666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">266666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">291666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">291666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">291666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">291666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">208333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">208333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">208333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">208333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">93000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">93000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">93000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">93000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">93000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">93000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">93000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">93000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">93000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">93000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">93000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">93000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">266666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">266666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">266666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">266666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">266666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">266666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">266666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">266666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">266666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">266666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">266666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">266666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">291666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">291666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">291666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">291666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">291666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">291666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">291666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">291666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">291666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">291666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">291666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">291666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">11368701.62</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">11368701.62</value>
</budget>
<capital-spend percentage="100" /><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P084160"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P084160?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P084160"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of contracts above threshold procured through open competition, in selected ministries (Health, Education, Agriculture, Public Works, and Finance). (PI-19 i, modified).
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="(To be determined by project effectiveness) In Francs CFA value"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2012-12-31" />
<target value="100 percent">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Legal and regulatory texts to enforce the new Budget Law are signed and effective.
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="Application texts have not been drafted yet (first quarter 2008)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="Decree on new budget nomenclature including programs, signed and effective">

</target>
<actual value="Decree on new budget nomenclature not drafted.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Availability of information on resources received by service delivery units (PEFA PI-23)
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="D    (Source: PEFA Report, 2007)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="B (source PEFA report)">
<comment><narrative>
Not met. No new PETS exercise was produced in 2010, 2011 or 2012.
</narrative></comment>
</target>
<actual value="C (source: PETS2 report, 2011)">
<comment><narrative>
No new PEFA report. However, PETS2 report on 2009 budget was published in Dec. 2010 (NSI website in 2011)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Completeness of the financial statements (in French, Loi de R#glement) (PI-25 i)
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="D (Source: PEFA Report, 2007)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="B  (Source: PEFA Report)">
<comment><narrative>
Not met
</narrative></comment>
</target>
<actual value="D+ (Source: own assessment)">
<comment><narrative>
No new PEFA report. (Assessment based on information provided by experts in the field with regards to LR 2011)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Timeliness of the issue of semi-annual budget reports (PI-24 ii)
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="D (Source: PEFA Report, 2007)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="B (Source: PEFA Report)">
<comment><narrative>
Not met.
</narrative></comment>
</target>
<actual value="D (source: own assessment)">
<comment><narrative>
No PEFA report. 
Semi-annual budget reports are produced, but delay is superior to 8 weeks.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Scope of the legislature scrutiny of the annual budget law. (PI-27-i)
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="C (Source: PEFA Report, 2007)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="B (Source: PEFA Report, 2007)">
<comment><narrative>
Not met.
</narrative></comment>
</target>
<actual value="C (source: own assessment)">
<comment><narrative>
No indication that value has changed from baseline at Nov. 2012 Parliament session.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Availability of information on resources received by service delivery units (PEFA PI-23)
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="D    (Source: PEFA Report, 2007)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="B (source PEFA report)">

</target>
<actual value="D">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Scope of the legislature scrutiny of the annual budget law. (PI-27-i)
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="C (Source: PEFA Report, 2007)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="B (Source: PEFA Report, 2007)">

</target>
<actual value="C (source: own assessment)">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Timeliness of the issue of semi-annual budget reports (PI-24 ii)
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="D (Source: PEFA Report, 2007)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="B (Source: PEFA Report)">

</target>
<actual value="D (source: own assessment)">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Control steps in expeditor chain
</narrative></title>
<baseline year="2006" iso-date="2006-12-09" value="22.00"><comment><narrative>Source is the PEMFAR report 2006</narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-09" />
<period-end iso-date="2012-12-31" />
<target value="8.00">
<comment><narrative>
This target accounts for 2/3 reduction in the number of steps.
</narrative></comment>
</target>
<actual value="22.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Completeness of the financial statements (in French, Loi de R#glement) (PI-25 i)
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="D (Source: PEFA Report, 2007)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="B  (Source: PEFA Report)">

</target>
<actual value="No change">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of contracts above threshold procured through open competition, in selected ministries (Health, Education, Agriculture, Public Works, and Finance). (PI-19 i, modified).
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="(To be determined by project effectiveness) In Francs CFA value"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2012-12-31" />
<target value="100 percent">

</target>
<actual value="">
<comment><narrative>
No change.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Completeness of the financial statements (in French, Loi de R#glement) (PI-25 i)
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="D (Source: PEFA Report, 2007)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="B (Source: PEFA Report)">

</target>
<actual value="D+ (Source: own assessment)">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Degree of integration and reconciliation between personnel records and payroll data. (PI-18 i)
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="D  (source: PEFA Report, 2007)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="B (source: PEFA Report)">
<comment><narrative>
Not met
</narrative></comment>
</target>
<actual value="D+ (source: own assessment)">
<comment><narrative>
No structural change in using the HR and Payroll databases are effective and systematic yet. D+ indicate the gradual efforts since2005 in cleaning progressively the 2 databases (SIGIPES-ANTILOPES). Merging of the 2 databases is in preparation.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Timeliness of the issue of semi-annual budget reports (PI-24 ii)
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="D (Source: PEFA Report, 2007)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="B (Source: PEFA Report)">

</target>
<actual value="Not evaluated.">
<comment><narrative>
Not evaluated. No indication for change from baseline.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of investment projects which are domestically financed in annual budget compliant with the new project legal and procedures framework.
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="Number of Projects: 0 percent"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="Number of Project: &amp;gt;= 20 percent">

</target>
<actual value="">
<comment><narrative>
The new Public Investment Management system are not yet operational and Manual of administrative procedures are not yetcompleted.Therefore there is no data to confirm the compliance of project in 2013 budget.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Control steps in expeditor chain
</narrative></title>
<baseline year="2006" iso-date="2006-12-09" value="22.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-09" />
<period-end iso-date="2012-12-31" />
<target value="8.00">

</target>
<actual value="22.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Availability of information on resources received by service delivery units (PEFA PI-23)
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="D (Source: PEFA Report, 2007)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="B (source PEFA report)">

</target>
<actual value="C (source: PETS2 report, 2011)">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Timeliness of the release of semi-annual budget reports on available media (government websites, national newspapers)
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="No publication of semi-annual budget reports in PM websites and Cameroon Tribune."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="Timeliness: 2 months">
<comment><narrative>
Partially met.
</narrative></comment>
</target>
<actual value="Semi-annual budget reports published in Cameroon Tribune only; Timeliness: 3 months">
<comment><narrative>
Semi-annual 2012 budget report was published in Cameroon Tribune in Sept. 2012. Not available on PM, DGT, MINEPAT or Presidencywebsites.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Scope of the legislature scrutiny of the annual budget law. (PI-27-i)
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="C (Source: PEFA Report, 2007)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="B (Source: PEFA Report, 2007)">

</target>
<actual value="Not evaluated">
<comment><narrative>
Not evaluated. No indication that value has changed from baseline.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of investment projects which are domestically financed in annual budget compliant with the new project legal and procedures framework.
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="Number of Projects: 0 percent"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="Number of Project: &amp;gt;= 20 percent">

</target>
<actual value="No change">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Legal and regulatory texts to enforce the new Budget Law are signed and effective.
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="Application texts have not been drafted yet (first quarter 2008)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="Decree on new budget  nomenclature including programs, signed and effective">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Degree of integration and reconciliation between personnel records and payroll data. (PI-18 i)
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="D  (source: PEFA Report, 2007)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="B (source: PEFA Report)">

</target>
<actual value="Not evaluated.">
<comment><narrative>
Not evaluated. Latest indication was D+
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of investment projects which are domestically financed in annual budget compliant with the new project legal and procedures framework.
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="Number of Projects: 0 percent"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="Number of Project: &amp;gt;= 20 percent">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Public access to key fiscal information (PEFA PI-10)
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="B (Source: PEFA Report, 2007)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="A (Source: PEFA Report)">

</target>
<actual value="B+">
<comment><narrative>
Source: 2008 PEFA Report
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Timeliness of the release of semi-annual budget reports on available media (government websites, national newspapers)
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="No publication of semi-annual budget reports in PM websites and Cameroon Tribune."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="Timeliness: 2 months">

</target>
<actual value="Semi-annual budget reports published in Cameroon Tribune only; Timeliness: 3 months">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Public access to key fiscal information (PEFA PI-10)
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="B (Source: PEFA Report, 2007)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="A (Source: PEFA Report)">

</target>
<actual value="B (source: Bank assessment)">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Legal and regulatory texts to enforce the new Budget Law are signed and effective.
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="Application texts have not been drafted yet (first quarter 2008)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="Decree on new budget  nomenclature including programs, signed and effective">
<comment><narrative>
Not met
</narrative></comment>
</target>
<actual value="Decree on new budget nomenclature not drafted.">
<comment><narrative>
Presidential circulars on Budget execution monitoring and 2013 Budget preparation were published in 2012.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Control steps in expeditor chain
</narrative></title>
<baseline year="2006" iso-date="2006-12-09" value="22.00"><comment><narrative>Source is the PEMFAR report 2006</narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-09" />
<period-end iso-date="2012-12-31" />
<target value="8.00">
<comment><narrative>
Not met.
</narrative></comment>
</target>
<actual value="22.00">
<comment><narrative>
No indication of change.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Degree of integration and reconciliation between personnel records and payroll data. (PI-18 i)
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="D (source: PEFA Report, 2007)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="B (source: PEFA Report)">

</target>
<actual value="D+ (source: own assessment)">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of contracts above threshold procured through open competition, in selected ministries (Health, Education, Agriculture, Public Works, and Finance). (PI-19 i, modified).
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="(To be determined by project effectiveness) In Francs CFA value"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2012-12-31" />
<target value="100 percent">
<comment><narrative>
No data available.
</narrative></comment>
</target>
<actual value="">
<comment><narrative>
No change. Baseline data at project effectiveness were never produced.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Timeliness of the release of semi-annual budget reports on available media (government websites, national newspapers)
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="No publication of semi-annual budget reports in PM websites and Cameroon Tribune."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="Timeliness: 2 months">

</target>
<actual value="Not evaluated">
<comment><narrative>
Not evaluated. Last indication was 3 months.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Public access to key fiscal information (PEFA PI-10)
</narrative></title>
<baseline year="2008" iso-date="2008-06-30" value="B (Source: PEFA Report, 2007)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-06-30" />
<period-end iso-date="2012-12-31" />
<target value="A (Source: PEFA Report)">
<comment><narrative>
Not met.
</narrative></comment>
</target>
<actual value="B (source: Bank assessment)">
<comment><narrative>
No new PEFA report. No major change since 2007 in PFM with regards to this indicator.
</narrative></comment>
</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P157733</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Hydropower Development on the Sanaga River Technical Assistance Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project development objective is to improve the Recipient's institutional capacity for a sustainable development of hydroelectric resources on the Sanaga River Basin.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0027251"><narrative>Republic of Cameroon</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="CM-COA-0027249"><narrative>Electricity Development Corporation (EDC)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2017-01-12"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2017-05-11"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2025-01-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2025-01-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Pravin Karki</narrative></person-name><telephone>+1-202-473-1000</telephone><email>pkarki@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>




<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002228111" />
            <name><narrative>Mbakaou Reservoir</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.41667 12.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002229162" />
            <name><narrative>Loulou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.43333 12.95</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002229681" />
            <name><narrative>Lagdo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.0263 13.6919</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002230309" />
            <name><narrative>Kikot</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.2 11.01667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002232239" />
            <name><narrative>Edea</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.8 10.13333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002232638" />
            <name><narrative>Donge</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.65 14.23333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002234971" />
            <name><narrative>Bamendjing</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.70526 10.48475</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008255353" />
            <name><narrative>Lom Pangar Dam</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.37847 13.4531</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008334597" />
            <name><narrative>Sanaga River</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.92333 11.51732</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0009239010" />
            <name><narrative>Nachtigal Bridge</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.79606 10.12652</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0009112402" />
            <name><narrative>Mapektieu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.84581 10.69303</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002227854" />
            <name><narrative>Mbengueni</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.78333 12.05</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="23220" percentage="67" xml:lang="en"/><sector vocabulary="1" code="14040" percentage="33" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LP" percentage="18.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Energy and Extractives</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LH" percentage="82.0000000" xml:lang="en"><narrative>FY17 - Renewable Energy Hydro</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="60" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="12" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000862" percentage="100" xml:lang="en"><narrative>Energy Policies &amp; Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="100" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000837" percentage="60" xml:lang="en"><narrative>Watershed Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="100" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="100" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="21" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">333333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">458333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">266666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">74000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">74000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">74000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">74000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">74000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">74000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">74000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">74000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">74000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">74000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">74000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">74000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">2411802.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">2411802.22</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">14465000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">11835000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">346092</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">423002</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">179143</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">146572</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">48292</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">59024</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">147604</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">180405</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">301803</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">246930</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">144111</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">117663</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">936907</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">1145108</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">1004200</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">1228152</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">242144</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">200212</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">56273</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">69315</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">114516</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">139964</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">150906</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">182823</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">126390</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">103448</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">148094</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">169147</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">155094</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">127480</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">10104</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">25071</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">108</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">11871</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">153387</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">202592</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">455679</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">981987</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">38847</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">795219</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">93676</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">121289</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">537982</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">202702</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">1090928</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">1242815</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">23722</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">118997</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">173146</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">43000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">52527</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">307131</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">251290</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-23517</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">1715456</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">2096669</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">43774</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">35815</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">254907</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">306246</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">510117</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">708014</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">406394</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">272838</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">283141</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">332101</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">264395</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">216323</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">439848</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">547195</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">191385</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">156588</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">35105</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">33244</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">-25574</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-53631</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-433520</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-3898</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-3774</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-5556</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-5738</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-7502</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-7268</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-15449</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-14958</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-21570</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-22399</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-23919</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-23271</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-25291</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-24475</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-38688</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-36713</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-43888</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-41321</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-64331</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-67543</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-75282</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-71513</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-75425</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-71491</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-180771</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-221122</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-249977</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-204361</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-194373</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-237759</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-240901</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-196941</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-245163</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-200425</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-209637</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-256431</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-259720</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-212326</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-265405</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-216974</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-27249"><narrative>Electricity Development Corporation (EDC); Ministry of Water and Energy (MINEE)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P157733"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P157733?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P157733"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Capacity needs assessment completed to identify future skills needs for Cameroon when developing the hydroelectricity value chain over the next 20 years
</narrative></title>
<baseline year="2017" iso-date="2017-05-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-05-11" />
<period-end iso-date="2025-01-30" />
<target value="Yes">
<comment><narrative>
Human resources needs assessment is completed since June 2023. The final reports were shared with the Bank afterwards.&amp;nbsp;
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Dam safety assessment of MapE, Bamendjin and Mbakaou completed
</narrative></title>
<baseline year="2017" iso-date="2017-05-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-05-11" />
<period-end iso-date="2025-01-31" />
<target value="Yes">
<comment><narrative>
The study is completed and the final workshop was held on April 1, 2024
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Generation capacity (MW) benefiting from the sustainaibility mechanisms developed under the project (i.e. Hydrology risk mitigation mechanisms and Dam safety framework adopted
</narrative></title>
<baseline year="2017" iso-date="2017-05-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-05-11" />
<period-end iso-date="2025-01-31" />
<target value="1,150.00">
<comment><narrative>
The risk mitigation study is ongoing.
</narrative></comment>
</target>
<actual value="1,110">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Methodology developed to evaluate the specific capacity enhancement of the Recipients human resources achieved by implementing the project
</narrative></title>
<baseline year="2017" iso-date="2017-05-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-05-11" />
<period-end iso-date="2025-01-30" />
<target value="Yes">
<comment><narrative>
Human resources needs assessment is completed since June 2023. The final reports were shared with the Bank afterwards.&amp;nbsp;
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
An operational model for managing reservoirs according to the forecasted and real time energy needs has been developed
</narrative></title>
<baseline year="2017" iso-date="2017-05-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-05-11" />
<period-end iso-date="2025-01-31" />
<target value="Yes">
<comment><narrative>
The implementation of this activity is ongoing.&amp;nbsp;
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Hydrology and Climate Change Study on the Sanaga River completed and approved by the Steering Committee
</narrative></title>
<baseline year="2017" iso-date="2017-05-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-05-11" />
<period-end iso-date="2025-01-31" />
<target value="Yes">
<comment><narrative>
This study is completed.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Sanaga River Basin Hydropower Potential Optimization Study available and approved by the Steering Committee
</narrative></title>
<baseline year="2017" iso-date="2017-05-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-05-11" />
<period-end iso-date="2025-01-31" />
<target value="Yes">
<comment><narrative>
The optimization study is completed. .
</narrative></comment>
</target>
<actual value="YES">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Sanaga river Basin commission  establishment study is completed
</narrative></title>
<baseline year="2017" iso-date="2017-05-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-05-11" />
<period-end iso-date="2025-01-30" />
<target value="Yes">
<comment><narrative>
The study is ongoing. The inception&amp;nbsp;report was issued in October 2023.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Qualified technical assistance for oversight of Nachtigal Hydropower Project's construction recruited before the works start
</narrative></title>
<baseline year="2017" iso-date="2017-05-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-05-11" />
<period-end iso-date="2025-01-31" />
<target value="Yes">
<comment><narrative>
The indicator was achieved with delay: the assistance was recruted in December 2021.&amp;nbsp;
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled
</narrative></title>
<baseline year="2017" iso-date="2017-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-05-15" />
<period-end iso-date="2025-01-15" />
<target value="1348">

</target>
<actual value="1110">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Priority Hydroelectric site on the Sanaga River identified
</narrative></title>
<baseline year="2017" iso-date="2017-05-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-05-11" />
<period-end iso-date="2025-01-31" />
<target value="Yes">
<comment><narrative>
The optimization study is completed.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Project-related grievances registered under the project grievance redress mechanism and addressed
</narrative></title>
<baseline year="2017" iso-date="2017-05-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-05-11" />
<period-end iso-date="2023-05-23" />
<target value="95.00">
<comment><narrative>
&amp;nbsp;The GRM was approved by the Bank in 2021. &amp;nbsp;The involvement of sector stakeholders (operators, hydropower project developers, other major users, CSOs, community organizations, socio-professional organizations, etc.) who are&amp;nbsp;developing&amp;nbsp; studies&amp;nbsp; in the Sanaga River basin and the dissemination of the GRM to them are essential to ensure that complaints are addressed timely and efficiently. To date, 02 complaints have been recorded in the GRM and are being processed.&amp;nbsp; One of the complaints has been verified in the field and a report has been issued by an independent consultant.&amp;nbsp; Close follow-up and continued dialogueith the complainants for the resolution and closure of these complaints are recommended. the other complaint is being processed by EDC.&amp;nbsp;
</narrative></comment>
</target>
<actual value="50.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Hydrology risk mitigation mechanisms identified and implementation roadmap prepared
</narrative></title>
<baseline year="2017" iso-date="2017-05-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-05-11" />
<period-end iso-date="2025-01-31" />
<target value="Yes">
<comment><narrative>
The different studies are completed. The final reports of the&amp;nbsp;hydrological risk mitigation mechanisms were validated during a workshop on April 1, 2024.

Climate change study and impact on hydrology on the Sanaga River is completed

The hydrology Risk Mitigation Mechanism are identified, the&amp;nbsp;implementation roadmap is prepared. they will be&amp;nbsp;available after the validation workshop
&amp;nbsp;
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of internships completed under the Project
</narrative></title>
<baseline year="2017" iso-date="2017-05-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-05-11" />
<period-end iso-date="2025-01-31" />
<target value="16.00">
<comment><narrative>
The interns&amp;nbsp;(16) are hired since July 2022.
</narrative></comment>
</target>
<actual value="16.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Dam safety framework adopted by MINEE and ready for implementation
</narrative></title>
<baseline year="2017" iso-date="2017-05-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-05-31" />
<period-end iso-date="2025-01-30" />
<target value="Yes">
<comment><narrative>
The contract for the preparation of the Dam Safety regulatory framework was signed in 2022 and cancelled after&amp;nbsp;the inception report&amp;nbsp;due contractual&amp;nbsp;issues. The&amp;nbsp;activity is being re-tendered.&amp;nbsp;  Technical advisory for dam safety regulation comprising two international experts have been hired
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Panel of Experts, including dam safety and environmental and social expertise, recruited
</narrative></title>
<baseline year="2017" iso-date="2017-05-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-05-11" />
<period-end iso-date="2025-01-30" />
<target value="Yes">
<comment><narrative>
Dam safety and E&amp;amp;S panels of experts are all recruited and mobilized since December 2021.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P166694</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Second Fiscal Consolidation and Inclusive Growth DPF</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[ The Operation will support Government efforts to (i) improve fiscal sustainability and public sector management: (ii) enhance competitiveness; and (iii) improve social services and scale up social protection.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Second Fiscal Consolidation and Inclusive Growth Development Policy Financing Project for Cameroon is to support government efforts to: (i) improve fiscal sustainability and public sector management; (ii) enhance competitiveness; and (iii) improve social services and scale up social protection. The operation is aligned with the government's economic growth, poverty reduction, and structural reform priorities as set forth in its long-term development agenda, vision 2035, and other key strategic documents, including the three-year emergency plan for accelerating growth. The operation builds on the achievements and advances the development objectives of its predecessor by maintaining a focus on the quality of governance mechanisms.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0036496"><narrative>Ministry of Economy, Planning and Regional Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0036496"><narrative>Ministry of Economy, Planning and Regional Development</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="CM-COA-0036497"><narrative>Ministry of Finance</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2018-11-15"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2019-08-28"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2020-08-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2020-08-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Rick Emery Tsouck Ibounde</narrative></person-name><telephone>+1-202-473-1000</telephone><email>rtsouckibounde@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2220957" />
                <name><narrative>Yaounde</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>3.86667 11.51667</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="15117" percentage="20" xml:lang="en"/><sector vocabulary="1" code="23111" percentage="10" xml:lang="en"/><sector vocabulary="1" code="21023" percentage="10" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="10" xml:lang="en"/><sector vocabulary="1" code="15129" percentage="10" xml:lang="en"/><sector vocabulary="1" code="15155" percentage="10" xml:lang="en"/><sector vocabulary="1" code="12220" percentage="10" xml:lang="en"/><sector vocabulary="1" code="11110" percentage="10" xml:lang="en"/><sector vocabulary="1" code="33110" percentage="5" xml:lang="en"/><sector vocabulary="1" code="21040" percentage="5" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TZ" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Other Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LZ" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Other Energy and Extractives</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EZ" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Other Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="40.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="10" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000014" percentage="10" xml:lang="en"><narrative>Trade</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="10" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="16" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="30" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000141" percentage="10" xml:lang="en"><narrative>Trade Facilitation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="10" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="10" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="30" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="10" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000141" percentage="10" xml:lang="en"><narrative>Trade Facilitation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="10" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="10" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="10" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="15" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="30" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="16" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000862" percentage="10" xml:lang="en"><narrative>Energy Policies &amp; Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000657" percentage="10" xml:lang="en"><narrative>Standards, Curriculum and Textbooks</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">208000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">712800.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">421800.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">974400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">1141400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">1299400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">709000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">1562200.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">1764000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">944800.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">1985400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">2094400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">1095000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">2280400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">2372800.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">2448400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">1254800.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">2572600.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">1322800.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">2730600.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">2882000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">3025000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">1567200.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">3228000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">3320200.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">1701400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">3531400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">3649600.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">1845600.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">3689600.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">3728400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">1890000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">3790000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">3786000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">3798600.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">1902800.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">3829000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">3875200.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">1958400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">3950400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">3996200.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">2019600.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">4081400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">4149600.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">2100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">4232000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">4247600.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">4247600.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">2142400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">4321800.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">4347400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">2179400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">4394800.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">4456600.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">2236800.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">4465400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">4446200.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">2212000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">4425000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">4433600.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">4444600.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">2229800.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">4473600.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">4487200.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">2247800.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">4504600.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">4518000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">2264000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">4103000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">2748200.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">208000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">712800.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">421800.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">974400.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">1141400.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">1299400.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">709000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">1562200.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">1764000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">944800.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">1985400.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">2094400.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">1095000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">2280400.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">2372800.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">2448400.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">1254800.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">2572600.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">1322800.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">2730600.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">2882000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">3025000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">1567200.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">3228000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">3320200.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">1701400.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">3531400.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">3649600.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">1845600.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">3689600.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">3728400.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">1890000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">3790000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">3786000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">3798600.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">1902800.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">3829000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">3875200.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">1958400.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">3950400.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">3996200.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">2019600.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">4081400.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">4149600.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">2100000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">4232000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">4247600.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">4247600.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">2142400.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">4321800.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">4347400.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">2179400.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">4394800.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">4456600.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">2236800.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">4465400.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">4446200.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">2212000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">4425000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">4433600.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">4444600.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">2229800.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">4473600.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">4487200.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">2247800.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">4504600.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">4518000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">2264000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">4103000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">2748200.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">200000000</value><description xml:lang="en"><narrative>Total Commitment in August Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-36497"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">200402775</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-36497"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-684486</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-36497"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-1287310</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-36497"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-1321433</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-36497"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">0</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-36497"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-1288564</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-36497"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-1194247</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-36497"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-1084346</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-36497"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-1161559</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-36497"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-1187405</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-36497"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-1165903</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-36497"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-1203477</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-36497"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-1178174</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-36497"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-1245359</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-36497"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-3375</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-36497"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-1220197</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-36497"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-3213203</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-36497"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-3455622</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-36497"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-3436815</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-36497"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P166694"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P166694?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P166694"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P117102</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>CM-Sanitation Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To improve planning and management of the Recipient's sanitation sector as well as toprovide access to sanitation services through pilot approaches in selected areas.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the First Phase of the Sanitation Project for Cameroon is to improve planning and management of the recipient's sanitation sector as well as to provide access to sanitation services through pilot approaches in selected areas. There are three components to the project, the first component being urban sanitation. This component will focus on full-scale pilot activities in Douala, the largest city in Cameroon, that integrate support for hygiene promotion and sanitation marketing with construction of latrines, condominial sewerage, and sludge treatment plants. The second component is the rural sanitation. The component will support hygiene promotion and sanitation marketing in the extreme north region. It will provide partial subsidies to households to finance household latrines and finance public latrines in schools and clinics. Finally, the third component is the institutional strengthening and project management. The component will provide technical assistance to clarify roles and responsibilities and establish a sustainable financing mechanism in the sector, and will finance the Project Implementation Unit and other project management costs.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0003210"><narrative>REPUBLIC OF CAMEROON</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="CM-COA-0003209"><narrative>Douala City Council (CUD)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2010-05-27"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2011-06-23"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2017-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2017-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Charles Delfieux</narrative></person-name><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002231755" />
            <name><narrative> Far North Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>11 14.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002231755" />
            <name><narrative>Far North Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>11 14.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002232593" />
            <name><narrative> Douala</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.0482702 9.7042799</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002232593" />
            <name><narrative>Douala</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.0482702 9.7042799</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="14010" percentage="50" xml:lang="en"/><sector vocabulary="1" code="14022" percentage="50" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WF" percentage="17.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Water, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WA" percentage="83.0000000" xml:lang="en"><narrative>FY17 - Sanitation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="39" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="10" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="10" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000712" percentage="40" xml:lang="en"><narrative>Services and Housing for the Poor</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="79" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="21" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="39" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="10" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">416666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">416666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">416666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">416666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">620000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">620000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">620000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">620000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">620000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">620000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">620000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">620000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">620000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">620000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">620000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">620000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">916666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">916666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">916666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">916666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">11282523.23</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">11282523.23</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">30000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">-4957452</value><description xml:lang="en"><narrative>Total Commitment Cancellations in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-2404339</value><description xml:lang="en"><narrative>Total Commitment Cancellations in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">467409</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">416362</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">26178</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">27766</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-01-31"/><value value-date="2013-01-31">10255</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">87138</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">36251</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">49395</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">66435</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">111099</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-07-31"/><value value-date="2013-07-31">79178</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">19978</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">241983</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">101967</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">58293</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">56342</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">55650</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">193951</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">47835</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">51855</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">39998</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">136994</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">17661</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">87777</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">159476</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">132855</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">202488</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">132239</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">36504</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">127562</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">79191</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">251958</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">35360</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">76610</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">41542</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">526450</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">350197</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">73962</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">80536</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">787436</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">815010</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">83970</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">92310</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">384174</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">116380</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">446762</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">157096</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">56137</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">189392</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">255820</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">684560</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">439092</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">268921</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">440965</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">675972</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">929115</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">809136</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">1130418</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">1100193</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">439419</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">629725</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">1862791</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">1128002</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">-3804</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">-4695</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">-6898</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-8397</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-9723</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-13730</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-19438</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-26239</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-31461</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-49663</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-69537</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-69219</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-69242</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-68806</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-67417</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-71054</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-69445</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-69256</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-65100</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-67100</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-65218</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-57293</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-67655</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-60748</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-64088</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-61970</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-61552</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-187741</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-182805</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-169870</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-178655</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-175179</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-176094</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-176636</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-176160</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-6350</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-174827</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-180637</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-3209"><narrative>Douala City Council (CUD)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P117102"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P117102?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P117102"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Primary and secondary school children provided with access to improved and gender-separated sanitation at school under the project
</narrative></title>
<baseline year="2011" iso-date="2011-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-05-27" />
<period-end iso-date="2017-03-31" />
<target value="121900.00">

</target>
<actual value="33806.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New public latrines resulting from the project intervention
</narrative></title>
<baseline year="2011" iso-date="2011-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-05-27" />
<period-end iso-date="2017-03-31" />
<target value="2,120.00">

</target>
<actual value="624.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of local authorities that have developed a community sanitation plan acceptable to the regional sanitation committee
</narrative></title>
<baseline year="2011" iso-date="2011-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-05-27" />
<period-end iso-date="2017-03-31" />
<target value="17.00">

</target>
<actual value="17.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Masons trained and equipped to build latrines and provide sanitation services
</narrative></title>
<baseline year="2011" iso-date="2011-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-05-27" />
<period-end iso-date="2017-03-31" />
<target value="650.00">

</target>
<actual value="250.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
People washing hands with soap
</narrative></title>
<baseline year="2011" iso-date="2011-05-27" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-05-27" />
<period-end iso-date="2017-03-31" />
<target value="60.00">

</target>
<actual value="33.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of person-hours of training provided to staff of agencies responsible for sanitation
</narrative></title>
<baseline year="2011" iso-date="2011-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-05-27" />
<period-end iso-date="2017-03-31" />
<target value="10000.00">

</target>
<actual value="74046.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People trained to improve hygiene behavior/sanitation practices under the proj
</narrative></title>
<baseline year="2011" iso-date="2011-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-05-27" />
<period-end iso-date="2017-03-31" />
<target value="480,000.00">

</target>
<actual value="471,144.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of schools provided with access to water supply under the Project
</narrative></title>
<baseline year="2015" iso-date="2015-03-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-03-02" />
<period-end iso-date="2017-03-31" />
<target value="236.00">

</target>
<actual value="87.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
People washing hands with soap
</narrative></title>
<baseline year="2011" iso-date="2011-05-27" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-05-27" />
<period-end iso-date="2017-03-31" />
<target value="60.00">

</target>
<actual value="33.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved sanitation services
</narrative></title>
<baseline year="2011" iso-date="2011-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-05-27" />
<period-end iso-date="2017-03-31" />
<target value="126,878.00">

</target>
<actual value="8,340.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2011" iso-date="2011-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-05-27" />
<period-end iso-date="2017-03-31" />
<target value="731,128.00">

</target>
<actual value="511,820.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
People washing hands with soap
</narrative></title>
<baseline year="2011" iso-date="2011-05-27" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-05-27" />
<period-end iso-date="2017-03-31" />
<target value="60.00">

</target>
<actual value="33.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of person-hours of training provided to staff of agencies responsible for sanitation
</narrative></title>
<baseline year="2011" iso-date="2011-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-05-27" />
<period-end iso-date="2017-03-31" />
<target value="10000.00">

</target>
<actual value="74046.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of local authorities that have developed a community sanitation plan acceptable to the regional sanitation committee
</narrative></title>
<baseline year="2011" iso-date="2011-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-05-27" />
<period-end iso-date="2017-03-31" />
<target value="17.00">

</target>
<actual value="17.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
School teachers trained in hygiene education
</narrative></title>
<baseline year="2011" iso-date="2011-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-05-27" />
<period-end iso-date="2017-03-31" />
<target value="1,700.00">

</target>
<actual value="386.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of local authorities that have developed a community sanitation plan acceptable to the regional sanitation committee
</narrative></title>
<baseline year="2011" iso-date="2011-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-05-27" />
<period-end iso-date="2017-03-31" />
<target value="17.00">

</target>
<actual value="17.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improved latrines constructed under the project
</narrative></title>
<baseline year="2011" iso-date="2011-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-05-27" />
<period-end iso-date="2017-03-31" />
<target value="17,800.00">

</target>
<actual value="1,170.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of person-hours of training provided to staff of agencies responsible for sanitation
</narrative></title>
<baseline year="2011" iso-date="2011-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-05-27" />
<period-end iso-date="2017-03-31" />
<target value="10,000.00">

</target>
<actual value="74,046.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Primary and secondary school children provided with access to improved and gender-separated sanitation at school under the project
</narrative></title>
<baseline year="2011" iso-date="2011-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-05-27" />
<period-end iso-date="2017-03-31" />
<target value="121,900.00">

</target>
<actual value="31,700.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Primary and secondary school children provided with access to improved and gender-separated sanitation at school under the project
</narrative></title>
<baseline year="2011" iso-date="2011-05-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-05-27" />
<period-end iso-date="2017-03-31" />
<target value="121900.00">

</target>
<actual value="31700.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P152755</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Electricity Transmission and Reform Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The project development objective is to improve the capacity, efficiency, and reliability of Cameroona??s national electricitytransmission network.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Electricity Transmission and Reform Project is to improve the capacity, efficiency, and reliability of Cameroon's national electricity transmission network. There are three components to the project, the first component being provision of support towards the operationalization of SONATREL's transmission portfolio. This component is underpinned by a detailed action plan/roadmap, and will include the following sub-components: handover of transmission assets, including the spin-off, sale, and transfer to SONATREL, consolidation of SONATREL, including institutional and regulatory framework, technical and management support for start-up and initial operations of SONATREL, and overall management of the National Transmission Grid Investment Program. The second component is the strengthening of the national transmission grid. This component will improve the capacity and reliability of Cameroon's national electricity transmission network by financing priority investments to upgrade and extend the national transmission networks and strengthen the reliability of power supply in the interconnected systems. Finally, the third component is the project management support and capacity building.  The project will finance technical assistance, analytical work, and capacity building support to key sector stakeholders, including AER, ARSEL, and MINEE (Ministry in charge of Water and Energy) to ensure clarity of roles and responsibilities, further bolstering sector governance within the context of the new sector framework. Moreover, the component will ensure the provision of needed technical, financial, operational, and fiduciary assistance to SONATREL's Project Implementation Unit (PIU) for the implementation of the project.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0022105"><narrative>Republic of Cameroon</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="CM-COA-0022104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2016-01-12"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2016-12-07"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2026-11-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2026-11-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Momodou A K Njie</narrative></person-name><telephone>+1-202-473-1000</telephone><email>maknjie@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002220957" />
            <name><narrative>Yaounde</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.86667 11.51667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002221789" />
            <name><narrative>South Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>2.75 11.58333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002221932" />
            <name><narrative>Song</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.7 11.28333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002223603" />
            <name><narrative>North Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.5 14</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002224452" />
            <name><narrative>Ngousso</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.35 12.68333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002224828" />
            <name><narrative>Ngaoundere</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.26667 14.01667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002224921" />
            <name><narrative>Deido</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.0701 9.7253</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002225539" />
            <name><narrative>Nachtigal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.35 11.63333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002227402" />
            <name><narrative>Meïganga</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.51667 14.3</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002228078" />
            <name><narrative>Mbalmayo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.72361 9.955</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002228373" />
            <name><narrative>Maroua</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.59095 14.31593</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002228521" />
            <name><narrative>Mangombe</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.81667 10.11667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002229162" />
            <name><narrative>Loulou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.43333 12.95</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002229681" />
            <name><narrative>Lagdo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.0263 13.6919</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002229752" />
            <name><narrative>Kumba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.6363 9.4469</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002229761" />
            <name><narrative>Kribi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>2.93725 9.90765</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002229886" />
            <name><narrative>Koumasi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.63333 11.91667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002231505" />
            <name><narrative>Foumbang</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.9 14.65</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002231835" />
            <name><narrative>East Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.83333 14.16667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002232593" />
            <name><narrative>Douala</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.04827 9.70428</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002233387" />
            <name><narrative>Republic of Cameroon</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6 12.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002233704" />
            <name><narrative>Bonaberi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.0779 9.6759</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002234359" />
            <name><narrative>Bertoua</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.57728 13.68459</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002234663" />
            <name><narrative>Batouri</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.43333 14.36667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002234724" />
            <name><narrative>Bassa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.0559 9.7475</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002234974" />
            <name><narrative>Bamenda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.9597 10.14597</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002235189" />
            <name><narrative>Bafoussam</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.47775 10.41759</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002235907" />
            <name><narrative>Ahala</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.8 11.48333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002236053" />
            <name><narrative>Abong Mbang</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.98333 13.18333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002595206" />
            <name><narrative>Ngodi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.7042 9.7228</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008260044" />
            <name><narrative>Kribi Power Station</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.01 9.96</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0011002364" />
            <name><narrative>Makepe Missoke</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.0605 9.73592</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006858333" />
            <name><narrative>Njom</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.0738 9.7632</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006856073" />
            <name><narrative>Bakoko</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.2153 9.7162</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006731531" />
            <name><narrative>Garoua</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.2281 14.81743</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006730668" />
            <name><narrative>Djamboutou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.6479 14.85951</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002594933" />
            <name><narrative>Logbessou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.0808 9.7949</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002594930" />
            <name><narrative>Sodiko</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.1176 9.6658</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002594910" />
            <name><narrative>Bekoko</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.1137 9.5795</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002594856" />
            <name><narrative>Bitenge</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.7754 9.2567</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002232283" />
            <name><narrative>Ebolowa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>2.9 11.15</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002232239" />
            <name><narrative>Edea</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.8 10.13333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002230876" />
            <name><narrative>Guider</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.9333 13.94671</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002230078" />
            <name><narrative>Kondong</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.05 11.85</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002228014" />
            <name><narrative>Mbang</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.15 14.31667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002226947" />
            <name><narrative>Metchum Division</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.5 10.16667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002226462" />
            <name><narrative>Missellele</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.1224 9.4449</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002225875" />
            <name><narrative>Moumbel</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.96667 14.13333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002224197" />
            <name><narrative>Njombe</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.58056 9.66472</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002224038" />
            <name><narrative>Nkolbison</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.88333 11.45</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002224026" />
            <name><narrative>Nkole</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>2.48333 10.38333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002223968" />
            <name><narrative>Nkolkoumou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.86667 11.4</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002223828" />
            <name><narrative>Nkometou I</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.05 11.55</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002223763" />
            <name><narrative>Nkongsamba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.9547 9.9404</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002223695" />
            <name><narrative>Nkoumou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.5 12.28333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002223412" />
            <name><narrative>Nyabessan</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>2.4 10.4</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002223354" />
            <name><narrative>Nyem</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.08333 12.05</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002223336" />
            <name><narrative>Nyom I</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.93333 11.51667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002223335" />
            <name><narrative>Nyom II</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.98333 11.51667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002222039" />
            <name><narrative>Simbok</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.81667 11.48333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="32161" percentage="45" xml:lang="en"/><sector vocabulary="1" code="31193" percentage="33" xml:lang="en"/><sector vocabulary="1" code="31194" percentage="14" xml:lang="en"/><sector vocabulary="1" code="32130" percentage="8" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LP" percentage="12.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Energy and Extractives</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LT" percentage="88.0000000" xml:lang="en"><narrative>FY17 - Energy Transmission and Distribution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000861" percentage="91" xml:lang="en"><narrative>Energy Efficiency</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000862" percentage="12" xml:lang="en"><narrative>Energy Policies &amp; Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="91" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="3" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="91" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="91" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000861" percentage="91" xml:lang="en"><narrative>Energy Efficiency</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000863" percentage="91" xml:lang="en"><narrative>Access to Energy</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">857142.86</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">857142.86</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">857142.86</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">857142.86</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">857142.86</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">857142.86</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">857142.86</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">7000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">7000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">7000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">7000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">7000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">7000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">7000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">7000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">7000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">7000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">7000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">7000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">10333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">10333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">10333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">10333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">10333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">10333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">10333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">10333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">10333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">10333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">10333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">10333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">27866242.41</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">27866242.41</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">325000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">5063371</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">746739</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">335326</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">348305</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">371447</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">193501</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">7276</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">548502</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">699836</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">72133</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">3038772</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">287527</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">886144</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">174527</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">72372</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">122352</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">55136</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">436476</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">72537</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">101072</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">330413</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">131161</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">198991</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">419967</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">228550</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">272982</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">633501</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">91675</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">431934</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">290758</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">695710</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">764034</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">200866</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">250460</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">564804</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">2432369</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">8041861</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">1525800</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">475299</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">486893</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">504438</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">391041</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">759275</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">5983551</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">150921</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">2197133</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">2215980</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">8855876</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">38620659</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">1230609</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">4521602</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">445302</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">7879934</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">5247487</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">879556</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">486924</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">4636931</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">4714283</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">5178232</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">2977132</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">1648686</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">3816704</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">16189224</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">5112137</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">3140034</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">2610734</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">11128623</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">7843800</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">9328529</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">11857959</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">1522118</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">7139466</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">2519825</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">5235495</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">2385832</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">4791829</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">1646551</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">16111489</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">1054859</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">9369345</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">3850218</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">1875794</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">5331007</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">6562866</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">7746789</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">3097185</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">3626413</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">1664874</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">231367</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">684181</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">720975</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">476184</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">2229139</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">833065</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">2026224</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">1745996</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">-854815</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-689628</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-44</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">-456266</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-461160</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-89</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-473672</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-107</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-464040</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-525286</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-104</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-509600</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-521</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-529398</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-499954</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-1056</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-817213</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-2370087</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-3848615</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-5172315</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-2529</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-5689102</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-5522476</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-1833</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-5334468</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-805</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-5325226</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-4075948</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-4608506</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-5869411</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-6718661</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-6833608</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-22104"><narrative>SociEtE Nationale de Transport de l’ElectricitE (SONATREL)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P152755"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P152755?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P152755"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in the hours of power outages that are linked to malfunctions in the transmission system / improvement of transmission system stability - System Average Interruption Duration Index, SAIDI
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="49.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="20.00">

</target>
<actual value="30.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of works contracts signed
</narrative></title>
<baseline year="2016" iso-date="2016-11-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-08" />
<period-end iso-date="2026-06-08" />
<target value="11.00">

</target>
<actual value="11.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of three-phase transformers installed
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="12.00">
<comment><narrative>
The transformers at the Nyom 2, Nkolbisson, Missole, Ngodi Bakoko, Bonaberi and Deido have been installed
</narrative></comment>
</target>
<actual value="9.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of work contracts executed
</narrative></title>
<baseline year="2016" iso-date="2016-11-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-24" />
<period-end iso-date="2026-06-13" />
<target value="10.00">
<comment><narrative>
Number of work contracts executed
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Victims of GBV/SEA taken into care
</narrative></title>
<baseline year="2016" iso-date="2016-11-10" value="100"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-10" />
<period-end iso-date="2026-06-10" />
<target value="100.00">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transmission lines constructed under the project
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="455.00">
<comment><narrative>
Number of HV lines constructed under the project and which construction has been considered satisfactory by the owners engineer.
</narrative></comment>
</target>
<actual value="370">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in the hours of power outages that are linked to malfunctions in the transmission system / improvement of transmission system stability - System Average Interruption Duration Index, SAIDI
</narrative></title>
<baseline year="2016" iso-date="2016-11-28" value="49.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-28" />
<period-end iso-date="2026-06-13" />
<target value="20.00">

</target>
<actual value="30.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in the hours of power outages that are linked to malfunctions in the transmission system / improvement of transmission system stability - System Average Interruption Duration Index, SAIDI
</narrative></title>
<baseline year="2016" iso-date="2016-11-28" value="49.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-28" />
<period-end iso-date="2026-06-13" />
<target value="20.00">

</target>
<actual value="36.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in the hours of power outages that are linked to malfunctions in the transmission system / improvement of transmission system stability - System Average Interruption Duration Index, SAIDI
</narrative></title>
<baseline year="2016" iso-date="2016-11-28" value="49.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-28" />
<period-end iso-date="2026-06-13" />
<target value="20.00">
<comment><narrative>
to be updated by Sonatrel
</narrative></comment>
</target>
<actual value="49.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in the hours of power outages that are linked to malfunctions in the transmission system / improvement of transmission system stability - System Average Interruption Duration Index, SAIDI
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="49.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="25.00">
<comment><narrative>
The indicator improves as the transmission lines and substations are progressively commissioned. The next improvement is envisaged in November 2026 with the commissioning of the 400 kV Nkolnkoumou - Edea line as well as the infrastructure in Douala and in the North.

The end target is revised to take into account the non-realization of projects that should have been implemented by GoC and would have contributed to the improvement in outage hours
</narrative></comment>
</target>
<actual value="30.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in the hours of power outages that are linked to malfunctions in the transmission system / improvement of transmission system stability - System Average Interruption Duration Index, SAIDI
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="49.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="25.00">
<comment><narrative>
The indicator improves as the transmission lines and substations are progressively commissioned. The next improvement is envisaged in November 2026 with the commissioning of the 400 kV Nkolnkoumou - Edea line as well as the infrastructure in Douala and in the North.

The end target is revised to take into account the non-realization of projects that should have been implemented by GoC and would have contributed to the improvement in outage hours
</narrative></comment>
</target>
<actual value="30.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in the hours of power outages that are linked to malfunctions in the transmission system / improvement of transmission system stability - System Average Interruption Duration Index, SAIDI
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="49.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="20.00">

</target>
<actual value="30.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in transmission network losses (percent)
</narrative></title>
<baseline year="2016" iso-date="2016-11-28" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-28" />
<period-end iso-date="2026-06-11" />
<target value="2.50">
<comment><narrative>
The indicator increases as the transmission lines and substations are progressively&amp;nbsp;commissioned.&amp;nbsp; The next increase is envisaged in June 2026 with the commissioning of the 400 kV Nkolnkoumou - Edea line
</narrative></comment>
</target>
<actual value="4.8">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in transmission network losses (percent)
</narrative></title>
<baseline year="2016" iso-date="2016-11-28" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-28" />
<period-end iso-date="2026-06-11" />
<target value="2.50">
<comment><narrative>
The indicator changes&amp;nbsp;as the transmission lines and substations are progressively&amp;nbsp;commissioned.&amp;nbsp; The next increase is envisaged in January 2026 with the commissioning of the HV Lines around Douala.
</narrative></comment>
</target>
<actual value="4.8">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in transmission network losses (percent)
</narrative></title>
<baseline year="2016" iso-date="2016-11-28" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-28" />
<period-end iso-date="2026-06-11" />
<target value="2.50">
<comment><narrative>
The indicator changes&amp;nbsp;as the transmission lines and substations are progressively&amp;nbsp;commissioned.&amp;nbsp; The next change&amp;nbsp;is envisaged in August 2025 with the commissioning of the HV Lines around Yaounde.
</narrative></comment>
</target>
<actual value="5.20">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in transmission network losses (percent)
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="4.0">
<comment><narrative>
The indicator improves as the transmission lines and substations are progressively commissioned. The next improvement is envisaged in November 2026 with the commissioning of the 400 kV Nkolnkoumou - Edea line as well as the infrastructure in Douala and in the North.

The end target is revised to take into account the non-realization of projects that should have been implemented by GoC and would have contributed to the improvement of losses
</narrative></comment>
</target>
<actual value="4.8">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in transmission network losses (percent)
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="4.0">
<comment><narrative>
The indicator improves as the transmission lines and substations are progressively commissioned. The next improvement is envisaged in November 2026 with the commissioning of the 400 kV Nkolnkoumou - Edea line as well as the infrastructure in Douala and in the North.

The end target is revised to take into account the non-realization of projects that should have been implemented by GoC and would have contributed to the improvement of losses
</narrative></comment>
</target>
<actual value="4.8">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in transmission network losses (percent)
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="2.50">
<comment><narrative>
The indicator increases as the transmission lines and substations are progressively&amp;nbsp;commissioned.&amp;nbsp; The next increase is envisaged in June 2026 with the commissioning of the 400 kV Nkolnkoumou - Edea line
</narrative></comment>
</target>
<actual value="4.8">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in transmission network wheeling capacity (MW)
</narrative></title>
<baseline year="2016" iso-date="2016-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-28" />
<period-end iso-date="2026-06-12" />
<target value="500.00">
<comment><narrative>
The indicator increases as the transmission lines and substations are progressively&amp;nbsp;commissioned.&amp;nbsp; The next increase is envisaged in June 2026 with the commissioning of the 400 kV Nkolnkoumou - Edea line
</narrative></comment>
</target>
<actual value="420.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in transmission network wheeling capacity (MW)
</narrative></title>
<baseline year="2016" iso-date="2016-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-28" />
<period-end iso-date="2026-06-12" />
<target value="500.00">
<comment><narrative>
The indicator increases as the transmission lines and substations are progressively&amp;nbsp;commissioned.&amp;nbsp; The next increase is envisaged in January 2026 with the commissioning of the HV Lines around Douala.
</narrative></comment>
</target>
<actual value="420.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in transmission network wheeling capacity (MW)
</narrative></title>
<baseline year="2016" iso-date="2016-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-28" />
<period-end iso-date="2026-06-12" />
<target value="500.00">
<comment><narrative>
The indicator increases as the transmission lines and substations are progressively&amp;nbsp;commissioned.&amp;nbsp; The next increase is envisaged in August 2025 with the commissioning of the HV Lines around Yaounde.
</narrative></comment>
</target>
<actual value="360.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in transmission network wheeling capacity (MW)
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="500.00">
<comment><narrative>
The indicator increases as the transmission lines and substations are progressively&amp;nbsp;commissioned.&amp;nbsp; The next increase is envisaged in June 2026 with the commissioning of the 400 kV Nkolnkoumou - Edea line
</narrative></comment>
</target>
<actual value="420.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in transmission network wheeling capacity (MW)
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="500.00">
<comment><narrative>
The indicator increases as the transmission lines and substations are progressively&amp;nbsp;commissioned.&amp;nbsp; The next increase is envisaged in June 2026 with the commissioning of the 400 kV Nkolnkoumou - Edea line
</narrative></comment>
</target>
<actual value="420.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in transmission network wheeling capacity (MW)
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="500.00">
<comment><narrative>
The indicator increases as the transmission lines and substations are progressively&amp;nbsp;commissioned.&amp;nbsp; The next increase is envisaged in June 2026 with the commissioning of the 400 kV Nkolnkoumou - Edea line
</narrative></comment>
</target>
<actual value="420.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Project-related grievances registered under the project GRM addressed (within 1 month)
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="100.00">

</target>
<actual value="16">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transmission lines constructed under the project
</narrative></title>
<baseline year="2016" iso-date="2016-11-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-24" />
<period-end iso-date="2026-06-13" />
<target value="455.00">
<comment><narrative>
Number of HV lines constructed under the project and which construction has been considered satisfactory by the owners engineer.
</narrative></comment>
</target>
<actual value="370">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reform roadmap fully implemented - including new regulatory framework in place
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="SONATREL established and functional from own revenues">
<comment><narrative>
Satisfactory implementation of the reform roadmap were monitored as follows:- Year 1: Updating and harmonization of the existing sector legislation and the new regulatory framework in place;- Year 2: Human resources in place and capacity building program fully defined;- Year 3: Capacity building program fully implemented;- Year 4: SONATREL fully operational.
</narrative></comment>
</target>
<actual value="100% of network access contracts signed between SONATREL and customers.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Full accounting and legal separation of ENEO's transmission assets from the holding and their subsequent transfer to SONATREL
</narrative></title>
<baseline year="2016" iso-date="2016-11-24" value="SONATREL opening balance sheet available and validated"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-24" />
<period-end iso-date="2026-06-14" />
<target value="Accounts audit report for the year prepared and validated">
<comment><narrative>
All relevant current, fixed and tangible assets of the transmission subsector have been spun off and properly accounted for in SONATRELs opening balance.
</narrative></comment>
</target>
<actual value="Annual audit reports prepared and validated">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in transmission network wheeling capacity (MW)
</narrative></title>
<baseline year="2016" iso-date="2016-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-28" />
<period-end iso-date="2026-06-12" />
<target value="500.00">
<comment><narrative>
The indicator increases as the transmission lines and substations are progressively&amp;nbsp;commissioned.&amp;nbsp; The next increase is envisaged in January 2026 with the commissioning of the HV Lines around Douala.
</narrative></comment>
</target>
<actual value="420.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in transmission network losses (percent)
</narrative></title>
<baseline year="2016" iso-date="2016-11-28" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-28" />
<period-end iso-date="2026-06-11" />
<target value="2.50">
<comment><narrative>
The indicator increases as the transmission lines and substations are progressively&amp;nbsp;commissioned.&amp;nbsp; The next increase is envisaged in June 2026 with the commissioning of the 400 kV Nkolnkoumou - Edea line
</narrative></comment>
</target>
<actual value="4.8">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of staff trained
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="125">
<comment><narrative>
The PMU has&amp;nbsp;prioritised the completion of the transmission infrastructure (especially Nachtigal associated facilities) and has focused its efforts in that regard. Some capacity building activities have been realised but it is unlikely that the target shall be met due to the non-update of the Business Plan that when completed, would have reflected the required capacity building needs. This shall now be considered under the vertical energy MPA under preparation.

The following indicator shall be tracked with respect to gender inclusion as part of the Additional Financing:

Internship program enabling women to access safeguards positions in the energy sector (Number) Baseline: 3 Target: 6
</narrative></comment>
</target>
<actual value="120.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional transformer capacity in the network
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="840,000.00">

</target>
<actual value="520,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Full accounting and legal separation of ENEO's transmission assets from the holding and their subsequent transfer to SONATREL
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="SONATREL opening balance sheet available and validated"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="Accounts audit report for the year prepared and validated">
<comment><narrative>
All relevant current, fixed and tangible assets of the transmission subsector have been spun off and properly accounted for in SONATRELs opening balance.
</narrative></comment>
</target>
<actual value="Annual audit reports prepared and validated">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transmission lines constructed under the project
</narrative></title>
<baseline year="2016" iso-date="2016-11-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-24" />
<period-end iso-date="2026-06-13" />
<target value="455.00">
<comment><narrative>
Number of HV lines constructed under the project and which construction has been considered satisfactory by the owners engineer.
</narrative></comment>
</target>
<actual value="354">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Victims of GBV/SEA taken into care
</narrative></title>
<baseline year="2016" iso-date="2016-11-10" value="100"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-10" />
<period-end iso-date="2026-06-10" />
<target value="100.00">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in the hours of power outages that are linked to malfunctions in the transmission system / improvement of transmission system stability - System Average Interruption Duration Index, SAIDI
</narrative></title>
<baseline year="2016" iso-date="2016-11-28" value="49.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-28" />
<period-end iso-date="2026-06-13" />
<target value="20.00">
<comment><narrative>
to be updated by Sonatrel
</narrative></comment>
</target>
<actual value="49.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Victims of GBV/SEA taken into care
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="100"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="100.00">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Full accounting and legal separation of ENEO's transmission assets from the holding and their subsequent transfer to SONATREL
</narrative></title>
<baseline year="2016" iso-date="2016-11-24" value="SONATREL opening balance sheet available and validated"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-24" />
<period-end iso-date="2026-06-14" />
<target value="Accounts audit report for the year prepared and validated">
<comment><narrative>
All relevant current, fixed and tangible assets of the transmission subsector have been spun off and properly accounted for in SONATRELs opening balance.
</narrative></comment>
</target>
<actual value="Annual audit reports prepared and validated">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in transmission network wheeling capacity (MW)
</narrative></title>
<baseline year="2016" iso-date="2016-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-28" />
<period-end iso-date="2026-06-12" />
<target value="500.00">
<comment><narrative>
The indicator increases as the transmission lines and substations are progressively&amp;nbsp;commissioned.&amp;nbsp; The next increase is envisaged in August 2025 with the commissioning of the HV Lines around Yaounde.
</narrative></comment>
</target>
<actual value="360.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of staff trained
</narrative></title>
<baseline year="2016" iso-date="2016-11-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-24" />
<period-end iso-date="2026-06-15" />
<target value="125">
<comment><narrative>
The PMU has&amp;nbsp;prioritised the completion of the transmission infrastructure (especially Nachtigal associated facilities) and has focused its efforts in that regard. Some capacity building activities have been realised but it is unlikely that the target shall be met due to the non-update of the Business Plan that when completed, would have reflected the required capacity building needs. This shall now be considered under the vertical energy MPA under preparation.
</narrative></comment>
</target>
<actual value="120.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Work contracts executed
</narrative></title>
<baseline year="2016" iso-date="2016-11-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-14" />
<period-end iso-date="2026-11-14" />
<target value="10.00">
<comment><narrative>
Three contracts have been concluded and these relate to (i) Nyom II Substation, (ii) HV Lines around Yaounde, and (iii) HV Substations around Yaounde
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reform roadmap fully implemented - including new regulatory framework in place
</narrative></title>
<baseline year="2016" iso-date="2016-11-24" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-24" />
<period-end iso-date="2026-06-14" />
<target value="SONATREL fully operational">
<comment><narrative>
Satisfactory implementation of the reform roadmap will be monitored as follows:- Year 1: Updating and harmonization of the existing sector legislation and the new regulatory framework in place;- Year 2: Human resources in place and capacity building program fully defined;- Year 3: Capacity building program fully implemented;- Year 4: SONATREL fully operational.
</narrative></comment>
</target>
<actual value="100% of network access contracts signed between SONATREL and customers.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional transformer capacity in the network
</narrative></title>
<baseline year="2016" iso-date="2016-11-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-10" />
<period-end iso-date="2026-06-10" />
<target value="840,000.00">

</target>
<actual value="520,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Works contracts signed
</narrative></title>
<baseline year="2016" iso-date="2016-11-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-14" />
<period-end iso-date="2026-11-14" />
<target value="11.00">

</target>
<actual value="11.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of work contracts executed
</narrative></title>
<baseline year="2016" iso-date="2016-11-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-24" />
<period-end iso-date="2026-06-13" />
<target value="10.00">
<comment><narrative>
Number of work contracts executed
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in the hours of power outages that are linked to malfunctions in the transmission system / improvement of transmission system stability - System Average Interruption Duration Index, SAIDI
</narrative></title>
<baseline year="2016" iso-date="2016-11-28" value="49.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-28" />
<period-end iso-date="2026-06-13" />
<target value="20.00">

</target>
<actual value="30.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in the hours of power outages that are linked to malfunctions in the transmission system / improvement of transmission system stability - System Average Interruption Duration Index, SAIDI
</narrative></title>
<baseline year="2016" iso-date="2016-11-28" value="49.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-28" />
<period-end iso-date="2026-06-13" />
<target value="20.00">

</target>
<actual value="36.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in the hours of power outages that are linked to malfunctions in the transmission system / improvement of transmission system stability - System Average Interruption Duration Index, SAIDI
</narrative></title>
<baseline year="2016" iso-date="2016-11-28" value="49.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-28" />
<period-end iso-date="2026-06-13" />
<target value="20.00">
<comment><narrative>
to be updated by Sonatrel
</narrative></comment>
</target>
<actual value="49.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in the hours of power outages that are linked to malfunctions in the transmission system / improvement of transmission system stability - System Average Interruption Duration Index, SAIDI
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="49.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="25.00">
<comment><narrative>
The indicator improves as the transmission lines and substations are progressively commissioned. The next improvement is envisaged in November 2026 with the commissioning of the 400 kV Nkolnkoumou - Edea line as well as the infrastructure in Douala and in the North.

The end target is revised to take into account the non-realization of projects that should have been implemented by GoC and would have contributed to the improvement in outage hours
</narrative></comment>
</target>
<actual value="30.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in the hours of power outages that are linked to malfunctions in the transmission system / improvement of transmission system stability - System Average Interruption Duration Index, SAIDI
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="49.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="25.00">
<comment><narrative>
The indicator improves as the transmission lines and substations are progressively commissioned. The next improvement is envisaged in November 2026 with the commissioning of the 400 kV Nkolnkoumou - Edea line as well as the infrastructure in Douala and in the North.

The end target is revised to take into account the non-realization of projects that should have been implemented by GoC and would have contributed to the improvement in outage hours
</narrative></comment>
</target>
<actual value="30.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in the hours of power outages that are linked to malfunctions in the transmission system / improvement of transmission system stability - System Average Interruption Duration Index, SAIDI
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="49.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="20.00">

</target>
<actual value="30.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in transmission network losses (percent)
</narrative></title>
<baseline year="2016" iso-date="2016-11-28" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-28" />
<period-end iso-date="2026-06-11" />
<target value="2.50">
<comment><narrative>
The indicator increases as the transmission lines and substations are progressively&amp;nbsp;commissioned.&amp;nbsp; The next increase is envisaged in June 2026 with the commissioning of the 400 kV Nkolnkoumou - Edea line
</narrative></comment>
</target>
<actual value="4.8">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in transmission network losses (percent)
</narrative></title>
<baseline year="2016" iso-date="2016-11-28" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-28" />
<period-end iso-date="2026-06-11" />
<target value="2.50">
<comment><narrative>
The indicator changes&amp;nbsp;as the transmission lines and substations are progressively&amp;nbsp;commissioned.&amp;nbsp; The next increase is envisaged in January 2026 with the commissioning of the HV Lines around Douala.
</narrative></comment>
</target>
<actual value="4.8">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in transmission network losses (percent)
</narrative></title>
<baseline year="2016" iso-date="2016-11-28" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-28" />
<period-end iso-date="2026-06-11" />
<target value="2.50">
<comment><narrative>
The indicator changes&amp;nbsp;as the transmission lines and substations are progressively&amp;nbsp;commissioned.&amp;nbsp; The next change&amp;nbsp;is envisaged in August 2025 with the commissioning of the HV Lines around Yaounde.
</narrative></comment>
</target>
<actual value="5.20">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in transmission network losses (percent)
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="4.0">
<comment><narrative>
The indicator improves as the transmission lines and substations are progressively commissioned. The next improvement is envisaged in November 2026 with the commissioning of the 400 kV Nkolnkoumou - Edea line as well as the infrastructure in Douala and in the North.

The end target is revised to take into account the non-realization of projects that should have been implemented by GoC and would have contributed to the improvement of losses
</narrative></comment>
</target>
<actual value="4.8">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in transmission network losses (percent)
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="4.0">
<comment><narrative>
The indicator improves as the transmission lines and substations are progressively commissioned. The next improvement is envisaged in November 2026 with the commissioning of the 400 kV Nkolnkoumou - Edea line as well as the infrastructure in Douala and in the North.

The end target is revised to take into account the non-realization of projects that should have been implemented by GoC and would have contributed to the improvement of losses
</narrative></comment>
</target>
<actual value="4.8">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in transmission network losses (percent)
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="2.50">
<comment><narrative>
The indicator increases as the transmission lines and substations are progressively&amp;nbsp;commissioned.&amp;nbsp; The next increase is envisaged in June 2026 with the commissioning of the 400 kV Nkolnkoumou - Edea line
</narrative></comment>
</target>
<actual value="4.8">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in transmission network wheeling capacity (MW)
</narrative></title>
<baseline year="2016" iso-date="2016-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-28" />
<period-end iso-date="2026-06-12" />
<target value="500.00">
<comment><narrative>
The indicator increases as the transmission lines and substations are progressively&amp;nbsp;commissioned.&amp;nbsp; The next increase is envisaged in June 2026 with the commissioning of the 400 kV Nkolnkoumou - Edea line
</narrative></comment>
</target>
<actual value="420.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in transmission network wheeling capacity (MW)
</narrative></title>
<baseline year="2016" iso-date="2016-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-28" />
<period-end iso-date="2026-06-12" />
<target value="500.00">
<comment><narrative>
The indicator increases as the transmission lines and substations are progressively&amp;nbsp;commissioned.&amp;nbsp; The next increase is envisaged in January 2026 with the commissioning of the HV Lines around Douala.
</narrative></comment>
</target>
<actual value="420.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in transmission network wheeling capacity (MW)
</narrative></title>
<baseline year="2016" iso-date="2016-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-28" />
<period-end iso-date="2026-06-12" />
<target value="500.00">
<comment><narrative>
The indicator increases as the transmission lines and substations are progressively&amp;nbsp;commissioned.&amp;nbsp; The next increase is envisaged in August 2025 with the commissioning of the HV Lines around Yaounde.
</narrative></comment>
</target>
<actual value="360.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in transmission network wheeling capacity (MW)
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="500.00">
<comment><narrative>
The indicator increases as the transmission lines and substations are progressively&amp;nbsp;commissioned.&amp;nbsp; The next increase is envisaged in June 2026 with the commissioning of the 400 kV Nkolnkoumou - Edea line
</narrative></comment>
</target>
<actual value="420.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in transmission network wheeling capacity (MW)
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="500.00">
<comment><narrative>
The indicator increases as the transmission lines and substations are progressively&amp;nbsp;commissioned.&amp;nbsp; The next increase is envisaged in June 2026 with the commissioning of the 400 kV Nkolnkoumou - Edea line
</narrative></comment>
</target>
<actual value="420.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in transmission network wheeling capacity (MW)
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="500.00">
<comment><narrative>
The indicator increases as the transmission lines and substations are progressively&amp;nbsp;commissioned.&amp;nbsp; The next increase is envisaged in June 2026 with the commissioning of the 400 kV Nkolnkoumou - Edea line
</narrative></comment>
</target>
<actual value="420.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Victims of GBV/SEA taken into care
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="100"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="100.00">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reform roadmap fully implemented - including new regulatory framework in place
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="SONATREL fully operational">
<comment><narrative>
Satisfactory implementation of the reform roadmap were monitored as follows:- Year 1: Updating and harmonization of the existing sector legislation and the new regulatory framework in place;- Year 2: Human resources in place and capacity building program fully defined;- Year 3: Capacity building program fully implemented;- Year 4: SONATREL fully operational.
</narrative></comment>
</target>
<actual value="100% of network access contracts signed between SONATREL and customers.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Victims of GBV/SEA taken into care
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="100"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="100.00">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Upgrade of SCADA
</narrative></title>
<baseline year="2016" iso-date="2016-11-08" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-08" />
<period-end iso-date="2026-06-08" />
<target value="SCADA RIS and RIN operational">

</target>
<actual value="Contract under implementation and executed at 50.46%">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in transmission network losses (percent)
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="4.0">
<comment><narrative>
The indicator improves as the transmission lines and substations are progressively commissioned. The next improvement is envisaged in November 2026 with the commissioning of the 400 kV Nkolnkoumou - Edea line as well as the infrastructure in Douala and in the North.

The end target is revised to take into account the non-realization of projects that should have been implemented by GoC and would have contributed to the improvement of losses
</narrative></comment>
</target>
<actual value="4.8">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reform roadmap fully implemented - including new regulatory framework in place
</narrative></title>
<baseline year="2016" iso-date="2016-11-24" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-24" />
<period-end iso-date="2026-06-14" />
<target value="SONATREL fully operational">
<comment><narrative>
Satisfactory implementation of the reform roadmap were monitored as follows:- Year 1: Updating and harmonization of the existing sector legislation and the new regulatory framework in place;- Year 2: Human resources in place and capacity building program fully defined;- Year 3: Capacity building program fully implemented;- Year 4: SONATREL fully operational.
</narrative></comment>
</target>
<actual value="100% of network access contracts signed between SONATREL and customers.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Victims of GBV/SEA taken into care
</narrative></title>
<baseline year="2016" iso-date="2016-11-10" value="100"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-10" />
<period-end iso-date="2026-06-10" />
<target value="100.00">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in transmission network losses (percent)
</narrative></title>
<baseline year="2016" iso-date="2016-11-28" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-28" />
<period-end iso-date="2026-06-11" />
<target value="2.50">
<comment><narrative>
The indicator changes&amp;nbsp;as the transmission lines and substations are progressively&amp;nbsp;commissioned.&amp;nbsp; The next change&amp;nbsp;is envisaged in August 2025 with the commissioning of the HV Lines around Yaounde.
</narrative></comment>
</target>
<actual value="5.20">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in transmission network losses (percent)
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="4.0">
<comment><narrative>
The indicator improves as the transmission lines and substations are progressively commissioned. The next improvement is envisaged in November 2026 with the commissioning of the 400 kV Nkolnkoumou - Edea line as well as the infrastructure in Douala and in the North.

The end target is revised to take into account the non-realization of projects that should have been implemented by GoC and would have contributed to the improvement of losses
</narrative></comment>
</target>
<actual value="4.8">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people compensated
</narrative></title>
<baseline year="2016" iso-date="2016-11-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-10" />
<period-end iso-date="2026-06-10" />
<target value="5,000.00">

</target>
<actual value="5302">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Project-related grievances registered under the project GRM addressed (within 1 month)
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="100.00">

</target>
<actual value="16">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Three-phase transformers installed
</narrative></title>
<baseline year="2016" iso-date="2016-11-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-14" />
<period-end iso-date="2026-11-14" />
<target value="12.00">
<comment><narrative>
The transformers at the Nyom 2, Nkolbisson, Missole, Ngodi Bakoko, Bonaberi and Deido have been installed
</narrative></comment>
</target>
<actual value="9.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in the hours of power outages that are linked to malfunctions in the transmission system / improvement of transmission system stability - System Average Interruption Duration Index, SAIDI
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="49.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="25.00">
<comment><narrative>
The indicator improves as the transmission lines and substations are progressively commissioned. The next improvement is envisaged in November 2026 with the commissioning of the 400 kV Nkolnkoumou - Edea line as well as the infrastructure in Douala and in the North.

The end target is revised to take into account the non-realization of projects that should have been implemented by GoC and would have contributed to the improvement in outage hours
</narrative></comment>
</target>
<actual value="30.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of staff trained
</narrative></title>
<baseline year="2016" iso-date="2016-11-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-24" />
<period-end iso-date="2026-06-15" />
<target value="125">
<comment><narrative>
The PMU has&amp;nbsp;prioritised the completion of the&amp;nbsp;Nachtigal associated facilities and has focused its efforts in that regard. Some capacity building activities have been realised but it is unlikely that the target shall be met due to the non-update of the Business Plan that when completed, would have reflected the required capacity building needs. This shall now be considered under the vertical energy MPA under preparation.
</narrative></comment>
</target>
<actual value="114.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Project-related grievances registered under the project GRM addressed (within 1 month)
</narrative></title>
<baseline year="2016" iso-date="2016-11-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-10" />
<period-end iso-date="2026-06-10" />
<target value="100.00">

</target>
<actual value="42">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of works contracts signed
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="11.00">

</target>
<actual value="11.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of three-phase transformers installed
</narrative></title>
<baseline year="2016" iso-date="2016-11-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-24" />
<period-end iso-date="2026-06-12" />
<target value="12.00">
<comment><narrative>
Number of three-phase transformers installed
</narrative></comment>
</target>
<actual value="9.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Upgrade of SCADA
</narrative></title>
<baseline year="2016" iso-date="2016-11-08" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-08" />
<period-end iso-date="2026-06-08" />
<target value="SCADA RIS and RIN operational">

</target>
<actual value="Contract under implementation and executed at 93%">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in transmission network losses (percent)
</narrative></title>
<baseline year="2016" iso-date="2016-11-28" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-28" />
<period-end iso-date="2026-06-11" />
<target value="2.50">
<comment><narrative>
The indicator changes&amp;nbsp;as the transmission lines and substations are progressively&amp;nbsp;commissioned.&amp;nbsp; The next increase is envisaged in January 2026 with the commissioning of the HV Lines around Douala.
</narrative></comment>
</target>
<actual value="4.8">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people compensated
</narrative></title>
<baseline year="2016" iso-date="2016-11-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-10" />
<period-end iso-date="2026-06-10" />
<target value="5,000.00">

</target>
<actual value="5210">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transmission lines constructed under the project
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="455.00">
<comment><narrative>
Number of HV lines constructed under the project and which construction has been considered satisfactory by the owners engineer.
</narrative></comment>
</target>
<actual value="370">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional transformer capacity in the network
</narrative></title>
<baseline year="2016" iso-date="2016-11-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-10" />
<period-end iso-date="2026-06-10" />
<target value="840,000.00">

</target>
<actual value="380,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional transformer capacity in the network
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="840,000.00">

</target>
<actual value="520,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reform roadmap fully implemented - including new regulatory framework in place
</narrative></title>
<baseline year="2016" iso-date="2016-11-24" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-24" />
<period-end iso-date="2026-06-14" />
<target value="SONATREL fully operational">
<comment><narrative>
Satisfactory implementation of the reform roadmap will be monitored as follows:- Year 1: Updating and harmonization of the existing sector legislation and the new regulatory framework in place;- Year 2: Human resources in place and capacity building program fully defined;- Year 3: Capacity building program fully implemented;- Year 4: SONATREL fully operational.
</narrative></comment>
</target>
<actual value="100% of network access contracts signed between SONATREL and customers.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Full accounting and legal separation of ENEO's transmission assets from the holding and their subsequent transfer to SONATREL
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="SONATREL opening balance sheet available and validated"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="Accounts audit report for the year prepared and validated">
<comment><narrative>
All relevant current, fixed and tangible assets of the transmission subsector have been spun off and properly accounted for in SONATRELs opening balance.
</narrative></comment>
</target>
<actual value="Annual audit reports prepared and validated">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of staff trained
</narrative></title>
<baseline year="2016" iso-date="2016-11-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-24" />
<period-end iso-date="2026-06-15" />
<target value="125">
<comment><narrative>
The PMU has&amp;nbsp;prioritised the completion of the transmission infrastructure (especially Nachtigal associated facilities) and has focused its efforts in that regard. Some capacity building activities have been realised but it is unlikely that the target shall be met due to the non-update of the Business Plan that when completed, would have reflected the required capacity building needs. This shall now be considered under the vertical energy MPA under preparation.
</narrative></comment>
</target>
<actual value="114.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in transmission network losses (percent)
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="2.50">
<comment><narrative>
The indicator increases as the transmission lines and substations are progressively&amp;nbsp;commissioned.&amp;nbsp; The next increase is envisaged in June 2026 with the commissioning of the 400 kV Nkolnkoumou - Edea line
</narrative></comment>
</target>
<actual value="4.8">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Project-related grievances registered under the project GRM addressed (within 1 month)
</narrative></title>
<baseline year="2016" iso-date="2016-11-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-10" />
<period-end iso-date="2026-06-10" />
<target value="100.00">

</target>
<actual value="38">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of works contracts signed
</narrative></title>
<baseline year="2016" iso-date="2016-11-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-08" />
<period-end iso-date="2026-06-08" />
<target value="11.00">

</target>
<actual value="11.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional transformer capacity in the network
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="840,000.00">

</target>
<actual value="520,000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in the hours of power outages that are linked to malfunctions in the transmission system / improvement of transmission system stability - System Average Interruption Duration Index, SAIDI
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="49.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="25.00">
<comment><narrative>
The indicator improves as the transmission lines and substations are progressively commissioned. The next improvement is envisaged in November 2026 with the commissioning of the 400 kV Nkolnkoumou - Edea line as well as the infrastructure in Douala and in the North.

The end target is revised to take into account the non-realization of projects that should have been implemented by GoC and would have contributed to the improvement in outage hours
</narrative></comment>
</target>
<actual value="30.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Works contracts signed
</narrative></title>
<baseline year="2016" iso-date="2016-11-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-14" />
<period-end iso-date="2026-11-14" />
<target value="11.00">

</target>
<actual value="11.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Staff trained
</narrative></title>
<baseline year="2016" iso-date="2016-11-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-14" />
<period-end iso-date="2026-11-14" />
<target value="125">
<comment><narrative>
The PMU has&amp;nbsp;prioritised the completion of the transmission infrastructure (especially Nachtigal associated facilities) and has focused its efforts in that regard. Some capacity building activities have been realised but it is unlikely that the target shall be met due to the non-update of the Business Plan that when completed, would have reflected the required capacity building needs. This shall now be considered under the vertical energy MPA under preparation.

The following indicator shall be tracked with respect to gender inclusion as part of the Additional Financing:

Internship program enabling women to access safeguards positions in the energy sector (Number) Baseline: 3 Target: 6
</narrative></comment>
</target>
<actual value="120.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in transmission network wheeling capacity (MW)
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="500.00">
<comment><narrative>
The indicator increases as the transmission lines and substations are progressively&amp;nbsp;commissioned.&amp;nbsp; The next increase is envisaged in June 2026 with the commissioning of the 400 kV Nkolnkoumou - Edea line
</narrative></comment>
</target>
<actual value="420.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Three-phase transformers installed
</narrative></title>
<baseline year="2016" iso-date="2016-11-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-14" />
<period-end iso-date="2026-11-14" />
<target value="12.00">
<comment><narrative>
The transformers at the Nyom 2, Nkolbisson, Missole, Ngodi Bakoko, Bonaberi and Deido have been installed
</narrative></comment>
</target>
<actual value="9.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of work contracts executed
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="10.00">
<comment><narrative>
Three contracts have been concluded and these relate to (i) Nyom II Substation, (ii) HV Lines around Yaounde, and (iii) HV Substations around Yaounde
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reform roadmap fully implemented - including new regulatory framework in place
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="SONATREL established and functional from own revenues">
<comment><narrative>
Satisfactory implementation of the reform roadmap were monitored as follows:- Year 1: Updating and harmonization of the existing sector legislation and the new regulatory framework in place;- Year 2: Human resources in place and capacity building program fully defined;- Year 3: Capacity building program fully implemented;- Year 4: SONATREL fully operational.
</narrative></comment>
</target>
<actual value="100% of network access contracts signed between SONATREL and customers.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of works contracts signed
</narrative></title>
<baseline year="2016" iso-date="2016-11-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-08" />
<period-end iso-date="2026-06-08" />
<target value="11.00">

</target>
<actual value="11.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Project-related grievances registered under the project GRM addressed (within 1 month)
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="100.00">

</target>
<actual value="16">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in transmission network wheeling capacity (MW)
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="500.00">
<comment><narrative>
The indicator increases as the transmission lines and substations are progressively&amp;nbsp;commissioned.&amp;nbsp; The next increase is envisaged in June 2026 with the commissioning of the 400 kV Nkolnkoumou - Edea line
</narrative></comment>
</target>
<actual value="420.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Upgrade of SCADA
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="SCADA RIS and RIN operational">

</target>
<actual value="Contract under implementation and executed at 93%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people compensated
</narrative></title>
<baseline year="2016" iso-date="2016-11-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-10" />
<period-end iso-date="2026-06-10" />
<target value="5,000.00">

</target>
<actual value="5000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in transmission network wheeling capacity (MW)
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="500.00">
<comment><narrative>
The indicator increases as the transmission lines and substations are progressively&amp;nbsp;commissioned.&amp;nbsp; The next increase is envisaged in June 2026 with the commissioning of the 400 kV Nkolnkoumou - Edea line
</narrative></comment>
</target>
<actual value="420.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People compensated
</narrative></title>
<baseline year="2016" iso-date="2016-11-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-14" />
<period-end iso-date="2026-11-14" />
<target value="7,029.00">

</target>
<actual value="5336">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Staff trained
</narrative></title>
<baseline year="2016" iso-date="2016-11-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-14" />
<period-end iso-date="2026-11-14" />
<target value="125">
<comment><narrative>
The PMU has&amp;nbsp;prioritised the completion of the transmission infrastructure (especially Nachtigal associated facilities) and has focused its efforts in that regard. Some capacity building activities have been realised but it is unlikely that the target shall be met due to the non-update of the Business Plan that when completed, would have reflected the required capacity building needs. This shall now be considered under the vertical energy MPA under preparation.

The following indicator shall be tracked with respect to gender inclusion as part of the Additional Financing:

Internship program enabling women to access safeguards positions in the energy sector (Number) Baseline: 3 Target: 6
</narrative></comment>
</target>
<actual value="120.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Additional transformer capacity in the network
</narrative></title>
<baseline year="2016" iso-date="2016-11-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-10" />
<period-end iso-date="2026-06-10" />
<target value="840,000.00">

</target>
<actual value="520,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transmission lines constructed under the project
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="455.00">
<comment><narrative>
Number of HV lines constructed under the project and which construction has been considered satisfactory by the owners engineer.
</narrative></comment>
</target>
<actual value="370">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Full accounting and legal separation of ENEO's transmission assets from the holding and their subsequent transfer to SONATREL
</narrative></title>
<baseline year="2016" iso-date="2016-11-24" value="SONATREL opening balance sheet available and validated"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-24" />
<period-end iso-date="2026-06-14" />
<target value="Accounts audit report for the year prepared and validated">
<comment><narrative>
All relevant current, fixed and tangible assets of the transmission subsector have been spun off and properly accounted for in SONATRELs opening balance.
</narrative></comment>
</target>
<actual value="Annual audit reports prepared and validated">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Full accounting and legal separation of ENEO's transmission assets from the holding and their subsequent transfer to SONATREL
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="SONATREL opening balance sheet available and validated"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="Accounts audit report for the year prepared and validated">
<comment><narrative>
All relevant current, fixed and tangible assets of the transmission subsector have been spun off and properly accounted for in SONATRELs opening balance.
</narrative></comment>
</target>
<actual value="Annual audit reports prepared and validated">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in the hours of power outages that are linked to malfunctions in the transmission system / improvement of transmission system stability - System Average Interruption Duration Index, SAIDI
</narrative></title>
<baseline year="2016" iso-date="2016-11-28" value="49.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-28" />
<period-end iso-date="2026-06-13" />
<target value="20.00">

</target>
<actual value="30.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of three-phase transformers installed
</narrative></title>
<baseline year="2016" iso-date="2016-11-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-24" />
<period-end iso-date="2026-06-12" />
<target value="12.00">
<comment><narrative>
The transformers at the Nyom 2, Nkolbisson, Missole, Ngodi Bakoko, Bonaberi and Deido have been installed
</narrative></comment>
</target>
<actual value="9.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of work contracts executed
</narrative></title>
<baseline year="2016" iso-date="2016-11-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-24" />
<period-end iso-date="2026-06-13" />
<target value="10.00">
<comment><narrative>
Three contracts have been concluded and these relate to (i) Nyom II Substation, (ii) HV Lines around Yaounde, and (iii) HV Substations around Yaounde
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in transmission network wheeling capacity (MW)
</narrative></title>
<baseline year="2016" iso-date="2016-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-28" />
<period-end iso-date="2026-06-12" />
<target value="500.00">
<comment><narrative>
The indicator increases as the transmission lines and substations are progressively&amp;nbsp;commissioned.&amp;nbsp; The next increase is envisaged in June 2026 with the commissioning of the 400 kV Nkolnkoumou - Edea line
</narrative></comment>
</target>
<actual value="420.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Upgrade of SCADA
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="SCADA RIS and RIN operational">

</target>
<actual value="Contract under implementation and executed at 93%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Project-related grievances registered under the project GRM addressed (within 1 month)
</narrative></title>
<baseline year="2016" iso-date="2016-11-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-10" />
<period-end iso-date="2026-06-10" />
<target value="100.00">

</target>
<actual value="76">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in the hours of power outages that are linked to malfunctions in the transmission system / improvement of transmission system stability - System Average Interruption Duration Index, SAIDI
</narrative></title>
<baseline year="2016" iso-date="2016-11-28" value="49.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-28" />
<period-end iso-date="2026-06-13" />
<target value="20.00">

</target>
<actual value="36.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people compensated
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="7,029.00">

</target>
<actual value="5336">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Work contracts executed
</narrative></title>
<baseline year="2016" iso-date="2016-11-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-14" />
<period-end iso-date="2026-11-14" />
<target value="10.00">
<comment><narrative>
Three contracts have been concluded and these relate to (i) Nyom II Substation, (ii) HV Lines around Yaounde, and (iii) HV Substations around Yaounde
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transmission lines constructed under the project
</narrative></title>
<baseline year="2016" iso-date="2016-11-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-24" />
<period-end iso-date="2026-06-13" />
<target value="455.00">
<comment><narrative>
Number of HV lines constructed under the project and which construction has been considered satisfactory by the owners engineer.
</narrative></comment>
</target>
<actual value="370">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of three-phase transformers installed
</narrative></title>
<baseline year="2016" iso-date="2016-11-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-24" />
<period-end iso-date="2026-06-12" />
<target value="12.00">
<comment><narrative>
Number of three-phase transformers installed
</narrative></comment>
</target>
<actual value="7.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Upgrade of SCADA
</narrative></title>
<baseline year="2016" iso-date="2016-11-08" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-08" />
<period-end iso-date="2026-06-08" />
<target value="SCADA RIS and RIN operational">

</target>
<actual value="Contract under implementation and executed at 90%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Upgrade of SCADA
</narrative></title>
<baseline year="2016" iso-date="2016-11-15" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-15" />
<period-end iso-date="2026-11-15" />
<target value="SCADA RIS and RIN operational">

</target>
<actual value="Contract under implementation and executed at 93%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People compensated
</narrative></title>
<baseline year="2016" iso-date="2016-11-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-11-14" />
<period-end iso-date="2026-11-14" />
<target value="7,029.00">

</target>
<actual value="5336">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P154908</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Livestock Development Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objectives (PDO) are to improve productivity of selected livestock production systems and the commercialization of their products for the targeted beneficiaries, and to provide immediate and effective response in the event of an Eligible Crisis or Emergency. ]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objectives of  Livestock Development Project for Cameroon are to improve productivity of selected livestock production systems and the commercialization of their products for the targeted beneficiaries, and to provide immediate and effective response in the event of an Eligible Crisis or Emergency. This project has four components. 1) The first component, Improvement of livestock services access and delivery, aims to improve access to key livestock services for livestock producers, especially animal health services, improved genetic material and high quality inputs. It has the following subcomponents: (i) Access to Animal health services; (ii) Access to high quality inputs; (iii) Institutional support, capacity building and communication; and (iv) Contingency emergency response. 2)The second component, Improvement of pastoral productivity, access to markets, and resilience of pastoral communities, aims to increase the contribution of pastoral areas to the domestic supply of meat (especially for urban markets) while upgrading livestock production systems (cattle, small ruminants, poultry) for poor and conflict-affected communities. It has the following subcomponents: (i) Support to animal production practices and the community based management of pastoral areas; (ii) Support to commercialization and marketing of pastoral livestock products; and (iii) Improving the resilience of poor and conflict-affected communities. 3) The third subcomponent, Support to livestock value chains development, will support development of pig, poultry, beef, goat, sheep, milk and honey production and value chains in target areas for a broader engagement of local entrepreneurs in the sector. It has the following subcomponents: (i) Establishment of Productive Partnership; and (ii) Financing of Sub-Projects for Producer Organizations. 4) The fourth component, Project coordination, management, communication and monitoring, will support project implementation activities, including operating costs of the National Project Coordination Unit (NPCU) with offices at national and regional levels.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0024465"><narrative>Republic of Cameroon</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0024465"><narrative>Republic of Cameroon</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="CM-COA-0024464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2016-07-29"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2016-10-27"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2023-05-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2023-05-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Fidele Honorine Yobo A Koue Epse Nhiomog</narrative></person-name><telephone>+1-202-473-1000</telephone><email>fyoboakoueepsenh@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002221169" />
            <name><narrative>Wakwa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.23333 13.58333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002221788" />
            <name><narrative>South-West Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.2 9.3</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002221789" />
            <name><narrative>South Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>2.75 11.58333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002222934" />
            <name><narrative>West Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.5 10.66667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002223602" />
            <name><narrative>North-West Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.36667 10.36667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002223603" />
            <name><narrative>North Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.5 14</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002229166" />
            <name><narrative>LouguErE</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.48333 12.4</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002229336" />
            <name><narrative>Littoral Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.26667 10.13333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002229857" />
            <name><narrative>Nkounden</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.7031 10.66639</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002231755" />
            <name><narrative>Far North Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>11 14.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002231835" />
            <name><narrative>East Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.83333 14.16667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002233376" />
            <name><narrative>Centre Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.75 11.83333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002236015" />
            <name><narrative>Adamaoua Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.83333 13.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002232680" />
            <name><narrative>Dogba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.79118 14.3259</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="14010" percentage="95" xml:lang="en"/><sector vocabulary="1" code="14040" percentage="5" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YA" percentage="6.00000000" xml:lang="en"><narrative>FY17 - Agricultural markets, commercialization and agri-business</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AK" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Agriculture, Fishing &amp; Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="12.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AL" percentage="62.0000000" xml:lang="en"><narrative>FY17 - Livestock</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="55" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="16" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="55" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="73" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="33" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="51" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000067" percentage="53" xml:lang="en"><narrative>Nutrition and Food Security</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">555555.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">555555.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">555555.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">555555.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">555555.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">555555.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">555555.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">555555.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">555555.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">897500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">897500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">897500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">897500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">897500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">897500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">897500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">897500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">897500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">897500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">897500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">897500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">897500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">897500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">897500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">897500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">897500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">897500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">897500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">897500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">897500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">897500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">897500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">897500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">714285.71</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">714285.71</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">714285.71</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">714285.71</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">714285.71</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">714285.71</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">714285.71</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">555555.56</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">555555.56</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">555555.56</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">555555.56</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">555555.56</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">555555.56</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">555555.56</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">555555.56</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">555555.56</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">897500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">897500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">897500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">897500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">897500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">897500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">897500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">897500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">897500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">897500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">897500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">897500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">897500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">897500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">897500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">897500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">897500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">897500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">897500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">897500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">897500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">897500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">897500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">897500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">714285.71</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">714285.71</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">714285.71</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">714285.71</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">714285.71</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">714285.71</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">714285.71</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">3370435.24</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">3370435.24</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">100000000</value><description xml:lang="en"><narrative>Total Commitment in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-2205231</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-271846</value><description xml:lang="en"><narrative>Total Commitment Cancellations in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">1081956</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">9893579</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">308437</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">446373</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">342788</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">94876</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">2418684</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">205288</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">301248</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">3095973</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">560160</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">569939</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">1362153</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">368069</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-1133</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">1501402</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">992792</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">354581</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">1186149</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">393670</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">2144542</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">1699490</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">1681527</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">1139638</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">1686346</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">1984162</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">218046</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">8165779</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">2540764</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">1713463</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">9664332</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">949278</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">1691832</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">772521</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">937306</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">700960</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">108101</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">12276203</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">1952908</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">1544738</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">463448</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">2290521</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">1057322</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">838832</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">2639949</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">2026072</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">1406737</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">307110</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">502460</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">4999</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">6046276</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-2549</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-531</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-67126</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-113020</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">-119671</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-146346</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-182299</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-240783</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-298066</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-397386</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-600818</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-514271</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-835517</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-796899</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-820327</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-845033</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-822998</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-865333</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-835432</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-1663224</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-1561362</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-1587391</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-1583102</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-1530818</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-1531761</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-1514695</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-1576454</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-1591865</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-24464"><narrative>Ministry of Livestock, Fisheries and Animal Industries (MINEPIA)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P154908"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P154908?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P154908"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers reached with agricultural assets or services (of which female and youth)
</narrative></title>
<baseline year="2016" iso-date="2016-01-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-01-06" />
<period-end iso-date="2020-06-18" />
<target value="360.00">
<comment><narrative>
&lt;p&amp;gt;The target was revised upwards at mid term review. This was justified by the fact that actual realizations were already substantially higher than originally planned thanks to the positive response and high number of beneficiaries of the small ruminants&amp;#39; plague &amp;nbsp;vaccination campaigns.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="369.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered related to delivery of project benefits addressed.
</narrative></title>
<baseline year="2016" iso-date="2016-10-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-27" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Majority of the 386 complaints received concerned the complexity of procedures and processing times. Some claims were made against local service providers for requesting undue additional expenses for the preparation of Business Plans. With the generalized inflation, an increase in the number of complaints was witnessed denouncing the negative impact and delays in contract execution with service providers, the quality of infrastructure, the slow completion of contracts and the late payment of invoices.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="73.50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time taken to disburse funds requested by government for an eligible livestock crisis
</narrative></title>
<baseline year="2016" iso-date="2016-10-27" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-27" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The CERC has not been activated throughout the project lifetime to assess the government&amp;#39;s performance in this aspect.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="20.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of hectares managed sustainably as part of the communal planning process
</narrative></title>
<baseline year="2016" iso-date="2016-10-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-27" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The initial target was modest and conservative in anticipation of beneficiary potential resistance to new practices in an environment characterized by a high level of conflicts between farmers and grazers.&amp;nbsp; The EOP exceedingly surpassed the target thanks to successful awareness-raising among breeders and mayors. Infrastructures put in place required sufficient space for grazing, thereby multiplying efforts to increase and improve grazing land area.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="17475.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of communal management plans developed and implemented using a participatory approach
</narrative></title>
<baseline year="2016" iso-date="2016-10-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-27" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The target was achieved thanks to a&amp;nbsp;competitive process from the outset which led to select interested communes. The participatory approach included the development of a harmonized methodology, involvement of the commune executive at every stage to facilitate ownership, and involvement of qualified local service providers with a good knowledge of the context. Communes also committed to mobilize their counterpart funds as part of the matching grant scheme.&lt;/p&amp;gt;

&lt;p&amp;gt;The project has strengthened the resilience to climate shocks and conflict for beneficiary populations. This was achieved through introducing climate smart livestock practices for animal feeding (production of lick-stone, straw treatment, fodder production, etc.) for about 75,000 livestock producers including 16,500 women. Moreover, 7,287 hectares degraded pasture lands have benefited from the planting of improved species. About 6,900 vulnerable households were allocated more than 60,000 small ruminants as productive assets to engage in income generating activities, and about 4,500 women were equipped with tools to reduce their workload, including the construction of 100 biodigesters&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="30.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Post-vaccinal seroprevalence of small ruminant plague [PPR]
</narrative></title>
<baseline year="2016" iso-date="2016-10-27" value="36.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-27" />
<period-end iso-date="2020-06-30" />
<target value="70.00">
<comment><narrative>
&lt;p&amp;gt;At&amp;nbsp;appraisal, it was planned that this indicator would experience a 5% per year increase from Year 3 to Year 5, leading to an original end-target of 45%. But the target of this indicator was revised upwards&amp;nbsp;to be consistent with Cameroon&amp;rsquo;s commitment in terms of PPR eradication&amp;nbsp; with the &amp;ldquo;bazooka&amp;rdquo;-type approach that the country has adopted, consisting in vaccinating a high proportion of the small ruminant population for three consecutive years.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="74.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Client days of training provided (number)
</narrative></title>
<baseline year="2016" iso-date="2016-10-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-27" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The significant increase in the number of client days of training provided is explained by the fact that many new technologies and improved practices were introduced in the various value chains, targeting a variety of stakeholders, and the number of business plans financed also significantly increased from 200 to 500.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="49222.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of business plans financed by the project
</narrative></title>
<baseline year="2016" iso-date="2016-10-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-27" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="507.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiary satisfaction rate with quality of services provided by the project for the livestock sector (of which female and youth)
</narrative></title>
<baseline year="2016" iso-date="2016-10-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-27" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The project introduced a major innovation in its design through the Matching grant model, and focused on capacity strengthening in its implementation approaches. These included exposing beneficiaries to regular trainings in good animal husbandry practices,&amp;nbsp;environmental friendly practices such as tree planting,&amp;nbsp;climate smart solutions such as biodigester for waste management, etc. The project also promoted&amp;nbsp;local support, through local capacity builder for improved production techniques, procurement practices and access to quality veterinary services in rural an peri-urban areas.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="85.80">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Established Productive Partnerships
</narrative></title>
<baseline year="2016" iso-date="2016-10-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-27" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="25.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of management committees established and functional for pastoral infrastructures and grazing areas
</narrative></title>
<baseline year="2016" iso-date="2016-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-12-30" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;This new intermediary indicator was introduced during MTR to reflect the social engineering&amp;nbsp;and inclusiveness in the management of infrastructure at community level that was&amp;nbsp;not adequately captured in&amp;nbsp;the results framework.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="142.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Productivity of targeted species by direct beneficiaries (cattle, sheep and goat, poultry, pig and bees)
</narrative></title>
<baseline year="2016" iso-date="2016-10-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-27" />
<period-end iso-date="1900-01-01"/>
<target value="0.00">
<comment><narrative>
&lt;p&amp;gt;During mid-tern review, PDO sub-indicators were revised.&lt;/p&amp;gt;

&lt;p&amp;gt;On the sub-indicator on ruminants. A unique indicator mixing cattle and small ruminants countrywide could not provide insight into the differentiated effects of the PPR vaccination campaigns and pastoral areas improved management. Their effects would be better captured by the proposed two sub-indicators. A&amp;nbsp;sub-indicator was introduced &amp;ldquo;Mortality rate in cattle under 6 months in pastoral areas&amp;rdquo; to better capture MPPRs contribution to productivity gains, while the other sub-indicator was reformulated into the &amp;quot;Small ruminants mortality rate&amp;quot;.&amp;nbsp;&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;5 sub-indicators were reformulated to better capture evidence of their achievement in terms of productivity. Productivity of broilers, hens, and breeding pigs&amp;nbsp;is measured on a yearly basis and highly depends on the number of flocks raised, which is influenced by external factors such as chicks and piglet availability. in the milk value chain, lactation period varies from one producer to the other depending on the degree of intensification. It is thus proposed to measure milk production per year. POs also joined the project at different moments in time and very different productivity levels. This justified the proposal to&amp;nbsp;measure the expectd productivity gains in the various value chains in increments (%) rather than in absolute numbers.&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Quantity of improved genetic material (animal and vegetal) acquired and/or produced by the livestock public stations and the projects beneficiaries, and delivered to end-users
</narrative></title>
<baseline year="2016" iso-date="2016-10-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-27" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;During MTR, this&amp;nbsp;indicator was reformulated and further broken down to ease data collection and monitoring of project impact. While&amp;nbsp;it would be extremely difficult to predict how many farmers would&amp;nbsp;benefit from improved genetic material acquired and/or produced thanks to the project,&amp;nbsp;targets could be set as regards the numbers of improved genetic material (animal and veetal) to be produced and/or acquired under the project, by the MINEPIA livestock stations and the beneficiaries the project will work with, and delivered to final beneficiaries.&lt;/p&amp;gt;

&lt;p&amp;gt;Bovine genetic material target not met due to the fact that the bovine&amp;nbsp; insemination campaign implemented did not achieve the expected results. Only a limited number of inseminators trained in relation to needs. The performance of the inseminators trained by the project remained limited and discouraged farmers from resuming the exercie, thereby limiting farmers&amp;#39;&amp;nbsp;adoption of AI.&lt;/p&amp;gt;

&lt;p&amp;gt;The indicator on small ruminants was dropped during&amp;nbsp;MTR considering that too few small ruminants business plans had been&amp;nbsp;identified. The qualitative leap linked to importing improved genetic material for small ruminants remained very marginal&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="3442.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of producers in productive partnerships who have adopted an improved agricultural technology promoted by the project
</narrative></title>
<baseline year="2016" iso-date="2016-10-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-27" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="99.30">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers adopting improved agricultural technology  (of which female and youth)
</narrative></title>
<baseline year="2016" iso-date="2016-06-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-06-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Overall, 70.1% of the beneficiaries concerned by the adoption of improved techniques at the end of the project adopted these techniques. This represents a total of 38,688 beneficiaries who adopted the improved technologies promoted by PRODEL. Before receiving support, 52.9% of beneficiaries were already practicing 50% of the good practices promoted by PRODEL, i.e. an additional 20% gain in the long term.&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;The achievement&amp;nbsp;at completion is below the target considering the limited number of POs in producion at closing. With more PO entering into production and being able to demonstrate sustained increased in productivity, it is anticipated that the level of adoption of improved technologies promotoed by the project would increase.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="38.68">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of herders in the project area adopting at least one improved production practice under component 2
</narrative></title>
<baseline year="2016" iso-date="2016-10-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-27" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The achievement at EOP is exceeded because the project introduced above&amp;nbsp;10 improved production practices and some herders adopted more than one.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="96.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Incremental sales in targeted value chains (aggregated over all the targeted value chains)
</narrative></title>
<baseline year="2016" iso-date="2016-10-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-27" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="29.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of mediation platforms established and functional
</narrative></title>
<baseline year="2016" iso-date="2016-10-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-27" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="27.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Market management platforms benefiting from the participation of herders organizations
</narrative></title>
<baseline year="2016" iso-date="2016-10-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-10-27" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The EOP was not met because some of the targeted councils did not have a defined cattle market. The Project did not have the mandate to create new markets, but worked on improving the inclusiveness of existing markets.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="26.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P113027</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>CM-Community Development Program Support Project Phase-II</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objective is to improve delivery of priority basic services (in targeted communes, and  extend the ongoing process of decentralization to new regions. The main beneficiaries will be the communes and communities supported during PNDP I (155) plus 167 non covered communes, in which 110 in the five new regions.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Second Phase of the Community Development Program Support Project for Cameroon is to improve the delivery of specified basic social services in targeted communes, and extend the ongoing process in support to decentralization to new regions. There are three components to the project; the first component of the project is the local development support. This component helps to improve the socioeconomic conditions, increase the productivity of the natural resource base, and increase incomes of the population in the communes supported by the project. Achieving these goals requires putting in place various infrastructures and socioeconomic investments. This component will channel grants to communes to co-finance Communal Development plans (CDP) preparation activities or CDP-subprojects, as the case may be. The second component of the project is the decentralization support for communes. This component strengthens the institutional capacities in support to the decentralization process. It will also provide assistance for the implementation of capacity building activities for communes and other local stakeholders, such as local service providers, multidisciplinary teams of the sectoral ministries and technical service providers to enable them to assume an effective role as promoters of local development. Finally, the third component of the project is the coordination, management, monitoring and evaluation, and communication. This component facilitates: (a) administrative, technical, and financial management of the program; (b) coordination among all institutional partners to ensure efficient support to communes for local development; (c) effective contractual arrangements with communes, sectoral ministries, including acquisition of the equipment necessary for implementing the program; and (d) monitoring and evaluation of the performance and the financial, environmental, and social impacts of the program.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><activity-status code="3" /><activity-date type="1" iso-date="2009-01-15"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2009-06-18"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2013-11-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2013-11-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Amadou Nchare</narrative></person-name><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2220957" />
                <name><narrative>Yaounde</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>3.86667 11.51667</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="15129" percentage="50" xml:lang="en"/><sector vocabulary="1" code="43032" percentage="50" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EZ" percentage="12.0000000" xml:lang="en"><narrative>FY17 - Other Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="12.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WC" percentage="12.0000000" xml:lang="en"><narrative>FY17 - Water Supply</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="52.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="12.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000662" percentage="8" xml:lang="en"><narrative>Labor Market Institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="8" xml:lang="en"><narrative>Air quality management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000663" percentage="8" xml:lang="en"><narrative>Active Labor Market Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="36" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="5" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="24" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="5" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="8" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="36" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="16" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="25" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">643333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">643333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">643333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">643333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">643333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">643333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">643333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">643333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">643333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">643333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">643333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">643333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">873333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">873333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">873333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">873333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">873333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">873333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">873333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">873333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">873333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">873333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">873333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">873333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">883333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">883333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">883333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">883333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">883333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">883333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">883333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">883333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">883333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">883333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">883333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">883333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">756666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">756666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">756666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">756666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">756666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">756666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">756666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">756666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">756666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">756666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">756666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">756666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">176666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">176666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">176666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">176666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">176666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">176666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">176666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">176666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">176666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">176666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">176666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">176666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">643333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">643333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">643333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">643333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">643333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">643333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">643333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">643333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">643333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">643333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">643333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">643333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">873333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">873333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">873333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">873333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">873333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">873333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">873333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">873333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">873333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">873333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">873333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">873333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">883333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">883333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">883333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">883333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">883333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">883333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">883333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">883333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">883333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">883333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">883333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">883333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">756666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">756666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">756666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">756666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">756666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">756666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">756666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">756666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">756666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">756666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">756666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">514599.97</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">514599.97</value>
</budget>
<capital-spend percentage="100" /><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P113027"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P113027?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P113027"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Communes with a public information and citizen control mechanism of grant management in place and operational
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative>The project had previously reported on this indicator with a baseline reflecting progress in the old project and the progressreflecting the cumulative progress of the two projects. Starting with this ISR, the project will report with a zero baseline and anet progress value based on progress made under this project alone.</narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2013-11-30" />
<target value="195.00">

</target>
<actual value="10.00">
<comment><narrative>
A pilot citizen control (scorecard) was conducted in ten communes. Moreover, a survey on the satisfaction of beneficiaries hasbeendone
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Subprojects that have implemented the required environmental and social risk mitigation measures and are functional
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative>The project had previously reported on this indicator with a baseline reflecting progress in the old project and the progressreflecting the cumulative progress of the two projects. Starting with this ISR, the project will report with a zero baseline and anet progress value based on progress made under this project alone.</narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2013-11-30" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People in project area with improved access to health care facilities
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative>The project had previously reported on this indicator with a baseline reflecting progress in the old project and the progressreflecting the cumulative progress of the two projects. Starting with this ISR, the project will report with a zero baseline and anet progress value based on progress made under this project alone.</narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2013-11-30" />
<target value="102000.00">

</target>
<actual value="160000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households in project area with better road access to markets and social services
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative>Progress against this indicator was initially reported with a baseline reflecting results achieved under CDPSP-I. Based on advicereceived from AFTOS, starting with ISR #6, the baseline was reset to the value at the beginning of CDPSP-II.</narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2013-11-30" />
<target value="193000.00">

</target>
<actual value="32947.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improved community water points constructed or rehabilitated under the project
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative>Progress against this indicator was initially reported with a baseline reflecting results achieved under CDPSP-I. Based on advicereceived from AFTOS, starting with ISR #6, the baseline was reset to the value at the beginning of CDPSP-II.</narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2013-11-30" />
<target value="338.00">

</target>
<actual value="1081.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land use and management plans prepared for communes
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative>The project had previously reported on this indicator with a baseline reflecting progress in the old project and the progressreflecting the cumulative progress of the two projects. Starting with this ISR, the project will report with a zero baseline and anet progress value based on progress made under this project alone.</narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2013-11-30" />
<target value="100.00">

</target>
<actual value="90.00">
<comment><narrative>
In progress. An integrated mapping system has been put in place, and this will help ensure that land use plans are incorporated inthe CDPs.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Communes supported by the project that have reflected priority investments in the communal development plans and budgets
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative>The project had previously reported on this indicator with a baseline reflecting progress in the old project and the progressreflecting the cumulative progress of the two projects. Starting with this ISR, the project will report with a zero baseline and anet progress value based on progress made under this project alone.</narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2013-11-30" />
<target value="170.00">

</target>
<actual value="178.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Communes benefiting from the project grant - disaggregated by new and old
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative>The project had previously reported on this indicator with a baseline reflecting progress in the old project and the progressreflecting the cumulative progress of the two projects. Starting with this ISR, the project will report with a zero baseline and anet progress value based on progress made under this project alone.</narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2013-11-30" />
<target value="170.00">

</target>
<actual value="329.00">
<comment><narrative>
178 new communes and 151 old communes
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Eligible commune which have implemented subprojects have increased the rate of coverage of basic social services by at least 5 percent in at least one of the following four sectors: health, education,
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative>Progress against this indicator was initially reported with a baseline reflecting results achieved under CDPSP-I. Based on advicereceived from AFTOS, starting with ISR #6, the baseline was reset to the value at the beginning of CDPSP-II.</narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2013-11-30" />
<target value="147.00">

</target>
<actual value="133.00">
<comment><narrative>
Data collection to inform this OI is in progress
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Eligible  new communes that have prepared CDPs of a quality acceptable to the Association
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative>Progress against this indicator was initially reported with a baseline reflecting results achieved under CDPSP-I. Based on advicereceived from AFTOS, starting with ISR #6, the baseline was reset to the value at the beginning of CDPSP-II.</narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2013-11-30" />
<target value="90.00">

</target>
<actual value="92.00">
<comment><narrative>
91 new communes have prepared CDPs of a quality acceptable to the Association
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in rural areas provided with access to Improved Water Sources under the project
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative>Progress against this indicator was initially reported with a baseline reflecting results achieved under CDPSP-I. Based on advicereceived from AFTOS, starting with ISR #6, the baseline was reset to the value at the beginning of CDPSP-II.</narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2013-11-30" />
<target value="70000.00">

</target>
<actual value="270250.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students in project area with improved access to education facilities
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative>Progress against this indicator was initially reported with a baseline reflecting results achieved under CDPSP-I. Based on advicereceived from AFTOS, starting with ISR #6, the baseline was reset to the value at the beginning of CDPSP-II.</narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2013-11-30" />
<target value="20100.00">

</target>
<actual value="31380.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
External financial audit reports are produced on time and without any major reservations
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative>The project had previously reported on this indicator with a baseline reflecting progress in the old project and the progressreflecting the cumulative progress of the two projects. Starting with this ISR, the project will report with a zero baseline and anet progress value based on progress made under this project alone.</narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2013-11-30" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehabilitated, Rural
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative>The project had previously reported on this indicator with a baseline reflecting progress in the old project and the progressreflecting the cumulative progress of the two projects. Starting with this ISR, the project will report with a zero baseline and anet progress value based on progress made under this project alone.</narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2013-11-30" />
<target value="241.00">

</target>
<actual value="48.60">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New CDPs implemented
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2013-11-30" />
<target value="140.00">

</target>
<actual value="178.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
At least one technical and financial audit on the use of the grant and the quality of achievements is carried out randomly each year
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="No"><comment><narrative>The project had previously reported on this indicator with a baseline reflecting progress in the old project and the progressreflecting the cumulative progress of the two projects. Starting with this ISR, the project will report with a zero baseline and anet progress value based on progress made under this project alone.</narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2013-11-30" />
<target value="Yes">

</target>
<actual value="No">
<comment><narrative>
In progress. Completion expected before end of November 2013
</narrative></comment>
</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P163657</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Fiscal Consolidation and Inclusive Growth DPO</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Operation will help Cameroon adjust to the oil price shock by: (i) supporting structural reforms to reduce the fiscal deficit while protecting the poor;  and (ii) strengthening competitiveness of the non-oil economy. Board Schedule Comments]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The operation aims to support Cameroon's efforts to adjust to a substantial decline in oil prices which has precipitated a regional economic crisis and diminished the country's prospects for growth and poverty reduction. Cameroon, a lower middle income country with a population of about 23 million, is the largest economy in the Central African Economic and Monetary Community (CEMAC). The region is experiencing a difficult economic crisis precipitated by the steep fall in the price of oil, which comprised 76 percent of CEMAC's exports in 2014. The objective of the operation is to support the Government of Cameroon (GoC) in implementing structural reforms to support fiscal adjustment as well as reforms to boost competitiveness and mitigate economic vulnerability. This operation, in the amount of US$200 million, is the first of three Development Policy Financing (DPF) in a programmatic series. The proposed program is aligned with the GoC's reform program and with the World Bank Group Country (WBG) Partnership Framework for FY17-FY21. The DPF series supports structural reforms that will restore fiscal stability while improving competitiveness and protecting the poor through fiscal adjustment. Reforms would support increased productivity by removing bottlenecks in the infrastructure sector, and higher efficiency and more equitable access to social services, by improving service delivery in health, education and scaling up social protection. They will also address inefficient procurement practices and weak management of public enterprises. The series is organized around three pillars: (1) improving fiscal sustainability and public sector management; (2) improving financial sustainability and efficiency of key infrastructure to enhance competitiveness; and (3) improving social services and scaling up social protection to reduce vulnerability among the poor. The policy areas to be addressed under the DPF include: (i) revenue mobilization; (ii) wage bill management; (iii) public procurement reforms; (iv) SOE governance; (v) energy sector reforms; (vi) road maintenance; (vii) trade facilitation at the port of Douala; (viii) health services delivery; (viii) education sector reforms; and (ix) social protection.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0033012"><narrative>MinistEre de l’Economie, de la Planification et de l’amEnagement du Territoire.</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="CM-COA-0033013"><narrative>MinistEre de l’Economie, de la Planification et de l’amEnagement du Territoire.</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2017-11-22"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2017-12-20"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2018-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2018-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Sona Varma</narrative></person-name><telephone>+1-202-473-1000</telephone><email>svarma1@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2220957" />
                <name><narrative>Yaounde</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>3.86667 11.51667</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="15126" percentage="22" xml:lang="en"/><sector vocabulary="1" code="12110" percentage="22" xml:lang="en"/><sector vocabulary="1" code="11110" percentage="12" xml:lang="en"/><sector vocabulary="1" code="33120" percentage="11" xml:lang="en"/><sector vocabulary="1" code="23111" percentage="11" xml:lang="en"/><sector vocabulary="1" code="21023" percentage="11" xml:lang="en"/><sector vocabulary="1" code="15155" percentage="11" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EZ" percentage="11.0000000" xml:lang="en"><narrative>FY17 - Other Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TZ" percentage="22.0000000" xml:lang="en"><narrative>FY17 - Other Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="23.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="22.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="22.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000713" percentage="11" xml:lang="en"><narrative>Public Transport</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="11" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000657" percentage="11" xml:lang="en"><narrative>Standards, Curriculum and Textbooks</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000011" percentage="33" xml:lang="en"><narrative>Fiscal Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000633" percentage="22" xml:lang="en"><narrative>Health Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000713" percentage="11" xml:lang="en"><narrative>Public Transport</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000111" percentage="33" xml:lang="en"><narrative>Fiscal sustainability</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000111" percentage="33" xml:lang="en"><narrative>Fiscal sustainability</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="11" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="11" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="22" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000862" percentage="11" xml:lang="en"><narrative>Energy Policies &amp; Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000014" percentage="11" xml:lang="en"><narrative>Trade</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">200000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">200000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">200000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33013"><narrative>MinistEre de l’Economie, de la Planification et de l’amEnagement du Territoire.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">206170574</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33013"><narrative>MinistEre de l’Economie, de la Planification et de l’amEnagement du Territoire.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-509615</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33013"><narrative>MinistEre de l’Economie, de la Planification et de l’amEnagement du Territoire.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-825717</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33013"><narrative>MinistEre de l’Economie, de la Planification et de l’amEnagement du Territoire.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">-1080320</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33013"><narrative>MinistEre de l’Economie, de la Planification et de l’amEnagement du Territoire.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-1072970</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33013"><narrative>MinistEre de l’Economie, de la Planification et de l’amEnagement du Territoire.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-1097588</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33013"><narrative>MinistEre de l’Economie, de la Planification et de l’amEnagement du Territoire.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-975386</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33013"><narrative>MinistEre de l’Economie, de la Planification et de l’amEnagement du Territoire.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-1257110</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33013"><narrative>MinistEre de l’Economie, de la Planification et de l’amEnagement du Territoire.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-889975</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33013"><narrative>MinistEre de l’Economie, de la Planification et de l’amEnagement du Territoire.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-825139</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33013"><narrative>MinistEre de l’Economie, de la Planification et de l’amEnagement du Territoire.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-736632</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33013"><narrative>MinistEre de l’Economie, de la Planification et de l’amEnagement du Territoire.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-1056054</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33013"><narrative>MinistEre de l’Economie, de la Planification et de l’amEnagement du Territoire.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-3424639</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33013"><narrative>MinistEre de l’Economie, de la Planification et de l’amEnagement du Territoire.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-4757106</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33013"><narrative>MinistEre de l’Economie, de la Planification et de l’amEnagement du Territoire.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-5120639</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33013"><narrative>MinistEre de l’Economie, de la Planification et de l’amEnagement du Territoire.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-4752435</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33013"><narrative>MinistEre de l’Economie, de la Planification et de l’amEnagement du Territoire.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-4051546</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33013"><narrative>MinistEre de l’Economie, de la Planification et de l’amEnagement du Territoire.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-3509479</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33013"><narrative>MinistEre de l’Economie, de la Planification et de l’amEnagement du Territoire.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-3375844</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33013"><narrative>MinistEre de l’Economie, de la Planification et de l’amEnagement du Territoire.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-4234035</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33013"><narrative>MinistEre de l’Economie, de la Planification et de l’amEnagement du Territoire.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-4370267</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33013"><narrative>MinistEre de l’Economie, de la Planification et de l’amEnagement du Territoire.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-4334250</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-33013"><narrative>MinistEre de l’Economie, de la Planification et de l’amEnagement du Territoire.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P163657"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P163657?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P163657"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Period of payment of invoices by the Road Funds to companies
</narrative></title>
<baseline year="2016" iso-date="2016-12-31" value="180.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-12-31" />
<period-end iso-date="2020-12-31" />
<target value="90.00">

</target>
<actual value="50.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Percentage of SOEs publishing their audited annual financial reports
</narrative></title>
<baseline year="2016" iso-date="2016-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-12-31" />
<period-end iso-date="2020-12-31" />
<target value="20.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Governments arrears to ENEO. Baseline (2017)
</narrative></title>
<baseline year="2017" iso-date="2017-08-31" value="54000000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-08-31" />
<period-end iso-date="2020-12-31" />
<target value="0.00">

</target>
<actual value="51070000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of births attended by skilled professionals in the three northern regions of Cameroon
</narrative></title>
<baseline year="2016" iso-date="2016-12-31" value="37.60"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-12-31" />
<period-end iso-date="2020-12-31" />
<target value="42.00">

</target>
<actual value="49.30">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of health facilities under PBF contract with 100 percent of essential drugs in their checklist available during their quarterly evaluation in the 78 health districts already covered by PBF
</narrative></title>
<baseline year="2016" iso-date="2016-12-31" value="13.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-12-31" />
<period-end iso-date="2019-12-31" />
<target value="40.00">

</target>
<actual value="80.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Container dwell time at the Douala Port
</narrative></title>
<baseline year="2016" iso-date="2016-12-31" value="11.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-12-31" />
<period-end iso-date="2020-12-31" />
<target value="7.50">

</target>
<actual value="19.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Tax expenditures as a percent of GDP
</narrative></title>
<baseline year="2016" iso-date="2016-12-31" value="4.10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-12-31" />
<period-end iso-date="2020-12-31" />
<target value="3.10">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of textbooks per student in primary school
</narrative></title>
<baseline year="2016" iso-date="2016-12-31" value="0.07"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-12-31" />
<period-end iso-date="2020-12-31" />
<target value="0.50">

</target>
<actual value="0.14">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of textbooks per student in secondary school
</narrative></title>
<baseline year="2016" iso-date="2016-12-31" value="0.33"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-12-31" />
<period-end iso-date="2020-12-31" />
<target value="0.66">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Percentage of irregular/invalid HR and payment cases eliminated from the SIGIPES
</narrative></title>
<baseline year="2016" iso-date="2016-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-12-31" />
<period-end iso-date="2020-12-31" />
<target value="80.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P166072</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Valorization of Investments in the Valley of the Benue</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To provide sustainable irrigation and drainage services and improve agricultural production in irrigated areas of the Benue valley]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Valorization of Investments in the Valley of the Benue Project for Cameroon is to provide sustainable irrigation and drainage services and improve agricultural production in irrigated areas of the Benue valley. There are four components to the project, the first component being improvements of infrastructures and water management. The component is organized into three subcomponents: (a) upstream water resources monitoring and coordination by operationalizing the Water Management Committee of Lagdo dam (ComitE de Gestion de l’Eau du Barrage de Lagdo), as well as operation and safety of the Lagdo dam (which is managed by the publicprivate partnership company that produces and distributes energy in Cameroon named ENEO); (b) on the RB: irrigation rehabilitation of 1,090 ha and development of 4,230 ha, both for small farmers; on the left bank (LB): 3,628 ha for agro-industrial development and 1,496 ha for small farmers in existing villages within the perimeter; and (c) irrigation management transfer to the W.UAs on both banks. The second component is the support services for agricultural production. This component includes three subcomponents: e-vouchers for launching production in the irrigation perimeters, matching grants for production and agribusiness, and establishment of organizational management support centers. The third component is the capacity building and implementation. This component includes three components: institutional strengthening, agricultural innovation and training, and project implementation and monitoring and evaluation. Finally, the fourth component is the contingent emergency response.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0035817"><narrative>CAMEROON</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0035817"><narrative>CAMEROON</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="CM-COA-0035818"><narrative>MEADEN</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2019-02-14"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2020-09-08"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2027-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2027-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Fidele Honorine Yobo A Koue Epse Nhiomog</narrative></person-name><telephone>+1-202-473-1000</telephone><email>fyoboakoueepsenh@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002221314" />
            <name><narrative>Touroua</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.07752 12.97302</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002224610" />
            <name><narrative>Ngong</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.08333 11.38333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002229681" />
            <name><narrative>Lagdo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.05828 13.66605</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002231320" />
            <name><narrative>Garoua</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.30143 13.39771</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002233524" />
            <name><narrative>Boula-Ibbi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.55885 13.76317</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002234272" />
            <name><narrative>Bibemi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.30981 13.87918</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002234397" />
            <name><narrative>Benou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.23333 14.9</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002234564" />
            <name><narrative>Beka Goto</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.75 13.11667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002235252" />
            <name><narrative>Bascheo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.67222 13.37222</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002235957" />
            <name><narrative>Adoumri</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.25296 13.77435</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008665255" />
            <name><narrative>Ngong Haoussari</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.02511 13.50967</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008665279" />
            <name><narrative>Pitoa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.17869 13.72106</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008672917" />
            <name><narrative>Gaschiga</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.95519 13.31629</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002229494" />
            <name><narrative>Lere</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.55 13.55</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="14040" percentage="41" xml:lang="en"/><sector vocabulary="1" code="43040" percentage="21" xml:lang="en"/><sector vocabulary="1" code="31140" percentage="17" xml:lang="en"/><sector vocabulary="1" code="31166" percentage="16" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="4" xml:lang="en"/><sector vocabulary="1" code="31150" percentage="1" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AK" percentage="11.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Agriculture, Fishing &amp; Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YA" percentage="6.00000000" xml:lang="en"><narrative>FY17 - Agricultural markets, commercialization and agri-business</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="4.00000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AB" percentage="3.00000000" xml:lang="en"><narrative>FY17 - Agricultural Extension, Research, and Other Support Activities</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AI" percentage="76.0000000" xml:lang="en"><narrative>FY17 - Irrigation and Drainage</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000837" percentage="18" xml:lang="en"><narrative>Watershed Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="10" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="87" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="24" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="46" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="100" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000753" percentage="2" xml:lang="en"><narrative>Disaster Preparedness</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="90" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="19" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="2" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000626" percentage="10" xml:lang="en"><narrative>Pandemic Response</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="87" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="24" xml:lang="en"><narrative>Finance for Development</narrative></sector><humanitarian-scope type="1" vocabulary="1-2" code="EP-2020-000012-001"> </humanitarian-scope><humanitarian-scope type="2" vocabulary="2-1" code="HCOVD20"> </humanitarian-scope><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">428571.43</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">428571.43</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">428571.43</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">428571.43</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">428571.43</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">428571.43</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">428571.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">4250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">4250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">4250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">4250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">4250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">4250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">4250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">4250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">4250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">4250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">4250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">4250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">4333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">4333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">4333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">4333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">4333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">4333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">4333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">4333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">4333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">4333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">4333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">4333333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">3166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">3166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">3166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">3166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">3166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">3166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">3166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">3166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">3166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">3166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">3166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">3166666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">428571.43</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">428571.43</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">428571.43</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">428571.43</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">428571.43</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">428571.43</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">428571.42</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">750000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">2500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">2500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">2500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">2500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">2500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">2500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">2500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">2500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">2500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">2500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">2500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">2500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">4250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">4250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">4250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">4250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">4250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">4250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">4250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">4250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">4250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">4250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">4250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">4250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">4333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">4333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">4333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">4333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">4333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">4333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">4333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">4333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">4333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">4333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">4333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">4333333.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">3166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">3166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">3166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">3166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">3166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">3166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">3166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">3166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">3166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">3166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">3166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">3166666.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">1000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">1000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">1000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">1000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">1000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">1000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">1000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">1000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">1000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">1000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">1000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">1000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">1250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">1250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">1250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">1250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">106037103.82</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">106037103.82</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">200000000</value><description xml:lang="en"><narrative>Total Commitment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">5072214</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">5924351</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">644427</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">73982</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">331157</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">53028</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">88092</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">42476</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">172109</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">377779</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">222614</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">199771</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">229860</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">635171</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">9030790</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">13420455</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">2661450</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">1269193</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">1650707</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">589922</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">1401382</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">1261863</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">1803562</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">1532431</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">283179</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">952669</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">580929</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">1796455</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">1176448</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">1241369</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-79990</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">2801273</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">3361798</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">1913094</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">7525582</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">1139405</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">4639512</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">2065188</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">1091518</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">1450047</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">255303</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">3003530</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">276991</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">4035678</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">4215684</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">1548444</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-54155</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-68384</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-72578</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-109560</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-269797</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-281173</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-352843</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-473777</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-3448593</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-35818"><narrative>MEADEN</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P166072"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P166072?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P166072"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People and businesses using financial services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This indicator will be introduced in 2026 for monitoring.
</narrative></comment>
</target>
<actual value="168">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of organizations having subscribed with the CGER
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2027-09-30" />
<target value="500.00">
<comment><narrative>
Two Rural Management and Economy Centers are now operational in Lagdo and Garoua, with 286 members subscribed to the CGERs.  The centers provide accounting, financial assistance, and management support to smallholder farmers and rural enterprises. Construction is complete and equipment procurement is ongoing. Women represent 63 of the subscribed members.
</narrative></comment>
</target>
<actual value="284">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total amount of business plans financed
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2027-09-30" />
<target value="9,500,000.00">
<comment><narrative>
Amount
</narrative></comment>
</target>
<actual value="0.32">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This indicator will be introduced in 2026 for monitoring.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries (disaggregated by gender) who have received higher education training
</narrative></title>
<baseline year="2020" iso-date="2020-07-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-07-30" />
<period-end iso-date="2027-09-30" />
<target value="30.00">
<comment><narrative>
The scholarship program for higher education has exceeded its targets, with 35 students currently enrolled at University of Maroua compared to the original target of 30. The program includes 32 design engineers and 3 construction engineers specializing in agricultural studies for the 2024-2025 academic year. Women represent 35% of scholarship recipients, surpassing the 30% target and demonstrating strong gender inclusion. These scholarships focus on developing local expertise in irrigation engineering, agronomy, and agricultural management to support long-term sustainability of the Benoue Valley's agricultural development.
</narrative></comment>
</target>
<actual value="34">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Linear corridor flood alert system
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="15.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2027-09-30" />
<target value="250.00">
<comment><narrative>
The detailed studies are expected to be completed by the end of January 2025, and tender documents will be ready by April 2025. A contract for implementation is expected to be awarded by the end of 2025, and implementation is expected in 2026.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area provided with new/improved irrigation or drainage services
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="600.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2027-09-30" />
<target value="10000.00">
<comment><narrative>
On the right bank of the Benue River, the rehabilitation of 212 ha is expected to be completed by the end of February 2025, and 50% of 910 ha are expected to be delivered by the end of February 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total area irrigated
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="1,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2027-09-30" />
<target value="14,000.00">
<comment><narrative>
212 ha by March 2026 and  910 ha are expected to be completed by the end of January 2027.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct beneficiaries
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2027-09-30" />
<target value="26,000.00">
<comment><narrative>
Due to delays in infrastructure works, the first 212 hectares of the irrigated perimeter is now expected to be completed by the end of March 2026. Additionally, 910 hectares is projected to reach completion by January 2027. As a result, beneficiaries currently do not have access to the irrigated perimeter. In the meantime, they are engaged in trial plots within the Lagdo area through matching grants, while awaiting access to land within the irrigated perimeter as it becomes available.
</narrative></comment>
</target>
<actual value="1163">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Value of agricultural production in rehabilitated and improved irrigation area (CFA million/year)
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="720.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2027-09-30" />
<target value="90,740.00">
<comment><narrative>
Will be measured when completed land can be transferred to the firms. The first 212 Ha is expected by March 2026.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of established WUAs (for secondary canals)
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2027-09-30" />
<target value="27.00">
<comment><narrative>
The technical assistance contract for WUAs is operational, with five provisional associations formed—one for the 212-hectare rehabilitated zone and four for the 910-hectare development zone. Progress toward the target of 27 WUAs is slow due to infrastructure delays, with plans to establish 10 more in 2025.
</narrative></comment>
</target>
<actual value="6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of hydromet stations installed and functioning
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2027-09-30" />
<target value="8.00">
<comment><narrative>
The detailed studies are expected to be completed by the end of January 2025, and tender documents will be ready by April 2025. A contract for implementation is expected to be awarded by the end of 2025, and implementation is expected in 2026.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Amounts of total voucher
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2027-09-30" />
<target value="8,500,000.00">
<comment><narrative>
The contract for the e-voucher technical assistance has been awarded and is operational, with the platform currently under development. The system is constrained by by infrastructure delays to access to irrigated land.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Citizen engagement indicator: Monitoring of the Grievance Redress Mechanism (GRM)
</narrative></title>
<baseline year="2020" iso-date="2020-07-30" value="70.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-07-30" />
<period-end iso-date="2027-09-30" />
<target value="90.00">
<comment><narrative>
Since project effectiveness, 780 complaints have been registered through the GRM, with a closure rate exceeding 86%, indicating active engagement and responsiveness.
</narrative></comment>
</target>
<actual value="86">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers reached with agricultural assets or services
</narrative></title>
<baseline year="2020" iso-date="2020-07-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-07-29" />
<period-end iso-date="2027-09-30" />
<target value="13640.00">
<comment><narrative>
Beneficiaries have not yet started to receive e-vouchers. Pending availability and access to irrigated land.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area prepared by private enterprises
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2027-09-30" />
<target value="14,400.00">
<comment><narrative>
This indicator will be measured as irrigated land in Lot 2 becomes available. Priority access will be given to existing farmers in the Lagdo area as infrastructure works progress.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women in decision-making positions in WUAs
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2027-09-30" />
<target value="26.00">
<comment><narrative>
Of the 5 WUA established in 2024. 418 members, 95 women and 323 male. Out of the 418 members, 50 are in decision-making roles, of which 11 are female and 39 males.
</narrative></comment>
</target>
<actual value="22">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
MEADEN restructured
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2027-09-30" />
<target value="100.00">
<comment><narrative>
MEADEN's reorganization plan is progressing well, reaching 60% completion by mid-term review. The agency has filled 12 of 16 planned staff positions, with 4 additional recruitments underway. Six training sessions have been completed out of 21 planned, focusing on leadership and technical management skills. Infrastructure improvements are complete, including the rehabilitated Garoua headquarters and new equipment. MEADEN signed a partnership agreement with the Ministry of Agriculture in May 2025 to provide agricultural extension services. The agency is working on a sustainability plan to ensure long-term operations after project completion. These improvements are preparing MEADEN to manage irrigation infrastructure across the Benoue Valley effectively.
</narrative></comment>
</target>
<actual value="60">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Value of agricultural production in rehabilitated and improved irrigation area (CFA million/year)
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="720.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2027-09-30" />
<target value="90,740.00">
<comment><narrative>
Will be measured when completed land can be transferred to the firms. The first 212 Ha is expected by March 2026.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area prepared by private enterprises
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2027-09-30" />
<target value="14,400.00">
<comment><narrative>
This indicator will be measured as irrigated land in Lot 2 becomes available. Priority access will be given to existing farmers in the Lagdo area as infrastructure works progress.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Irrigation scheme management transferred to Water Users Associations
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2027-09-30" />
<target value="10,000.00">
<comment><narrative>
The Prime Minister signed the decree enabling Water User Associations (WUAs) to manage irrigation water on February 26, 2024, establishing the legal framework for irrigation perimeter management through a technical protocol. Additionally, the technical assistance contract for WUAs is fully operational in the field. Progress on WUAs includes establishing five associations: one for the 212-hectare rehabilitated zone and four for the 910-hectare development zone. An additional 10 WUAs are expected to be formed in 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries (disaggregated by gender) who have received training at the Innovation Training Center
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2027-09-30" />
<target value="600.00">
<comment><narrative>
Construction on the CIT is complete, and equipping is ongoing. It is expected to be fully operational by April 2026.
</narrative></comment>
</target>
<actual value="250">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total area irrigated
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="1,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2027-09-30" />
<target value="14,000.00">
<comment><narrative>
212 ha by March 2026 and  910 ha are expected to be completed by the end of January 2027.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct beneficiaries
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2027-09-30" />
<target value="26,000.00">
<comment><narrative>
Due to delays in infrastructure works, the first 212 hectares of the irrigated perimeter is now expected to be completed by the end of March 2026. Additionally, 910 hectares is projected to reach completion by January 2027. As a result, beneficiaries currently do not have access to the irrigated perimeter. In the meantime, they are engaged in trial plots within the Lagdo area through matching grants, while awaiting access to land within the irrigated perimeter as it becomes available.
</narrative></comment>
</target>
<actual value="1163">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with strengthened food and nutrition security
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This indicator will be introduced in 2025 for monitoring.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Irrigation scheme management transferred to Water Users Associations
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2027-09-30" />
<target value="10,000.00">
<comment><narrative>
The Prime Minister signed the decree enabling Water User Associations (WUAs) to manage irrigation water on February 26, 2024, establishing the legal framework for irrigation perimeter management through a technical protocol. Additionally, the technical assistance contract for WUAs is fully operational in the field. Progress on WUAs includes establishing five associations: one for the 212-hectare rehabilitated zone and four for the 910-hectare development zone. An additional 10 WUAs are expected to be formed in 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries (disaggregated by gender) who have received technical and vocational training
</narrative></title>
<baseline year="2020" iso-date="2020-07-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-07-30" />
<period-end iso-date="2027-09-30" />
<target value="1,000.00">
<comment><narrative>
Technical training programs have made steady progress with 427 beneficiaries completing training out of the 1,000-person target. The Lagdo Technical and Professional Agricultural School launched training for 250 students in July 2025, while the Garoua Agricultural Technical School continues with 177 participants who began in June 2025. Training covers practical skills including crop production, seed development, aquaculture, food processing, equipment maintenance, and irrigation system management.
</narrative></comment>
</target>
<actual value="427">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Cropping intensity
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="170.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2027-09-30" />
<target value="180.00">
<comment><narrative>
The first 212 ha is expected to be completed by the end of March 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Value of agricultural production in rehabilitated and improved irrigation area (CFA million/year)
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="720.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2027-09-30" />
<target value="90,740.00">
<comment><narrative>
Will be measured when completed land can be transferred to the firms. The first 212 Ha is expected by March 2026.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area prepared by private enterprises
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2027-09-30" />
<target value="14,400.00">
<comment><narrative>
This indicator will be measured as irrigated land in Lot 2 becomes available. Priority access will be given to existing farmers in the Lagdo area as infrastructure works progress.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Irrigation scheme management transferred to Water Users Associations
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2027-09-30" />
<target value="10,000.00">
<comment><narrative>
The Prime Minister signed the decree enabling Water User Associations (WUAs) to manage irrigation water on February 26, 2024, establishing the legal framework for irrigation perimeter management through a technical protocol. Additionally, the technical assistance contract for WUAs is fully operational in the field. Progress on WUAs includes establishing five associations: one for the 212-hectare rehabilitated zone and four for the 910-hectare development zone. An additional 10 WUAs are expected to be formed in 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total area irrigated
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="1,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2027-09-30" />
<target value="14,000.00">
<comment><narrative>
212 ha by March 2026 and  910 ha are expected to be completed by the end of January 2027.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct beneficiaries
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2027-09-30" />
<target value="26,000.00">
<comment><narrative>
Due to delays in infrastructure works, the first 212 hectares of the irrigated perimeter is now expected to be completed by the end of March 2026. Additionally, 910 hectares is projected to reach completion by January 2027. As a result, beneficiaries currently do not have access to the irrigated perimeter. In the meantime, they are engaged in trial plots within the Lagdo area through matching grants, while awaiting access to land within the irrigated perimeter as it becomes available.
</narrative></comment>
</target>
<actual value="1163">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Business plans financed
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2027-09-30" />
<target value="2,600.00">
<comment><narrative>
Number
</narrative></comment>
</target>
<actual value="168">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P505030</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Improving Performance, Accountability and Transparency in Cameroon PforR</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–00006031"><narrative>Republic of Cameroon</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="CM-COA-00006030"><narrative>Ministry of Finance (MINFI)</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2025-03-14"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2025-03-14"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2029-04-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2029-04-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Hugues Agossou</narrative></person-name><telephone>+1-202-473-1000</telephone><email>hagossou@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<contact-info type="2">
<mailing-address><narrative>
2 Rue de Narvik , Yaounde

</narrative></mailing-address></contact-info>


<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2220957" />
                <name><narrative>Yaounde</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>3.86667 11.51667</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="15116" percentage="38" xml:lang="en"/><sector vocabulary="1" code="15126" percentage="24" xml:lang="en"/><sector vocabulary="1" code="15117" percentage="23" xml:lang="en"/><sector vocabulary="1" code="15125" percentage="10" xml:lang="en"/><sector vocabulary="1" code="12220" percentage="5" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BBC" percentage="80.0000000" xml:lang="en"><narrative>Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HHG" percentage="5.00000000" xml:lang="en"><narrative>Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BBH" percentage="15.0000000" xml:lang="en"><narrative>Sub-National Government</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">11249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">11249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">11249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">11250003.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">3749999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">3749999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">3749999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">3749999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">3749999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">3749999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">3749999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">3749999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">3749999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">3749999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">3749999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">3750011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">4166677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">4166677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">833344.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">158197785.13</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">158197785.13</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">200000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-9219"><narrative>Cameroon Water Utilities Corporation (CAMWATER); Direction GEnErale des Impôts; Directorate General for Treasury and Public Accounts (DGTCFM) ; Ministry of Economy, Planning and Territorial Administration (MINEPAT); Ministry of Finance (MINFI); Ministry of Health; Ministry of Public Procurement (MINMAP); Regulatory Authority for Public Procurement (ARMP) </narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">1807590</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-9219"><narrative>Cameroon Water Utilities Corporation (CAMWATER); Direction GEnErale des Impôts; Directorate General for Treasury and Public Accounts (DGTCFM) ; Ministry of Economy, Planning and Territorial Administration (MINEPAT); Ministry of Finance (MINFI); Ministry of Health; Ministry of Public Procurement (MINMAP); Regulatory Authority for Public Procurement (ARMP) </narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">39994625</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-9219"><narrative>Cameroon Water Utilities Corporation (CAMWATER); Direction GEnErale des Impôts; Directorate General for Treasury and Public Accounts (DGTCFM) ; Ministry of Economy, Planning and Territorial Administration (MINEPAT); Ministry of Finance (MINFI); Ministry of Health; Ministry of Public Procurement (MINMAP); Regulatory Authority for Public Procurement (ARMP) </narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P505030"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P505030?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P505030"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of contract data relating to public procurement published online following the Open Contacting Data Standard
</narrative></title>
<baseline year="2024" iso-date="2024-06-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-10" />
<period-end iso-date="2028-12-10" />
<target value="80">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of contracts processed through COLEPS for selected Ministries
</narrative></title>
<baseline year="2024" iso-date="2024-09-27" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-27" />
<period-end iso-date="2028-11-27" />
<target value="70">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of active taxpayers (individuals)
</narrative></title>
<baseline year="2024" iso-date="2024-11-06" value="500"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-06" />
<period-end iso-date="2028-12-08" />
<target value="3000">

</target>
<actual value="500">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Monitoring of SOEs (PEFA Indicator 10.1)
</narrative></title>
<baseline year="2023" iso-date="2023-08-30" value="C"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-08-30" />
<period-end iso-date="2028-12-09" />
<target value="B+">

</target>
<actual value="C">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Non-oil domestic revenue as a percentage of non-oil GDP
</narrative></title>
<baseline year="2024" iso-date="2024-12-12" value="13"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-12" />
<period-end iso-date="2028-12-12" />
<target value="14.5">

</target>
<actual value="13">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people benefiting from climate-resilient public infrastructure
</narrative></title>
<baseline year="2024" iso-date="2024-12-05" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-05" />
<period-end iso-date="2028-12-05" />
<target value="20000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of ministries included in the climate-sensitive document annexed to the budget bill.
</narrative></title>
<baseline year="2024" iso-date="2024-12-02" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-02" />
<period-end iso-date="2028-12-02" />
<target value="47">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Billion FCFA of revenues from income tax on SMEs (“IGS”) transferred by Treasury to municipalities in a given year.
</narrative></title>
<baseline year="2024" iso-date="2024-12-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-10" />
<period-end iso-date="2027-12-10" />
<target value="60">
<comment><narrative>
As the government;s books of accoutns have not yet fully closed, DGI is unable to determine how much IGS revenue has been collected and transferred. DGI gave us assurance that the IGS is in force since Jan. 2025 and the amounts colected are automatically transferred to the municipalities.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Billion FCFA in CAMWATER's revenues, in a given year, in areas where smart meters are installed.
</narrative></title>
<baseline year="2024" iso-date="2024-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-14" />
<period-end iso-date="2028-12-14" />
<target value="1.2">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of newly approved investment projects across  five selected sectors in a given year, have adopted the  new methodology for prefeasibility and feasibility studies, incorporating climate c
</narrative></title>
<baseline year="2024" iso-date="2024-05-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-14" />
<period-end iso-date="2028-12-14" />
<target value="80">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of active taxpayers (businesses)
</narrative></title>
<baseline year="2024" iso-date="2024-11-06" value="47313"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-06" />
<period-end iso-date="2028-12-08" />
<target value="70000">

</target>
<actual value="47313">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Billion FCFA in public funds kept in commercial banks, in a given year
</narrative></title>
<baseline year="2023" iso-date="2023-12-14" value="200"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-14" />
<period-end iso-date="2028-12-14" />
<target value="40">

</target>
<actual value="200">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New tax revenues collected for and transferred to municipalities (in FCFA billion)
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2027-12-13" />
<target value="60">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people benefiting from climate-resilient public infrastructure
</narrative></title>
<baseline year="2024" iso-date="2024-12-05" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-05" />
<period-end iso-date="2028-12-05" />
<target value="20000">
<comment><narrative>
Not yet due
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people benefiting from climate-resilient public infrastructure
</narrative></title>
<baseline year="2024" iso-date="2024-12-05" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-05" />
<period-end iso-date="2028-12-05" />
<target value="20000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of ministries included in the climate-sensitive document annexed to the budget bill.
</narrative></title>
<baseline year="2024" iso-date="2024-12-02" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-02" />
<period-end iso-date="2028-12-02" />
<target value="47">
<comment><narrative>
As for 2026, 18 line ministries included in the climate-sensitive document annexed to the budget bill.
</narrative></comment>
</target>
<actual value="18">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of ministries included in the climate-sensitive document annexed to the budget bill.
</narrative></title>
<baseline year="2024" iso-date="2024-12-02" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-02" />
<period-end iso-date="2028-12-02" />
<target value="47">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New tax revenues collected for and transferred to municipalities (in FCFA billion)
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2027-12-13" />
<target value="60">
<comment><narrative>
Against a target of 10 billion at the end of 2025. 2025 target met.
</narrative></comment>
</target>
<actual value="10.35">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New tax revenues collected for and transferred to municipalities (in FCFA billion)
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2027-12-13" />
<target value="60">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of contracts processed through COLEPS for selected Ministries
</narrative></title>
<baseline year="2024" iso-date="2024-09-27" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-27" />
<period-end iso-date="2028-11-27" />
<target value="70">
<comment><narrative>
No result expected in 2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of contracts processed through COLEPS for selected Ministries
</narrative></title>
<baseline year="2024" iso-date="2024-09-27" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-27" />
<period-end iso-date="2028-11-27" />
<target value="70">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Billion FCFA in public funds kept in commercial banks, in a given year
</narrative></title>
<baseline year="2023" iso-date="2023-12-14" value="200"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-14" />
<period-end iso-date="2028-12-14" />
<target value="40">
<comment><narrative>
DLR 5.2 Billion FCFA in public funds kept in commercial banks. 
The indicator depends on the implementing effectiveness of the TSA, which in turn relies on a regional platform being developed by BEAC for all CEMAC countries. Deadlines have been repeatedly postponed, with a new target set for July 2026
</narrative></comment>
</target>
<actual value="200">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Billion FCFA in public funds kept in commercial banks, in a given year
</narrative></title>
<baseline year="2023" iso-date="2023-12-14" value="200"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-14" />
<period-end iso-date="2028-12-14" />
<target value="40">

</target>
<actual value="200">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Billion FCFA in actual gender-responsive expenditure reflecting execution of the Gender-responsive budgeting in the health sector, in a given year
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2028-12-10" />
<target value="X+25">
<comment><narrative>
This is significantly above the December 2028 target of 25 billion. The baseline appears questionable, and adjustments may need to be considered.
</narrative></comment>
</target>
<actual value="48.63">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of large and medium-sized enterprises active taxpayers filing though e-filing (e-billing) system in a given fiscal year
</narrative></title>
<baseline year="2024" iso-date="2024-10-14" value="2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-10-14" />
<period-end iso-date="2028-12-14" />
<target value="70">

</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Billion FCFA in actual gender-responsive expenditure reflecting execution of the Gender-responsive budgeting in the health sector, in a given year
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2028-12-10" />
<target value="X+25">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Billion FCFA in CAMWATER's revenues, in a given year, in areas where smart meters are installed.
</narrative></title>
<baseline year="2024" iso-date="2024-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-14" />
<period-end iso-date="2028-12-14" />
<target value="1.2">
<comment><narrative>
The procurement of smart meters is still ongoing. No smart meters  expected to be installed before October  2026
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Billion FCFA in CAMWATER's revenues, in a given year, in areas where smart meters are installed.
</narrative></title>
<baseline year="2024" iso-date="2024-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-14" />
<period-end iso-date="2028-12-14" />
<target value="1.2">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Billion FCFA of revenues from income tax on SMEs (“IGS”) transferred by Treasury to municipalities in a given year.
</narrative></title>
<baseline year="2024" iso-date="2024-12-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-10" />
<period-end iso-date="2027-12-10" />
<target value="60">
<comment><narrative>
Since April 2026, the amounts collected are automatically transferred to the municipalities.
</narrative></comment>
</target>
<actual value="10.35">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Billion FCFA of revenues from income tax on SMEs (“IGS”) transferred by Treasury to municipalities in a given year.
</narrative></title>
<baseline year="2024" iso-date="2024-12-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-10" />
<period-end iso-date="2027-12-10" />
<target value="60">
<comment><narrative>
As the government;s books of accoutns have not yet fully closed, DGI is unable to determine how much IGS revenue has been collected and transferred. DGI gave us assurance that the IGS is in force since Jan. 2025 and the amounts colected are automatically transferred to the municipalities.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of contract data relating to public procurement published online following the Open Contacting Data Standard
</narrative></title>
<baseline year="2024" iso-date="2024-06-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-10" />
<period-end iso-date="2028-12-10" />
<target value="80">
<comment><narrative>
No result expected in 2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of contract data relating to public procurement published online following the Open Contacting Data Standard
</narrative></title>
<baseline year="2024" iso-date="2024-06-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-10" />
<period-end iso-date="2028-12-10" />
<target value="80">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Each of the 15 largest SOEs has published in a given year its audited financial statements online within six months after the fiscal year end
</narrative></title>
<baseline year="2024" iso-date="2024-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-14" />
<period-end iso-date="2028-06-14" />
<target value="15">
<comment><narrative>
None of the 15 SOEs published their audit financial statement reports related to accounts closed in December 2024 by June 30, 2025.
Audited financial statements for the period ended December 31, 2025 are due to be published by June 30, 2026. The results will be known starting July 1, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Each of the 15 largest SOEs has published in a given year its audited financial statements online within six months after the fiscal year end
</narrative></title>
<baseline year="2024" iso-date="2024-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-14" />
<period-end iso-date="2028-06-14" />
<target value="15">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of newly approved investment projects across  five selected sectors in a given year, have adopted the  new methodology for prefeasibility and feasibility studies, incorporating climate c
</narrative></title>
<baseline year="2024" iso-date="2024-05-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-14" />
<period-end iso-date="2028-12-14" />
<target value="80">
<comment><narrative>
The methodology was developed and approved in 2026. It will be rolled out for the approval of the investment projects by July 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of newly approved investment projects across  five selected sectors in a given year, have adopted the  new methodology for prefeasibility and feasibility studies, incorporating climate c
</narrative></title>
<baseline year="2024" iso-date="2024-05-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-14" />
<period-end iso-date="2028-12-14" />
<target value="80">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of taxpayers with pre-filled property tax and PIT returns in a given year
</narrative></title>
<baseline year="2024" iso-date="2024-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-14" />
<period-end iso-date="2028-12-14" />
<target value="40">
<comment><narrative>
Annual target achieved.
</narrative></comment>
</target>
<actual value="59.73">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of taxpayers with pre-filled property tax and PIT returns in a given year
</narrative></title>
<baseline year="2024" iso-date="2024-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-14" />
<period-end iso-date="2028-12-14" />
<target value="40">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of large and medium-sized enterprises active taxpayers filing though e-filing (e-billing) system in a given fiscal year
</narrative></title>
<baseline year="2024" iso-date="2024-10-14" value="2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-10-14" />
<period-end iso-date="2028-12-14" />
<target value="70">
<comment><narrative>
Annual target achieved.
</narrative></comment>
</target>
<actual value="14.83">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of large and medium-sized enterprises active taxpayers filing though e-filing (e-billing) system in a given fiscal year
</narrative></title>
<baseline year="2024" iso-date="2024-10-14" value="2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-10-14" />
<period-end iso-date="2028-12-14" />
<target value="70">

</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of risk-based taxpayer audits
</narrative></title>
<baseline year="2024" iso-date="2024-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-15" />
<period-end iso-date="2028-12-08" />
<target value="75">
<comment><narrative>
The software for automatic risk-based taxpayer selection was not developed in 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of risk-based taxpayer audits
</narrative></title>
<baseline year="2024" iso-date="2024-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-15" />
<period-end iso-date="2028-12-08" />
<target value="75">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of revenues collected from VAT as a ratio of non-oil GDP, in a given year.
</narrative></title>
<baseline year="2024" iso-date="2024-05-14" value="4.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-14" />
<period-end iso-date="2028-12-14" />
<target value="6.0">
<comment><narrative>
As the government's books of accounts have not yet been fully finalized, the final figure will be known in early July 2026, when the Treasury trial balance as of June 30, 2026, will be issued.
</narrative></comment>
</target>
<actual value="4.3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of revenues collected from VAT as a ratio of non-oil GDP, in a given year.
</narrative></title>
<baseline year="2024" iso-date="2024-05-14" value="4.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-14" />
<period-end iso-date="2028-12-14" />
<target value="6.0">

</target>
<actual value="4.3">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of health facilities that meet performance and transparency targets
</narrative></title>
<baseline year="2024" iso-date="2024-06-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-12" />
<period-end iso-date="2028-12-12" />
<target value="64">
<comment><narrative>
Annual target not met. One Disbursement-Linked sub indicator out of 4 was partially reported by the IVA as achieved. MINSANTE has challenged some results and has been working to propose revised data by June 30, 2026.
</narrative></comment>
</target>
<actual value="1.6">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of health facilities that meet performance and transparency targets
</narrative></title>
<baseline year="2024" iso-date="2024-06-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-12" />
<period-end iso-date="2028-12-12" />
<target value="64">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of active taxpayers (businesses)
</narrative></title>
<baseline year="2024" iso-date="2024-11-06" value="47313"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-06" />
<period-end iso-date="2028-12-08" />
<target value="70000">
<comment><narrative>
Data as of December 31, 2025 are still being processed. The final figure will be known in July 2026.
</narrative></comment>
</target>
<actual value="47313">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of active taxpayers (businesses)
</narrative></title>
<baseline year="2024" iso-date="2024-11-06" value="47313"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-06" />
<period-end iso-date="2028-12-08" />
<target value="70000">

</target>
<actual value="47313">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of active taxpayers (individuals)
</narrative></title>
<baseline year="2024" iso-date="2024-11-06" value="500"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-06" />
<period-end iso-date="2028-12-08" />
<target value="3000">
<comment><narrative>
Data as of December 31, 2025 are still being processed. The final figure will be known in July 2026.
</narrative></comment>
</target>
<actual value="500">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of active taxpayers (individuals)
</narrative></title>
<baseline year="2024" iso-date="2024-11-06" value="500"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-06" />
<period-end iso-date="2028-12-08" />
<target value="3000">

</target>
<actual value="500">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Monitoring of SOEs (PEFA Indicator 10.1)
</narrative></title>
<baseline year="2023" iso-date="2023-08-30" value="C"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-08-30" />
<period-end iso-date="2028-12-09" />
<target value="B+">
<comment><narrative>
The assessment of this indicator will coincide with the upcoming PEFA. Alternatively, a self-assessment will be conducted by 2027. Therefore, the baseline's score remained unchanged.
</narrative></comment>
</target>
<actual value="C">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Monitoring of SOEs (PEFA Indicator 10.1)
</narrative></title>
<baseline year="2023" iso-date="2023-08-30" value="C"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-08-30" />
<period-end iso-date="2028-12-09" />
<target value="B+">

</target>
<actual value="C">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Non-oil domestic revenue as a percentage of non-oil GDP
</narrative></title>
<baseline year="2024" iso-date="2024-12-12" value="13"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-12" />
<period-end iso-date="2028-12-12" />
<target value="14.5">
<comment><narrative>
The 2025 estimated value, based on interim financial statements, confirms that the indicator is on track. The final figure will be known in early July 2026
</narrative></comment>
</target>
<actual value="13">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Non-oil domestic revenue as a percentage of non-oil GDP
</narrative></title>
<baseline year="2024" iso-date="2024-12-12" value="13"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-12" />
<period-end iso-date="2028-12-12" />
<target value="14.5">

</target>
<actual value="13">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of risk-based taxpayer audits
</narrative></title>
<baseline year="2024" iso-date="2024-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-15" />
<period-end iso-date="2028-12-08" />
<target value="75">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of taxpayers with pre-filled property tax and PIT returns in a given year
</narrative></title>
<baseline year="2024" iso-date="2024-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-14" />
<period-end iso-date="2028-12-14" />
<target value="40">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people benefiting from climate-resilient public infrastructure
</narrative></title>
<baseline year="2024" iso-date="2024-12-05" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-05" />
<period-end iso-date="2028-12-05" />
<target value="20000">
<comment><narrative>
Not yet due
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people benefiting from climate-resilient public infrastructure
</narrative></title>
<baseline year="2024" iso-date="2024-12-05" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-05" />
<period-end iso-date="2028-12-05" />
<target value="20000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Billion FCFA of revenues from income tax on SMEs (“IGS”) transferred by Treasury to municipalities in a given year.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="10.35">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Billion FCFA of revenues from income tax on SMEs (“IGS”) transferred by Treasury to municipalities in a given year.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of ministries included in the climate-sensitive document annexed to the budget bill.
</narrative></title>
<baseline year="2024" iso-date="2024-12-02" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-02" />
<period-end iso-date="2028-12-02" />
<target value="47">
<comment><narrative>
As for 2026, 18 line ministries included in the climate-sensitive document annexed to the budget bill.
</narrative></comment>
</target>
<actual value="18">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of ministries included in the climate-sensitive document annexed to the budget bill.
</narrative></title>
<baseline year="2024" iso-date="2024-12-02" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-02" />
<period-end iso-date="2028-12-02" />
<target value="47">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New tax revenues collected for and transferred to municipalities (in FCFA billion)
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2027-12-13" />
<target value="60">
<comment><narrative>
Against a target of 10 billion at the end of 2025. 2025 target met.
</narrative></comment>
</target>
<actual value="10.35">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New tax revenues collected for and transferred to municipalities (in FCFA billion)
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2027-12-13" />
<target value="60">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of contract data relating to public procurement published online following the Open Contacting Data Standard
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of contract data relating to public procurement published online following the Open Contacting Data Standard
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of contracts processed through COLEPS for selected Ministries
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of contracts processed through COLEPS for selected Ministries
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of contracts processed through COLEPS for selected Ministries
</narrative></title>
<baseline year="2024" iso-date="2024-09-27" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-27" />
<period-end iso-date="2028-11-27" />
<target value="70">
<comment><narrative>
No result expected in 2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of contracts processed through COLEPS for selected Ministries
</narrative></title>
<baseline year="2024" iso-date="2024-09-27" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-27" />
<period-end iso-date="2028-11-27" />
<target value="70">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Billion FCFA in public funds kept in commercial banks, in a given year
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="598"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="200">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Billion FCFA in public funds kept in commercial banks, in a given year
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="598"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="200">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Billion FCFA in public funds kept in commercial banks, in a given year
</narrative></title>
<baseline year="2023" iso-date="2023-12-14" value="200"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-14" />
<period-end iso-date="2028-12-14" />
<target value="40">
<comment><narrative>
DLR 5.2 Billion FCFA in public funds kept in commercial banks. 
The indicator depends on the implementing effectiveness of the TSA, which in turn relies on a regional platform being developed by BEAC for all CEMAC countries. Deadlines have been repeatedly postponed, with a new target set for July 2026
</narrative></comment>
</target>
<actual value="200">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Billion FCFA in public funds kept in commercial banks, in a given year
</narrative></title>
<baseline year="2023" iso-date="2023-12-14" value="200"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-14" />
<period-end iso-date="2028-12-14" />
<target value="40">

</target>
<actual value="200">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public Health facilities that comply with PFM guidelines and transparency indicators
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="1.6">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public Health facilities that comply with PFM guidelines and transparency indicators
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Billion FCFA in actual gender-responsive expenditure reflecting execution of the Gender-responsive budgeting in the health sector, in a given year
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="48.63">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Billion FCFA in actual gender-responsive expenditure reflecting execution of the Gender-responsive budgeting in the health sector, in a given year
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Billion FCFA in actual gender-responsive expenditure reflecting execution of the Gender-responsive budgeting in the health sector, in a given year
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2028-12-10" />
<target value="X+25">
<comment><narrative>
This is significantly above the December 2028 target of 25 billion. The baseline appears questionable, and adjustments may need to be considered.
</narrative></comment>
</target>
<actual value="48.63">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Billion FCFA in actual gender-responsive expenditure reflecting execution of the Gender-responsive budgeting in the health sector, in a given year
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2028-12-10" />
<target value="X+25">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Billion FCFA in CAMWATER's revenues, in a given year, in areas where smart meters are installed.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="None in 2025. The procurement of smart meters is still ongoing.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Billion FCFA in CAMWATER's revenues, in a given year, in areas where smart meters are installed.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Billion FCFA in CAMWATER's revenues, in a given year, in areas where smart meters are installed.
</narrative></title>
<baseline year="2024" iso-date="2024-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-14" />
<period-end iso-date="2028-12-14" />
<target value="1.2">
<comment><narrative>
The procurement of smart meters is still ongoing. No smart meters  expected to be installed before October  2026
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Billion FCFA in CAMWATER's revenues, in a given year, in areas where smart meters are installed.
</narrative></title>
<baseline year="2024" iso-date="2024-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-14" />
<period-end iso-date="2028-12-14" />
<target value="1.2">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Billion FCFA of revenues from income tax on SMEs (“IGS”) transferred by Treasury to municipalities in a given year.
</narrative></title>
<baseline year="2024" iso-date="2024-12-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-10" />
<period-end iso-date="2027-12-10" />
<target value="60">
<comment><narrative>
Since April 2026, the amounts collected are automatically transferred to the municipalities.
</narrative></comment>
</target>
<actual value="10.35">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Billion FCFA of revenues from income tax on SMEs (“IGS”) transferred by Treasury to municipalities in a given year.
</narrative></title>
<baseline year="2024" iso-date="2024-12-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-10" />
<period-end iso-date="2027-12-10" />
<target value="60">
<comment><narrative>
As the government;s books of accoutns have not yet fully closed, DGI is unable to determine how much IGS revenue has been collected and transferred. DGI gave us assurance that the IGS is in force since Jan. 2025 and the amounts colected are automatically transferred to the municipalities.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of contract data relating to public procurement published online following the Open Contacting Data Standard
</narrative></title>
<baseline year="2024" iso-date="2024-06-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-10" />
<period-end iso-date="2028-12-10" />
<target value="80">
<comment><narrative>
No result expected in 2025
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of contract data relating to public procurement published online following the Open Contacting Data Standard
</narrative></title>
<baseline year="2024" iso-date="2024-06-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-10" />
<period-end iso-date="2028-12-10" />
<target value="80">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of newly approved investment projects across  five selected sectors in a given year, have adopted the  new methodology for prefeasibility and feasibility studies, incorporating climate c
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="None in 2025. The methodology was developed and adopted in 2026">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of newly approved investment projects across  five selected sectors in a given year, have adopted the  new methodology for prefeasibility and feasibility studies, incorporating climate c
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Each of the 15 largest SOEs has published in a given year its audited financial statements online within six months after the fiscal year end
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="None of the 15 SOEs published their audit financial statement reports related to accounts closed in December 2024 by June 30, 2025. Audited financial statements for the period ended December 31, 2025 are due to be published by June 30, 2026. The results will be known starting July 1, 2026.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Each of the 15 largest SOEs has published in a given year its audited financial statements online within six months after the fiscal year end
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Each of the 15 largest SOEs has published in a given year its audited financial statements online within six months after the fiscal year end
</narrative></title>
<baseline year="2024" iso-date="2024-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-14" />
<period-end iso-date="2028-06-14" />
<target value="15">
<comment><narrative>
None of the 15 SOEs published their audit financial statement reports related to accounts closed in December 2024 by June 30, 2025.
Audited financial statements for the period ended December 31, 2025 are due to be published by June 30, 2026. The results will be known starting July 1, 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Each of the 15 largest SOEs has published in a given year its audited financial statements online within six months after the fiscal year end
</narrative></title>
<baseline year="2024" iso-date="2024-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-14" />
<period-end iso-date="2028-06-14" />
<target value="15">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of newly approved investment projects across  five selected sectors in a given year, have adopted the  new methodology for prefeasibility and feasibility studies, incorporating climate c
</narrative></title>
<baseline year="2024" iso-date="2024-05-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-14" />
<period-end iso-date="2028-12-14" />
<target value="80">
<comment><narrative>
The methodology was developed and approved in 2026. It will be rolled out for the approval of the investment projects by July 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of newly approved investment projects across  five selected sectors in a given year, have adopted the  new methodology for prefeasibility and feasibility studies, incorporating climate c
</narrative></title>
<baseline year="2024" iso-date="2024-05-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-14" />
<period-end iso-date="2028-12-14" />
<target value="80">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of taxpayers with pre-filled property tax and PIT returns in a given year
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="14.83">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of taxpayers with pre-filled property tax and PIT returns in a given year
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of taxpayers with pre-filled property tax and PIT returns in a given year
</narrative></title>
<baseline year="2024" iso-date="2024-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-14" />
<period-end iso-date="2028-12-14" />
<target value="40">
<comment><narrative>
Annual target achieved.
</narrative></comment>
</target>
<actual value="59.73">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of taxpayers with pre-filled property tax and PIT returns in a given year
</narrative></title>
<baseline year="2024" iso-date="2024-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-14" />
<period-end iso-date="2028-12-14" />
<target value="40">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of large and medium-sized enterprises active taxpayers filing though e-filing (e-billing) system in a given fiscal year
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="14.83">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of large and medium-sized enterprises active taxpayers filing though e-filing (e-billing) system in a given fiscal year
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of large and medium-sized enterprises active taxpayers filing though e-filing (e-billing) system in a given fiscal year
</narrative></title>
<baseline year="2024" iso-date="2024-10-14" value="2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-10-14" />
<period-end iso-date="2028-12-14" />
<target value="70">
<comment><narrative>
Annual target achieved.
</narrative></comment>
</target>
<actual value="14.83">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of large and medium-sized enterprises active taxpayers filing though e-filing (e-billing) system in a given fiscal year
</narrative></title>
<baseline year="2024" iso-date="2024-10-14" value="2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-10-14" />
<period-end iso-date="2028-12-14" />
<target value="70">

</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of risk-based taxpayer audits
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="35"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="The software for automatic risk-based selection of taxpayers was only developed in 2026">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of risk-based taxpayer audits
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="35"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of risk-based taxpayer audits
</narrative></title>
<baseline year="2024" iso-date="2024-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-15" />
<period-end iso-date="2028-12-08" />
<target value="75">
<comment><narrative>
The software for automatic risk-based taxpayer selection was not developed in 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of risk-based taxpayer audits
</narrative></title>
<baseline year="2024" iso-date="2024-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-15" />
<period-end iso-date="2028-12-08" />
<target value="75">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of revenues collected from VAT as a ratio of non-oil GDP, in a given year.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="4.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Will be known in July 2026">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of revenues collected from VAT as a ratio of non-oil GDP, in a given year.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="4.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="4.3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of revenues collected from VAT as a ratio of non-oil GDP, in a given year.
</narrative></title>
<baseline year="2024" iso-date="2024-05-14" value="4.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-14" />
<period-end iso-date="2028-12-14" />
<target value="6.0">
<comment><narrative>
As the government's books of accounts have not yet been fully finalized, the final figure will be known in early July 2026, when the Treasury trial balance as of June 30, 2026, will be issued.
</narrative></comment>
</target>
<actual value="4.3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of revenues collected from VAT as a ratio of non-oil GDP, in a given year.
</narrative></title>
<baseline year="2024" iso-date="2024-05-14" value="4.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-14" />
<period-end iso-date="2028-12-14" />
<target value="6.0">

</target>
<actual value="4.3">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of health facilities that meet performance and transparency targets
</narrative></title>
<baseline year="2024" iso-date="2024-06-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-12" />
<period-end iso-date="2028-12-12" />
<target value="64">
<comment><narrative>
Annual target not met. One Disbursement-Linked sub indicator out of 4 was partially reported by the IVA as achieved. MINSANTE has challenged some results and has been working to propose revised data by June 30, 2026.
</narrative></comment>
</target>
<actual value="1.6">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of health facilities that meet performance and transparency targets
</narrative></title>
<baseline year="2024" iso-date="2024-06-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-12" />
<period-end iso-date="2028-12-12" />
<target value="64">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of active taxpayers (businesses)
</narrative></title>
<baseline year="2024" iso-date="2024-11-06" value="47313"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-06" />
<period-end iso-date="2028-12-08" />
<target value="70000">
<comment><narrative>
Data as of December 31, 2025 are still being processed. The final figure will be known in July 2026.
</narrative></comment>
</target>
<actual value="47313">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of active taxpayers (businesses)
</narrative></title>
<baseline year="2024" iso-date="2024-11-06" value="47313"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-06" />
<period-end iso-date="2028-12-08" />
<target value="70000">

</target>
<actual value="47313">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of active taxpayers (individuals)
</narrative></title>
<baseline year="2024" iso-date="2024-11-06" value="500"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-06" />
<period-end iso-date="2028-12-08" />
<target value="3000">
<comment><narrative>
Data as of December 31, 2025 are still being processed. The final figure will be known in July 2026.
</narrative></comment>
</target>
<actual value="500">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of active taxpayers (individuals)
</narrative></title>
<baseline year="2024" iso-date="2024-11-06" value="500"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-06" />
<period-end iso-date="2028-12-08" />
<target value="3000">

</target>
<actual value="500">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Monitoring of SOEs (PEFA Indicator 10.1)
</narrative></title>
<baseline year="2023" iso-date="2023-08-30" value="C"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-08-30" />
<period-end iso-date="2028-12-09" />
<target value="B+">
<comment><narrative>
The assessment of this indicator will coincide with the upcoming PEFA. Alternatively, a self-assessment will be conducted by 2027. Therefore, the baseline's score remained unchanged.
</narrative></comment>
</target>
<actual value="C">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Monitoring of SOEs (PEFA Indicator 10.1)
</narrative></title>
<baseline year="2023" iso-date="2023-08-30" value="C"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-08-30" />
<period-end iso-date="2028-12-09" />
<target value="B+">

</target>
<actual value="C">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Non-oil domestic revenue as a percentage of non-oil GDP
</narrative></title>
<baseline year="2024" iso-date="2024-12-12" value="13"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-12" />
<period-end iso-date="2028-12-12" />
<target value="14.5">
<comment><narrative>
The 2025 estimated value, based on interim financial statements, confirms that the indicator is on track. The final figure will be known in early July 2026
</narrative></comment>
</target>
<actual value="13">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Non-oil domestic revenue as a percentage of non-oil GDP
</narrative></title>
<baseline year="2024" iso-date="2024-12-12" value="13"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-12" />
<period-end iso-date="2028-12-12" />
<target value="14.5">

</target>
<actual value="13">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of health facilities that meet performance and transparency targets
</narrative></title>
<baseline year="2024" iso-date="2024-06-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-12" />
<period-end iso-date="2028-12-12" />
<target value="64">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Each of the 15 largest SOEs has published in a given year its audited financial statements online within six months after the fiscal year end
</narrative></title>
<baseline year="2024" iso-date="2024-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-14" />
<period-end iso-date="2028-06-14" />
<target value="15">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of revenues collected from VAT as a ratio of non-oil GDP, in a given year.
</narrative></title>
<baseline year="2024" iso-date="2024-05-14" value="4.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-14" />
<period-end iso-date="2028-12-14" />
<target value="6.0">

</target>
<actual value="4.3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Billion FCFA in actual gender-responsive expenditure reflecting execution of the Gender-responsive budgeting in the health sector, in a given year
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2028-12-10" />
<target value="X+25">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P143801</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Cameroon - Multimodal Transport Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The project development objective is to increase multimodal transport efficiency and effectiveness along the Yaounde–Kousseri Corridor.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0012749"><narrative>Republic of Cameroon</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0012749"><narrative>Republic of Cameroon</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="CM-COA-0012748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2013-08-30"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2014-05-27"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2023-05-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2023-05-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Papa Mamadou Fall</narrative></person-name><telephone>+1-202-473-1000</telephone><email>pfall@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002220957" />
            <name><narrative>YaoundE</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.8666699 11.51667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002224827" />
            <name><narrative>NgaoundErE</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.3276501 13.58472</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002225471" />
            <name><narrative>NandEkE</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.46667 14.26667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002228373" />
            <name><narrative>Maroua</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.59095 14.31593</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002229798" />
            <name><narrative>KoussEri</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.07689 15.03063</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002231319" />
            <name><narrative>Garoua Boulaï</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.8833299 14.55</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002231320" />
            <name><narrative>Garoua</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.3014297 13.39771</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002231636" />
            <name><narrative>Figuil</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.7557402 13.9647</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002232593" />
            <name><narrative>Douala</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.0482702 9.7042799</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002233327" />
            <name><narrative>Dabanga</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>11.91793 14.64306</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002235319" />
            <name><narrative>Ayos</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.9000001 12.51667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008299279" />
            <name><narrative>Mbere Department</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.434 14.243</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007910864" />
            <name><narrative>Magada</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.10421 14.18456</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002225991" />
            <name><narrative>Mora</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>11.04611 14.14011</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002234359" />
            <name><narrative>Bertoua</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.57728 13.68459</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002233649" />
            <name><narrative>Boni</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.5500002 13.61667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002228497" />
            <name><narrative>Manjou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.6500001 13.01667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007108017" />
            <name><narrative>Mbe</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.8344302 10.15753</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="21023" percentage="84" xml:lang="en"/><sector vocabulary="1" code="21030" percentage="16" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="80.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TW" percentage="13.0000000" xml:lang="en"><narrative>FY17 - Railways</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TF" percentage="7.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Transportation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000141" percentage="100" xml:lang="en"><narrative>Trade Facilitation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000014" percentage="100" xml:lang="en"><narrative>Trade</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="1900-01-01"/>
<period-end iso-date="1900-01-01"/>
<value currency="USD" value-date="1900-01-01">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">75970.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">265469.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">329724.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">392772.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">452128.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">247364.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">540807.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">616706.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">683801.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">361106.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">750967.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">792289.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">839930.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">874791.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">447584.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">912918.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">941957.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">979374.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">664677.90</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">536050.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">717233.40</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">748261.80</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">775480.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">801873.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">643757.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">857549.70</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">876460.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">880821.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">898630.20</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">707231.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">917357.40</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">912216.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">916439.40</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">712982.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">926307.90</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">930117.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">930989.70</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">936497.70</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">728247.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">946274.40</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">949808.70</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">955775.70</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">959493.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">742731.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">958851.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">963257.40</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">968214.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">748837.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">966791.70</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">970096.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">977302.80</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">977807.70</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">753523.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">969958.80</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">961559.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">960182.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">963257.40</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">747985.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">969637.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">971886.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">973906.20</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">754659.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="1900-01-01"/>
<period-end iso-date="1900-01-01"/>
<value currency="USD" value-date="1900-01-01">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">75970.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">265469.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">329724.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">392772.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">452128.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">247364.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">540807.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">616706.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">683801.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">361106.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">750967.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">792289.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">839930.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">874791.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">447584.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">912918.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">941957.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">979374.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">664677.90</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">536050.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">717233.40</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">748261.80</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">775480.50</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">801873.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">643757.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">857549.70</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">876460.50</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">880821.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">898630.20</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">707231.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">917357.40</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">912216.60</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">916439.40</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">712982.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">926307.90</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">930117.60</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">930989.70</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">936497.70</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">728247.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">946274.40</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">949808.70</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">955775.70</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">959493.60</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">742731.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">958851.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">963257.40</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">968214.60</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">748837.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">966791.70</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">970096.50</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">977302.80</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">977807.70</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">753523.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">969958.80</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">961559.10</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">960182.10</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">963257.40</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">747985.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">969637.50</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">971886.60</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">973906.20</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">754659.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">7197204.02</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">7197204.02</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">71000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-41690</value><description xml:lang="en"><narrative>Total Commitment Cancellations in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">8427440</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">7918179</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">10937</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">34163</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">17489</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">8544</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">18313</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">8836</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">266044</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">8429665</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">606303</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">204373</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">218194</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">3065720</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">39227</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">3198290</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">2660966</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">5694320</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">2649444</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">1474878</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">175310</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">1616533</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">198871</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">1234598</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">2505966</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">2384413</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">1560217</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">4753200</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">1979330</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">2334916</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">26726</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-26795</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">119000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-10812</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-55396</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-62134</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-62592</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-60413</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-98750</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-102033</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-99091</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-111266</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-130248</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-129736</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-171684</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-185852</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-232169</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-236223</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-222687</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-231077</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-220985</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-232510</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-220846</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-235097</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-228019</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-226555</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-609915</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-608273</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-22292</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-603305</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-623730</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12748"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P143801"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P143801?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P143801"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share in good and fair condition of the Yaound-Kousseri national road
</narrative></title>
<baseline year="2014" iso-date="2014-06-09" value="62.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-06-09" />
<period-end iso-date="1900-01-01"/>
<target value="87.00">
<comment><narrative>
&lt;p&amp;gt;These are roads judged to be in good or average condition, according to the Ministry of Public Works classification.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="87.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
road rehabilitated
</narrative></title>
<baseline year="2014" iso-date="2014-06-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-06-10" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Target fully achieved.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="61.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average transport prices (per container ton-km between Douala and NDjamena)
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.15"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="0.14">
<comment><narrative>
&lt;p&amp;gt;Target achieved.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.12">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Freight volumes transported along the Douala  Ngaoundere corridor by train per year
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="1900000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="2300000.00">
<comment><narrative>
&lt;p&amp;gt;The target&amp;nbsp; was not achieved due to (i) the oil crisis since 2014, which led to a drop in transport to Chad, (ii) the prolonged security crisis in CAR since 2013, (iii) the serious deterioration of certain sections of the railway between B&amp;eacute;labo and Ngaound&amp;eacute;r&amp;eacute; and between Douala and Yaound&amp;eacute;, (iv) strong competition from road transport.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="1540000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of train slots
</narrative></title>
<baseline year="2014" iso-date="2014-01-02" value="25.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-01-02" />
<period-end iso-date="1900-01-01"/>
<target value="29.00">
<comment><narrative>
&lt;p&amp;gt;Number of train slots remained constant&amp;nbsp; during the project&amp;rsquo;s lifetime for the following exogenous factors: (i) the 2014, oil crisis led to an economic recession in Chad and thus an overall decline in transport to and from Chad, (ii) operational deficiencies causing slowdowns in train speeds leading to a loss of rail competitiveness due to the severe deterioration of the railroad between Belabo and Ngaoundere and between Douala and Yaounde, (iii) the strong competition from road transport&amp;nbsp;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="25.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average transport prices (per container between Douala and NDjamena)
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="6000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="5600.00">
<comment><narrative>
&lt;p&amp;gt;Target achieved&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="5560.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P112635</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>CM-Agricultural Competitiveness Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[Increase the competitiveness of beneficiary producer organizations working on target value chains.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Agricultural Competitiveness Project for Cameroon is to increase the competitiveness of eligible producer organizations working on target value chains. There are four components to the project, the first component being rehabilitating key rural infrastructure. The component will finance the rehabilitation of key rural infrastructure. The component will include two sub-components, the first for the rehabilitation of rural roads, and the second for the rehabilitation of irrigated perimeters. The second component is the economic partnerships. This component will support Producer Organizations (POs) working on target value chains and areas in establishing and implementing investment sub-projects linked to Economic Partnerships (EPs). The component will finance economic projects intended to address production, marketing and/or processing bottlenecks in the target value chains. The third component is the institutional support and capacity development. This component will develop the capacity of actors at different levels and will include three sub-components, targeting: (i) apex producer organizations, (ii) core functions of sectoral public services, and (iii) legal and regulatory framework. Finally, the fourth component is the project coordination, monitoring, and evaluation. This component will support the establishment, equipment and operations of the project coordination team, at both national and regional levels, responsible for project implementation, procurement, financial management, and overall monitoring and evaluation.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0002475"><narrative>REPUBLIC OF CAMEROON</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0002475"><narrative>REPUBLIC OF CAMEROON</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="CM-COA-0002476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2009-05-28"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2009-06-18"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2016-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2016-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Myriam Chaudron</narrative></person-name><telephone>+1-202-473-1000</telephone><email>mchaudron@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002221789" />
            <name><narrative>South Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>2.75 11.58333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002223602" />
            <name><narrative>North-West Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.3666701 10.36667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002223603" />
            <name><narrative>North Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.5 14</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002229336" />
            <name><narrative>Littoral Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.2666702 10.13333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002231755" />
            <name><narrative>Far North Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>11 14.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002233376" />
            <name><narrative>Centre Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.75 11.83333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002236015" />
            <name><narrative>Adamaoua Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.8333302 13.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002222934" />
            <name><narrative>West Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.5 10.66667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="21023" percentage="25" xml:lang="en"/><sector vocabulary="1" code="31110" percentage="25" xml:lang="en"/><sector vocabulary="1" code="31140" percentage="25" xml:lang="en"/><sector vocabulary="1" code="31194" percentage="25" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AI" percentage="15.0000000" xml:lang="en"><narrative>FY17 - Irrigation and Drainage</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AK" percentage="17.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Agriculture, Fishing &amp; Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="23.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AZ" percentage="8.00000000" xml:lang="en"><narrative>FY17 - Other Agriculture, Fishing and Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YA" percentage="37.0000000" xml:lang="en"><narrative>FY17 - Agricultural markets, commercialization and agri-business</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="83" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="18" xml:lang="en"><narrative>Finance for Development</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">566666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">566666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">566666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">566666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">566666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">566666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">566666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">566666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">566666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">566666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">566666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">566666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">738833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">738833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">738833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">738833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">738833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">738833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">738833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">738833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">738833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">738833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">738833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">738833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">772416.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">772416.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">772416.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">772416.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">772416.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">772416.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">772416.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">772416.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">772416.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">772416.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">772416.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">772416.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">750027.78</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">750027.78</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">750027.77</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">750027.78</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">750027.78</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">750027.77</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">750027.78</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">750027.78</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">750027.77</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">750027.78</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">750027.78</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">750027.77</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">566666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">566666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">566666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">566666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">566666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">566666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">566666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">566666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">566666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">566666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">566666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">566666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">738833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">738833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">738833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">738833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">738833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">738833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">738833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">738833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">738833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">738833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">738833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">738833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">772416.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">772416.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">772416.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">772416.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">772416.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">772416.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">772416.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">772416.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">772416.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">772416.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">772416.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">772416.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">750027.78</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">750027.78</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">750027.77</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">750027.78</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">750027.78</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">750027.77</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">750027.78</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">750027.78</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">750027.77</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">750027.78</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">750027.78</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">82992.52</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">82992.52</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2009-06-30"/><value value-date="2009-06-30">60000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">-600327</value><description xml:lang="en"><narrative>Total Commitment Cancellations in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">-23263</value><description xml:lang="en"><narrative>Total Commitment Cancellations in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-02-28"/><value value-date="2010-02-28">665930</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-04-30"/><value value-date="2010-04-30">3672647</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-07-31"/><value value-date="2010-07-31">392920</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-09-30"/><value value-date="2010-09-30">212322</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">250145</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-01-31"/><value value-date="2011-01-31">412469</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">125272</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">238178</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">293728</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-07-31"/><value value-date="2011-07-31">757711</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">594680</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-10-31"/><value value-date="2011-10-31">1101893</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">85</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">463653</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-01-31"/><value value-date="2012-01-31">567853</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">822062</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">788260</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">243183</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">2536654</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">656995</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">1667575</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">243982</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">794892</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">719001</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">675558</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">705040</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">1257020</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">4892305</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">1927204</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">1345427</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">324842</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">2424217</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">1232072</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">1691820</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">1571927</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">1726091</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">2097959</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">2290268</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">2101296</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">718964</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">1418748</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">947718</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">1768280</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">1416903</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">580917</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">508974</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">127719</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">1205117</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">1429305</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">232996</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">581972</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">709940</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">294083</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">760653</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">462203</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">1335881</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-480766</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">1658885</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">87313</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">-27672</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">111792</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">14439</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">172494</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">-839163</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">103785</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-53839</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">206569</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">926</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-23263</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-09-30"/><value value-date="2010-09-30">-14606</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">-20453</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">-24096</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">-34199</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">-49851</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">-66941</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">-102245</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">-129846</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-151613</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-160594</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-197804</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-197075</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-208381</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-201171</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-212741</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-215975</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-207648</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-207678</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-202896</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-196399</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-217249</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-193049</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-208446</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-191649</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-189510</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-187564</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-164152</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-194832</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-174307</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-184212</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-177737</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-176493</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-549543</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-543383</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-560424</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-564576</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-563093</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-549037</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-509493</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-535841</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-525414</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-528159</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-529785</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-528358</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-18834</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-524569</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-541785</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2476"><narrative>Ministry of Economy, Planning and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P112635"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P112635?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P112635"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
POs engaged in economic partnerships
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2016-12-30" />
<target value="1000.00">

</target>
<actual value="1555.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sub-projects presented
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2016-12-30" />
<target value="2000.00">

</target>
<actual value="1250.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
POs in targeted areas satisfed with support services received from apex organizations
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2016-12-30" />
<target value="80.00">

</target>
<actual value="39.40">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
POs managed effectively (hold regular meeting, record their decision, open and manage a bank account and have regularly elected officials)
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2016-12-30" />
<target value="80.00">

</target>
<actual value="89.76">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
POs adopting business plans
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2016-12-30" />
<target value="70.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sub-projects approved
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2016-12-30" />
<target value="1000.00">

</target>
<actual value="1138.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Unqualified technical and safeguards audits
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2016-12-30" />
<target value="70.00">

</target>
<actual value="91.50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
POs receiving support services through apex organizations
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2016-12-30" />
<target value="500.00">

</target>
<actual value="267.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in average rice yields in the rehabilitated irrigated areas (tons/ha)
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="5.20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2016-12-30" />
<target value="6.10">

</target>
<actual value="6.90">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the value of sales from Producer Organizations supported by the Proejct
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2016-12-30" />
<target value="20.00">

</target>
<actual value="69.28">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehabilitated, Rural
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2016-12-30" />
<target value="500.00">

</target>
<actual value="230.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Sub-projects profitable (positive gross profit) 1 year after completion
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2016-12-30" />
<target value="80.00">

</target>
<actual value="94.70">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Incremental volume of annual certified seeds produced (tons)
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2016-12-30" />
<target value="500.00">

</target>
<actual value="1500.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in transportation time to closest market
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2016-12-30" />
<target value="20.00">

</target>
<actual value="20.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction of post-harvest losses from supported POs with access to the new transport infrastructures
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2016-12-30" />
<target value="20.00">

</target>
<actual value="30.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P156210</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Cameroon: Inclusive and Resilient Cities Development Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The PDO is to improve urban management and access to infrastructure in selected urban areas, particularly for poor neighborhoods, and increase resilience to natural hazards and other eligible crises.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Inclusive and Resilient Cities Development Project for Cameroon is to improve urban management and access to infrastructure in selected urban areas, particularly for poor neighborhoods, and increase resilience to natural hazards and other eligible crises. There are four components to the project, the first component being strengthening capacity for inclusive and resilient urban management. This component will finance the provision of TA to relevant national and local level Government institutions to strengthen their capacity to develop and implement inclusive and resilient urban development strategies and programs and improve urban management8 through two sub-components: support to CTDs for inclusive and resilient urban management; and support to national Government to improve urban planning tools and land management for more inclusive and resilient cities. The second component is the improving connectivity and living environment in beneficiary cities. This component will finance a range of investments to improve connectivity and integration of poor neighborhoods within the beneficiary cities, access to infrastructure and basic services in targeted neighborhoods, and the broader living environment of beneficiary cities. The technical designs for the works will integrate climate change and disaster risk management considerations. The third component is the Contingent Emergency Response (CER). This component is included in accordance with OP/BP 10.00 (Investment Project Financing), paragraphs 12 and 13, for contingent emergency response through the provision of immediate response to an Eligible Crisis or Emergency, as needed. It will allow the GoC to request the World Bank for rapid reallocation of project funds to respond promptly and effectively to an eligible emergency or crisis, that is a natural or man-made disaster or crisis that has caused or is likely to imminently cause a major adverse economic and/or social impact. An operations manual for this component will be developed. Finally, the fourth component is the project management, coordination, monitoring and evaluation.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0025636"><narrative>Republic of Cameroon</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0025636"><narrative>Republic of Cameroon</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0025636"><narrative>Republic of Cameroon</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="CM-COA-0025637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2017-04-20"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2017-08-22"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2025-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2025-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Hazem Abdelfattah</narrative></person-name><telephone>+1-202-473-1000</telephone><email>habdelfattah@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002220957" />
            <name><narrative>Yaounde</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.86667 11.51667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002224827" />
            <name><narrative>Ngaoundere</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.32765 13.58472</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002228373" />
            <name><narrative>Maroua</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.59095 14.31593</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002229752" />
            <name><narrative>Kumba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.6363 9.4469</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002229798" />
            <name><narrative>Kousseri</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.07689 15.03063</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002232594" />
            <name><narrative>Douala</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.75528 9.94472</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002234663" />
            <name><narrative>Batouri</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.43333 14.36667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="21023" percentage="63" xml:lang="en"/><sector vocabulary="1" code="43032" percentage="27" xml:lang="en"/><sector vocabulary="1" code="14020" percentage="10" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TC" percentage="61.0000000" xml:lang="en"><narrative>FY17 - Urban Transport</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WA" percentage="8.00000000" xml:lang="en"><narrative>FY17 - Sanitation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="31.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="13" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="12" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="10" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000712" percentage="50" xml:lang="en"><narrative>Services and Housing for the Poor</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="0" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="12" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="13" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="94" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000712" percentage="50" xml:lang="en"><narrative>Services and Housing for the Poor</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="16" xml:lang="en"><narrative>Climate change</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">303030.30</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">303030.30</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">303030.30</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">454545.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">454545.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">454545.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">454545.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">454545.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">454545.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">454545.47</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">454545.47</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">454545.46</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">2666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">2666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">2666666.65</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">303030.30</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">16457037.82</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">16457037.82</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">160000000</value><description xml:lang="en"><narrative>Total Commitment in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">2004725</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">1756279</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">3566030</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">18563007</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">141923</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">122956</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">16814318</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">92484</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">230400</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">632407</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">357777</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">326154</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">6709291</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">582647</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">1114890</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">240041</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">300548</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">76333</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">69241</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">116457</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">204610</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">615766</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">22465256</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">932064</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">258416</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">306567</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">643166</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">8925386</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">354519</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">6237560</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">3105110</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">10428274</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">2004140</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">6215783</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">12972773</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">487416</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">1776593</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">3166697</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">3047358</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">979338</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">8044111</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-3445850</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-6164</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-25885</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-29323</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-30074</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-97899</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-173988</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-159124</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-337627</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-349673</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-340332</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-524042</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-533361</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-784861</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-958953</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-2518427</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-2574465</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-2527845</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-2605663</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-2554451</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-2786963</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-2732220</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-25637"><narrative>Ministry of Urban Development and Housing (MINHDU)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P156210"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P156210?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P156210"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sector land use plans developed and validated under the project
</narrative></title>
<baseline year="2017" iso-date="2017-04-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-04-14" />
<period-end iso-date="2025-06-14" />
<target value="5.00">

</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cities for which the urban database is updated regularly
</narrative></title>
<baseline year="2017" iso-date="2017-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-04-30" />
<period-end iso-date="2025-06-30" />
<target value="4.00">

</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with water, sanitation, and hygiene
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2025-06-13" />
<target value="0">
<comment><narrative>
Not reported by project closing.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Functional Neighborhood Development Committees where elected positions are occupied by at least (a) 30 % women and (b) 20% youth (number)
</narrative></title>
<baseline year="2017" iso-date="2017-04-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-04-28" />
<period-end iso-date="2025-06-28" />
<target value="15.00">
<comment><narrative>
This indicator measures the involvement of women and youth in local decision-making reflected by the share of elected posts of neighborhood development committees which are occupied by women and youth.
</narrative></comment>
</target>
<actual value="17.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries that feel project investments reflected their needs (percentage, disaggregated by gender)
</narrative></title>
<baseline year="2017" iso-date="2017-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-04-30" />
<period-end iso-date="2025-06-30" />
<target value="80.00">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with improved urban living conditions
</narrative></title>
<baseline year="2017" iso-date="2017-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-04-30" />
<period-end iso-date="2025-06-30" />
<target value="651400.00">

</target>
<actual value="773078">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered related to delivery of project benefits that are actually addressed
</narrative></title>
<baseline year="2017" iso-date="2017-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-04-30" />
<period-end iso-date="2025-06-30" />
<target value="100.00">
<comment><narrative>
At project closing, the grievance redress mechanism registered a resolution rate of 90.4% for complaints related to the delivery of project benefits, falling short of the 100% target. Most unresolved grievances were linked to complex issues surrounding resettlement and compensation for trunk infrastructure works.
</narrative></comment>
</target>
<actual value="90.24">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cities with improved livability, sustainability, and/or management
</narrative></title>
<baseline year="2017" iso-date="2017-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-04-30" />
<period-end iso-date="2025-06-30" />
<target value="7.00">

</target>
<actual value="7.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CTDs that publish semi-annually the progress achieved on commitments made in their city contracts
</narrative></title>
<baseline year="2017" iso-date="2017-04-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-04-28" />
<period-end iso-date="2025-06-28" />
<target value="13.00">
<comment><narrative>
The number of CTDs (CUs, Cas, and urban communes) that make publicly available every six months their progress in achieving the various performance indicators included in their City contracts
</narrative></comment>
</target>
<actual value="13.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area protected from a flodding event with a 10-year return period (ha)
</narrative></title>
<baseline year="2017" iso-date="2017-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-04-30" />
<period-end iso-date="2025-06-30" />
<target value="280.00">
<comment><narrative>
The cumulative urban area that has been protected from a flooding event with a 10-year return period owing to the construction and rehabilitation of storm water drainage
</narrative></comment>
</target>
<actual value="364.12">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Drainage constructed or rehabilitated
</narrative></title>
<baseline year="2017" iso-date="2017-04-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-04-28" />
<period-end iso-date="2025-06-28" />
<target value="57.30">
<comment><narrative>
The cumulative length of the storm water drainage systems built or rehabilitated under the project, thereby contributing to improvements in flood control.
</narrative></comment>
</target>
<actual value="73.43">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries that feel project investments reflected their needs (percentage, disaggregated by gender)
</narrative></title>
<baseline year="2017" iso-date="2017-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-04-30" />
<period-end iso-date="2025-06-30" />
<target value="80.00">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cities with improved livability, sustainability, and/or management
</narrative></title>
<baseline year="2017" iso-date="2017-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-04-30" />
<period-end iso-date="2025-06-30" />
<target value="7.00">

</target>
<actual value="7.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area protected from a flodding event with a 10-year return period (ha)
</narrative></title>
<baseline year="2017" iso-date="2017-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-04-30" />
<period-end iso-date="2025-06-30" />
<target value="280.00">
<comment><narrative>
The cumulative urban area that has been protected from a flooding event with a 10-year return period owing to the construction and rehabilitation of storm water drainage
</narrative></comment>
</target>
<actual value="364.12">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with improved urban living conditions
</narrative></title>
<baseline year="2017" iso-date="2017-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-04-30" />
<period-end iso-date="2025-06-30" />
<target value="651400.00">

</target>
<actual value="773078">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CTDs that achieve annual targets for the execution of the priority maintenance programs (PMP) (included in their city contracts)
</narrative></title>
<baseline year="2017" iso-date="2017-04-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-04-28" />
<period-end iso-date="2025-06-28" />
<target value="9.00">
<comment><narrative>
The number of CTDs (CUs, CAs, and urban communes) that achieve satisfactory annual execution rates of their priority maintenance programs. The annual targets for execution rates are defined in their City Contracts
</narrative></comment>
</target>
<actual value="9.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Pedestrian paths built
</narrative></title>
<baseline year="2017" iso-date="2017-04-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-04-28" />
<period-end iso-date="2025-06-28" />
<target value="78.00">
<comment><narrative>
Cumulative length of pedestrian lanes built or rehabilitated under the project, including those along the urban trunk roads
</narrative></comment>
</target>
<actual value="94.81">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Youth-led initiatives supported by the project, of which 40% led by women
</narrative></title>
<baseline year="2017" iso-date="2017-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-04-30" />
<period-end iso-date="2025-06-30" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sludge deposed in the treatment plan in Ngombe (daily volume, m3 and % of capacity)
</narrative></title>
<baseline year="2017" iso-date="2017-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-04-30" />
<period-end iso-date="2025-06-30" />
<target value="350.00">
<comment><narrative>
The target was not met at closing because the plant was not fully operational.
</narrative></comment>
</target>
<actual value="192">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Unplanned settlement area for which the defined upgrading plans have been implemented
</narrative></title>
<baseline year="2017" iso-date="2017-04-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-04-28" />
<period-end iso-date="2025-06-28" />
<target value="800.00">
<comment><narrative>
The total area covered by neighborhood upgrading activities in the participating cities
</narrative></comment>
</target>
<actual value="800.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads constructed or rehabilitated
</narrative></title>
<baseline year="2017" iso-date="2017-04-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-04-28" />
<period-end iso-date="2025-06-28" />
<target value="33.00">
<comment><narrative>
The cumulative length of all urban roads (with associated facilities including drainage and sidewalks) built or rehabilitated under the project and contributing to improvement on urban accessibility
</narrative></comment>
</target>
<actual value="42.45">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries that feel project investments reflected their needs (percentage, disaggregated by gender)
</narrative></title>
<baseline year="2017" iso-date="2017-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-04-30" />
<period-end iso-date="2025-06-30" />
<target value="80.00">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cities with improved livability, sustainability, and/or management
</narrative></title>
<baseline year="2017" iso-date="2017-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-04-30" />
<period-end iso-date="2025-06-30" />
<target value="7.00">

</target>
<actual value="7.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area protected from a flodding event with a 10-year return period (ha)
</narrative></title>
<baseline year="2017" iso-date="2017-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-04-30" />
<period-end iso-date="2025-06-30" />
<target value="280.00">
<comment><narrative>
The cumulative urban area that has been protected from a flooding event with a 10-year return period owing to the construction and rehabilitation of storm water drainage
</narrative></comment>
</target>
<actual value="364.12">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with improved urban living conditions
</narrative></title>
<baseline year="2017" iso-date="2017-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-04-30" />
<period-end iso-date="2025-06-30" />
<target value="651400.00">

</target>
<actual value="773078">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2025-06-11" />
<target value="0">
<comment><narrative>
Not reported by project closing.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P175249</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Cameroon First Fiscal, Inclusive and Sustainable Growth DPF</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The development objective is to: (i) improve fiscal sustainability, governance, and public sector management; (ii) strengthen human capital, and women's economic empowerment; and (iii) lay the foundations for sustainable infrastructure development.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[Cameroon's development agenda is articulated in its Vision 2035, which targets the country's transformation into an emerging economy by 2035. Vision 2035 focuses on alleviating poverty, accelerating industrialization, and consolidating democracy and national unity while respecting the country's diversity. To operationalize the vision, Cameroon adopted the SND30, its SND in November 2020. The SND30 aims to create favorable conditions for economic growth, improve the living conditions of the population as well as their access to basic social services, strengthen adaptation to climate change, and improve governance. To achieve these objectives, the SND30 is organized around four main pillars: (i) structural transformation of the economy; (ii) human capital development; (iii) job creation and economic inclusion; and (iv) governance, decentralization, and strategic management of the State. Under Pillars 2 and 3, the SND30 also puts greater emphasis on the need for social inclusion including by accelerating decentralization to building Cameroon's resilience. As Cameroon continues to navigate multiple overlapping crises, maintaining its long-term goals for sustainable, resilient, and inclusive development is critical. 
]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0047359"><narrative>Republic of Cameroon</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="CM-COA-0047358"><narrative>Ministry of Finance</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2021-10-14"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2022-12-19"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2023-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2023-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Amina Coulibaly</narrative></person-name><telephone>+1-202-473-1000</telephone><email>acoulibaly4@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2220957" />
                <name><narrative>Yaounde</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>3.86667 11.51667</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="15185" percentage="22" xml:lang="en"/><sector vocabulary="1" code="11220" percentage="17" xml:lang="en"/><sector vocabulary="1" code="15155" percentage="11" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="11" xml:lang="en"/><sector vocabulary="1" code="24010" percentage="11" xml:lang="en"/><sector vocabulary="1" code="31140" percentage="11" xml:lang="en"/><sector vocabulary="1" code="11322" percentage="6" xml:lang="en"/><sector vocabulary="1" code="21023" percentage="6" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="4" xml:lang="en"/><sector vocabulary="1" code="21024" percentage="1" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AI" percentage="11.0000000" xml:lang="en"><narrative>FY17 - Irrigation and Drainage</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="ES" percentage="6.00000000" xml:lang="en"><narrative>FY17 - Secondary Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="11.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="11.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EP" percentage="17.0000000" xml:lang="en"><narrative>FY17 - Primary Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FA" percentage="11.0000000" xml:lang="en"><narrative>FY17 - Banking Institutions</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="11.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="22.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="11" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="11" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="11" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000714" percentage="11" xml:lang="en"><narrative>Urban Planning</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000521" percentage="11" xml:lang="en"><narrative>Social Safety Nets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="11" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000074" percentage="11" xml:lang="en"><narrative>Road Safety</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="9" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="22" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000651" percentage="22" xml:lang="en"><narrative>Access to Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000712" percentage="11" xml:lang="en"><narrative>Services and Housing for the Poor</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="11" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000523" percentage="11" xml:lang="en"><narrative>Social protection delivery systems</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="11" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000713" percentage="11" xml:lang="en"><narrative>Public Transport</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="10" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000652" percentage="11" xml:lang="en"><narrative>Education Financing</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000114" percentage="11" xml:lang="en"><narrative>Tax policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000111" percentage="11" xml:lang="en"><narrative>Fiscal sustainability</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="22" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="11" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000111" percentage="11" xml:lang="en"><narrative>Fiscal sustainability</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000011" percentage="22" xml:lang="en"><narrative>Fiscal Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000652" percentage="11" xml:lang="en"><narrative>Education Financing</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="10" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="11" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000067" percentage="11" xml:lang="en"><narrative>Nutrition and Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000656" percentage="11" xml:lang="en"><narrative>Education Governance, School-Based Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="4" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="22" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000412" percentage="11" xml:lang="en"><narrative>Domestic Revenue Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000712" percentage="11" xml:lang="en"><narrative>Services and Housing for the Poor</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="11" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">100000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">100000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">100000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-47358"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">107124660</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-47358"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P175249"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P175249?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P175249"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P104525</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Cameroon Health Sector Support Investment (SWAP)</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To increase utilization and improve the quality of health services with a particular focus on child and maternal health and communicable diseases.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Health Sector Support Investment Project for Cameroon is to increase utilization and improve the quality of health services with a particular focus on child and maternal health and communicable diseases. There are two components to the project. The first component is the district service delivery. It will address three critical impediments confronting the delivery of services at the district level: (i) scarcity of funds to meet operating expenses will be addressed by channeling financial resources to districts for operating resources to meet the day-to-day requirements of a district health system (e.g., supervision, community outreach, recruitment of contractual staff, bonus payments, consumables); (ii) lack of focus on achievement of results and lack of accountability mechanisms of the district health system will be addressed by pilot testing a few different approaches to performance-based contracting, including contracting of districts, Non-Governmental Organizations (NGOs), and health facilities; and (iii) modest managerial capacity at district level will be addressed by also pilot testing alternative approaches to strengthening district management, such as competitively recruiting private sector individuals. It will support the financing of performance based contracts (including financing of operating costs, goods, and technical assistance) between the provincial health funds and district health committees, NGOs or health facilities, contribute to the operating costs of the special funds for health promotion, and finance the procurement of required drugs, reagents and commodities to be done at the national level. The second component is the institutional strengthening. It will include technical and financial support to strengthen two key normative functions of the Ministry of Health at the national, provincial, and district levels. Support will be provided in two main areas: (a) contract design and management, including setting up the institutional framework and systems and building capacity to prepare, negotiate, and manage contracts; and (b) putting in place a unified information system to generate up to date, reliable, financial and programmatic data.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0001630"><narrative>Ministry of Economy, Planning and Regional Development</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="CM-COA-0001629"><narrative>Ministry of Public Health</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2008-03-07"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2008-06-24"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2017-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2017-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Ibrahim Magazi</narrative></person-name><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>




<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002223602" />
            <name><narrative> North-West Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.3666701 10.36667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002223603" />
            <name><narrative>North Province</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.5 14</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002231755" />
            <name><narrative>Far North</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>11 14.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002231835" />
            <name><narrative>East</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.8333299 14.16667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002236015" />
            <name><narrative>Adamaoua</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.8333302 13.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002233387" />
            <name><narrative> Republic of Cameroon</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6 12.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002229336" />
            <name><narrative> Littoral Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.2666702 10.13333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002221788" />
            <name><narrative> South-West Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.1999998 9.3000002</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="12110" percentage="46" xml:lang="en"/><sector vocabulary="1" code="12250" percentage="27" xml:lang="en"/><sector vocabulary="1" code="13020" percentage="27" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="60.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000623" percentage="25" xml:lang="en"><narrative>Tuberculosis</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="62" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000637" percentage="24" xml:lang="en"><narrative>Child Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="25" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000621" percentage="13" xml:lang="en"><narrative>HIV/AIDS</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000635" percentage="13" xml:lang="en"><narrative>Reproductive and Maternal Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="62" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="25" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">366666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">366666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">366666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">366666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">366666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">366666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">366666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">366666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">366666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">366666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">366666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">366666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">466666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">466666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">466666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">466666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">466666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">466666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">466666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">466666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">466666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">466666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">466666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">466666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">433333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">433333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">433333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">466666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">466666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">466666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">433333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">433333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">433333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">433333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">366666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">366666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">366666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">233333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">233333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">233333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2008-06-30"/><value value-date="2008-06-30">25000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">20000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">-37903</value><description xml:lang="en"><narrative>Total Commitment Cancellations in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-1718812</value><description xml:lang="en"><narrative>Total Commitment Cancellations in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-04-30"/><value value-date="2008-04-30">13542</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2008</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-07-31"/><value value-date="2008-07-31">86812</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2008</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-10-31"/><value value-date="2008-10-31">34062</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2008</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-07-31"/><value value-date="2009-07-31">351654</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-12-31"/><value value-date="2009-12-31">32105</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-06-30"/><value value-date="2010-06-30">22383</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-01-31"/><value value-date="2011-01-31">213664</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">1076712</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">353712</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-07-31"/><value value-date="2011-07-31">208000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">59892</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">179172</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">1368843</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">296540</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">913558</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">798500</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">204288</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">2143956</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">1982481</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">143669</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">3004289</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">1149650</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">50025</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">4597146</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">338168</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">584630</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">38881</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">2741471</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">45510</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">12117586</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">364383</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">163403</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">1461503</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">3870672</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">496531</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">366654</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">274706</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">-6248</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">-12958973</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">6000368</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">6012137</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">156959</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">595327</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-1113866</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">-199587</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-64441</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-02-28"/><value value-date="2010-02-28">-1477</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-08-31"/><value value-date="2010-08-31">-1521</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-02-28"/><value value-date="2011-02-28">-1542</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-08-31"/><value value-date="2011-08-31">-6813</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">-8644</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">-13711</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">-25058</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">-37756</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">-62813</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">-74695</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">-3300</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">-78196</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">-84733</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">-54172</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">-80831</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">-47557</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">-79948</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">-63190</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">-52284</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">-77324</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">-80599</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">-59799</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-67808</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-83533</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-34</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-1101</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-65828</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-80176</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">-675</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-65543</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-77511</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-75557</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-62331</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-80029</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-62492</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-516</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-77766</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-61669</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-63419</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-77414</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-75039</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-62409</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-72913</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-60680</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-56618</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-65053</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-60605</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-77014</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-58748</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-68824</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-65283</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-57864</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-59701</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-69873</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-56534</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-64449</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-68636</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-60134</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-62728</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-55392</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-1881</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-211901</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">-3007</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-209586</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-209132</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-211707</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-1111</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-214566</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-220610</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-217356</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-210650</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-198831</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-204610</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-203475</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-202020</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-205149</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-157949</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-4178</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-3307</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-150832</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-196023</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-209703</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-161455</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-3266</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-4102</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-156536</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-203453</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1629"><narrative>Ministry of Public Health; PBF Technical Unit</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P104525"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P104525?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P104525"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Health facilities achieving an average score of  75% of the  quality index of services as measured in RBF in the targeted areas
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2017-12-31" />
<target value="60.00">

</target>
<actual value="61.47">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New cases of  TB detected and treated in targeted areas
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2017-12-31" />
<target value="10000.00">

</target>
<actual value="13226.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Tuberculosis treatment success rate in targeted areas
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2017-12-31" />
<target value="80%">

</target>
<actual value="80">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Tracer drugs available in targeted health facilities on the day of the visit (Percentage, Custom)
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Partially Achieved. The indicator is at 60.7% of the target value.
</narrative></comment>
</target>
<actual value="45.49">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Tuberculosis treatment success rate in targeted areas
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2017-12-31" />
<target value="80%">

</target>
<actual value="80.36">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Pregnant women receiving antenatal care during a visit to a health provider (number) (Number, Core)
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Core indicator in PAD. Achieved. The indicator attained 413.5% of the target value
</narrative></comment>
</target>
<actual value="826,912.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Consultations provided to people from the poorest quintile as measured by asset index in targeted areas
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2017-12-31" />
<target value="75000.00">

</target>
<actual value="814517.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health facilities reporting monthly activities using standard report form in targeted areas (Number, Custom)
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Achieved. The indicator is at 100.7% of the target value.
</narrative></comment>
</target>
<actual value="75.5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Consultations provided to people from the poorest quintile as measured by asset index in targeted areas (Percentage, Custom)
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Achieved. The indicator is at 941.1% of the target value. Data reported and verified from national PBF statistics and regional Performance Purchasing Agencies dated December 2016.
</narrative></comment>
</target>
<actual value="705,824.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New acceptors of modern contraceptive methods in targeted areas
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2017-12-31" />
<target value="40000.00">

</target>
<actual value="142235.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female beneficiaries (Percentage, Core Supplement)
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Core indicator in PAD. Achieved.  The indicator attained 342.9% of the target value. Data reported and verified from national PBF statistics and regional Performance Purchasing Agencies dated December 2016.
</narrative></comment>
</target>
<actual value="3,035,054.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Tracer drugs available in targeted health facilities on the day of the visit
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2017-12-31" />
<target value="75.00">

</target>
<actual value="48.98">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Children by the first anniversary who have received one dose of Vit. A in the last six months in targeted areas (Number,
Custom)
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Achieved. The indicator attained 212.0% of the target value.
</narrative></comment>
</target>
<actual value="424,028.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of births attended by skilled professional in targeted areas
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2017-12-31" />
<target value="60000">

</target>
<actual value="265450">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Children by the first anniversary who have received one dose of Vit. A in the last six months in targeted areas
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2017-12-31" />
<target value="200000.00">

</target>
<actual value="466768.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Consultations provided to people from the poorest quintile as measured by asset index in targeted areas
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2017-12-31" />
<target value="75000.00">

</target>
<actual value="772255.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with access to a basic package of health, nutrition, or reproductive health services (number) (Number, Core)
</narrative></title>
<baseline year="2009" iso-date="2009-04-30" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-04-30" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Achieved. The indicator attained 363.93% of the target value.
</narrative></comment>
</target>
<actual value="5,458,964.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Children immunized (number)
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2017-12-31" />
<target value="200000">

</target>
<actual value="336496">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Children immunized (number) (Text, Custom)
</narrative></title>
<baseline year="2006" iso-date="2006-01-01" value="72% (2006 MICS)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Core indicator in PAD. Achieved. The indicator attained 150% of the target value.
</narrative></comment>
</target>
<actual value="300,040.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Children immunized (number)
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2017-12-31" />
<target value="200000">

</target>
<actual value="379822">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health facilities reporting monthly activities using standard report form in targeted areas
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2017-12-31" />
<target value="75.00">

</target>
<actual value="82.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries (Number, Core)
</narrative></title>
<baseline year="2009" iso-date="2009-03-02" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-02" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Core indicator in PAD. Achieved. The indicator attained 337.4% of the target value.
</narrative></comment>
</target>
<actual value="5,972,620.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health facilities reporting monthly activities using standard report form in targeted areas
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2017-12-31" />
<target value="75.00">

</target>
<actual value="72.11">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health facilities achieving an average score of 75% of the quality index of services as measured in RBF in the targeted areas
(Percentage, Custom)
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Achieved. The indicator is at 105.5% of the target value.
</narrative></comment>
</target>
<actual value="63.27">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Percentage of births attended by skilled professional (Text, Custom)
</narrative></title>
<baseline year="2006" iso-date="2006-01-01" value="63%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Core indicator in PAD. Achieved. The indicator attained 391.5% of the target value.
</narrative></comment>
</target>
<actual value="234,894.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New acceptors of modern contraceptive methods in targeted areas (Number, Custom)
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Achieved. The indicator attained 306.1% of the target value.
</narrative></comment>
</target>
<actual value="122,425.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Tracer drugs available in targeted health facilities on the day of the visit
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2017-12-31" />
<target value="75.00">

</target>
<actual value="20.97">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New cases of TB detected and treated in targeted areas (Number, Custom)
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Core indicator in PAD. Achieved. The indicator attained 120.4% of the target value.
</narrative></comment>
</target>
<actual value="12,030.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with access to a basic package of health, nutrition, or reproductive health services (number)
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2017-12-31" />
<target value="1500000.00">

</target>
<actual value="6766200.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Pregnant women receiving antenatal care during a visit to a health provider (number)
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2017-12-31" />
<target value="200000.00">

</target>
<actual value="934988.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Patients treated for TB (number) (Text, Custom)
</narrative></title>
<baseline year="2009" iso-date="2009-04-30" value="Littoral: 51% N-West: 66%
S-West: 50% East: 38% (
% for each region)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-04-30" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Achieved. The indicator attained 100% of the target value. As reported with previous ISRs, this is the average rate over the period of the project. The actual TB success rate for December 2016 is 114%.
</narrative></comment>
</target>
<actual value="80%">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of births attended by skilled professional in targeted areas
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2017-12-31" />
<target value="60000">

</target>
<actual value="306395">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New acceptors of modern contraceptive methods in targeted areas
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2017-12-31" />
<target value="40000.00">

</target>
<actual value="165062.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with access to a basic package of health, nutrition, or reproductive health services (number)
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2017-12-31" />
<target value="1500000.00">

</target>
<actual value="6122792.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Pregnant women receiving antenatal care during a visit to a health provider (number)
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2017-12-31" />
<target value="200000.00">

</target>
<actual value="1094661.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Health facilities achieving an average score of  75% of the  quality index of services as measured in RBF in the targeted areas
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2017-12-31" />
<target value="60.00">

</target>
<actual value="61.47">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New cases of  TB detected and treated in targeted areas
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2017-12-31" />
<target value="10000.00">

</target>
<actual value="14948.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Children by the first anniversary who have received one dose of Vit. A in the last six months in targeted areas
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2017-12-31" />
<target value="200000.00">

</target>
<actual value="525746.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P150999</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Cameroon Transport Sector Development Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The PDO is to: (a) strengthen transport planning; (b) improve transport efficiency and safety on the Babadjou-Bamenda section of the Yaounde - Bamenda transport corridor; and (c) enhance safety and security at selected airports.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objectives of Transport Sector Development Project for Cameroon are to: (a) strengthen transport planning; (b) improve transport efficiency and safety on the Babadjou-Bamenda section of the Yaounde - Bamenda transport corridor; and (c) enhance safety and security at selected airports. This project has four component. 1) The first component, Transport Planning and Capacity Building, aims at strengthening the capacity of the public sector in the planning, development, management and maintenance of transport infrastructure. It has the following subcomponents: (a) Training in transport planning, including data collection and management of modeling tools; (b) Institutional strengthening studies; (c) Preparation of the transport priority investment program (TPIP); (d) Identification and preparation of pilot transport infrastructure PPP projects; and (e) Development of a resilience and climate change adaptation strategy for land transport. 2) The second component, Road Transport Efficiency Improvement, is expected to reduce travel time between Babadjou and Bamenda by improving physical and safety conditions on the most degraded section of the priority road corridor linking the capital city of YaoundE to Bamenda. It has the following subcomponents: (a) Rehabilitation and reconstruction of the Babadjou-Bamenda road section of the YaoundE-Bamenda road corridor; (b) Provision of complementary infrastructure along the Babadjou-Bamenda Road section; (c) Strengthening road safety oversight; and (d) Strengthening of road asset management through provision of technical assistance and equipment. 3) The third component, Air Transport Safety and Security Improvement, focuses primarily on facilitating International Civil Aviation Organization's (ICAO) effective implementation (EI) rating of Aerodrome and Ground Assistance (AGA) at project airports (YaoundE, Douala, Garoua and Maroua), as well as the ICAO's rating of Cameroon's security oversight system.  It has the following subcomponents: (a) Strengthening of airport safety and security infrastructure; (b) Strengthening air transport safety and security oversight; and (c) Strengthening of planning capacity in air transport. 4) The fourth component, Support to Project Implementation Management and Monitoring, will finance technical assistance, equipment, training and operating costs for the Project.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0020031"><narrative>Republic of Cameroon</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="CM-COA-0020032"><narrative>Cellule BAD-BM, Ministry of Public Works</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2015-09-30"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2016-10-27"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2026-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2026-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Jean Philippe Garcon</narrative></person-name><telephone>+1-202-473-1000</telephone><email>jgarcon@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>




<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002231320" />
            <name><narrative>Garoua</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.30143 13.39771</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002234974" />
            <name><narrative>Bamenda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.9597 10.14597</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002235299" />
            <name><narrative>Babadjou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.67153 10.17918</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007668241" />
            <name><narrative>Salak Airport</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.4514 14.2574</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006301544" />
            <name><narrative>Yaounde</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.72256 11.55327</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><sector vocabulary="1" code="16011" percentage="46" xml:lang="en"/><sector vocabulary="1" code="52010" percentage="27" xml:lang="en"/><sector vocabulary="1" code="16050" percentage="27" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TF" percentage="8.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TC" percentage="40.0000000" xml:lang="en"><narrative>FY17 - Urban Transport</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="29.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TV" percentage="23.0000000" xml:lang="en"><narrative>FY17 - Aviation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000014" percentage="4" xml:lang="en"><narrative>Trade</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="4" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="97" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="0" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="9" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="9" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="0" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000074" percentage="67" xml:lang="en"><narrative>Road Safety</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">1111111.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">1111111.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">1111111.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">1111111.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">1111111.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">1111111.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">1111111.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">1111111.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">1111111.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">2916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">4583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">4583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">4583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">4583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">4583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">4583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">4583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">4583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">4583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">4583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">4583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">4583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">3750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">3750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">3750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">3750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">3750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">3750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">3750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">3750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">3750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">3750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">3750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">3750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">11366263.42</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">5015852.93</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">30593649.42</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">6335699.64</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">2538542.11</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">3744719.45</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">16603837.64</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">25787930.31</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">229697.72</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">6797238.23</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">104220.57</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">42276.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">369312.43</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">88667.95</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">42762512.05</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">192000000</value><description xml:lang="en"><narrative>Total Commitment in October Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">50000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">516769</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">11366263</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">5015853</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">30593649</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">6335700</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">2538542</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">3744719</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">16603838</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">25787930</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">229698</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">6797238</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">104221</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">42276</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">369312</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">88668</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">42762512</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">67939</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">245325</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">1378006</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">1758206</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">94141</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">20583570</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">83459</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">128839</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">54410</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">258413</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">267937</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">7829472</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">77588</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">46114</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">12659</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">247694</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">288400</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">4327872</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">3787904</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">11737403</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">95120</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">2473640</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-516769</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-528927</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">-444886</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-473805</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-478624</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-446248</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-526331</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-2650</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-481077</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-447636</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-403145</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-152</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-591764</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-1819206</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-2848027</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-3510164</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-3812327</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-3245708</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-3192510</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-157</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-3132884</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-2302277</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-3253540</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-3154957</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-3452966</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-4098763</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-4109738</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-20032"><narrative>Cellule BAD-BM, Ministry of Public Works; Unite de Gestion du Projet, Cameroon Civil Aviation Authority</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P150999"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P150999?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P150999"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Progress in adopting the first Transport Priority Investment Program (TPIP)
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="No TPIP"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="TPIP completed">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="TPIP completed">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project-implemented AGA Corrective measures validated by ICAO-monitored missions
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="15.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Citizen engagement consultations carried out on a bi-annual basis with participation from project beneficiaries
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="10.00">

</target>
<actual value="6.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Secondary roads reconstructed integrating climate resilience measures
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="50.00">
<comment><narrative>
Secondary roads of lot 1 are completed.
</narrative></comment>
</target>
<actual value="12.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project-implemented AGA Corrective measures validated by ICAO-monitored missions
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="15.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Progress in improving physical road condition on the project road section between Babadjou and Bamenda
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="&amp;gt;14"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="&lt;=5">
<comment><narrative>
This indicator will be measured at the end of work on each section of road by the MDC supported by the Project Engineer.
</narrative></comment>
</target>
<actual value="&lt;=5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Security intrusions on the air side at the international airports of YaoundE, and Douala
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="500.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="0.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
ICAO's EI rating of Aerodrome and Ground Assistance (AGA) at project airports
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="36.20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="53.00">

</target>
<actual value="43.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced access to transportation services
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="2,499,000.00">

</target>
<actual value="1,400,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Road Transport efficiency improvement: Roads rehabilitated integrating climate resilience measures
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="52.00">
<comment><narrative>
works on lot 1 and 2 are completed or almost completed and sections open to trafic
</narrative></comment>
</target>
<actual value="35">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Progress in applying Multimodal Transport Benchmarks (MTBs) to TPIP and DSCE 2
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="MTBs inexistent"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="MTBs mainstreamed in DSCE 2 and applied to the first PTIP">

</target>
<actual value="MTBs mainstreamed in DSCE 2 and applied to the first PTIP">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time by a Twenty Foot Equivalent Unit (TEU) on the project road section between Babadjou and Bamenda
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="120.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="60.00">
<comment><narrative>
The progress of road works on Babadjou-Matazem-Welcome-Bamenda significantly reduces the average travel time between Babadjou and Bamenda.
</narrative></comment>
</target>
<actual value="&lt;=60">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Citizen engagement consultations carried out on a bi-annual basis with participation from project beneficiaries
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="10.00">

</target>
<actual value="6.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Progress in adopting the first Transport Priority Investment Program (TPIP)
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="No TPIP"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="TPIP completed">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="TPIP completed">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Complaints addressed within the stipulated GRM timeframe
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="100.00">

</target>
<actual value="65.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Progress in applying Multimodal Transport Benchmarks (MTBs) to TPIP and DSCE 2
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="MTBs inexistent"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="MTBs mainstreamed in DSCE 2 and applied to the first PTIP">

</target>
<actual value="MTBs mainstreamed in DSCE 2 and applied to the first PTIP">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Progress in improving physical road condition on the project road section between Babadjou and Bamenda
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="&amp;gt;14"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="&lt;=5">
<comment><narrative>
This indicator will be measured at the end of work on each section of road by the MDC supported by the Project Engineer.
</narrative></comment>
</target>
<actual value="&lt;=5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Complaints addressed within the stipulated GRM timeframe
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="100.00">

</target>
<actual value="54.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Progress made by CCAA towards certifying at least one of the identified airports in conformity with ICAO SARPs
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="1.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced access to transportation services
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="2,499,000.00">

</target>
<actual value="1,400,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Citizen engagement consultations carried out on a bi-annual basis with participation from project beneficiaries
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="10.00">

</target>
<actual value="6.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced access to transportation services
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="2,499,000.00">

</target>
<actual value="1,400,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Security intrusions on the air side at the international airports of YaoundE, and Douala
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="500.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="0.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Progress made by CCAA towards certifying at least one of the identified airports in conformity with ICAO SARPs
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="1.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project-implemented AGA Corrective measures validated by ICAO-monitored missions
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="15.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Progress in adopting the first Transport Priority Investment Program (TPIP)
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="No TPIP"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="TPIP completed">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="TPIP completed">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of existing water systems integrating climate resilience measures rehabilitated or extended
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="10.00">

</target>
<actual value="10.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Accident black spots removed on the project road section between Babadjou and Bamenda
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="17.00">
<comment><narrative>
Works on lot 1 are completed.
</narrative></comment>
</target>
<actual value="17">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Market sheds integrating climate resilience measures built for road side vendors on the project road section between Babadjou and Bamenda
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="25.00">

</target>
<actual value="15">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
ICAO's EI rating of Aerodrome and Ground Assistance (AGA) at project airports
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="36.20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="53.00">

</target>
<actual value="43.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
ICAO's EI rating of Aerodrome and Ground Assistance (AGA) at project airports
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="36.20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="53.00">

</target>
<actual value="43.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
ICAO's EI rating of Aerodrome and Ground Assistance (AGA) at project airports
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="36.20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="53.00">

</target>
<actual value="43.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual road accidents recorded along the project road between Babadjou and Bamenda
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="56.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="40.00">
<comment><narrative>
During the first eleven months of the year, the 2025 number of accidents decreased significantly.
</narrative></comment>
</target>
<actual value="14">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual road accidents recorded along the project road between Babadjou and Bamenda
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="56.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="40.00">
<comment><narrative>
During the first four months of the year, the 2025 number of accidents decreased significantly.
</narrative></comment>
</target>
<actual value="9">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual road accidents recorded along the project road between Babadjou and Bamenda
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="56.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="40.00">
<comment><narrative>
During the first eleven months of the year, the 2025 number of accidents decreased significantly.
</narrative></comment>
</target>
<actual value="14">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improve road asset management: Kilometers of roads maintained under a three-year renewable maintenance contract
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="52.00">
<comment><narrative>
This indicator cannot be collected at this time. Road maintenance work will not begin until the Road Fund budget guarantee period has expired.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improve road asset management: Kilometers of roads maintained under a three-year renewable maintenance contract
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="52.00">
<comment><narrative>
This indicator cannot be collected at this time. Road maintenance work will not begin until the Road Fund budget guarantee period has expired.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improve road asset management: Kilometers of roads maintained under a three-year renewable maintenance contract
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="52.00">
<comment><narrative>
This indicator cannot be collected at this time. Road maintenance work will not begin until the Road Fund budget guarantee period has expired.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Road Transport efficiency improvement: Roads rehabilitated integrating climate resilience measures
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="52.00">
<comment><narrative>
works on lot 1 and 2 are completed or almost completed and sections open to trafic
</narrative></comment>
</target>
<actual value="35">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of persons graduated in transport planning of which 35 women
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="150.00">

</target>
<actual value="132">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Secondary roads reconstructed integrating climate resilience measures
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="50.00">
<comment><narrative>
Secondary roads of lot 1 are completed.
</narrative></comment>
</target>
<actual value="12.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time by a Twenty Foot Equivalent Unit (TEU) on the project road section between Babadjou and Bamenda
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="120.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="60.00">
<comment><narrative>
The progress of road works on Babadjou-Matazem-Welcome-Bamenda significantly reduces the average travel time between Babadjou and Bamenda.
</narrative></comment>
</target>
<actual value="&lt;=60">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time by a Twenty Foot Equivalent Unit (TEU) on the project road section between Babadjou and Bamenda
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="120.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="60.00">
<comment><narrative>
The progress of road works on Babadjou-Matazem-Welcome-Bamenda significantly reduces the average travel time between Babadjou and Bamenda.
</narrative></comment>
</target>
<actual value="&lt;=60">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time by a Twenty Foot Equivalent Unit (TEU) on the project road section between Babadjou and Bamenda
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="120.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="60.00">
<comment><narrative>
The progress of road works on Babadjou-Matazem-Welcome-Bamenda significantly reduces the average travel time between Babadjou and Bamenda.
</narrative></comment>
</target>
<actual value="&lt;=60">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Progress in improving physical road condition on the project road section between Babadjou and Bamenda
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="&amp;gt;14"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="&lt;=5">
<comment><narrative>
This indicator will be measured at the end of work on each section of road by the MDC supported by the Project Engineer.
</narrative></comment>
</target>
<actual value="&lt;=5">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Progress in improving physical road condition on the project road section between Babadjou and Bamenda
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="&amp;gt;14"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="&lt;=5">
<comment><narrative>
This indicator will be measured at the end of work on each section of road by the MDC supported by the Project Engineer.
</narrative></comment>
</target>
<actual value="&lt;=5">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Progress in improving physical road condition on the project road section between Babadjou and Bamenda
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="&amp;gt;14"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="&lt;=5">
<comment><narrative>
This indicator will be measured at the end of work on each section of road by the MDC supported by the Project Engineer.
</narrative></comment>
</target>
<actual value="&lt;=5">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Progress in applying Multimodal Transport Benchmarks (MTBs) to TPIP and DSCE 2
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="MTBs inexistent"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="MTBs mainstreamed in DSCE 2 and applied to the first PTIP">

</target>
<actual value="MTBs mainstreamed in DSCE 2 and applied to the first PTIP">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Progress in applying Multimodal Transport Benchmarks (MTBs) to TPIP and DSCE 2
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="MTBs inexistent"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="MTBs mainstreamed in DSCE 2 and applied to the first PTIP">

</target>
<actual value="MTBs mainstreamed in DSCE 2 and applied to the first PTIP">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Progress in applying Multimodal Transport Benchmarks (MTBs) to TPIP and DSCE 2
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="MTBs inexistent"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="MTBs mainstreamed in DSCE 2 and applied to the first PTIP">

</target>
<actual value="MTBs mainstreamed in DSCE 2 and applied to the first PTIP">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Accident black spots removed on the project road section between Babadjou and Bamenda
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="17.00">
<comment><narrative>
Works on lot 1 are completed.
</narrative></comment>
</target>
<actual value="17.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Road Transport efficiency improvement: Roads rehabilitated integrating climate resilience measures
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="52.00">

</target>
<actual value="17.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual road accidents recorded along the project road between Babadjou and Bamenda
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="56.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="40.00">
<comment><narrative>
During the first eleven months of the year, the 2025 number of accidents decreased significantly.
</narrative></comment>
</target>
<actual value="14">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improve road asset management: Kilometers of roads maintained under a three-year renewable maintenance contract
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="52.00">
<comment><narrative>
This indicator cannot be collected at this time. Road maintenance work will not begin until the Road Fund budget guarantee period has expired.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of persons graduated in transport planning of which 35 women
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="150.00">
<comment><narrative>
Remaining students will be graduated by September 2025.
</narrative></comment>
</target>
<actual value="86">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Accident black spots removed on the project road section between Babadjou and Bamenda
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="17.00">
<comment><narrative>
Works on lot 1 are completed.
</narrative></comment>
</target>
<actual value="17">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improve road asset management: Kilometers of roads maintained under a three-year renewable maintenance contract
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="52.00">
<comment><narrative>
This indicator cannot be collected at this time. Road maintenance work will not begin until the Road Fund budget guarantee period has expired.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
ICAO's EI rating of Aerodrome and Ground Assistance (AGA) at project airports
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="36.20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="53.00">

</target>
<actual value="43.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
ICAO's EI rating of Aerodrome and Ground Assistance (AGA) at project airports
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="36.20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="53.00">

</target>
<actual value="43.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
ICAO's EI rating of Aerodrome and Ground Assistance (AGA) at project airports
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="36.20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="53.00">

</target>
<actual value="43.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual road accidents recorded along the project road between Babadjou and Bamenda
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="56.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="40.00">
<comment><narrative>
During the first eleven months of the year, the 2025 number of accidents decreased significantly.
</narrative></comment>
</target>
<actual value="14">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual road accidents recorded along the project road between Babadjou and Bamenda
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="56.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="40.00">
<comment><narrative>
During the first four months of the year, the 2025 number of accidents decreased significantly.
</narrative></comment>
</target>
<actual value="9">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual road accidents recorded along the project road between Babadjou and Bamenda
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="56.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="40.00">
<comment><narrative>
During the first eleven months of the year, the 2025 number of accidents decreased significantly.
</narrative></comment>
</target>
<actual value="14">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improve road asset management: Kilometers of roads maintained under a three-year renewable maintenance contract
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="52.00">
<comment><narrative>
This indicator cannot be collected at this time. Road maintenance work will not begin until the Road Fund budget guarantee period has expired.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improve road asset management: Kilometers of roads maintained under a three-year renewable maintenance contract
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="52.00">
<comment><narrative>
This indicator cannot be collected at this time. Road maintenance work will not begin until the Road Fund budget guarantee period has expired.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improve road asset management: Kilometers of roads maintained under a three-year renewable maintenance contract
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="52.00">
<comment><narrative>
This indicator cannot be collected at this time. Road maintenance work will not begin until the Road Fund budget guarantee period has expired.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual road accidents recorded along the project road between Babadjou and Bamenda
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="56.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="40.00">
<comment><narrative>
During the first four months of the year, the 2025 number of accidents decreased significantly.
</narrative></comment>
</target>
<actual value="9">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time by a Twenty Foot Equivalent Unit (TEU) on the project road section between Babadjou and Bamenda
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="120.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="60.00">
<comment><narrative>
The progress of road works on Babadjou-Matazem-Welcome-Bamenda significantly reduces the average travel time between Babadjou and Bamenda.
</narrative></comment>
</target>
<actual value="&lt;=60">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time by a Twenty Foot Equivalent Unit (TEU) on the project road section between Babadjou and Bamenda
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="120.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="60.00">
<comment><narrative>
The progress of road works on Babadjou-Matazem-Welcome-Bamenda significantly reduces the average travel time between Babadjou and Bamenda.
</narrative></comment>
</target>
<actual value="&lt;=60">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time by a Twenty Foot Equivalent Unit (TEU) on the project road section between Babadjou and Bamenda
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="120.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="60.00">
<comment><narrative>
The progress of road works on Babadjou-Matazem-Welcome-Bamenda significantly reduces the average travel time between Babadjou and Bamenda.
</narrative></comment>
</target>
<actual value="&lt;=60">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Progress in improving physical road condition on the project road section between Babadjou and Bamenda
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="&amp;gt;14"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="&lt;=5">
<comment><narrative>
This indicator will be measured at the end of work on each section of road by the MDC supported by the Project Engineer.
</narrative></comment>
</target>
<actual value="&lt;=5">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Progress in improving physical road condition on the project road section between Babadjou and Bamenda
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="&amp;gt;14"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="&lt;=5">
<comment><narrative>
This indicator will be measured at the end of work on each section of road by the MDC supported by the Project Engineer.
</narrative></comment>
</target>
<actual value="&lt;=5">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Progress in improving physical road condition on the project road section between Babadjou and Bamenda
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="&amp;gt;14"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="&lt;=5">
<comment><narrative>
This indicator will be measured at the end of work on each section of road by the MDC supported by the Project Engineer.
</narrative></comment>
</target>
<actual value="&lt;=5">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Progress in applying Multimodal Transport Benchmarks (MTBs) to TPIP and DSCE 2
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="MTBs inexistent"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="MTBs mainstreamed in DSCE 2 and applied to the first PTIP">

</target>
<actual value="MTBs mainstreamed in DSCE 2 and applied to the first PTIP">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Progress in applying Multimodal Transport Benchmarks (MTBs) to TPIP and DSCE 2
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="MTBs inexistent"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="MTBs mainstreamed in DSCE 2 and applied to the first PTIP">

</target>
<actual value="MTBs mainstreamed in DSCE 2 and applied to the first PTIP">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Progress in applying Multimodal Transport Benchmarks (MTBs) to TPIP and DSCE 2
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="MTBs inexistent"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="MTBs mainstreamed in DSCE 2 and applied to the first PTIP">

</target>
<actual value="MTBs mainstreamed in DSCE 2 and applied to the first PTIP">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time by a Twenty Foot Equivalent Unit (TEU) on the project road section between Babadjou and Bamenda
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="120.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="60.00">
<comment><narrative>
The progress of road works on Babadjou-Matazem-Welcome-Bamenda significantly reduces the average travel time between Babadjou and Bamenda.
</narrative></comment>
</target>
<actual value="&lt;=60">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Complaints addressed within the stipulated GRM timeframe
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="100.00">

</target>
<actual value="54.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of existing water systems integrating climate resilience measures rehabilitated or extended
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="10.00">

</target>
<actual value="10.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of existing water systems integrating climate resilience measures rehabilitated or extended
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="10.00">

</target>
<actual value="10.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Progress made by CCAA towards certifying at least one of the identified airports in conformity with ICAO SARPs
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="1.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Market sheds integrating climate resilience measures built for road side vendors on the project road section between Babadjou and Bamenda
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="25.00">

</target>
<actual value="15">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
ICAO's EI rating of Aerodrome and Ground Assistance (AGA) at project airports
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="36.20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="53.00">

</target>
<actual value="43.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Security intrusions on the air side at the international airports of YaoundE, and Douala
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="500.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="0.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of persons graduated in transport planning of which 35 women
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="150.00">

</target>
<actual value="132">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Secondary roads reconstructed integrating climate resilience measures
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="50.00">
<comment><narrative>
Secondary roads of lot 1 are completed.
</narrative></comment>
</target>
<actual value="12.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Market sheds integrating climate resilience measures built for road side vendors on the project road section between Babadjou and Bamenda
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2026-06-30" />
<target value="25.00">

</target>
<actual value="15.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P109588</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Environmental and Social Capacity Building for the Energy Sector</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The development objective of the project would be to: Improve the management of and the accountability for environmental and social issues related to large infrastructure investments, with an initial focus on the energy sector.  The Project would initially focus capacity building efforts towards the energy sector, in support of the Energy Sector Development Project.  The mobilization of supplemental resources to more explicitly address issues in the mining and transport sectors would be explored during the project's mid-term review.  The expected long-term benefits of the project are to: (i) reduce the negative externalities of large infrastructure projects, and (ii) develop a transparent, stable and fair framework for managing environmental and social risks that should comfort large infrastructure investments, and (iii) institutionalizes information flows between the populations affected by large infrastructure projects and other stakeholders, and political decision-makers.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Environmental and Social Capacity Building for the Energy Sector Project for Cameroon is to improve the management of and the accountability for environmental and social issues related to large infrastructure investments, with an initial focus on the energy sector. The project will initially focus capacity building efforts towards the energy sector, in support of the Energy Sector Development Project. The mobilization of supplemental resources to more explicitly address issues in the mining and transport sectors will be explored during the project's midterm review. The expected long-term benefits of the project are to: (i) reduce the negative externalities of large infrastructure projects; (ii) develop a transparent, stable and fair framework for managing environmental and social risks that can improve the enabling environment for large infrastructure investments; and (iii) institutionalizes information flows between the populations affected by large infrastructure projects and other stakeholders, and political decision-makers. The project will include the following three components: (i) strengthening the ministry in charge of the environment to fulfill its mandate to define, monitor and control environmental and social obligations of large infrastructure project, in compliance with the environmental law of 1996 and its implementation decrees; (ii) establishing frameworks to manage social externalities associated with large infrastructure projects, in compliance with international best practices; and (iii) supporting the environment unit in the ministry of energy and water to ensure that the environmental and social issues arising from large energy sector infrastructure projects are addressed in compliance with international best practices.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><activity-status code="3" /><activity-date type="1" iso-date="2008-06-24"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2008-06-24"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2013-06-27"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2013-06-27"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Dahlia Lotayef</narrative></person-name><telephone>+1-202-473-1000</telephone><email>dlotayef@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2220957" />
                <name><narrative>Yaounde</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>3.86667 11.51667</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="15126" percentage="45" xml:lang="en"/><sector vocabulary="1" code="41010" percentage="55" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="96.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LZ" percentage="4.00000000" xml:lang="en"><narrative>FY17 - Other Energy and Extractives</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000053" percentage="3" xml:lang="en"><narrative>Fragility, Conflict and Violence</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000512" percentage="30" xml:lang="en"><narrative>Other Excluded Groups</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000053" percentage="3" xml:lang="en"><narrative>Fragility, Conflict and Violence</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000533" percentage="3" xml:lang="en"><narrative>Forced Displacement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="17" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000084" percentage="33" xml:lang="en"><narrative>Environmental policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000511" percentage="17" xml:lang="en"><narrative>Indigenous People and Ethnic Minorities</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">504065.03</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">504065.03</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">504065.03</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">504065.03</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">504065.03</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">504065.03</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">330623.30</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">330623.30</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">330623.31</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">330623.30</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">330623.30</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">330623.31</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">330623.30</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">330623.30</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">330623.31</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">330623.30</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">330623.30</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">330623.31</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">417344.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">417344.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">417344.16</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">417344.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">417344.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">417344.16</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">417344.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">417344.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">417344.16</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">417344.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">417344.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">417344.16</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">417344.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">417344.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">417344.16</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">417344.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">417344.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">417344.16</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">417344.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">417344.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">417344.16</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">417344.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">417344.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">417344.16</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">330623.30</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">330623.30</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">330623.31</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">330623.30</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">330623.30</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">330623.31</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">330623.30</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">330623.30</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">330623.31</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">504065.03</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">504065.03</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">504065.03</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">504065.03</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">504065.03</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">504065.03</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">330623.30</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">330623.30</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">330623.31</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">330623.30</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">330623.30</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">330623.31</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">330623.30</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">330623.30</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">330623.31</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">330623.30</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">330623.30</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">330623.31</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">417344.17</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">417344.17</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">417344.16</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">417344.17</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">417344.17</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">417344.16</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">417344.17</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">417344.17</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">417344.16</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">417344.17</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">417344.17</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">417344.16</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">417344.17</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">417344.17</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">417344.16</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">417344.17</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">417344.17</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">417344.16</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">417344.17</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">417344.17</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">417344.16</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">417344.17</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">417344.17</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2013-06-27"/>
<value currency="USD" value-date="2013-06-27">13805849.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2013-06-27"/>
<value currency="USD" value-date="2013-06-27">13805849.56</value>
</budget>
<capital-spend percentage="100" /><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P109588"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P109588?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P109588"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Energy sector facilities (existing) for which all environmental and social impacts have been identified through an audit process
</narrative></title>
<baseline year="2008" iso-date="2008-05-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-05-29" />
<period-end iso-date="2014-03-31" />
<target value="80.00">

</target>
<actual value="13.00">
<comment><narrative>
No data available beyond March 2012.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sector guidelines on standards and procedural issues that integrate international best practices published
</narrative></title>
<baseline year="2008" iso-date="2008-05-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-05-29" />
<period-end iso-date="2014-03-31" />
<target value="6.00">

</target>
<actual value="2.00">
<comment><narrative>
Only two guidelines were prepared. The remaining one is still under preparation.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
EAs for new investments reviewed by Inter-Ministerial Committee (yearly)
</narrative></title>
<baseline year="2008" iso-date="2008-05-29" value="54.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-05-29" />
<period-end iso-date="2014-03-31" />
<target value="45.00">

</target>
<actual value="80.00">
<comment><narrative>
No data available beyond March 2012.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Pollution permits and licences issued
</narrative></title>
<baseline year="2008" iso-date="2008-05-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-05-29" />
<period-end iso-date="2014-03-31" />
<target value="0.00">

</target>
<actual value="0.00">
<comment><narrative>
The legislation doesn't cover pollution permits and licenses. This indicator was not be  able to be reviewed at the MTR process,due to the early cancellation request.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reference health database developed (for selected reference sites)
</narrative></title>
<baseline year="2008" iso-date="2008-05-29" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-05-29" />
<period-end iso-date="2014-03-31" />
<target value="">

</target>
<actual value="">
<comment><narrative>
Reference data for the three main sites (Lom Pangar, Mem vele and Kribi) still not shared by the Ministry of Health (consideredconfidential).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Domestic stakeholders with satisfactory understanding of norms and standards in matters of env &amp; social diligence of large projects(KPI)
</narrative></title>
<baseline year="2008" iso-date="2008-05-29" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-05-29" />
<period-end iso-date="2014-03-31" />
<target value="30.00">

</target>
<actual value="20.00">
<comment><narrative>
No data available beyond May 2012
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Energy sector facilities (existing) for which all enviromental &amp; social impacts have been addressed (KPI)
</narrative></title>
<baseline year="2008" iso-date="2008-05-29" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-05-29" />
<period-end iso-date="2014-03-31" />
<target value="80.00">

</target>
<actual value="50.00">
<comment><narrative>
Field missions to project sites were suspended since February 2012
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Legal framework on cultural patrimony updated
</narrative></title>
<baseline year="2008" iso-date="2008-05-29" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-05-29" />
<period-end iso-date="2014-03-31" />
<target value="Yes">

</target>
<actual value="">
<comment><narrative>
Activity stopped following Project's cancellation
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Feedback comments/ questions about env/ social diligence provided monthly on the project website
</narrative></title>
<baseline year="2008" iso-date="2008-05-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-05-29" />
<period-end iso-date="2014-03-31" />
<target value="50.00">

</target>
<actual value="30.00">
<comment><narrative>
The website design has been completed and operational .
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
EMPs for large electricity infrastructure satisfactorily implemented
</narrative></title>
<baseline year="2008" iso-date="2008-05-29" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-05-29" />
<period-end iso-date="2014-03-31" />
<target value="80.00">

</target>
<actual value="80.00">
<comment><narrative>
No major change .
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Non-compliance cases for which legal actions have been taken
</narrative></title>
<baseline year="2008" iso-date="2008-05-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-05-29" />
<period-end iso-date="2014-03-31" />
<target value="80.00">

</target>
<actual value="50.00">
<comment><narrative>
Based on results of the consolidated report of the inspection missions conducted in May 2012, it appears that 174 facilities havebeen inspected, and legal actions have been taken against 46 cases of non-compliance
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
SESA for the energy sector completed and disseminated
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2014-03-31" />
<target value="Yes">

</target>
<actual value="">
<comment><narrative>
Study is being prepared in the context of another Bank project (PDSEN) following cancellation of PRECESS.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Policy to protecting and promoting the rights of marginal populations adopted
</narrative></title>
<baseline year="2008" iso-date="2008-05-29" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-05-29" />
<period-end iso-date="2014-03-31" />
<target value="Yes">
<comment><narrative>
Indicator not met as a result of the cancellation.
</narrative></comment>
</target>
<actual value="">
<comment><narrative>
The hiring process of the consultant to prepare the draft policy stopped as a result of the project's cancellation.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Infrastructure projects in the energy sector approved that comply with int standards for environmental &amp; social issues (KPI)
</narrative></title>
<baseline year="2008" iso-date="2008-05-29" value="5.00"><comment><narrative>percentage per annum</narrative></comment></baseline>
<period>
<period-start iso-date="2008-05-29" />
<period-end iso-date="2014-03-31" />
<target value="80.00">

</target>
<actual value="100.00">
<comment><narrative>
All large Energy Projects submitted to the Interministerial Committee received an Environmental Conformity Certificates.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Facilities for which annual environmental performance report certified as compliant by MinEP with EMP (KPI)
</narrative></title>
<baseline year="2008" iso-date="2008-05-29" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-05-29" />
<period-end iso-date="2014-03-31" />
<target value="70.00">

</target>
<actual value="30.30">
<comment><narrative>
24 facilities (21,87%) have implemented their ESMPs in a satisfactory manner;
50 facilities (45,45%) have implemented the ESMP inamoderate way; while 15 facilities (13,63%) has an unsatisfactory performance.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Legislation on land management and compensation systems for involuntary resettlement adopted
</narrative></title>
<baseline year="2008" iso-date="2008-05-29" value="N0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-05-29" />
<period-end iso-date="2014-03-31" />
<target value="Yes">

</target>
<actual value="no">
<comment><narrative>
The procurement process stopped due to the cancellation request.
</narrative></comment>
</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P114077</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>CM - Lom Pangar Hydropower Proj. (FY12)</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The project development objective of the proposed LPHP is to increase hydropower generation capacity and reduce seasonal variability of water flow in the Sanaga River and to increase access to electricity.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Lom Pangar Hydropower Project for Cameroon is to increase hydropower generation capacity and reduce seasonal variability of water flow in the Sanaga River and to increase access to electricity. There are four components to the project. The first component is Lom Pangar regulating dam. This component will co-finance the construction of the Lom Pangar regulating dam on the Lom River. Based on the engineering design, the dam will be 46 meters high and 7 meters wide at the crest and be composed of a central overflow section with embankment wings and a saddle dam. The second component is Lom Pangar Power Plant and Transmission Line. A 30 MW hydropower plant consisting of four Francis turbines will be constructed at the foot of the dam. The power plant will be connected through a 105 kilometer 90 kV transmission line to the existing Eastern Network at Bertoua. A HV/MV substation will be constructed in Bertoua. This component will also include a rural electrification sub-component to connect 13 localities between the hydropower plant and Bertoua and the electrification of approximately 2,400 households12. It will also include social mitigation measures related to the power plant and transmission line. The third component is environmental and social measures. This component is comprised of eight sub-components: six sub-components linked to the Environmental and Social Management Plan (ESMP), a sub-component on the Resettlement Action Plans (RAPs) and a local development sub-component. The fourth component is technical assistance and project management. This component is composed of three sub components: i) technical assistance, ii) communications, and iii) project management.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0002742"><narrative>Electricity Development Corporation (EDC)</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0002742"><narrative>Electricity Development Corporation (EDC)</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="CM-COA-0002737"><narrative>Electricity Development Corporation (EDC)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2010-07-15"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2012-03-27"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2019-06-28"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2019-06-28"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Nicolas Jean Marie Sans</narrative></person-name><telephone>+1-202-473-1000</telephone><email>nsans@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002231835" />
            <name><narrative>East Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.8333299 14.16667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="23220" percentage="76" xml:lang="en"/><sector vocabulary="1" code="21023" percentage="13" xml:lang="en"/><sector vocabulary="1" code="15126" percentage="5" xml:lang="en"/><sector vocabulary="1" code="12230" percentage="4" xml:lang="en"/><sector vocabulary="1" code="31220" percentage="1" xml:lang="en"/><sector vocabulary="1" code="15117" percentage="1" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="1.00000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LP" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Energy and Extractives</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="1.00000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="13.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LH" percentage="75.0000000" xml:lang="en"><narrative>FY17 - Renewable Energy Hydro</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="1" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000723" percentage="16" xml:lang="en"><narrative>Rural Infrastructure and service delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="12" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000522" percentage="6" xml:lang="en"><narrative>Social Insurance and Pensions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="6" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="1" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="4" xml:lang="en"><narrative>Air quality management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="4" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="1" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="64" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="16" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="16" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="1" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="1" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="1" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="64" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000823" percentage="4" xml:lang="en"><narrative>Soil Pollution</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">166666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">166666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">2083333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">2083333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">2083333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">2083333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">2083333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">2083333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">2083333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">2083333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">2083333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">2083333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">2083333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">2083333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">2083333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">2083333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">2083333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">2083333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">2083333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">1666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">1666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">1666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">1666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">833333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">833333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2019-06-28"/>
<value currency="USD" value-date="2019-06-28">9634370.38</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2019-06-28"/>
<value currency="USD" value-date="2019-06-28">9634370.38</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">132000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-1814970</value><description xml:lang="en"><narrative>Total Commitment Cancellations in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">31610366</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">9170113</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-07-31"/><value value-date="2013-07-31">1740998</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">2554629</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">1390526</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">1264470</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">241068</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">1327224</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">1335638</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">313839</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">909305</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">9024712</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">1300828</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">3547306</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">2642672</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">2788581</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">916845</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">5492801</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">3406833</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">3438577</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">2627928</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">840478</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">1371239</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">1017617</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">7424660</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">2235240</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">4218766</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">1181599</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">4386796</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">209584</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">1573127</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">577322</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">1291318</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">56307</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">1152702</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">607871</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">346486</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">3566073</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">257788</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">881553</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">248275</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">243025</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">127043</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">174500</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">1430379</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-82608</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-16769</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">-85708</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">-180652</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-199777</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-235317</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-310031</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-312020</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-355128</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-369211</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-411802</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-424360</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-481</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-414920</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-420992</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-419850</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-429846</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-447979</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-441117</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-455361</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-427683</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-375315</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-457838</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-409540</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-398280</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-414088</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-398163</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-405591</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-384441</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-1082697</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-1130345</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-1115525</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-1115340</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-1126487</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-1117355</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-1149784</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-1140513</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-2737"><narrative>Electricity Development Corporation (EDC)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P114077"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P114077?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P114077"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transmission lines constructed or rehabilitated under the project
</narrative></title>
<baseline year="2013" iso-date="2013-08-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-08-02" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The construction of the transmission lines has been launched, and delivery is expected by March 2021.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Commissioning of Lom Pangar regulating dam completed
</narrative></title>
<baseline year="2012" iso-date="2012-03-01" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-03-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The partial impoundment of the Lom Pangar reservoir dam was carried out on September 26, 2015, followed by complete impoundment in June 2016. Provisional reception of the reservoir dam took place on June 30, 2017, and final acceptance took place on June 30, 2019, after a warranty period of two years&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average annual household income of project directly affected persons
</narrative></title>
<baseline year="2012" iso-date="2012-03-01" value="1360.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-03-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;In the absence of official information for this indicator, we present the values of gross national income per capita, which increased by about 6 percent, from a level of US$1,360 in 2012 to US$1,440.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="1440.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of households newly connected to the electricity grid
</narrative></title>
<baseline year="2012" iso-date="2012-03-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-03-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Toward achieving the PDO, the following activities are under way: (a) the construction of a 105 km transmission line in 90 kV to connect the Lom Pangar plant to the HV/MV substation in Bertoua; and (b) the construction of a 200 km MV line from the Bertoua subsation to the two other substations to be built in Batouri and Abong-Mbang.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Operation manual for the dam and reservoir is completed and staff are trained on its use
</narrative></title>
<baseline year="2012" iso-date="2012-03-01" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-03-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transmission line constructed under the project
</narrative></title>
<baseline year="2012" iso-date="2012-03-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-03-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2012" iso-date="2012-03-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-03-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The target was exceeded by 15 percent. At project closure, there were 1,184,372 connected households in the Southern Interconnected Network that benefitted from an improved electricity production at Song Loulou and Ed&amp;eacute;a plants. Applying an average of 5 persons per household, direct project beneficiaries reached 5,921,860&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="5921860.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Quantity of hydroelectricity additionally generated under the project - New capacity at Lom Pangar
</narrative></title>
<baseline year="2012" iso-date="2012-03-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-03-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The power production by the Lom Pangar plant will be gradually and respectively commissioned in April, June, August, and October 2021. Expected production starting 2022 with respect to the operational mode of reservoir management is as follows: (a) 141.5 GWh i management mode prioritizing Sanaga basin regulation (utilization factor of 54%) or (b) 270.1 GWh in the management mode prioritizing hydropower generation (utilization factor of 100%).&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Commissioning of Lom Pangar power plant completed
</narrative></title>
<baseline year="2012" iso-date="2012-03-01" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-03-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Based on the progress level of the construction of the plant, the hydroelectric plant will be fully completed by the end of 2021. The four production groups will be gradually and respectively commissioned in April, June, August, and October 2021.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="N">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Dam Safety Panel recommendations are implemented in a timely and quality manner
</narrative></title>
<baseline year="2012" iso-date="2012-03-01" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-03-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Quantity of hydroelectricity additionally generated under the project at the two existing plants on the Sanaga River
</narrative></title>
<baseline year="2012" iso-date="2012-03-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-03-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The target of quantity of additional hydroelectricity was exceeded by 14 percent at end-June 2019, reflecting an increase in water supply to the downstream plants following the final reservoir impounding in June 2016&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="684.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Guaranteed all-season water flow of the Sanaga River.
</narrative></title>
<baseline year="2012" iso-date="2012-03-01" value="720.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-03-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The target of guaranteed all-season water flow on the Sanaga River was slightly exceeded by 1 percent. After the complete reservoir impoundment in June 2016, it was possible to store a quantity of water of 6.284 billion m3 that was used during the year 2017. The latter has allowed the flow of water of about 1,050 m3/s to Song Mbengue for 100% of the time.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="1050.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to electricity by household connections
</narrative></title>
<baseline year="2013" iso-date="2013-08-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-08-02" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Toward achieving the PDO, the following activities are under way: (a) the construction of a 105 km transmission line in 90 kV to connect the Lom Pangar plant to the HV/MV substation in Bertoua; and (b) the construction of a 200 km MV line from the Bertoua subsation to the two other substations to be built in Batouri and Abong-Mbang.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Generation Capacity of Hydropower constructed or rehabilitated under the project
</narrative></title>
<baseline year="2013" iso-date="2013-08-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-08-02" />
<period-end iso-date="2018-12-31" />
<target value="120.00">
<comment><narrative>
&lt;p&amp;gt;The target of quantity of additional hydroelectricity was exceeded by 14 percent at end-June 2019, reflecting an increase in water supply to the downstream plants following the final reservoir impounding in June 2016. This additional generation is equivalent to an additional generation&amp;nbsp;capacity of 120 MW in the existing plants downstream of the Lom Pangar project.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="120.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual Expert Panel environmental and social monitoring report disseminated and made publically available
</narrative></title>
<baseline year="2012" iso-date="2012-03-01" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-03-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Gorilla population in Deng Deng Forest
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="300.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Based on the 2016 expert report of the inventory of the DDNP great apes population, the gorilla population in Deng Deng forest is 1.01 individuals per km&amp;sup2; in 2016, or 390 individuals. As no recent census of gorillas was conducted in the DDNP, the 2016 number is maintained by end-June 2019.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="300.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P070656</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>FOREST AND ENVIRONMENT DEVELOPMENT PROGRAM</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The development objective of the proposed Forest and Environment Policy Development Grant (FEDPG) is to strengthen public and private efforts to achieve socially-, economically-, and ecologically-sustainable use of national forest and wildlife resources.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Forest and Environmental Policy Development Program Project represents the International Development association (IDA) and the Global Environment Facility (GEF) contribution to a multi-donor national forest and environment sector development program, initiated and led by the Government of Cameroon. It will help consolidate and scale up recent successful forest sector policy reforms, support capacity-building, and strengthen forest and environment institutions, by expanding their work programs in the fields of environmental monitoring, policy oversight, law enforcement, forest management, biodiversity conservation, and community-based forest activities. Given the concentration of poverty in rural areas (where most o f the poor live, and where 64 percent of all inhabitants are poor), the hardship and low wages typical of forest employment, and the forest's role as the principal source of cash income for the rural poor - the operation is self-targeting on the poor. Through its focus on sectoral policy, institutional reform, law enforcement, regulation of forest production and environmental monitoring, rehabilitation of degraded national parks and biodiversity conservation sites, the project will have a strong positive impact on the environment. However, the project carries significant risks associated with political and financial sustainability. For the Bank, there are also fiduciary risks. Nonetheless, the project integrates comprehensive measures to address or mitigate each risk: it is designed and sequenced to build institutional capacity to effectively address these risks. Given the Bank's considerable involvement in sector reforms over the past several years in Cameroon, any potential downside associated with inaction would far outweigh the risks associated with the operation itself.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><activity-status code="3" /><activity-date type="1" iso-date="2001-09-28"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2006-02-28"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2011-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2011-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Ananie Cyrille Ekoumou Abanda</narrative></person-name><telephone>+1-202-473-1000</telephone><email>aekoumouabanda@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2220957" />
                <name><narrative>Yaounde</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>3.86667 11.51667</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="15110" percentage="25" xml:lang="en"/><sector vocabulary="1" code="15112" percentage="5" xml:lang="en"/><sector vocabulary="1" code="15130" percentage="2" xml:lang="en"/><sector vocabulary="1" code="31120" percentage="32" xml:lang="en"/><sector vocabulary="1" code="31220" percentage="36" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AZ" percentage="32.0000000" xml:lang="en"><narrative>FY17 - Other Agriculture, Fishing and Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="25.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BG" percentage="2.00000000" xml:lang="en"><narrative>FY17 - Law and Justice</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="5.00000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AT" percentage="36.0000000" xml:lang="en"><narrative>FY17 - Forestry</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000834" percentage="19" xml:lang="en"><narrative>Biodiversity</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000725" percentage="5" xml:lang="en"><narrative>Land Administration and Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="14" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="30" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="5" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000725" percentage="5" xml:lang="en"><narrative>Land Administration and Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="10" xml:lang="en"><narrative>Air quality management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="10" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="24" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000835" percentage="5" xml:lang="en"><narrative>Landscape Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="10" xml:lang="en"><narrative>Air quality management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="24" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000084" percentage="29" xml:lang="en"><narrative>Environmental policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="14" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000084" percentage="29" xml:lang="en"><narrative>Environmental policies and institutions</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2006-02-01"/>
<period-end iso-date="2006-02-28"/>
<value currency="USD" value-date="2006-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-03-01"/>
<period-end iso-date="2006-03-31"/>
<value currency="USD" value-date="2006-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-04-01"/>
<period-end iso-date="2006-04-30"/>
<value currency="USD" value-date="2006-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-05-01"/>
<period-end iso-date="2006-05-31"/>
<value currency="USD" value-date="2006-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-06-01"/>
<period-end iso-date="2006-06-30"/>
<value currency="USD" value-date="2006-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">3266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">3266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">3266666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">2700000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">2700000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">2700000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">2366666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">2366666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">2366666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-02-01"/>
<period-end iso-date="2006-02-28"/>
<value currency="USD" value-date="2006-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-03-01"/>
<period-end iso-date="2006-03-31"/>
<value currency="USD" value-date="2006-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-04-01"/>
<period-end iso-date="2006-04-30"/>
<value currency="USD" value-date="2006-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-05-01"/>
<period-end iso-date="2006-05-31"/>
<value currency="USD" value-date="2006-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-06-01"/>
<period-end iso-date="2006-06-30"/>
<value currency="USD" value-date="2006-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">3266666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">3266666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">3266666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">2700000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">2700000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">2700000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">2366666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">2366666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">2366666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2079-01-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2079-01-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2079-01-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">14955336.57</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2079-01-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">14955336.57</value>
</budget>
<capital-spend percentage="0" /><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P070656"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P070656?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P070656"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Intermediate outcome indicator(s) - 1. Increase ratio between the number of sanctions effectively applied to the number of decisions of sanctions with regard to illegal exploitation.
</narrative></title>
<baseline year="2006" iso-date="2006-04-27" value="37.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-04-27" />
<period-end iso-date="2011-12-31" />
<target value="90.00">

</target>
<actual value="60.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Intermediate outcome indicator(s) - 2. Maintain percentage of annual area fee revenue transferred to rural communes.
</narrative></title>
<baseline year="2006" iso-date="2006-04-27" value="40.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-04-27" />
<period-end iso-date="2011-12-31" />
<target value="40.00">

</target>
<actual value="40.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
5. Forest Management Units (UFAs) with signed final concession agreements (%)
</narrative></title>
<baseline year="2005" iso-date="2005-01-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-01-31" />
<period-end iso-date="2011-12-31" />
<target value="100.00">
<comment><narrative>
Note that some FMUs were abandoned in recent years and final estimate will not include these, since they will have to bere-tendered before a Definitive Convention can be signed.
</narrative></comment>
</target>
<actual value="24.48">
<comment><narrative>
24/98 UFA
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1. Increase percentage of production forests under a forest management plan.
</narrative></title>
<baseline year="2005" iso-date="2005-03-01" value="66.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-03-01" />
<period-end iso-date="2009-12-31" />
<target value="100.00">
<comment><narrative>
100% of all forests allocated up to December 2005 (target value met)
</narrative></comment>
</target>
<actual value="89.79">
<comment><narrative>
88 UFA on assigned 98 have a management plan developed and approved for an area of 5 421 094 ha
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
3. Increase of Average Protected Area Management Effectiveness Score from 28 to 50+ for 8 key protected areas existing in 2005.
</narrative></title>
<baseline year="2005" iso-date="2005-12-30" value="28.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-12-30" />
<period-end iso-date="2011-09-30" />
<target value="50.00">
<comment><narrative>
independent evaluation of PAME scores during 2011, to compare with baseline and ensure that target score has been maintained orexceeded is ongoing
</narrative></comment>
</target>
<actual value="55.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
4. Forest Management Units (UFAs) with reviewed management plan (%)
</narrative></title>
<baseline year="2005" iso-date="2005-01-31" value="66.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-01-31" />
<period-end iso-date="2011-12-31" />
<target value="100.00">

</target>
<actual value="0.00">
<comment><narrative>
08 UFA
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The management in the 8 focus  UTOs improves
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0 UTO : SEG55"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2011-12-31" />
<target value="Number of focus UTOs being created (MES 55)">

</target>
<actual value="">
<comment><narrative>
Independent evaluation is ongoing
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
2. Prevent additional kilometres of illegal roads built in all parks and forest management units.
</narrative></title>
<baseline year="2004" iso-date="2004-12-30" value="1024 km"><comment><narrative>In 2009, WRI (formerly Global Forest Watch) were contracted to update previous baseline (prepared in 2004) which estimated thatthere were 357km of irregular roads. Using a more refined approach to analyze new data, the revised baseline was revised to 1024kmof irregular roads existing up to December 2005. This serves as a baseline for subsequent comparison.</narrative></comment></baseline>
<period>
<period-start iso-date="2004-12-30" />
<period-end iso-date="2011-09-30" />
<target value="">
<comment><narrative>
WRI will be commissioned again in 2011 to update their measurement of irregular logging roads, using new imagery for the period2008-2011.  Results will be compared with previous trend.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P167795</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Douala Urban Mobility Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objective is to improve urban mobility and support inclusive urban and economic development along selected Bus Rapid Transit corridors and its feeder lines in Douala.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of Douala Urban Mobility Project for Cameroon is to improve urban mobility and support inclusive urban and economic development along selected Bus Rapid Transit corridors and its feeder lines in Douala. This project has five components. 1) The first component, Support to institutional strengthening and professionalization of existing public transport operators, aims to finance associated works, services, and goods for the following activities in support of institutional reform and regulatory strengthening, professionalization of formal and informal operators. 2) The second component, Bus Rapid Transit (BRT) infrastructure facilities, systems, and rolling stock, will finance associated works, services, and goods. 3) The third component, Transit-Oriented Development around the BRT system, has the following sub-components: (i) Road and non-motorized infrastructure improvements along feeder roads; and (ii) Corridor Development Strategy and public space improvements around BRT stations. 4) The fourth component, Project management and capacity building, finance services and goods for Project management costs, Capacity building and TA for the PIU, and Technical support to the PIU for components 2 and 3. 5) The fifth component, Contingent Emergency Response (CERC), provides an immediate and effective response in the event of an eligible crisis or emergency.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0037839"><narrative>Republic of Cameroon</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="CM-COA-0037838"><narrative>Communaute Urbaine de Douala (Douala City Council)</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2020-07-08"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2022-06-02"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2028-06-16"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2028-06-16"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Alphonse Soh</narrative></person-name><telephone>+1-202-473-1000</telephone><email>asoh1@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002232593" />
            <name><narrative>Douala</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.04827 9.70428</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002233387" />
            <name><narrative>Republic of Cameroon</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.369722 12.354722</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002595276" />
            <name><narrative>Ndog Bong</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.71556 9.85917</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0009165753" />
            <name><narrative>Carrefour Ndokoti</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.04345 9.74248</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="21012" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TF" percentage="3.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TC" percentage="97.0000000" xml:lang="en"><narrative>FY17 - Urban Transport</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000713" percentage="100" xml:lang="en"><narrative>Public Transport</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000715" percentage="13" xml:lang="en"><narrative>Municipal Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="11" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="97" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="100" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="15" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000713" percentage="100" xml:lang="en"><narrative>Public Transport</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="95" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="15" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000626" percentage="97" xml:lang="en"><narrative>Pandemic Response</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="100" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="100" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000714" percentage="13" xml:lang="en"><narrative>Urban Planning</narrative></sector><humanitarian-scope type="1" vocabulary="1-2" code="EP-2020-000012-001"> </humanitarian-scope><humanitarian-scope type="2" vocabulary="2-1" code="HCOVD20"> </humanitarian-scope><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">3700000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">3690000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">3670000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">3650000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">3640000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">7210000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">3580000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">3560000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">3540000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">3520000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">3500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">6940000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">3440000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">3420000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">3400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">3390000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">6730000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">3350000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">3340000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">3340000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">3330000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">3340000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">6720000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">3410000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">3460000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">3540000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">3650000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">3770000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">7670000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">3470000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">2340000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">1580000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">1630000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">3490000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">1880000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">1970000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">2050000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">2140000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">2290000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">4490000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">2220000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">2220000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">2240000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">2280000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">2340000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">4920000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">2620000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">2750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">2030000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">2070000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">4300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">2250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">2350000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">2460000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">2600000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">5230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">12470000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">6540000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">6430000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">6290000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">6170000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">6080000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">12000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">5950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">5940000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">5940000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">17850000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">5980000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">5990000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">6010000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">6030000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">6050000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">12170000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">6120000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">6150000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">6170000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">6200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">6220000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">12520000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">6300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">6330000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">6350000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">6380000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">25660000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-16"/>
<value currency="USD" value-date="2028-06-16">408386813.53</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-16"/>
<value currency="USD" value-date="2028-06-16">408386813.53</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">202300000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-37838"><narrative>Communaute Urbaine de Douala (Douala City Council)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">217700000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-37838"><narrative>Communaute Urbaine de Douala (Douala City Council)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">522005</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-37838"><narrative>Communaute Urbaine de Douala (Douala City Council)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">2209846</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-37838"><narrative>Communaute Urbaine de Douala (Douala City Council)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">4475942</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-37838"><narrative>Communaute Urbaine de Douala (Douala City Council)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-4482386</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-37838"><narrative>Communaute Urbaine de Douala (Douala City Council)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">3058375</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-37838"><narrative>Communaute Urbaine de Douala (Douala City Council)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">4732168</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-37838"><narrative>Communaute Urbaine de Douala (Douala City Council)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">0</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-37838"><narrative>Communaute Urbaine de Douala (Douala City Council)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">0</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-37838"><narrative>Communaute Urbaine de Douala (Douala City Council)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">1008265</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-37838"><narrative>Communaute Urbaine de Douala (Douala City Council)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">88972</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-37838"><narrative>Communaute Urbaine de Douala (Douala City Council)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-522005</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-37838"><narrative>Communaute Urbaine de Douala (Douala City Council)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-215829</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-37838"><narrative>Communaute Urbaine de Douala (Douala City Council)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-345222</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-37838"><narrative>Communaute Urbaine de Douala (Douala City Council)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-43818</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-37838"><narrative>Communaute Urbaine de Douala (Douala City Council)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-36178</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-37838"><narrative>Communaute Urbaine de Douala (Douala City Council)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-383775</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-37838"><narrative>Communaute Urbaine de Douala (Douala City Council)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P167795"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P167795?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P167795"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Pedestrian and cycle paths rehabilitated to climate resilience standards
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="100.00">
<comment><narrative>
This indicator reflects  how the project improves soft mobility by tracking the progress of the rehabilitation of pedestrian and cycle paths rehabilitated to climate resilience standards in the project area.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Population of Douala able to access at least one additional health facility within 45 minutes using public transport
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="77.00">
<comment><narrative>
This indicator measures the improved accessibility to health services the project is expected to provide by measuring the percentage of the population who have access to at least one additional health facility using public transport.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Completed pilot urban planning projects around BRT stations
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="2.00">
<comment><narrative>
This indicator  measures the number of pilot projects - urban development around BRT stations - that are finalized using the TOD approach.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average weekday passenger ridership using the BRT routes
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="535,000.00">
<comment><narrative>
This indicator measures the average daily ridership of the BRT. The data collected will be disaggregated by gender.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2028-02-15" />
<target value="800,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of female staff in:
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="8.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="20.00">
<comment><narrative>
This indicator measures the percentage of women employed in the construction stage and in operations of the BRT, to reflect the gender empowerment impact of the project.
</narrative></comment>
</target>
<actual value="8.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Definition of an incentive mechanism for fleet renewal
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="Yes">
<comment><narrative>
This indicator measures progress in tackling the issue of aging and highly emitting vehicles, by structuring an incentive mechanism for fleet renewal. A fleet renewal strategy will be developed and  will identify both the type of eligible fleet (taxis and/or miniuses) and the suitable mechanism based on best practices in similar countries.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances addressed within the project Grievance Redress Mechanism (GRM) timeframe during BRT operation
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="100.00">
<comment><narrative>
This is to ensure that any citizen has the possibility to provide feedback on the BRT operations and any complaint/reclamation is appropriately handled and addressed, keeping the citizen informed about the status of the complaint until its conclusion.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Tactical urban sites rehabilitated for the informal sector (stations, stops...)
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="22.00">
<comment><narrative>
This indicator measures the number of rehabilitated tactical facilities (such as stations and stops) used by informal transport providers outside the BRT corridor. It will reflect their integration in the overall transport system.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of an integrated digital platform connecting users and transport operators
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="Yes">
<comment><narrative>
This indicator measures the progress in implementing an integrated digital platform for public transport users and operators, which will contribute to organize and professionalize the urban mobility sector and incumbent operators.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Tactical urban sites rehabilitated for the informal sector (stations, stops...)
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="22.00">
<comment><narrative>
This indicator measures the number of rehabilitated tactical facilities (such as stations and stops) used by informal transport providers outside the BRT corridor. It will reflect their integration in the overall transport system.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Definition of an incentive mechanism for fleet renewal
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="Yes">
<comment><narrative>
This indicator measures progress in tackling the issue of aging and highly emitting vehicles, by structuring an incentive mechanism for fleet renewal. A fleet renewal strategy will be developed and  will identify both the type of eligible fleet (taxis and/or miniuses) and the suitable mechanism based on best practices in similar countries.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual GHG emissions net savings on BRT corridors in tCO2eq
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="27,400.00">
<comment><narrative>
This indicator  will measure the annual GHG emissions savings enabled by the project thanks to the induced modal shift to lower-emitting (BRT) or non-emitting (cycling, walking) modes on the BRT corridor.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A comprehensive communication strategy covering the institutional and social aspects of the project is operational
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="Yes">
<comment><narrative>
A global communication strategy covering the institutional and social aspects of the project is implemented and operational. This strategy will ensure a constant stakeholders' - in particular incumbent operators' -  support and buy-in to the project as well as the awareness of the population on BRT development and activities.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A strategic restructuring plan is finalized for the public operator SOCATUR
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="Yes">
<comment><narrative>
This indicator measures progress in reforming and restructuring the public operator SOCATUR thanks to capacity building and TA activities. A strategic plan will be defined to reorganize the SOCATUR network, its fares and its fleet, improve the management of operations, integrate the SOCATUR lines to the urban network.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A road safety management plan is in place within the BRT operator
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="Yes">
<comment><narrative>
This indicator will measure the focus on road safety for BRT operations. The requirement for a road safety management plan will be part of the concession agreement.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A regulatory framework for public transport providers is in place
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="Yes">
<comment><narrative>
The project will provide TA to define a new regulatory framework of the urban mobility sector and for public transport providers including, but not limited to, vehicle/route licensing, taxation, fines and violations, and permits issuance.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of female staff in:
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="8.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="20.00">
<comment><narrative>
This indicator measures the percentage of women employed in the construction stage and in operations of the BRT, to reflect the gender empowerment impact of the project.
</narrative></comment>
</target>
<actual value="8.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in serious injuries and fatalities along the BRT corridor
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="30.00">
<comment><narrative>
This indicator measures road safety improvements along the BRT corridor.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Relevant staff from CUD and stakeholder institutions having completed institutional training programs
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="50.00">
<comment><narrative>
This indicator measures the percentage of relevant staff from the CUD and stakeholder institutions that have completed institutional training programs.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Operational BRT buses operated by private operator
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="251.00">
<comment><narrative>
This indicator measures the number of operational buses and will reflect the level of transport services provision through the availability of the BRT fleet (privately financed) after the hiring of the BRT operator. This indicator will also capture the main PCM leveraged by the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances addressed within the project Grievance Redress Mechanism (GRM) timeframe during BRT operation
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="100.00">
<comment><narrative>
This is to ensure that any citizen has the possibility to provide feedback on the BRT operations and any complaint/reclamation is appropriately handled and addressed, keeping the citizen informed about the status of the complaint until its conclusion.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Completed pilot urban planning projects around BRT stations
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="2.00">
<comment><narrative>
This indicator  measures the number of pilot projects - urban development around BRT stations - that are finalized using the TOD approach.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
BRT infrastructure constructed to climate resilience standards
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="100.00">
<comment><narrative>
This indicator tracks the progress of the construction of the whole BRT infrastructure to climate resilience standards. It consists in the aggregation of the financial progress of each works contract (roads, stations, terminals, depots...).
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Pedestrian and cycle paths rehabilitated to climate resilience standards
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="100.00">
<comment><narrative>
This indicator reflects  how the project improves soft mobility by tracking the progress of the rehabilitation of pedestrian and cycle paths rehabilitated to climate resilience standards in the project area.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances addressed within the project Grievance Redress Mechanism (GRM) timeframe during construction
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="100.00">
<comment><narrative>
This indicator is to ensure that any citizen has the possibility to provide feedback during the construction of the infrastructure and any complaint/reclamation is appropriately handled and addressed, keeping the citizen informed about the status of the complaint until its conclusion.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Feeder roads rehabilitated to climate resilience standards
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="100.00">
<comment><narrative>
This indicator tracks the progress of the rehabilitation of feeder roads to climate resiliency standards.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual disclosure by CUD of the audited annual financial statements and the operational results of the BRT
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="Yes">
<comment><narrative>
The CUD will be the main entity in charge of monitoring the BRT operations and concession. This indicator will reflect the capacity of CUD in playing that role and the transparent implementation of the BRT operations and concession.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transport service providers trained through formal training programs
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="7,500.00">
<comment><narrative>
This indicator measures the number of transport operators enrolled and having completed formal training programs financed by the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A contract agreement with a private company to invest and operate the BRT is signed
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="Yes">
<comment><narrative>
This indicator mesures the operational effectiveness of the project via a signed concession agreement - operations, maintenance, and provision of the BRT fleet - with a BRT operator. The CUD will receive transaction advisor to define the business and support the procurement process until reaching financial closing.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2028-02-15" />
<target value="800,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Population of Douala able to access at least one additional health facility within 45 minutes using public transport
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="77.00">
<comment><narrative>
This indicator measures the improved accessibility to health services the project is expected to provide by measuring the percentage of the population who have access to at least one additional health facility using public transport.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Population of Douala able to access at least one additional health facility within 45 minutes using public transport
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="77.00">
<comment><narrative>
This indicator measures the improved accessibility to health services the project is expected to provide by measuring the percentage of the population who have access to at least one additional health facility using public transport.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Population of Douala able to access at least one additional health facility within 45 minutes using public transport
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="77.00">
<comment><narrative>
This indicator measures the improved accessibility to health services the project is expected to provide by measuring the percentage of the population who have access to at least one additional health facility using public transport.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Population of Douala able to access to the city center within a 60-minute commuting period using public transport
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="16.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="33.00">
<comment><narrative>
This indicator measures the improved accessibility the project is expected to provide to Douala residents in terms of employment opportunities, economic development and services located in the city center (of coordinates: 9.69296331E, 4.03973582N).
</narrative></comment>
</target>
<actual value="16.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Population of Douala able to access to the city center within a 60-minute commuting period using public transport
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="16.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="33.00">
<comment><narrative>
This indicator measures the improved accessibility the project is expected to provide to Douala residents in terms of employment opportunities, economic development and services located in the city center (of coordinates: 9.69296331E, 4.03973582N).
</narrative></comment>
</target>
<actual value="16.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Population of Douala able to access to the city center within a 60-minute commuting period using public transport
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="16.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="33.00">
<comment><narrative>
This indicator measures the improved accessibility the project is expected to provide to Douala residents in terms of employment opportunities, economic development and services located in the city center (of coordinates: 9.69296331E, 4.03973582N).
</narrative></comment>
</target>
<actual value="16.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Satisfaction rating by public transport users of the BRT
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="75.00">
<comment><narrative>
This indicator will reflect the improvement in public transport services and the increase in satisfaction by BRT users. A sub-indicator will report women's answers.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Satisfaction rating by public transport users of the BRT
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="75.00">
<comment><narrative>
This indicator will reflect the improvement in public transport services and the increase in satisfaction by BRT users. A sub-indicator will report women's answers.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Satisfaction rating by public transport users of the BRT
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="75.00">
<comment><narrative>
This indicator will reflect the improvement in public transport services and the increase in satisfaction by BRT users. A sub-indicator will report women's answers.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average rush hour in-vehicle travel time on BRT routes
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="58.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="48.40">
<comment><narrative>
This indicator measures the average in-vehicle time of the BRT at morning peak hours between 7:00am and 9:00 am.
</narrative></comment>
</target>
<actual value="58.50">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average rush hour in-vehicle travel time on BRT routes
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="58.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="48.40">
<comment><narrative>
This indicator measures the average in-vehicle time of the BRT at morning peak hours between 7:00am and 9:00 am.
</narrative></comment>
</target>
<actual value="58.50">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average rush hour in-vehicle travel time on BRT routes
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="58.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="48.40">
<comment><narrative>
This indicator measures the average in-vehicle time of the BRT at morning peak hours between 7:00am and 9:00 am.
</narrative></comment>
</target>
<actual value="58.50">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of the project with improved working and/or living conditions around TOD investments
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="3,192.00">
<comment><narrative>
This indicator measures the number of Douala's inhabitants who benefit from the development of transport services and urban development carried out by the project. The project will foster economic and employment opportunities and women empowerment. It is the sum of the sub-indicators below.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of the project with improved working and/or living conditions around TOD investments
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="3,192.00">
<comment><narrative>
This indicator measures the number of Douala's inhabitants who benefit from the development of transport services and urban development carried out by the project. The project will foster economic and employment opportunities and women empowerment. It is the sum of the sub-indicators below.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of the project with improved working and/or living conditions around TOD investments
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="3,192.00">
<comment><narrative>
This indicator measures the number of Douala's inhabitants who benefit from the development of transport services and urban development carried out by the project. The project will foster economic and employment opportunities and women empowerment. It is the sum of the sub-indicators below.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average weekday passenger ridership using the BRT routes
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="535,000.00">
<comment><narrative>
This indicator measures the average daily ridership of the BRT. The data collected will be disaggregated by gender.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average weekday passenger ridership using the BRT routes
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="535,000.00">
<comment><narrative>
This indicator measures the average daily ridership of the BRT. The data collected will be disaggregated by gender.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Population of Douala able to access to the city center within a 60-minute commuting period using public transport
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="16.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="33.00">
<comment><narrative>
This indicator measures the improved accessibility the project is expected to provide to Douala residents in terms of employment opportunities, economic development and services located in the city center (of coordinates: 9.69296331E, 4.03973582N).
</narrative></comment>
</target>
<actual value="16.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average weekday passenger ridership using the BRT routes
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="535,000.00">
<comment><narrative>
This indicator measures the average daily ridership of the BRT. The data collected will be disaggregated by gender.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A comprehensive communication strategy covering the institutional and social aspects of the project is operational
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="Yes">
<comment><narrative>
A global communication strategy covering the institutional and social aspects of the project is implemented and operational. This strategy will ensure a constant stakeholders' - in particular incumbent operators' -  support and buy-in to the project as well as the awareness of the population on BRT development and activities.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Pedestrian and cycle paths rehabilitated to climate resilience standards
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="100.00">
<comment><narrative>
This indicator reflects  how the project improves soft mobility by tracking the progress of the rehabilitation of pedestrian and cycle paths rehabilitated to climate resilience standards in the project area.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A road safety management plan is in place within the BRT operator
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="Yes">
<comment><narrative>
This indicator will measure the focus on road safety for BRT operations. The requirement for a road safety management plan will be part of the concession agreement.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Population of Douala able to access to the city center within a 60-minute commuting period using public transport
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="16.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="33.00">
<comment><narrative>
This indicator measures the improved accessibility the project is expected to provide to Douala residents in terms of employment opportunities, economic development and services located in the city center (of coordinates: 9.69296331E, 4.03973582N).
</narrative></comment>
</target>
<actual value="16.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Operational BRT buses operated by private operator
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="251.00">
<comment><narrative>
This indicator measures the number of operational buses and will reflect the level of transport services provision through the availability of the BRT fleet (privately financed) after the hiring of the BRT operator. This indicator will also capture the main PCM leveraged by the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of female staff in:
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="8.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="20.00">
<comment><narrative>
This indicator measures the percentage of women employed in the construction stage and in operations of the BRT, to reflect the gender empowerment impact of the project.
</narrative></comment>
</target>
<actual value="8.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual disclosure by CUD of the audited annual financial statements and the operational results of the BRT
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="Yes">
<comment><narrative>
The CUD will be the main entity in charge of monitoring the BRT operations and concession. This indicator will reflect the capacity of CUD in playing that role and the transparent implementation of the BRT operations and concession.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual GHG emissions net savings on BRT corridors in tCO2eq
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="27,400.00">
<comment><narrative>
This indicator  will measure the annual GHG emissions savings enabled by the project thanks to the induced modal shift to lower-emitting (BRT) or non-emitting (cycling, walking) modes on the BRT corridor.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of the project with improved working and/or living conditions around TOD investments
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="3,192.00">
<comment><narrative>
This indicator measures the number of Douala's inhabitants who benefit from the development of transport services and urban development carried out by the project. The project will foster economic and employment opportunities and women empowerment. It is the sum of the sub-indicators below.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Operational BRT buses operated by private operator
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="251.00">
<comment><narrative>
This indicator measures the number of operational buses and will reflect the level of transport services provision through the availability of the BRT fleet (privately financed) after the hiring of the BRT operator. This indicator will also capture the main PCM leveraged by the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transport service providers trained through formal training programs
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="7,500.00">
<comment><narrative>
This indicator measures the number of transport operators enrolled and having completed formal training programs financed by the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A contract agreement with a private company to invest and operate the BRT is signed
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="Yes">
<comment><narrative>
This indicator mesures the operational effectiveness of the project via a signed concession agreement - operations, maintenance, and provision of the BRT fleet - with a BRT operator. The CUD will receive transaction advisor to define the business and support the procurement process until reaching financial closing.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Relevant staff from CUD and stakeholder institutions having completed institutional training programs
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="50.00">
<comment><narrative>
This indicator measures the percentage of relevant staff from the CUD and stakeholder institutions that have completed institutional training programs.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A regulatory framework for public transport providers is in place
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="Yes">
<comment><narrative>
The project will provide TA to define a new regulatory framework of the urban mobility sector and for public transport providers including, but not limited to, vehicle/route licensing, taxation, fines and violations, and permits issuance.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Population of Douala able to access at least one additional health facility within 45 minutes using public transport
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="77.00">
<comment><narrative>
This indicator measures the improved accessibility to health services the project is expected to provide by measuring the percentage of the population who have access to at least one additional health facility using public transport.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
BRT infrastructure constructed to climate resilience standards
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="100.00">
<comment><narrative>
This indicator tracks the progress of the construction of the whole BRT infrastructure to climate resilience standards. It consists in the aggregation of the financial progress of each works contract (roads, stations, terminals, depots...).
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Feeder roads rehabilitated to climate resilience standards
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="100.00">
<comment><narrative>
This indicator tracks the progress of the rehabilitation of feeder roads to climate resiliency standards.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of an integrated digital platform connecting users and transport operators
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="Yes">
<comment><narrative>
This indicator measures the progress in implementing an integrated digital platform for public transport users and operators, which will contribute to organize and professionalize the urban mobility sector and incumbent operators.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Completed pilot urban planning projects around BRT stations
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="2.00">
<comment><narrative>
This indicator  measures the number of pilot projects - urban development around BRT stations - that are finalized using the TOD approach.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances addressed within the project Grievance Redress Mechanism (GRM) timeframe during BRT operation
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="100.00">
<comment><narrative>
This is to ensure that any citizen has the possibility to provide feedback on the BRT operations and any complaint/reclamation is appropriately handled and addressed, keeping the citizen informed about the status of the complaint until its conclusion.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A regulatory framework for public transport providers is in place
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="Yes">
<comment><narrative>
The project will provide TA to define a new regulatory framework of the urban mobility sector and for public transport providers including, but not limited to, vehicle/route licensing, taxation, fines and violations, and permits issuance.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Satisfaction rating by public transport users of the BRT
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="75.00">
<comment><narrative>
This indicator will reflect the improvement in public transport services and the increase in satisfaction by BRT users. A sub-indicator will report women's answers.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Feeder roads rehabilitated to climate resilience standards
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="100.00">
<comment><narrative>
This indicator tracks the progress of the rehabilitation of feeder roads to climate resiliency standards.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances addressed within the project Grievance Redress Mechanism (GRM) timeframe during construction
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="100.00">
<comment><narrative>
This indicator is to ensure that any citizen has the possibility to provide feedback during the construction of the infrastructure and any complaint/reclamation is appropriately handled and addressed, keeping the citizen informed about the status of the complaint until its conclusion.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average weekday passenger ridership using the BRT routes
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="535,000.00">
<comment><narrative>
This indicator measures the average daily ridership of the BRT. The data collected will be disaggregated by gender.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Definition of an incentive mechanism for fleet renewal
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="Yes">
<comment><narrative>
This indicator measures progress in tackling the issue of aging and highly emitting vehicles, by structuring an incentive mechanism for fleet renewal. A fleet renewal strategy will be developed and  will identify both the type of eligible fleet (taxis and/or miniuses) and the suitable mechanism based on best practices in similar countries.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances addressed within the project Grievance Redress Mechanism (GRM) timeframe during construction
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="100.00">
<comment><narrative>
This indicator is to ensure that any citizen has the possibility to provide feedback during the construction of the infrastructure and any complaint/reclamation is appropriately handled and addressed, keeping the citizen informed about the status of the complaint until its conclusion.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A contract agreement with a private company to invest and operate the BRT is signed
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="Yes">
<comment><narrative>
This indicator mesures the operational effectiveness of the project via a signed concession agreement - operations, maintenance, and provision of the BRT fleet - with a BRT operator. The CUD will receive transaction advisor to define the business and support the procurement process until reaching financial closing.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A road safety management plan is in place within the BRT operator
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="Yes">
<comment><narrative>
This indicator will measure the focus on road safety for BRT operations. The requirement for a road safety management plan will be part of the concession agreement.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual disclosure by CUD of the audited annual financial statements and the operational results of the BRT
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="Yes">
<comment><narrative>
The CUD will be the main entity in charge of monitoring the BRT operations and concession. This indicator will reflect the capacity of CUD in playing that role and the transparent implementation of the BRT operations and concession.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A strategic restructuring plan is finalized for the public operator SOCATUR
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="Yes">
<comment><narrative>
This indicator measures progress in reforming and restructuring the public operator SOCATUR thanks to capacity building and TA activities. A strategic plan will be defined to reorganize the SOCATUR network, its fares and its fleet, improve the management of operations, integrate the SOCATUR lines to the urban network.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual GHG emissions net savings on BRT corridors in tCO2eq
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="27,400.00">
<comment><narrative>
This indicator  will measure the annual GHG emissions savings enabled by the project thanks to the induced modal shift to lower-emitting (BRT) or non-emitting (cycling, walking) modes on the BRT corridor.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Transport service providers trained through formal training programs
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="7,500.00">
<comment><narrative>
This indicator measures the number of transport operators enrolled and having completed formal training programs financed by the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average rush hour in-vehicle travel time on BRT routes
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="58.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="48.40">
<comment><narrative>
This indicator measures the average in-vehicle time of the BRT at morning peak hours between 7:00am and 9:00 am.
</narrative></comment>
</target>
<actual value="58.50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
BRT infrastructure constructed to climate resilience standards
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="100.00">
<comment><narrative>
This indicator tracks the progress of the construction of the whole BRT infrastructure to climate resilience standards. It consists in the aggregation of the financial progress of each works contract (roads, stations, terminals, depots...).
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in serious injuries and fatalities along the BRT corridor
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="30.00">
<comment><narrative>
This indicator measures road safety improvements along the BRT corridor.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A comprehensive communication strategy covering the institutional and social aspects of the project is operational
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="Yes">
<comment><narrative>
A global communication strategy covering the institutional and social aspects of the project is implemented and operational. This strategy will ensure a constant stakeholders' - in particular incumbent operators' -  support and buy-in to the project as well as the awareness of the population on BRT development and activities.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A strategic restructuring plan is finalized for the public operator SOCATUR
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="Yes">
<comment><narrative>
This indicator measures progress in reforming and restructuring the public operator SOCATUR thanks to capacity building and TA activities. A strategic plan will be defined to reorganize the SOCATUR network, its fares and its fleet, improve the management of operations, integrate the SOCATUR lines to the urban network.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Population of Douala able to access at least one additional health facility within 45 minutes using public transport
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="77.00">
<comment><narrative>
This indicator measures the improved accessibility to health services the project is expected to provide by measuring the percentage of the population who have access to at least one additional health facility using public transport.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Population of Douala able to access at least one additional health facility within 45 minutes using public transport
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="77.00">
<comment><narrative>
This indicator measures the improved accessibility to health services the project is expected to provide by measuring the percentage of the population who have access to at least one additional health facility using public transport.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Population of Douala able to access at least one additional health facility within 45 minutes using public transport
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="77.00">
<comment><narrative>
This indicator measures the improved accessibility to health services the project is expected to provide by measuring the percentage of the population who have access to at least one additional health facility using public transport.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Population of Douala able to access to the city center within a 60-minute commuting period using public transport
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="16.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="33.00">
<comment><narrative>
This indicator measures the improved accessibility the project is expected to provide to Douala residents in terms of employment opportunities, economic development and services located in the city center (of coordinates: 9.69296331E, 4.03973582N).
</narrative></comment>
</target>
<actual value="16.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Population of Douala able to access to the city center within a 60-minute commuting period using public transport
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="16.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="33.00">
<comment><narrative>
This indicator measures the improved accessibility the project is expected to provide to Douala residents in terms of employment opportunities, economic development and services located in the city center (of coordinates: 9.69296331E, 4.03973582N).
</narrative></comment>
</target>
<actual value="16.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Population of Douala able to access to the city center within a 60-minute commuting period using public transport
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="16.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="33.00">
<comment><narrative>
This indicator measures the improved accessibility the project is expected to provide to Douala residents in terms of employment opportunities, economic development and services located in the city center (of coordinates: 9.69296331E, 4.03973582N).
</narrative></comment>
</target>
<actual value="16.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Satisfaction rating by public transport users of the BRT
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="75.00">
<comment><narrative>
This indicator will reflect the improvement in public transport services and the increase in satisfaction by BRT users. A sub-indicator will report women's answers.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Satisfaction rating by public transport users of the BRT
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="75.00">
<comment><narrative>
This indicator will reflect the improvement in public transport services and the increase in satisfaction by BRT users. A sub-indicator will report women's answers.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Satisfaction rating by public transport users of the BRT
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="75.00">
<comment><narrative>
This indicator will reflect the improvement in public transport services and the increase in satisfaction by BRT users. A sub-indicator will report women's answers.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average rush hour in-vehicle travel time on BRT routes
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="58.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="48.40">
<comment><narrative>
This indicator measures the average in-vehicle time of the BRT at morning peak hours between 7:00am and 9:00 am.
</narrative></comment>
</target>
<actual value="58.50">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average rush hour in-vehicle travel time on BRT routes
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="58.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="48.40">
<comment><narrative>
This indicator measures the average in-vehicle time of the BRT at morning peak hours between 7:00am and 9:00 am.
</narrative></comment>
</target>
<actual value="58.50">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average rush hour in-vehicle travel time on BRT routes
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="58.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="48.40">
<comment><narrative>
This indicator measures the average in-vehicle time of the BRT at morning peak hours between 7:00am and 9:00 am.
</narrative></comment>
</target>
<actual value="58.50">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of the project with improved working and/or living conditions around TOD investments
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="3,192.00">
<comment><narrative>
This indicator measures the number of Douala's inhabitants who benefit from the development of transport services and urban development carried out by the project. The project will foster economic and employment opportunities and women empowerment. It is the sum of the sub-indicators below.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of the project with improved working and/or living conditions around TOD investments
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="3,192.00">
<comment><narrative>
This indicator measures the number of Douala's inhabitants who benefit from the development of transport services and urban development carried out by the project. The project will foster economic and employment opportunities and women empowerment. It is the sum of the sub-indicators below.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of the project with improved working and/or living conditions around TOD investments
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="3,192.00">
<comment><narrative>
This indicator measures the number of Douala's inhabitants who benefit from the development of transport services and urban development carried out by the project. The project will foster economic and employment opportunities and women empowerment. It is the sum of the sub-indicators below.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average weekday passenger ridership using the BRT routes
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="535,000.00">
<comment><narrative>
This indicator measures the average daily ridership of the BRT. The data collected will be disaggregated by gender.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average weekday passenger ridership using the BRT routes
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="535,000.00">
<comment><narrative>
This indicator measures the average daily ridership of the BRT. The data collected will be disaggregated by gender.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average weekday passenger ridership using the BRT routes
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="535,000.00">
<comment><narrative>
This indicator measures the average daily ridership of the BRT. The data collected will be disaggregated by gender.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of an integrated digital platform connecting users and transport operators
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="Yes">
<comment><narrative>
This indicator measures the progress in implementing an integrated digital platform for public transport users and operators, which will contribute to organize and professionalize the urban mobility sector and incumbent operators.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average rush hour in-vehicle travel time on BRT routes
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="58.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="48.40">
<comment><narrative>
This indicator measures the average in-vehicle time of the BRT at morning peak hours between 7:00am and 9:00 am.
</narrative></comment>
</target>
<actual value="58.50">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Satisfaction rating by public transport users of the BRT
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="75.00">
<comment><narrative>
This indicator will reflect the improvement in public transport services and the increase in satisfaction by BRT users. A sub-indicator will report women's answers.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Tactical urban sites rehabilitated for the informal sector (stations, stops...)
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="22.00">
<comment><narrative>
This indicator measures the number of rehabilitated tactical facilities (such as stations and stops) used by informal transport providers outside the BRT corridor. It will reflect their integration in the overall transport system.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Relevant staff from CUD and stakeholder institutions having completed institutional training programs
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="50.00">
<comment><narrative>
This indicator measures the percentage of relevant staff from the CUD and stakeholder institutions that have completed institutional training programs.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in serious injuries and fatalities along the BRT corridor
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="30.00">
<comment><narrative>
This indicator measures road safety improvements along the BRT corridor.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2028-02-15" />
<target value="800,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of the project with improved working and/or living conditions around TOD investments
</narrative></title>
<baseline year="2022" iso-date="2022-05-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-03" />
<period-end iso-date="2028-02-18" />
<target value="3,192.00">
<comment><narrative>
This indicator measures the number of Douala's inhabitants who benefit from the development of transport services and urban development carried out by the project. The project will foster economic and employment opportunities and women empowerment. It is the sum of the sub-indicators below.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P143417</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>The Agriculture Investment and Market Development Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To support the transformation of low productivity, subsistence-oriented cassava, maize and sorghum sub-sectors into commercially-oriented and competitive value chains in four agro-ecological areas.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Agriculture Investment and Market Development Project for Cameroon is to support the transformation of low productivity, subsistence-oriented cassava, maize, and sorghum sub-sectors into commercially-oriented and competitive value chains in four agro-ecological areas. The project has three components. The first component, support to agricultural production, processing, and marketing aim to establish productive partnerships (PPs) between producer organizations (POs) and agri-business (ABs) that will lead to increased productivity, production, and quality of the identified value chains. The component is organized under four sub-components: (i) establishing of PPs; (ii) financing of sub-project (SPs) for POs; (iii) financing of basic public infrastructure; and (iv) supporting improved access to rural financing. The second component, support to seed production and distribution system, relevant public services, and technology transfer will support the implementation of first component by: (a) strengthening the seed system and the capacity of public services key to the project; (b) creating a framework for cooperation between the Government of Cameroon (GOC), POs, ABs, financial institution (FIs), and other actors that will play an important role in the project; and (c) enhancing agricultural technology transfers. It comprises three sub-components: (i) enhancement of the seed production and distribution systems? relevant public services; (ii) building a commodity-based public-private consultation and partnership framework; and (iii) enhancement of agricultural technology transfers and promotion of healthy food and nutrition practices. The third component, project coordination and management objective is to: (a) ensure effective strategic and operational planning, monitoring, and implementation of the project and efficient coordination between first and second components and the various sources of funding and project implementation partners; (b) evaluate the project?s final results and impact on smallholders and POs; and (c) communicate efficiently to various public entities on project activities, outcomes, and lessons learnt. The component has two sub-components: (i) strategic planning, coordination, management, and implementation support; and (ii) monitoring and evaluation, communication, and knowledge production and sharing.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0012432"><narrative>THE REPUBLIC OF CAMEROON</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0012432"><narrative>THE REPUBLIC OF CAMEROON</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="CM-COA-0012433"><narrative>MINADER</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2014-05-28"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2014-09-25"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2021-07-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2021-07-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Nabil M. Chaherli</narrative></person-name><telephone>+1-202-473-1000</telephone><email>nchaherli@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002222230" />
            <name><narrative>Sangmelima</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>2.9333301 11.98333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002222568" />
            <name><narrative>Pitoa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.3838997 13.50231</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002224828" />
            <name><narrative>Ngaoundere</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.2666702 14.01667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002228372" />
            <name><narrative>Maroua</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.61163 14.31656</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002235024" />
            <name><narrative>Bali</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.5271001 9.3168001</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002235284" />
            <name><narrative>Babessa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.6833296 13.6</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002236053" />
            <name><narrative>Abong Mbang</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.98333 13.18333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002231414" />
            <name><narrative>Galim</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.0999999 12.48333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002225457" />
            <name><narrative>Nanga Eboko</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.6833301 12.36667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002222486" />
            <name><narrative>Pouma</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.8499999 10.51667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002221362" />
            <name><narrative>Touboro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.7708001 15.3568</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002224490" />
            <name><narrative>Ngoumou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.1999998 12.91667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002227230" />
            <name><narrative>Melong</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.12181 9.9614296</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002227402" />
            <name><narrative>Meiganga</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.5166702 14.3</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002227651" />
            <name><narrative>Mbongo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.8 11.23333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002234684" />
            <name><narrative>Batibo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.8358002 9.8552999</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="31161" percentage="50" xml:lang="en"/><sector vocabulary="1" code="31120" percentage="50" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AH" percentage="28.0000000" xml:lang="en"><narrative>FY17 - Crops</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AB" percentage="8.00000000" xml:lang="en"><narrative>FY17 - Agricultural Extension, Research, and Other Support Activities</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AI" percentage="22.0000000" xml:lang="en"><narrative>FY17 - Irrigation and Drainage</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="21.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YA" percentage="21.0000000" xml:lang="en"><narrative>FY17 - Agricultural markets, commercialization and agri-business</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="50" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="15" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="15" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="86" xml:lang="en"><narrative>Rural Development</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">646000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">646000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">646000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">646000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">646000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">646000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">646000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">646000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">646000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">1666666.65</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">1666666.65</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">1666666.65</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">2083333.35</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">416666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">416666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">416666.65</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">416666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">416666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">416666.65</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">10437480.75</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">10437480.75</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">100000000</value><description xml:lang="en"><narrative>Total Commitment in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">2111209</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">6935851</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">2608749</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">9646974</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">7644015</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">111956</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">1089870</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">3575652</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">9797304</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">7783063</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">1692743</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">2286519</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">558414</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">6056565</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">243160</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">-163</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">6593103</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">450676</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">273925</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">344695</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">180341</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">1016158</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">6820748</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">1169731</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">292601</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">3360748</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">272977</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">361096</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">813830</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">4618271</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">186466</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">701270</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">728208</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">-109888</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-79732</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-574585</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-12467</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-109939</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-127265</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-216298</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-311449</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-336149</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-368969</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-490186</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-554130</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-626116</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-682569</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-762408</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-818992</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-773667</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-814453</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-797224</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-765013</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-739527</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-718960</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-653046</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-752136</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-690941</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-692361</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-1467339</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-1461615</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-1519291</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-1520485</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-1489915</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-1428754</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-1403908</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-1431141</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-1413756</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-1410527</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-1399623</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-1437814</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-35151</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-1416672</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-1459484</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-12433"><narrative>MINADER</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P143417"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P143417?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P143417"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Productive Partnerships established and functionning
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2018-02-04" />
<target value="20.00">
<comment><narrative>
&lt;p&amp;gt;The achievement against the end of Project target was 100 percent. The PAD target was 35 PPs. The 2018 restructuring adjusted down the target to 20. At the end of the Project 20 PPs were established. Despite a 100 percent not all the PPs were functioning as intended.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="20.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased volume of targeted crops sold by participating cooperatives to buyers from productive partnerships (Agro-Business)
</narrative></title>
<baseline year="2017" iso-date="2017-09-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-09-11" />
<period-end iso-date="2019-06-27" />
<target value="40600.00">
<comment><narrative>
&lt;p&amp;gt;An increase in volume marketed indicator was added during the February 2018 restructuring to measure the effectiveness of the contractual arrangements among those participating. The initial outcome targets set for this indicator were 65,700, 10,600, and 14,400metric ton for maize, sorghum, and cassava respectively. During the June 2019 restructuring, the outcome targets for maize and cassava were revised down to 25,000 and 5,000 metric ton respectively. Beneficiary cooperative marketed 114.3, 132.0, and 89.0 percent of the revised targets for maize, sorghum, and cassava, respectively. Cassava marketing failed to meet target because many of the purchase contracts for cassava failed.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="47017.33">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Rate of credit reimbursement of participating cooperatives to partner Financial Institutions (IFPs)
</narrative></title>
<baseline year="2017" iso-date="2017-09-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-09-11" />
<period-end iso-date="2018-02-04" />
<target value="75.00">
<comment><narrative>
&lt;p&amp;gt;The target was exceeded: 108 percent. This indicator was added during the 2018 restructuring to measure the effectiveness of FIs&amp;rsquo; credit mechanism for cooperatives. The PDA target was 75 percent. The Project achieved 81 percent.&amp;nbsp; The end of Project impact study revealed that for IFPs outside the partnership with AIMDP, the repayment rate of loans intended for agriculture is around 60 percent on average.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="81.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered related to delvery of project benefits addressed
</narrative></title>
<baseline year="2018" iso-date="2018-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-01" />
<period-end iso-date="2014-09-25" />
<target value="0.00">
<comment><narrative>
&lt;p&amp;gt;At closing the GRM was operational,&amp;nbsp;with a total 165 complaints registered. 122 complaints were related to road works, 10 to micro-projects, 32 to activities related to Nutrition, and 1 complaint related to procurement. At the end of the Project, 159 complaints out of the 165 were closed. The unresolved complaints were related to rural roads not completed at closing.&amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="96.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Commodity platform established
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2021-07-30" />
<target value="1.00">

</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farms that have adopted bio-fortified varieties
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2021-07-30" />
<target value="900.00">

</target>
<actual value="958.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Foundation seeds produced and distributed
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2019-06-27" />
<target value="9450381.00">
<comment><narrative>
&lt;p&amp;gt;Foundation seeds produced and distributed achieved 92, 38, 101, and 78 percent of the end of project targets for maize, sorghum,cassava cuttings, and bio-fortified cassava respectively. At PAD the targets were 130, 130, 9000000, and 735000 metric ton respectively. During the February 2018 restructuring the targets for maize, sorghum, cassava cutting, and bio-fortified cassava were adjusted to 176, 205, 4680000, and 550000 respectively. The June 2019 adjusted the target for cassava cutting to 8900000.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="93021460.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sub-projects implemented
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2021-07-30" />
<target value="100.00">

</target>
<actual value="78.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sub-projects implemented
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2018-02-04" />
<target value="100.00">
<comment><narrative>
&lt;p&amp;gt;The achievement against the end of Project target was 78 percent. The PAD target was 300 SPs. The 2018 restructuring adjusted down the target to 100. At the end of the Project 78 SPs were established.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="78.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Clients who have adopted an improved agr. technology promoted by the project
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2018-02-04" />
<target value="25000.00">
<comment><narrative>
&lt;p&amp;gt;The Project achieved 67 percent of the target. At PDA the target was set at 120,000 beneficiaries. The target was adjusted down to 25,000 during the February 2018 restructuring. At closing the number of beneficiaries who have adopted improved agriculture technologies promoted by the project was 16,752&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="16752.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women who benefited from labor-saving technologies and equipment
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2018-02-04" />
<target value="25000.00">
<comment><narrative>
&lt;p&amp;gt;At closing Achievement against target was about 35 percent. The PAD target was 84000 women beneficiaries. After the 2018 restructuring the target was set to 25000. At the end of the Project only 8735 women had benefited from labor-saving technologies and equipment.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="8735.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Commodity platform established
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2014-09-25" />
<target value="1.00">
<comment><narrative>
&lt;p&amp;gt;The PAD proposed to establish a commodity-based public-private consultation platform as a permanent institution to promote valued chain development of target commodities. A platform was set up on April 13, 2015 by Ministerial decision N&amp;deg; 0711/CAB/MINADER/ and launched on September 17, 2015 (100% completion rate).&amp;nbsp;The technical coordinators and secretaries of the four committees were elected in 2018 and the committees submitted roadmaps for the implementation of their action plan included in the AWPB. Although the initiative to create the platform was positively appreciated by stakeholders, the effects (implementation of information systemson the market, resolution of conflicts discussed or resolved, etc.) envisioned by its creation were not yet visible at closing.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehabilitated, Rural
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2021-07-30" />
<target value="190.00">

</target>
<actual value="217.30">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farms that have adopted bio-fortified varieties
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2019-06-27" />
<target value="900.00">
<comment><narrative>
&lt;p&amp;gt;The target was exceeded: 106 percent. At PAD the target was set at 6000 beneficiaries. The 2018 restructuring revised the targetdown to 310. The 2019 restructuring adjusted the target to 900 beneficiaries. At closing 958 farms had adopted bio-fortified varieties.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="958.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Productive Partnerships established and functionning
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2021-07-30" />
<target value="20.00">

</target>
<actual value="20.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Certified seeds produced and distributed
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2019-06-27" />
<target value="22604400.00">
<comment><narrative>
&lt;p&amp;gt;Certified seeds produced and distributed achieved 45, 14, 83, and 10 percent of the end of Project targets for maize, sorghum, cassava cuttings, and bio-fortified cassava respectively. The PAD targets were 3700, 3800, 80000000, and 5000000 metric ton respectively. After restructuring these targets were revised to 4400, 1000, 20890000, and 1709000 respectively. At the end of the Project, only 1977, 137, 17394000, and 169500 of certified seeds were produced and distributed for maize, sorghum, cassava cuttings, and bio-fortified cassava respectively. This low level of achievement is explained by the fact that production activities of eligible sorghum seed cooperatives (registered, having adopted business plans, having mobilized their 10%) to co-financing of PIDMA started quite late (year 2020), particularly for maize and sorghum.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="17565614.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase yield of targeted crops by direct beneficiaries
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2018-06-27" />
<target value="0.00">
<comment><narrative>
&lt;p&amp;gt;The Project achieved 89, 96, and 89 percent of targets for maize, sorghum, cassava respectively. The targets were 267, 200, and 300 percent increase over baseline averages of 1.5, 1, 8 MT/ha for maize, sorghum, and cassava respectively. The actual yields achieved represented increases of 237 percent, 191 percent, and 279 percent for maize, sorghum, and cassava respectively. &amp;nbsp;This indicator is linked to the support to the seed production and distribution system, relevant public services and to technology transfer.&amp;nbsp;While crop yields in all three-value chain significantly increased compare to the baseline, they all failed to meet the targets. This is due to several factors: (i) including reduction in costs of activities supporting technologies transfer; (ii)&amp;nbsp;Inadequacy of certain varieties of maize seeds distributed; (ii) unpredictable weather in the North and the Far North region; (iii) security crises in the North West and the South West.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of participating cooperatives with a Director and a functioning business accounting system
</narrative></title>
<baseline year="2017" iso-date="2017-09-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-09-11" />
<period-end iso-date="2018-02-04" />
<target value="100.00">
<comment><narrative>
&lt;p&amp;gt;Achievement against target was 75 percent. This indicator was added during the 2018 restructuring to evaluate beneficiary cooperatives operations. &amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="75.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of participating cooperatives with a Director and a functioning business accounting system
</narrative></title>
<baseline year="2017" iso-date="2017-09-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-09-11" />
<period-end iso-date="2021-07-30" />
<target value="100.00">

</target>
<actual value="75.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Post-harvest or processing facilities constructed or rehabilitated
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2021-07-30" />
<target value="100.00">

</target>
<actual value="115.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Agro-Business buyers' rate of satisfaction on achievement of contractual commitments of cooperatives for selected commodities
</narrative></title>
<baseline year="2017" iso-date="2017-09-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-09-11" />
<period-end iso-date="2018-02-04" />
<target value="0.00">
<comment><narrative>
&lt;p&amp;gt;Achievements against targets were 92, 89, and 29 percent for maize, sorghum, and cassava respectively. This indicator was added during the 2018 restructuring to remeasure satisfaction of effectiveness of implementation of contractual arrangements between producers and buyers. For maize and sorghum, the satisfaction rates improved significantly once the productive investment such as drying, and storage units were put in place. Acquisition of processing unit for maize recorded extended delays. &amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women who benefited from labor-saving technologies and equipment
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2021-07-30" />
<target value="25000.00">

</target>
<actual value="8735.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehabilitated, Rural
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2019-06-27" />
<target value="190.00">
<comment><narrative>
&lt;p&amp;gt;The target was exceeded: 114 percent. At PAD the target was set at 500 km of rural roads rehabilitated. The 2018 restructuring revised the target down to 193. The 2019 restructuring adjusted the target to 190 km. At closing 217 farms had adopted bio-fortified varieties. There was however a substantial sustainability risk as the committees set up by the Project for maintenance of infrastructures were still nascent with limited resources.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="217.30">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increased quality as measured by price premium of produce sold by beneficiary farmers in the targeted value chains
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2014-09-25" />
<target value="0.00">
<comment><narrative>
&lt;p&amp;gt;Maize quality as measured by price premium achieved by beneficiaries exceed target: 114.6 percent. Sorghum falls short of meeting the target by 14.3 percent. For cassava, at closing, the cooperatives were still at the start of delivery. The initial prices for maize and sorghum were XAF 133,800 and 175,000 per ton respectively. The average unit prices negotiated with ABs were XAF 156,808 and 205,000 per ton generating price premia 17.2 and 17.14 percent for maize and sorghum respectively. Delays in delivery for ccassavastems from the fact the initial AIMDP model was incompatible with private sector&lt;strong&amp;gt;.&lt;/strong&amp;gt; In the PAD beneficiary cooperatives in the cassava value chain were expected to process cassava and supply starch to NCSA. The later, requested convincing proof of production capacity (in terms of land, infrastructure, and human resource) before signing the purchase agreement.&amp;nbsp;In addition, for NCSA the actual contract was conditional to meeting the quality standard audited by its own experts. This risk management strategy of NCSA was incompatible with the AIMDP partnership scheme of AIMDP in which deals were expected to be made before installation of starch processing facilities. Later, NCSA decided to drop purchasing the starch. At the same time small and processing units recorded delays in equipment acquisitions.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of credit granted by IFPs to participating cooperatives (in thousands)
</narrative></title>
<baseline year="2017" iso-date="2017-09-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-09-11" />
<period-end iso-date="2021-07-30" />
<target value="5740000.00">

</target>
<actual value="5910.73">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of credit granted by IFPs to participating cooperatives (in thousands)
</narrative></title>
<baseline year="2017" iso-date="2017-09-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-09-11" />
<period-end iso-date="2019-06-27" />
<target value="5740000.00">
<comment><narrative>
&lt;p&amp;gt;The target was exceeded: 108 percent. This indicator was added during the 2018 restructuring. The target was initially set at US$ 2697000. The 2019 restructuring revised the target up to US$ 5,740,000. &amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="5759000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2019-06-27" />
<target value="140000.00">
<comment><narrative>
&lt;p&amp;gt;The target was exceeded: 126 percent. The PAD target was 120,000 beneficiaries. The target was revised up during the 2019 restructuring to 140,000 beneficiaries. At closing 176,254 people had benefited from the Project, of which Female beneficiaries were 36 percent compared to the target of 70 percent (51 percent).&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="176254.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Post-harvest or processing facilities constructed or rehabilitated
</narrative></title>
<baseline year="2014" iso-date="2014-09-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-09-25" />
<period-end iso-date="2019-06-27" />
<target value="100.00">
<comment><narrative>
&lt;p&amp;gt;The target was exceeded: 115 percent. &amp;nbsp;At PAD the target was set at 160 Post-harvest or processing facilities. The 2019 restructuring revised the target down to 100. At closing 115 Post-harvest or processing facilities were constructed or rehabilitated.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="115.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered related to delvery of project benefits addressed
</narrative></title>
<baseline year="2018" iso-date="2018-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-01-01" />
<period-end iso-date="2021-07-30" />
<target value="90.00">

</target>
<actual value="165.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Rate of credit reimbursement of participating cooperatives to partner Financial Institutions (IFPs)
</narrative></title>
<baseline year="2017" iso-date="2017-09-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-09-11" />
<period-end iso-date="2021-07-30" />
<target value="75.00">

</target>
<actual value="81.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P104456</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>CM-Energy Sector Development SIL (FY08)</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The overall project development objective is to increase access to modern energy in targeted rural areas and improve theplanning and management of sector resources by all energy sector institutions.  Through its intervention, the project is expectedto contribute to improved reliability of electricity supply.  Increased access to and reliability of electricity are key factors inthe realizationof the Government of Cameroon's (GOC) growth and poverty reduction strategy.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The overall Energy Sector Development Project for Cameroon development objective is to increase access to modern energy in targeted rural areas and improve the planning and management of sector resources by all energy sector institutions. Through its intervention, the project is expected to contribute to improved reliability of electricity supply. Increased access to and reliability of electricity are key factors in the realization of the Government of Cameroon's (GOC) growth and poverty reduction strategy. There are three components to the project. The first component of the project is Rural Energy Fund (REF). This component will help set up a rural energy fund as foreseen under National Energy Plan for Poverty Reduction (PANERP) and the decree establishing Agence d 'Electrification Rurale (AER). A financing mechanism based on best practice examples from countries such as Mali and Burkina Faso will streamline interventions and increase the effectiveness of investments in rural energy. The second component of the project is capacity building. This component will provide technical assistance to Ministere de I'Energie et de I'Eau (MINEE) to (i) improve the planning of least cost investments; (ii) finalize the legal and institutional framework of the energy sector; (iii) communication; and (iv) complementary studies and provide necessary training and equipment. The third component of the project is project preparation including Lom Pangar Project (LPHP) preparation. This component will assist Electricity Development Corporation (EDC) with the preparation of LPHP and AER with the preparation of rural energy projects.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0001620"><narrative>REPUBLIC OF CAMEROON</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0001620"><narrative>REPUBLIC OF CAMEROON</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="CM-COA-0001621"><narrative>AER</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2007-09-27"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2008-06-24"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2017-04-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2017-04-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Stephan Claude Frederic Garnier</narrative></person-name><telephone>+1-202-473-1000</telephone><email>sgarnier@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>











<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002231835" />
            <name><narrative>East Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.8333299 14.16667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002222696" />
            <name><narrative>Pangar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.3666701 13.51667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002229251" />
            <name><narrative>Departement du Lom-et-Djerem</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.1666698 13.83333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002229259" />
            <name><narrative>Lom</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.3333302 13.4</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007670583" />
            <name><narrative>Eastern Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4 14</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="23111" percentage="38" xml:lang="en"/><sector vocabulary="1" code="23310" percentage="62" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LT" percentage="75.0000000" xml:lang="en"><narrative>FY17 - Energy Transmission and Distribution</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="25.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="10" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="8" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="8" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000723" percentage="58" xml:lang="en"><narrative>Rural Infrastructure and service delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="8" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="8" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="8" xml:lang="en"><narrative>Job Creation</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">613846.15</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">613846.15</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">613846.15</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">613846.15</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">613846.15</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">613846.15</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">613846.15</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">613846.15</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">613846.15</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">613846.15</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">613846.15</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">613846.15</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">767307.69</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">767307.69</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">767307.69</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">767307.69</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">767307.69</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">767307.69</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">767307.69</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">767307.69</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">767307.69</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">767307.69</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">767307.69</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">767307.69</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">767307.69</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">767307.69</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">767307.69</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">767307.69</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">767307.69</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">767307.69</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">767307.69</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">767307.69</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">767307.69</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">767307.69</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">767307.69</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">767307.69</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">741730.77</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">741730.77</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">741730.77</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">741730.77</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">741730.77</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">741730.77</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">741730.77</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">741730.77</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">741730.77</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">741730.77</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">741730.77</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">741730.77</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">31377848.92</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">31377848.92</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2008-06-30"/><value value-date="2008-06-30">65000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">-15000000</value><description xml:lang="en"><narrative>Total Commitment Cancellations in April Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-5121372</value><description xml:lang="en"><narrative>Total Commitment Cancellations in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-4314166</value><description xml:lang="en"><narrative>Total Commitment Cancellations in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-03-31"/><value value-date="2009-03-31">1282979</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-09-30"/><value value-date="2009-09-30">25036</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-10-31"/><value value-date="2009-10-31">80131</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-12-31"/><value value-date="2009-12-31">131867</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-02-28"/><value value-date="2010-02-28">163579</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-03-31"/><value value-date="2010-03-31">17033</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-06-30"/><value value-date="2010-06-30">198712</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-07-31"/><value value-date="2010-07-31">6951</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-08-31"/><value value-date="2010-08-31">112928</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-10-31"/><value value-date="2010-10-31">419123</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">68995</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-01-31"/><value value-date="2011-01-31">330788</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">90978</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-04-30"/><value value-date="2011-04-30">20666</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">321244</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">1382731</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-07-31"/><value value-date="2011-07-31">1850308</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">571485</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-10-31"/><value value-date="2011-10-31">293206</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">23336</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">62624</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-01-31"/><value value-date="2012-01-31">1337933</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">317919</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">83820</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">130515</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">223913</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">9565</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">39440</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">41348</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">46868</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">115141</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">836238</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-01-31"/><value value-date="2013-01-31">1051177</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">352247</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">324310</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">29592</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">78740</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">491923</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-07-31"/><value value-date="2013-07-31">916811</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">386507</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">35720</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">35111</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">697158</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">238990</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">76021</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">322681</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">45404</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">51824</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">300693</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">64927</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">76833</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">102688</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">24854</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">30972</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">379503</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">242396</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">86820</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">134590</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">274626</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">119428</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">26349</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">253189</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">378544</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">174698</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">957752</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">79629</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">499400</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">541112</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">1520970</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">622580</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">287734</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">281564</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">977211</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">698313</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">896673</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">1398712</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">376713</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">1753457</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">960454</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">1108696</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">385485</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">287265</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">2091561</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">-427635</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-25580</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-6669</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-4904</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-81069</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-08-31"/><value value-date="2009-08-31">-4354</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-02-28"/><value value-date="2010-02-28">-5323</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-08-31"/><value value-date="2010-08-31">-6964</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-02-28"/><value value-date="2011-02-28">-9049</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-08-31"/><value value-date="2011-08-31">-12191</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">-30232</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">-33957</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">-38542</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">-45612</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">-54260</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">-59316</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">-54103</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">-62978</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">-64856</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">-76227</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">-85972</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">-114965</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-127197</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-121629</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-117240</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-114139</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-121390</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-116947</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-116499</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-112925</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-109726</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-97897</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-115897</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-103572</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-98244</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-105151</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-96988</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-103289</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-94398</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-2864</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-364306</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">-5004</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-360122</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-359181</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-363603</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-1848</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-322720</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-331992</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-327095</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-317003</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-299217</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-307914</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-306206</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-304016</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-308725</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-6288</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-294991</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-315578</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-6174</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-306172</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-1621"><narrative>AER; ARSEL; EDC; MINEE</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P104456"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P104456?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P104456"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Transparent water pricing mechanism adopted by GOC
</narrative></title>
<baseline year="2008" iso-date="2008-05-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-05-31" />
<period-end iso-date="2017-01-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
No of Households receiving a grid connection
</narrative></title>
<baseline year="2008" iso-date="2008-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-05-31" />
<period-end iso-date="2017-01-31" />
<target value="25000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Rural Electrification Master Plan approved
</narrative></title>
<baseline year="2008" iso-date="2008-05-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-05-31" />
<period-end iso-date="2017-04-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Preparatory activities of the Lom Pangar Project in accordance with international best practice technical, environmental and socialstandards, as measured by compliance with World Bank safeguards
</narrative></title>
<baseline year="2008" iso-date="2008-05-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-05-31" />
<period-end iso-date="2017-04-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
AES SONEL/AER/MINEE adopts joint rural electrification investment plan
</narrative></title>
<baseline year="2013" iso-date="2013-02-20" value="Yes"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-02-20" />
<period-end iso-date="2017-04-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Energy Sector Development Plan 2030 approved
</narrative></title>
<baseline year="2008" iso-date="2008-05-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-05-31" />
<period-end iso-date="2017-04-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new household connections in electrified towns and villages
</narrative></title>
<baseline year="2008" iso-date="2008-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-05-31" />
<period-end iso-date="2017-04-30" />
<target value="10,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with new or improved electricity service
</narrative></title>
<baseline year="2008" iso-date="2008-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-05-31" />
<period-end iso-date="2017-04-30" />
<target value="50,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
COPPER approves rural electrification investment plan
</narrative></title>
<baseline year="2013" iso-date="2013-02-20" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-02-20" />
<period-end iso-date="2017-04-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
EDC has prepared the Environmental and Social Management Plan for Lom Pangar in line with World Bank safeguard policies
</narrative></title>
<baseline year="2008" iso-date="2008-05-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-05-31" />
<period-end iso-date="2017-01-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Preparatory activities of the Lom Pangar Project in accordance with international best practice technical, environmental and socialstandards, as measured by compliance with World Bank safeguards
</narrative></title>
<baseline year="2008" iso-date="2008-05-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-05-31" />
<period-end iso-date="2017-04-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
AES SONEL/AER/MINEE adopts joint rural electrification investment plan
</narrative></title>
<baseline year="2013" iso-date="2013-02-20" value="Yes"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-02-20" />
<period-end iso-date="2017-04-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
COPPER approves rural electrification investment plan
</narrative></title>
<baseline year="2013" iso-date="2013-02-20" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-02-20" />
<period-end iso-date="2017-01-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
AES SONEL/AER/MINEE adopts joint rural electrification investment plan
</narrative></title>
<baseline year="2013" iso-date="2013-02-20" value="Yes"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-02-20" />
<period-end iso-date="2017-01-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new household connections in electrified towns and villages
</narrative></title>
<baseline year="2008" iso-date="2008-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-05-31" />
<period-end iso-date="2017-04-30" />
<target value="10000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Functional review of electricity sector regulation completed
</narrative></title>
<baseline year="2013" iso-date="2013-02-20" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-02-20" />
<period-end iso-date="2017-01-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2008" iso-date="2008-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-05-31" />
<period-end iso-date="2017-04-30" />
<target value="50,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Environmental and Social Management Plan for Lom Pangar prepared in line World Bank safeguards policies
</narrative></title>
<baseline year="2008" iso-date="2008-05-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-05-31" />
<period-end iso-date="2017-04-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of rural energy projects prepared
</narrative></title>
<baseline year="2008" iso-date="2008-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-05-31" />
<period-end iso-date="2017-01-31" />
<target value="3.00">

</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Long and medium term sector strategy with least cost integrated plan prepared (adopted - yes/no)
</narrative></title>
<baseline year="2008" iso-date="2008-05-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-05-31" />
<period-end iso-date="2017-01-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
COPPER approves rural electrification investment plan
</narrative></title>
<baseline year="2013" iso-date="2013-02-20" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-02-20" />
<period-end iso-date="2017-04-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Preparatory activities of the Lom Pangar Project in accordance with international best practice technical, environmental and socialstandards, as measured by compliance with World Bank safeguards
</narrative></title>
<baseline year="2008" iso-date="2008-05-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-05-31" />
<period-end iso-date="2017-01-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Energy Sector Development Plan 2030 approved
</narrative></title>
<baseline year="2008" iso-date="2008-05-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-05-31" />
<period-end iso-date="2017-04-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Functional review of electricity sector regulation completed
</narrative></title>
<baseline year="2013" iso-date="2013-02-20" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-02-20" />
<period-end iso-date="2017-04-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Rural Electrification Master Plan approved
</narrative></title>
<baseline year="2008" iso-date="2008-05-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-05-31" />
<period-end iso-date="2017-04-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of rural electrification schemes put out to tender
</narrative></title>
<baseline year="2008" iso-date="2008-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-05-31" />
<period-end iso-date="2017-04-30" />
<target value="3.00">

</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of rural electrification schemes put out to tender
</narrative></title>
<baseline year="2008" iso-date="2008-05-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-05-31" />
<period-end iso-date="2017-04-30" />
<target value="3.00">

</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Environmental and Social Management Plan for Lom Pangar prepared in line World Bank safeguards policies
</narrative></title>
<baseline year="2008" iso-date="2008-05-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-05-31" />
<period-end iso-date="2017-04-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Functional review of electricity sector regulation completed
</narrative></title>
<baseline year="2013" iso-date="2013-02-20" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-02-20" />
<period-end iso-date="2017-04-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P156679</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Health System Performance Reinforcement Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The new Project Development Objective (PDO) is to: (i) increase utilization and improve the quality of health services with a particular focus on reproductive, maternal, child and adolescent health, and nutritional services for the population of Cameroon, including refugees and refugee host communities, and (ii) in the event of an Eligible Emergency, to provide immediate and effective response to said Eligible Emergency]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Health System Performance Reinforcement Project for Cameroon is to increase utilization and improve the quality of health services with a particular focus on reproductive, maternal, child, and adolescent health and nutrition services. The project comprises of two components. The first component, strengthening of health service delivery consists of three sub-components: (i) payment of performance; (ii) support to the implementation and supervision of performance-based financing; and (iii) additional support for improving access to a key package of reproductive, maternal, neonatal, child, and adolescent health (RMNCAH) and nutrition services. The second component, institutional strengthening for improved health system performance will support institutional strengthening at national, regional, and district levels for improved health system performance. It consists of three sub-components: (i) strengthening institutional capacities for improved health system stewardship, including monitoring and evaluation; (ii) reinforcement of civil registration and vital statistics systems; and (iii) program coordination.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0026181"><narrative>Republic of Cameroon</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="CM-COA-0026182"><narrative>Ministry of Public Health</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2016-06-16"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2016-05-03"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2022-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2022-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Aissatou Diack</narrative></person-name><telephone>+1-202-473-1000</telephone><email>adiack@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002220853" />
            <name><narrative>Yokadouma</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.51667 15.05</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002221030" />
            <name><narrative>Yagoua</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.34107 15.23288</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002221046" />
            <name><narrative>Yabassi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.45697 9.96822</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002221362" />
            <name><narrative>Touboro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.7708 15.3568</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002221424" />
            <name><narrative>Tokonbere</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.86347 14.1496</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002221513" />
            <name><narrative>Tignere</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.36667 12.65</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002221530" />
            <name><narrative>Tibati</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.46504 12.62843</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002221788" />
            <name><narrative>South-West Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.2 9.3</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002221789" />
            <name><narrative>South Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>2.75 11.58333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002222399" />
            <name><narrative>Roua</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.99214 13.77559</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002222439" />
            <name><narrative>Rey Bouba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.6724 14.1786</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002222539" />
            <name><narrative>Poli</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.4756 13.24097</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002222609" />
            <name><narrative>Pette</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.96778 14.50083</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002222934" />
            <name><narrative>West Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.5 10.66667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002223602" />
            <name><narrative>North-West Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.36667 10.36667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002223603" />
            <name><narrative>North Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.5 14</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002224163" />
            <name><narrative>Nkambe</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.63333 10.66667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002224432" />
            <name><narrative>Nguelemendouka</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.38333 12.91667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002224609" />
            <name><narrative>Ngong</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.58333 10.43333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002224827" />
            <name><narrative>Ngaoundere</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.32765 13.58472</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002225325" />
            <name><narrative>Ndelele</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.04065 14.92501</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002225823" />
            <name><narrative>Moutouroua</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.19896 14.17777</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002225884" />
            <name><narrative>Moulvouday</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.40588 14.85385</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002227015" />
            <name><narrative>Messamena</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.74127 12.82388</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002227027" />
            <name><narrative>Meri</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.77352 14.12153</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002227402" />
            <name><narrative>Meiganga</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.51667 14.3</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002228019" />
            <name><narrative>Mbang</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.58333 13.33333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002228373" />
            <name><narrative>Maroua</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.59095 14.31593</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002228675" />
            <name><narrative>Mamfe</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.75132 9.3137</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002229152" />
            <name><narrative>Loum</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.7182 9.7351</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002229249" />
            <name><narrative>Lomie</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.16667 13.61667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002229336" />
            <name><narrative>Littoral Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.26667 10.13333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002229411" />
            <name><narrative>Limbe</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.0242 9.2149</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002229681" />
            <name><narrative>Lagdo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.0263 13.6919</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002229748" />
            <name><narrative>Kumbo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.2 10.66667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002229752" />
            <name><narrative>Kumba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.6363 9.4469</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002229780" />
            <name><narrative>Koza</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.86846 13.88205</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002229798" />
            <name><narrative>Kousseri</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.07689 15.03063</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002230158" />
            <name><narrative>Kolofata</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>11.1621 14.01151</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002230802" />
            <name><narrative>Hinale</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>11.58408 14.99171</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002230873" />
            <name><narrative>Guidiguis</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.13366 14.70748</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002230876" />
            <name><narrative>Guider</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.9333 13.94671</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002231004" />
            <name><narrative>Goulfey</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.38389 14.9033</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002231291" />
            <name><narrative>Gazawa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.53084 14.14043</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002231319" />
            <name><narrative>Garoua Boulai</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.88333 14.55</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002231320" />
            <name><narrative>Garoua</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.30143 13.39771</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002231482" />
            <name><narrative>Fundong</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.25 10.26667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002231636" />
            <name><narrative>Figuil</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.75574 13.9647</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002231755" />
            <name><narrative>Far North Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>11 14.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002231835" />
            <name><narrative>East Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.83333 14.16667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002232239" />
            <name><narrative>Edea</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.8 10.13333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002232498" />
            <name><narrative>Doume</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.85 12.86667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002232774" />
            <name><narrative>Djohong</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.83333 14.7</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002233376" />
            <name><narrative>Centre Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.75 11.83333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002233410" />
            <name><narrative>Buea</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.1527 9.241</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002233445" />
            <name><narrative>Bourrah</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.25075 13.51033</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002234272" />
            <name><narrative>Bibemi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.30981 13.87918</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002234339" />
            <name><narrative>Betare Oya</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.6 14.08333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002234359" />
            <name><narrative>Bertoua</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.57728 13.68459</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002234663" />
            <name><narrative>Batouri</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.43333 14.36667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002236015" />
            <name><narrative>Adamaoua Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.83333 13.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002236053" />
            <name><narrative>Abong Mbang</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.98333 13.18333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002576483" />
            <name><narrative>Ngaoundal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.5 13.26667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002596838" />
            <name><narrative>Mayo Oulo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.96859 13.61834</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002596842" />
            <name><narrative>Guere</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.06537 15.28908</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006685554" />
            <name><narrative>Bogo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>11.22778 14.11318</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002231115" />
            <name><narrative>Golombe</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.64365 13.86816</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002230528" />
            <name><narrative>Kamba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.56111 9.65833</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002230435" />
            <name><narrative>Karmay</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.07775 15.16513</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002230334" />
            <name><narrative>Kette</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.96577 14.56306</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002230285" />
            <name><narrative>Bankim</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.08303 11.4905</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002229047" />
            <name><narrative>Mada</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.63033 14.48419</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002228977" />
            <name><narrative>Maga</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.8434 14.93962</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002228881" />
            <name><narrative>Makary</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>12.5717 14.46663</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002226641" />
            <name><narrative>Mindif</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.39757 14.43626</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002226312" />
            <name><narrative>Mogode</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.60845 13.57045</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002226275" />
            <name><narrative>Mokolo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.74244 13.80227</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002226215" />
            <name><narrative>Moloundou</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>2.05 15.16667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002221607" />
            <name><narrative>Tchollire</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.4022 14.1698</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002221241" />
            <name><narrative>Vele</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.51088 15.15368</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0009074073" />
            <name><narrative>Mora</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.88292 13.95979</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008665279" />
            <name><narrative>Pitoa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.17869 13.72106</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002234942" />
            <name><narrative>Ndop</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.98843 10.43859</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002234794" />
            <name><narrative>Banyo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.75 11.81667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008672917" />
            <name><narrative>Gaschiga</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>9.95519 13.31629</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="12110" percentage="92" xml:lang="en"/><sector vocabulary="1" code="13020" percentage="2" xml:lang="en"/><sector vocabulary="1" code="12261" percentage="2" xml:lang="en"/><sector vocabulary="1" code="12250" percentage="2" xml:lang="en"/><sector vocabulary="1" code="12240" percentage="2" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="89.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HF" percentage="11.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000637" percentage="2" xml:lang="en"><narrative>Child Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="0" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000635" percentage="3" xml:lang="en"><narrative>Reproductive and Maternal Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000635" percentage="3" xml:lang="en"><narrative>Reproductive and Maternal Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="10" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="97" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000671" percentage="1" xml:lang="en"><narrative>Nutrition</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000067" percentage="2" xml:lang="en"><narrative>Nutrition and Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000671" percentage="1" xml:lang="en"><narrative>Nutrition</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="0" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000637" percentage="2" xml:lang="en"><narrative>Child Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000626" percentage="1" xml:lang="en"><narrative>Pandemic Response</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="92" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><humanitarian-scope type="1" vocabulary="1-2" code="EP-2020-000012-001"> </humanitarian-scope><humanitarian-scope type="2" vocabulary="2-1" code="HCOVD20"> </humanitarian-scope><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">77468.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">373900.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">464400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">553200.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">636800.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">717300.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">813700.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">919000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">491800.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">746588.80</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">785250.40</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">832817.20</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">876112.40</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">906086.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">930919.20</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">960530.80</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">998685.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">1448100.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">755000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">1562600.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">1630200.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">1689500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">1747000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">1833300.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">1893700.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">1916500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">1931600.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">1982300.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">999800.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">1994100.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">1988100.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">2004800.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">2018100.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">2026400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">2028300.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">2040300.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">2055000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">2066100.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">749702.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">2082300.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">2090400.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">2091100.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">2091300.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">2105600.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">2109800.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">2106300.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">2113500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">2129200.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">771856.40</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">9277645.21</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">9365360.87</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">9365360.87</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">100000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">6000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">30000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-27651104</value><description xml:lang="en"><narrative>Total Commitment Cancellations in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">9277645</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">3123073</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">15269121</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">15074076</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">3819215</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">2294471</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">861649</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">14545455</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">7039586</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">1820101</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">15270519</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">218519</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">8079023</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-5413306</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-335397</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">38786</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">-324409</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-23488</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-123692</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-98708</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-167270</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-275695</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-274572</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-373788</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-464511</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-11027</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-581496</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-24525</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-750222</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-35959</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-33141</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-773697</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-792067</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-31231</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-820995</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-32922</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-698575</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-29921</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-775411</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-28769</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-28643</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-709184</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-736040</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-29306</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-702682</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-28998</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-688885</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-29017</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-1688316</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-1643925</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-1528945</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-1606606</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-1576901</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-86774</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-1583574</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-87920</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-1592306</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-89475</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-93588</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-1599737</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-93954</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-1535588</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-94788</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-1624429</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-96863</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-26182"><narrative>Ministry of Public Health</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P156679"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P156679?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P156679"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of acceptors of modern contraception in the three Northern regions (Adamawa, North and Far North) and the East
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="4232.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;This indicator was introduced during the 2020 restructuring and the baseline date&amp;nbsp;was not specified. It is assumed that the baseline data was from the last complete year available at the time of submission, December 2019&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="1307472.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of pregnant women receiving at least 4 antenatal care visits in the three Northern regions (Adamawa, North and Far North) and the East
</narrative></title>
<baseline year="2016" iso-date="2016-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-06-30" />
<period-end iso-date="2022-12-31" />
<target value="814656.00">
<comment><narrative>
&lt;p&amp;gt;The baseline is set as zero as this indicator was originally a percentage&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="840517.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of children aged 6-59 months who received a vitamin A supplement in the last six months
</narrative></title>
<baseline year="2016" iso-date="2016-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-06-30" />
<period-end iso-date="2022-12-31" />
<target value="3128788.00">

</target>
<actual value="3708867.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of reported maternal deaths audited in PBF districts
</narrative></title>
<baseline year="2016" iso-date="2016-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-06-30" />
<period-end iso-date="2022-12-31" />
<target value="25.00">

</target>
<actual value="53.87">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of refugees who have received healthcare (curative and preventive) at health facilities in the three Northern regions (Adamawa, North and Far North) and the East
</narrative></title>
<baseline year="2018" iso-date="2018-07-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-02" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Average score of the quality of care checklist
</narrative></title>
<baseline year="2016" iso-date="2016-06-30" value="30.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-06-30" />
<period-end iso-date="2022-12-31" />
<target value="50.00">

</target>
<actual value="76.84">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of children and pregnant women dewormed
</narrative></title>
<baseline year="2018" iso-date="2018-07-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-02" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="2113253.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of refugee children and pregnant women dewormed
</narrative></title>
<baseline year="2018" iso-date="2018-07-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-02" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of facilities with 100% tracer drugs available in targeted health facilities on the day of the visit
</narrative></title>
<baseline year="2016" iso-date="2016-06-30" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-06-30" />
<period-end iso-date="2022-12-31" />
<target value="40.00">

</target>
<actual value="59.03">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People who have received essential health, nutrition, and population (HNP) services
</narrative></title>
<baseline year="2016" iso-date="2016-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-06-30" />
<period-end iso-date="2022-12-31" />
<target value="6020987.00">
<comment><narrative>
&lt;p&amp;gt;The original targets for the sub-indicators related to immunization&amp;nbsp;and assisted deliveries were initially included as percentages. The indicator for nutrition services was included in 2020 and had no target set in 2016&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="7771066.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of the national population covered by the PBF program
</narrative></title>
<baseline year="2016" iso-date="2016-06-30" value="25.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-06-30" />
<period-end iso-date="2022-12-31" />
<target value="95.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of COVID-19 designated healthcare facilities with required equipment for treatment of critical patients as per approved national protocol
</narrative></title>
<baseline year="2020" iso-date="2020-03-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-27" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="11.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of consultations provided to the poor and vulnerable free of charge
</narrative></title>
<baseline year="2016" iso-date="2016-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-06-30" />
<period-end iso-date="2022-12-31" />
<target value="1502057.00">

</target>
<actual value="1224221.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of children under 24 months being weighed for growth monitoring in the three Northern regions (Adamawa, North, Far North) and the East
</narrative></title>
<baseline year="2020" iso-date="2020-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="2342533.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Patients/people referred to the health facilities by community health workers
</narrative></title>
<baseline year="2016" iso-date="2016-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-06-30" />
<period-end iso-date="2022-12-31" />
<target value="1403217.00">

</target>
<actual value="1480159.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P084002</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>CM-Urban and Water Development Support Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The project development objective is to increase access of the urban population, particularly those living in low-income settlements, to basic infrastructure and services, including water supply. To achieve this objective, the project will (i) assist the various stakeholders of urban development in the preparation and implementation of tools and investments designed to increase access to services to as large a number of beneficiaries as possible; and (ii) support and facilitate the implementation of the public-private partnership in the provision of urban water services.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The project development objective of the Cameroon - Urban and Water Development Support Project is to increase access o f the urban population, particularly those living in low-income settlements, to basic infrastructure and services, including water. The project will include three main components: (i) capacity building and support to decentralization, (ii) infrastructure works in low-income settlements, and (iii) support to the implementation of the public-private partnership in urban water services.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0000489"><narrative>MINEPAT</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="CM-COA-0000490"><narrative>CAMWATER (Cameroon Water Utilities Corporation)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2005-02-07"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2007-05-29"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2015-08-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2015-08-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Charles Delfieux</narrative></person-name><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>




<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002220957" />
            <name><narrative>Yaounde</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.8666699 11.51667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002232593" />
            <name><narrative>Douala</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.0482702 9.7042799</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002224922" />
            <name><narrative>New Bell</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.0353999 9.7215004</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002228079" />
            <name><narrative>Mbalmayo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.51667 11.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002228373" />
            <name><narrative>Maroua</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>10.59095 14.31593</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002234974" />
            <name><narrative>Bamenda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.9597001 10.14597</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="14020" percentage="43" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="5" xml:lang="en"/><sector vocabulary="1" code="43032" percentage="52" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="84.0000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="5.00000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TC" percentage="2.00000000" xml:lang="en"><narrative>FY17 - Urban Transport</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="5.00000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="4.00000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="66" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000211" percentage="17" xml:lang="en"><narrative>Investment and Business Climate</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="17" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="12" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="10" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="5" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="17" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="17" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000211" percentage="17" xml:lang="en"><narrative>Investment and Business Climate</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="5" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">466666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">466666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">466666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">830266.79</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">830266.79</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">830266.79</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">830266.79</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">830266.79</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">830266.79</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">830266.79</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">830266.79</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">830266.79</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">830266.79</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">830266.79</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">830266.79</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">2333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">2333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">2333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">2333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">774915.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">774915.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">774915.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">99632.01</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">99632.01</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">99632.01</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">16666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">16666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">16666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">300000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">300000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">830266.79</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">830266.79</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">830266.79</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2007-05-31"/><value value-date="2007-05-31">80000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2007</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2010-09-30"/><value value-date="2010-09-30">28700000</value><description xml:lang="en"><narrative>Total Commitment in September Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">-16366912</value><description xml:lang="en"><narrative>Total Commitment Cancellations in April Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">-433088</value><description xml:lang="en"><narrative>Total Commitment Cancellations in April Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-1462994</value><description xml:lang="en"><narrative>Total Commitment Cancellations in March Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-05-31"/><value value-date="2008-05-31">813249</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-06-30"/><value value-date="2008-06-30">1925492</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-10-31"/><value value-date="2008-10-31">208968</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-11-30"/><value value-date="2008-11-30">50164</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-12-31"/><value value-date="2008-12-31">106909</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-01-31"/><value value-date="2009-01-31">29708</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-03-31"/><value value-date="2009-03-31">152604</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-04-30"/><value value-date="2009-04-30">907072</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-05-31"/><value value-date="2009-05-31">2034143</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-07-31"/><value value-date="2009-07-31">191261</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-08-31"/><value value-date="2009-08-31">176622</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-09-30"/><value value-date="2009-09-30">643718</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-10-31"/><value value-date="2009-10-31">24146</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-11-30"/><value value-date="2009-11-30">301509</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-12-31"/><value value-date="2009-12-31">735495</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-02-28"/><value value-date="2010-02-28">1795723</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-03-31"/><value value-date="2010-03-31">536002</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-04-30"/><value value-date="2010-04-30">670979</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-05-31"/><value value-date="2010-05-31">3568391</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-06-30"/><value value-date="2010-06-30">826269</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-07-31"/><value value-date="2010-07-31">1586245</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-08-31"/><value value-date="2010-08-31">1886196</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-09-30"/><value value-date="2010-09-30">2230705</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-10-31"/><value value-date="2010-10-31">1204422</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">287713</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">820846</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-01-31"/><value value-date="2011-01-31">967899</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-02-28"/><value value-date="2011-02-28">416169</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">704598</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-04-30"/><value value-date="2011-04-30">702872</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">1012819</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">494162</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-07-31"/><value value-date="2011-07-31">2714984</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-08-31"/><value value-date="2011-08-31">400308</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">26567</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-10-31"/><value value-date="2011-10-31">1253001</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">678991</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-01-31"/><value value-date="2012-01-31">828062</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">839825</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">128522</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">1550535</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">772914</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">469231</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">1781956</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">3424260</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">420456</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">492005</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-01-31"/><value value-date="2013-01-31">839110</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">788003</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">117999</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">1126355</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">934861</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">379407</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-07-31"/><value value-date="2013-07-31">939095</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">1349951</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">1242126</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">1367682</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">231551</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">1863673</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">1982424</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">1477623</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">1009674</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">2637259</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">2272023</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">1423352</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">248468</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">764229</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">2857691</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">1082348</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">2763466</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">1280195</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">682869</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">579378</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">597588</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">505802</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">5394767</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">55969</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">610728</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">485321</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">201852</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">384521</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">2289974</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">1127473</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">175167</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">223296</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">1282629</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">1484410</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2008-08-31"/><value value-date="2008-08-31">-52308</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2008</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-02-28"/><value value-date="2009-02-28">-10997</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-08-31"/><value value-date="2009-08-31">-19109</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2009</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-02-28"/><value value-date="2010-02-28">-26689</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-08-31"/><value value-date="2010-08-31">-50514</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2010</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-02-28"/><value value-date="2011-02-28">-85450</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-08-31"/><value value-date="2011-08-31">-104530</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2011</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">-124829</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">-128800</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2012</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">-159454</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">-173029</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2013</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">-190806</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">-216959</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2014</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">-216161</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">-27343</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">-253141</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">-43565</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2015</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">-44305</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">-265052</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">-43676</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">-272255</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2016</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">-263041</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">-42247</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">-44045</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">-274236</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-281376</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-45648</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-1028</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-267342</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-42774</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">-437</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-258323</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-42903</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-42648</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-251771</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-266841</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-43820</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-167</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-259092</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-44031</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-44489</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-257792</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-249803</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-43223</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-41998</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-242722</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-216335</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-37558</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-44236</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-256681</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-228980</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-39695</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-37729</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-217010</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-232465</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-40302</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-214194</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-37264</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-39663</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-228163</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-212524</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-36377</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">-731295</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2017</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-757916</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-23399</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-703781</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">-9925</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-713417</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-711565</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-720326</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-3761</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-730074</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-120566</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-750620</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-118778</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-739547</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-716730</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-115113</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-108655</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-676517</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-696179</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-111813</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-111193</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-692318</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-687366</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-110397</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-112107</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-698013</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-2315</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-14136</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-107088</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-667042</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-713509</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-114596</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-13879</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-2274</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-695274</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-111149</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-490"><narrative>CAMWATER (Cameroon Water Utilities Corporation); MINHDU (Ministere de l'Habitat et du Developpement Urbain)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P084002"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P084002?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P084002"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of municipal budget allocated to maintenance of investments
</narrative></title>
<baseline year="2010" iso-date="2010-08-31" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-31" />
<period-end iso-date="2015-08-31" />
<target value="10.00">

</target>
<actual value="5.00">
<comment><narrative>
Previous figure was the objective, not the actual achievement (PIU)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in urban areas provided with access to Improved Water Sources under the project
</narrative></title>
<baseline year="2010" iso-date="2010-08-31" value="6950000.00"><comment><narrative>Value as of 08/31/2010: 6,950,000</narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-31" />
<period-end iso-date="2015-08-31" />
<target value="8200000.00">

</target>
<actual value="7300000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of social connections
</narrative></title>
<baseline year="2010" iso-date="2010-08-31" value="7000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-31" />
<period-end iso-date="2015-08-31" />
<target value="70000.00">

</target>
<actual value="22212.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction of share of public customer in total water consumption
</narrative></title>
<baseline year="2010" iso-date="2010-08-31" value="40.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-31" />
<period-end iso-date="2015-08-31" />
<target value="20.00">

</target>
<actual value="37.95">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in urban areas provided with access to all-season roads within a 500 meter range under the project
</narrative></title>
<baseline year="2010" iso-date="2010-08-31" value="150000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-31" />
<period-end iso-date="2015-08-31" />
<target value="390000.00">

</target>
<actual value="420658.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improved community water points constructed or rehabilitated under the project
</narrative></title>
<baseline year="2010" iso-date="2010-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-31" />
<period-end iso-date="2015-08-31" />
<target value="1200.00">

</target>
<actual value="82.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction of share of public customer in total water consumption
</narrative></title>
<baseline year="2010" iso-date="2010-08-31" value="40.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-31" />
<period-end iso-date="2015-08-31" />
<target value="20.00">

</target>
<actual value="36.55">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of city development contracts
</narrative></title>
<baseline year="2010" iso-date="2010-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-31" />
<period-end iso-date="2015-08-31" />
<target value="6.00">

</target>
<actual value="6.00">
<comment><narrative>
Target achieved
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of city development contracts
</narrative></title>
<baseline year="2010" iso-date="2010-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-31" />
<period-end iso-date="2015-08-31" />
<target value="6.00">

</target>
<actual value="6.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehabilitated, Non-rural
</narrative></title>
<baseline year="2010" iso-date="2010-08-31" value="12.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-31" />
<period-end iso-date="2015-08-31" />
<target value="41.00">

</target>
<actual value="80.40">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Progress towards financial equilibrium of the urban water supply sector.
</narrative></title>
<baseline year="2010" iso-date="2010-08-31" value="Financial equilibrium reached"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-31" />
<period-end iso-date="2015-08-31" />
<target value="Financial equilibrium maintained">

</target>
<actual value="Efforts to restore the financial equilibrium">
<comment><narrative>
Restoration in progress
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people benefiting from appropriate drainage
</narrative></title>
<baseline year="2010" iso-date="2010-08-31" value="150000.00"><comment><narrative>Value as of 08/31/2010: 150000</narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-31" />
<period-end iso-date="2015-08-31" />
<target value="390000.00">

</target>
<actual value="201480.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of newly built/rehabilitated water supply networks (km)
</narrative></title>
<baseline year="2010" iso-date="2010-08-31" value="40.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-31" />
<period-end iso-date="2015-08-31" />
<target value="200.00">

</target>
<actual value="115.74">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of newly built/rehabilitated drainage works in targeted areas (km)
</narrative></title>
<baseline year="2010" iso-date="2010-08-31" value="13.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-31" />
<period-end iso-date="2015-08-31" />
<target value="49.00">

</target>
<actual value="106.60">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of newly built/rehabilitated water supply networks (km)
</narrative></title>
<baseline year="2010" iso-date="2010-08-31" value="40.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-31" />
<period-end iso-date="2015-08-31" />
<target value="200.00">

</target>
<actual value="151.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of newly built/rehabilitated drainage works in targeted areas (km)
</narrative></title>
<baseline year="2010" iso-date="2010-08-31" value="13.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-31" />
<period-end iso-date="2015-08-31" />
<target value="49.00">

</target>
<actual value="62.70">
<comment><narrative>
Target over-achieved
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of social connections
</narrative></title>
<baseline year="2010" iso-date="2010-08-31" value="7000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-31" />
<period-end iso-date="2015-08-31" />
<target value="70000.00">
<comment><narrative>
Target = 50000 GPOBA-funded connections + 20000 IDA-funded social connections
</narrative></comment>
</target>
<actual value="18854.00">
<comment><narrative>
18854 GPOBA-funded connections (March 2014) - To be further updated by Camwater
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New piped household water connections that are resulting from the project intervention
</narrative></title>
<baseline year="2010" iso-date="2010-08-31" value="25000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-31" />
<period-end iso-date="2015-08-31" />
<target value="235000.00">
<comment><narrative>
Target = 200000 from original project + 35000 from AF
</narrative></comment>
</target>
<actual value="75250.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people benefitting from appropriate drainage
</narrative></title>
<baseline year="2010" iso-date="2010-08-31" value="150000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-31" />
<period-end iso-date="2015-08-31" />
<target value="390000.00">

</target>
<actual value="544483.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Progress towards financial equilibrium of the urban water supply sector.
</narrative></title>
<baseline year="2010" iso-date="2010-08-31" value="Financial equilibrium reached"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-31" />
<period-end iso-date="2015-08-31" />
<target value="Financial equilibrium maintained">

</target>
<actual value="Efforts to restore the financial equilibrium (the private operator's net cash balance as of 12/31/2014 is not yet available)">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New piped household water connections that are resulting from the project intervention
</narrative></title>
<baseline year="2010" iso-date="2010-08-31" value="25000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-31" />
<period-end iso-date="2015-08-31" />
<target value="235000.00">

</target>
<actual value="130000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of municipal budget allocated to maintenance of investments
</narrative></title>
<baseline year="2010" iso-date="2010-08-31" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-31" />
<period-end iso-date="2015-08-31" />
<target value="10.00">

</target>
<actual value="10.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improved community water points constructed or rehabilitated under the project
</narrative></title>
<baseline year="2010" iso-date="2010-08-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-31" />
<period-end iso-date="2015-08-31" />
<target value="1200.00">
<comment><narrative>
Activity for 1200 new standpipes by Camwater was cancelled
</narrative></comment>
</target>
<actual value="82.00">
<comment><narrative>
34 standpipes and 48 wells reported by the Urban Component. Activity for 1200 new standpipes by Camwater was cancelled
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehabilitated, Non-rural
</narrative></title>
<baseline year="2010" iso-date="2010-08-31" value="4.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-31" />
<period-end iso-date="2015-08-31" />
<target value="41.00">

</target>
<actual value="32.60">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in urban areas provided with access to all-season roads within a 500 meter range under the project
</narrative></title>
<baseline year="2010" iso-date="2010-08-31" value="150000.00"><comment><narrative>Value as of 08/31/2010: 150,000</narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-31" />
<period-end iso-date="2015-08-31" />
<target value="390000.00">

</target>
<actual value="144319.00">
<comment><narrative>
Indicator updated from 200 m to 500 m to match core indicator
</narrative></comment>
</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P075964</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Education Development Capacity Building Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objective of the restructured project is to develop and apply management and learning tools for use by government andcommunities to improve efficiency and accountability of the Cameroon education sector.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Education Development Capacity Building Project is to: (i) increase the efficiency and equity of primary and secondary education, with a focus on the disadvantaged areas (ZEP); and (ii) improve the relevance of secondary and higher education to the needs of the economy. The project consists of the following four components; Component 1) will improve the administrative management of the education system through improvements in administrative management and controls, personnel management and planning. Component 2) will improve pedagogic management in order to make the teaching and learning process more efficient. Component 3) aims at increasing the demand for primary education and promoting gender equity in the Adamawa, Far-North, East, and North provinces. Component 4) will raise the overall quality and relevance of teaching, research and professional development by improving the system's ability to internally generate a critical mass of high quality academics, researchers and professionals, particularly in disciplines critical to the country's development.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><activity-status code="3" /><activity-date type="1" iso-date="2002-12-13"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2005-05-31"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2012-09-01"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2012-09-01"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Shobhana Sosale</narrative></person-name><telephone>+1-202-473-1000</telephone><email>ssosale@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002231835" />
            <name><narrative>East Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.8333299 14.16667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002231755" />
            <name><narrative>Far North Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>11 14.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002223603" />
            <name><narrative>North Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.5 14</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002220957" />
            <name><narrative>Yaounde</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.8666699 11.51667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002232593" />
            <name><narrative>Douala</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.0482702 9.7042799</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002236015" />
            <name><narrative>Adamaoua Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.8333302 13.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="11120" percentage="55" xml:lang="en"/><sector vocabulary="1" code="11220" percentage="25" xml:lang="en"/><sector vocabulary="1" code="12250" percentage="10" xml:lang="en"/><sector vocabulary="1" code="15117" percentage="10" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EZ" percentage="55.0000000" xml:lang="en"><narrative>FY17 - Other Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EP" percentage="25.0000000" xml:lang="en"><narrative>FY17 - Primary Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="14" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000652" percentage="15" xml:lang="en"><narrative>Education Financing</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="29" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="15" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="15" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000637" percentage="14" xml:lang="en"><narrative>Child Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="15" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="15" xml:lang="en"><narrative>Public Finance Management</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2005-05-01"/>
<period-end iso-date="2005-05-31"/>
<value currency="USD" value-date="2005-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-06-01"/>
<period-end iso-date="2005-06-30"/>
<value currency="USD" value-date="2005-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-07-01"/>
<period-end iso-date="2005-07-31"/>
<value currency="USD" value-date="2005-07-31">175000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-08-01"/>
<period-end iso-date="2005-08-31"/>
<value currency="USD" value-date="2005-08-31">175000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-09-01"/>
<period-end iso-date="2005-09-30"/>
<value currency="USD" value-date="2005-09-30">175000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-10-01"/>
<period-end iso-date="2005-10-31"/>
<value currency="USD" value-date="2005-10-31">175000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-11-01"/>
<period-end iso-date="2005-11-30"/>
<value currency="USD" value-date="2005-11-30">175000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-12-01"/>
<period-end iso-date="2005-12-31"/>
<value currency="USD" value-date="2005-12-31">175000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-01-01"/>
<period-end iso-date="2006-01-31"/>
<value currency="USD" value-date="2006-01-31">175000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-02-01"/>
<period-end iso-date="2006-02-28"/>
<value currency="USD" value-date="2006-02-28">175000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-03-01"/>
<period-end iso-date="2006-03-31"/>
<value currency="USD" value-date="2006-03-31">175000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-04-01"/>
<period-end iso-date="2006-04-30"/>
<value currency="USD" value-date="2006-04-30">175000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-05-01"/>
<period-end iso-date="2006-05-31"/>
<value currency="USD" value-date="2006-05-31">175000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-06-01"/>
<period-end iso-date="2006-06-30"/>
<value currency="USD" value-date="2006-06-30">175000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">458333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">66666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">16666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">16666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">16666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">16666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">16666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">16666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">16666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">16666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">16666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">16666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">16666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">16666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-05-01"/>
<period-end iso-date="2005-05-31"/>
<value currency="USD" value-date="2005-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-06-01"/>
<period-end iso-date="2005-06-30"/>
<value currency="USD" value-date="2005-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-07-01"/>
<period-end iso-date="2005-07-31"/>
<value currency="USD" value-date="2005-07-31">175000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-08-01"/>
<period-end iso-date="2005-08-31"/>
<value currency="USD" value-date="2005-08-31">175000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-09-01"/>
<period-end iso-date="2005-09-30"/>
<value currency="USD" value-date="2005-09-30">175000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-10-01"/>
<period-end iso-date="2005-10-31"/>
<value currency="USD" value-date="2005-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-11-01"/>
<period-end iso-date="2005-11-30"/>
<value currency="USD" value-date="2005-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-12-01"/>
<period-end iso-date="2005-12-31"/>
<value currency="USD" value-date="2005-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-01-01"/>
<period-end iso-date="2006-01-31"/>
<value currency="USD" value-date="2006-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-02-01"/>
<period-end iso-date="2006-02-28"/>
<value currency="USD" value-date="2006-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-03-01"/>
<period-end iso-date="2006-03-31"/>
<value currency="USD" value-date="2006-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-04-01"/>
<period-end iso-date="2006-04-30"/>
<value currency="USD" value-date="2006-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-05-01"/>
<period-end iso-date="2006-05-31"/>
<value currency="USD" value-date="2006-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-06-01"/>
<period-end iso-date="2006-06-30"/>
<value currency="USD" value-date="2006-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2012-09-01"/>
<value currency="USD" value-date="2012-09-01">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2012-09-01"/>
<value currency="USD" value-date="2012-09-01">0.00</value>
</budget>
<capital-spend percentage="100" /><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P075964"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P075964?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P075964"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Production of updated action plans for the education sector strategy
</narrative></title>
<baseline year="2010" iso-date="2010-04-20" value="Action plans are updated every three years"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-20" />
<period-end iso-date="2012-09-01" />
<target value="Action plans are updated and validated annually for all 4 sectors">

</target>
<actual value="The target has not yet been met. It is likely that they will be met only after project closing since the analytical work has commenced. Action plans will be developed based on the completion of the revised education sector strategy">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of projects implemented with participation of beneficiary communities in the ZEP
</narrative></title>
<baseline year="2010" iso-date="2010-04-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-20" />
<period-end iso-date="2012-09-01" />
<target value="86.00">

</target>
<actual value="57.00">
<comment><narrative>
The activity has now been completed by Plan Cameroon.  
Note: The number of schools initially envisaged was 86. However, since 29schools were either being already rehabilitated by other development partners, or by the government through the BIP (Budgetd'investissement public), and some of the schools required significant rehabilitation since the technical evaluation revealedgreater than 50% degradation, the IDA project financed the sensitization program and rehabilitation of works in the remaining 57schools which wereassessed to have 50% or less degradation. The 50% threshold was set to ensure that sufficient funds wereavailable to carry out fulland reasonable rehabilitation of the schools.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regularly updated documentation used to support the development of the sector
</narrative></title>
<baseline year="2010" iso-date="2010-04-20" value="No"><comment><narrative>The education sector lacks relevant and up-to-date analytical studies to guide the development of the education sector strategy</narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-20" />
<period-end iso-date="2012-09-01" />
<target value="Yes">
<comment><narrative>
Up-to-date documentation is produced and used to inform the strategy, including the following studies: - Analysis of thepost-basiceducation system - Review of the impact of the contract teachers program on the quality of education - Country StatusReport (RESEN)
</narrative></comment>
</target>
<actual value="No">
<comment><narrative>
The work is ongoing and likely to be completed only after project closing. Analytical work under component 1 has been started withthe recruitment of international technical expertise who are collaborating with the National Technical Team. The synthesis study onthe analytical documents in the sector is being completed and will serve asan input for the revision of the education sectorstrategy.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of additional classrooms built or rehabilitated at the primary level resulting from project interventions.
</narrative></title>
<baseline year="2010" iso-date="2010-04-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-20" />
<period-end iso-date="2012-09-01" />
<target value="430.00">

</target>
<actual value="419.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Preparation of budgets at the primary, secondary and higher levels of the education system based on statistical analysis
</narrative></title>
<baseline year="2010" iso-date="2010-04-20" value="Budgets are prepared without accurate and relevant statistical data and analyses."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-20" />
<period-end iso-date="2012-09-01" />
<target value="Budgets are fully aligned with strategic goals of the sector and based on relevant statistical data.">

</target>
<actual value="Challenges with respect to the availability of reliable data persist. However, the data verification and cleaning exercise isbeingundertaken, and the revised ESS will be based on the statistical analysis of largely reconciled data. The revised ESS willserve asthe basis for the 2013 budget arbitration at the primary, secondary and higher education levels.">
<comment><narrative>
The development of a methodological guide providing guidelines to better align budget with strategy continues to be work-in-progress.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
School health card published for primary and secondary education
</narrative></title>
<baseline year="2010" iso-date="2010-04-20" value="No school health card"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-20" />
<period-end iso-date="2012-09-01" />
<target value="School health card finalized and validated">

</target>
<actual value="The school health card and the school score cards have been completed and validated for primary and secondary education levels.">
<comment><narrative>
The school health cards and the school report cards were completed in 2011 their dissemination is ongoing.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regularly updated documentation used to support the development of the sector
</narrative></title>
<baseline year="2010" iso-date="2010-04-20" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-20" />
<period-end iso-date="2012-09-01" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2012-09-01" />
<target value="75,000.00">

</target>
<actual value="93,761.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2012-09-01" />
<target value="75000.00">

</target>
<actual value="93761.00">
<comment><narrative>
The schools rehabilitation/ renovation has now been completed, the construction of latrines has commenced, and 33 out of 37 wellshave been dug. 34,883 community members through 1190 meetings in the 4 ZEP regions have benefited from the mobilization andsensitization program.
Meanwhile, 113 capacity development activities have been undertaken since the original project wasimplemented, of which 32 capacity development activites/workshops have benefited 1,576 direct beneficiaries since the project wasrestructured in April2010. Further, an estimated 57,302 students in 57 schools will benefit from the schoolsrehabilitation/renovation activity. The target of 75,000 was based on an renovation and community sensitization of an estimated 86schools.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Production of tools that facilitate knowledge exchanges and participation in the international dialogue on education ( CITI and GDLN)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2012-09-01" />
<target value="1000 documents have been consulted">

</target>
<actual value="The production of tools that facilitate knowledge exchanges and participation in international dialogue on education have not yetbeen instituted due to the delays in the procurement of the GDLN equipment, which have now been received and are being installed.With respect to the CITI, there is insufficient evidence to substantiate the achievement of the target.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Production of analytical tools (ex: simulation models)
</narrative></title>
<baseline year="2010" iso-date="2010-04-20" value="There is a lack of capacity to develop and use simulation models or other budget supporting tool s"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-20" />
<period-end iso-date="2012-09-01" />
<target value="Analytical tools are developed and used for budget preparation in each sub-sector">

</target>
<actual value="The target has not been met.  It is likely that they will be after project closing. The analytical tools are being developed (ex.financing simulation model) and will be used to inform the budget preparation in eachsub-sector during the 2013 budget cycle.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of projects implemented with participation of beneficiary communities in the ZEP
</narrative></title>
<baseline year="2010" iso-date="2010-04-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-20" />
<period-end iso-date="2012-09-01" />
<target value="86.00">

</target>
<actual value="57.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Institutional audits prepared and evidence of the implementation of recommendations
</narrative></title>
<baseline year="2010" iso-date="2010-04-20" value="No evaluation of the implementation of the recommendations"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-20" />
<period-end iso-date="2012-09-01" />
<target value="Action plan for implementing recommendations has been implemented">

</target>
<actual value="The action plan for implementing the recommendations of the institutional audits is under preparation.">
<comment><narrative>
The action plan will be completed by end-August 2012, prior to project closing.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
System for learning assessment at the primary level
</narrative></title>
<baseline year="2010" iso-date="2010-04-20" value="Yes"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-20" />
<period-end iso-date="2012-09-01" />
<target value="Yes">

</target>
<actual value="Yes">
<comment><narrative>
A summative evaluation of student achievement/ assessment system after primary education does exist. However, there are no regularformative, qualitative assessments. Further, the early grade reading assessment results undertaken in 2011/12 have not yet beenvalidated by the Ministry of Basic Education.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Improved efficiency and equity in teacher deployment
</narrative></title>
<baseline year="2010" iso-date="2010-04-20" value="45.00"><comment><narrative>45% of teachers in the teaching cadre at the primary education level are not deployed according to schooling needs.</narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-20" />
<period-end iso-date="2012-09-01" />
<target value="25.00">

</target>
<actual value="48.00">
<comment><narrative>
MoE states that as a result of addressing the teacher deployment issue through the hiring of contract teachers at primary schoolslevel, the deployment issue is being progressively resolved.  However, evidence shows that teacher deployment is still a challengeat48%. The challenges in terms of teacher deployment are more fully discussed in the EFA-FTI Project Implementation CompletionReportdated June 28, 2012.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of additional classrooms built or rehabilitated at the primary level resulting from project interventions.
</narrative></title>
<baseline year="2010" iso-date="2010-04-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-20" />
<period-end iso-date="2012-09-01" />
<target value="430.00">
<comment><narrative>
additional classrooms rehabilitated under component 4
</narrative></comment>
</target>
<actual value="419.00">
<comment><narrative>
The contract anticipates 419 rehabilitated classrooms. However, there have been some issues with constructionscompanies/enterprises in the Eastern Region. It is therefore likely that the final number of rehabilitated classrooms could be lessthan the target number. The contracts with the community level enterprises for schools renovation were signed in April/May, and therehabilitation is now under completion.  The community sensitization work has also been completed.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
School health card published for primary and secondary education
</narrative></title>
<baseline year="2010" iso-date="2010-04-20" value="No school health card"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-20" />
<period-end iso-date="2012-09-01" />
<target value="School health card finalized and validated">

</target>
<actual value="The school health card and the school score cards have been completed and validated for primary and secondary education levels.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Institutional audits prepared and evidence of the implementation of recommendations
</narrative></title>
<baseline year="2010" iso-date="2010-04-20" value="No evaluation of the implementation of the recommendations"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-20" />
<period-end iso-date="2012-09-01" />
<target value="Action plan for implementing recommendations has been implemented">

</target>
<actual value="The action plan for implementing the recommendations of the institutional audits is under preparation.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Institutional audits disseminated to a large audience
</narrative></title>
<baseline year="2010" iso-date="2010-04-20" value="Audit realized but report not finalized and results not disseminated"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-20" />
<period-end iso-date="2012-09-01" />
<target value="5 regional workshops organized to disseminate the results of the audits">

</target>
<actual value="The audits completed and finalized have not yet been disseminated to a large audience.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of subsidies allocated to private schools in compliance with the criteria laid out in the operations manual
</narrative></title>
<baseline year="2010" iso-date="2010-04-20" value="0.00"><comment><narrative>Operation Manual for the allocation of subsidies developed but not enforced</narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-20" />
<period-end iso-date="2012-09-01" />
<target value="100.00">

</target>
<actual value="0.00">
<comment><narrative>
There is no limited evidence of the percentage of subsidies allocated to private schools in compliance with the criteria laid outin the operations manual.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Institutional audits disseminated to a large audience
</narrative></title>
<baseline year="2010" iso-date="2010-04-20" value="Audit realized but report not finalized and results not disseminated"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-20" />
<period-end iso-date="2012-09-01" />
<target value="5 regional workshops organized to disseminate the results of the audits">

</target>
<actual value="The audits completed and finalized have not yet been disseminated to a large audience.">
<comment><narrative>
The project secretariat has not yet organized the regional workshops to disseminate the
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Biennial update of the ESS based on analytic work conducted during preceding two years
</narrative></title>
<baseline year="2010" iso-date="2010-04-20" value="The strategy is updated every 2 years but no reliable statistical data or analytical products are available to inform policy makers."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-20" />
<period-end iso-date="2012-09-01" />
<target value="The updated strategy is informed by reliable data and relevant analytical work.">

</target>
<actual value="The revision of the ESS is underway based on analytical work having been launched over the past few months. The revised ESS will inform the 2013 budget cycle.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Production of updated action plans for the education sector strategy
</narrative></title>
<baseline year="2010" iso-date="2010-04-20" value="Action plans are updated every three years"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-20" />
<period-end iso-date="2012-09-01" />
<target value="Action plans are updated and validated annually for all 4 sectors">

</target>
<actual value="The target has not yet been met. It is likely that they will be met only after project closing since the analytical work hascommenced. Action plans will be developed based on the completion of the revised education sector strategy">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Production of analytical tools (ex: simulation models)
</narrative></title>
<baseline year="2010" iso-date="2010-04-20" value="There is a lack of capacity to develop and use simulation models or other budget supporting tool s"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-20" />
<period-end iso-date="2012-09-01" />
<target value="Analytical tools are developed and used for budget preparation in each sub-sector">

</target>
<actual value="The target has not been met. It is likely that they will be after project closing. The analytical tools are being developed (ex. financing simulation model) and will be used to inform the budget preparation in eachsub-sector during the 2013 budget cycle.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual publication of statistical yearbook for three levels of education
</narrative></title>
<baseline year="2010" iso-date="2010-04-09" value="Delayed production of statistical data, sometimes not accompanied with analytical report"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-09" />
<period-end iso-date="2012-09-01" />
<target value="Annual publication of statistical yearbook for three levels of education">

</target>
<actual value="The annual statistical yearbooks for the three levels of educatoin are being published regularly.">
<comment><narrative>
There are challenges with the data credibility and validity. The team of international experts in collaboration with the NationalTechnical Team are triangulating the data for verification, cleaning, and reconciliation.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
System for learning assessment at the primary level
</narrative></title>
<baseline year="2010" iso-date="2010-04-20" value="Yes"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-20" />
<period-end iso-date="2012-09-01" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Biennial update of the ESS based on analytic work conducted during preceding two years
</narrative></title>
<baseline year="2010" iso-date="2010-04-20" value="The strategy is updated every 2 years but no reliable statistical data or analytical products are available to inform policy makers."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-20" />
<period-end iso-date="2012-09-01" />
<target value="The updated strategy is informed by reliable data and relevant analytical work.">

</target>
<actual value="The revision of the ESS is underway based on analytical work having been launched over the past few months. The revised ESS willinform the 2013 budget cycle.">
<comment><narrative>
The analytical work on the education sector country status report is underway.  The data collection is ongoing, and the financialsimulation model is envisaged to be completed by end-September 2012 (after project closing date). 
The activities linked to thepreparation of the Education Sector strategy and the post-basic education study have also been launched albeit not throughfinancing fromthe project, but through financing from the Global Partnership for Education (GPE). The government is currentlyrevising the ESS onthe basis of analytical studies undertaken during the last few months.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual publication of statistical yearbook for three levels of education
</narrative></title>
<baseline year="2010" iso-date="2010-04-09" value="Delayed production of statistical data, sometimes not accompanied with analytical report"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-09" />
<period-end iso-date="2012-09-01" />
<target value="Annual publication of statistical yearbook for three levels of education">

</target>
<actual value="The annual statistical yearbooks for the three levels of educatoin are being published regularly.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiary participation in school functioning and school accountability in 86 selected schools in the ZEP
</narrative></title>
<baseline year="2010" iso-date="2010-04-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-20" />
<period-end iso-date="2012-09-01" />
<target value="86.00">

</target>
<actual value="57.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of subsidies allocated to private schools in compliance with the criteria laid out in the operations manual
</narrative></title>
<baseline year="2010" iso-date="2010-04-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-20" />
<period-end iso-date="2012-09-01" />
<target value="100.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Preparation of budgets at the primary, secondary and higher levels of the education system based on statistical analysis
</narrative></title>
<baseline year="2010" iso-date="2010-04-20" value="Budgets are prepared without accurate and relevant statistical data and analyses."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-20" />
<period-end iso-date="2012-09-01" />
<target value="Budgets are fully aligned with strategic goals of the sector and based on relevant statistical data.">

</target>
<actual value="Challenges with respect to the availability of reliable data persist. However, the data verification and cleaning exercise is beingundertaken, and the revised ESS will be based on the statistical analysis of largely reconciled data. The revised ESS will serve asthe basis for the 2013 budget arbitration at the primary, secondary and higher education levels.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiary participation in school functioning and school accountability in 86 selected schools in the ZEP
</narrative></title>
<baseline year="2010" iso-date="2010-04-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-20" />
<period-end iso-date="2012-09-01" />
<target value="86.00">

</target>
<actual value="57.00">
<comment><narrative>
The activity has now been completed by Plan Cameroon.  
Note: The number of schools initially envisaged was 86. However, since 29schools were either being already rehabilitated by other development partners, or by the government through the BIP (Budgetd'investissement public), and some of the schools required significant rehabilitation since the technical evaluation revealedgreater than 50% degradation, the IDA project financed the sensitization program and rehabilitation of works in the remaining 57schools which wereassessed to have 50% or less degradation. The 50% threshold was set to ensure that sufficient funds wereavailable to carry out fulland reasonable rehabilitation of the schools.
</narrative></comment>
</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P160926</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>CAMEROON Education Reform Support Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objective is to improve equitable access to quality basic education, with a focus on selected disadvantaged areas]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Education Reform Support Project for Cameroon is to improve equitable access to quality basic education, with a focus on selected disadvantaged areas. The project comprises of three components. The first component, improving access, quality, and education system management supports three government priority areas: (a) enhancing equitable access to quality pre-primary and primary education; (b) strengthening education system management; and (c) the recently identified additional priority of supporting the education needs of public schools in host communities with refugees. The second component, improving school effectiveness through performance-based financing (PBF) aim to improve the quality of schooling, student retention, and school governance, with an emphasis on girls education. The third component, institutional strengthening and project management aims to strengthen the capacity of education sector line ministries and relevant agencies toward the achievement of education sector strategy (ESS) objectives. It consists of following sub-components: (i) institutional capacity strengthening; and (ii) project management.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0030266"><narrative>Ministry of Economy and Planning</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0030266"><narrative>Ministry of Economy and Planning</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="CM-COA-0030265"><narrative>Ministry of Basic Education</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2017-11-23"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2018-05-01"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2026-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2026-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Mouhamadou Moustapha Lo</narrative></person-name><telephone>+1-202-473-1000</telephone><email>mlo@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002221788" />
            <name><narrative>South-West Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.2 9.3</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002221789" />
            <name><narrative>South Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>2.75 11.58333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002222934" />
            <name><narrative>West Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>5.5 10.66667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002223602" />
            <name><narrative>North-West Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.36667 10.36667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002223603" />
            <name><narrative>North Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>8.5 14</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002229336" />
            <name><narrative>Littoral Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.26667 10.13333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002231755" />
            <name><narrative>Far North Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>11 14.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002231835" />
            <name><narrative>East Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>3.83333 14.16667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002233376" />
            <name><narrative>Centre Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>4.75 11.83333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002233387" />
            <name><narrative>Republic of Cameroon</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6 12.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002236015" />
            <name><narrative>Adamaoua Region</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>6.83333 13.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="11320" percentage="29" xml:lang="en"/><sector vocabulary="1" code="11240" percentage="28" xml:lang="en"/><sector vocabulary="1" code="11220" percentage="28" xml:lang="en"/><sector vocabulary="1" code="11110" percentage="15" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EF" percentage="27.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EC" percentage="24.0000000" xml:lang="en"><narrative>FY17 - Early Childhood Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="ES" percentage="25.0000000" xml:lang="en"><narrative>FY17 - Secondary Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EP" percentage="24.0000000" xml:lang="en"><narrative>FY17 - Primary Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000656" percentage="100" xml:lang="en"><narrative>Education Governance, School-Based Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000657" percentage="88" xml:lang="en"><narrative>Standards, Curriculum and Textbooks</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000652" percentage="27" xml:lang="en"><narrative>Education Financing</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="100" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000652" percentage="27" xml:lang="en"><narrative>Education Financing</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="1" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000651" percentage="88" xml:lang="en"><narrative>Access to Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000655" percentage="88" xml:lang="en"><narrative>Student Assessment</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">2666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">2666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">3333333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">7000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">7000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">7000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">2666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">500902.96</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">5294501.83</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">5581.09</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">181419.94</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">189991.11</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">133200.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">6526.84</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">217053.12</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">15045.84</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">422725.55</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">90150.97</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">100000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">30000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2018</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">45000000</value><description xml:lang="en"><narrative>Total Commitment in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">500903</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">4000319</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">1294183</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">5581</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">172599</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">8821</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">18507</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">171484</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">123978</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">9222</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">6527</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">217053</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">15046</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">75604</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">347122</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">79160</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">10991</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">16173</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">96589</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">68085</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">2144</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">17265</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">57883</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">189754</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">22465</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">43583</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">229253</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">280291</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">32092</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">4425937</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">14224394</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">197637</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">20332</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">123694</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">26780</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">306933</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">59784</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">62915</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">5012</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">15472</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">69669</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">124068</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">9165</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">2700505</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">1988444</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">5329350</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">183620</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">28340</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">244295</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">34577</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">349577</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">3885305</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">104198</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">410206</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">109035</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">5020303</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">2689887</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">7138309</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">191482</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">102978</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">166634</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">562578</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">3593466</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">7874195</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">6679060</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">177830</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">19023</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">161214</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">51777</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">101858</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">71476</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">110894</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">18048</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">1032629</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">2246065</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">5304907</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">148831</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">598949</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">58292</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">185571</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">69265</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">177145</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">1754230</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">4349878</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">3959525</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">394176</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">969196</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">97692</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">386875</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">96593</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">262420</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">1010416</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">474686</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">2698730</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">273148</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">2146972</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">68030</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">714958</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">140292</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">764902</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">4659345</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">1981706</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">6088374</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">1008039</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">363500</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">268770</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">2213841</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">157563</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-331903</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">101695</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">6002206</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">1382359</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">710438</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">349848</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">762452</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">53223</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">191458</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">633184</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">159090</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">222120</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-27577</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-37385</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-43269</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-84760</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-141148</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-129617</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-8527</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-196538</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-58595</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-257896</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-88728</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-294210</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-112965</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-326576</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-137696</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-350299</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-169208</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-396177</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-199113</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-433973</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-230850</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-1448700</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-1422466</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-1466256</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-1437438</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-1564762</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-1537472</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-745847</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-30265"><narrative>Ministry of Basic Education</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P160926"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P160926?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P160926"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Impact evaluation of Performance-based Financing available and disclosed
</narrative></title>
<baseline year="2020" iso-date="2020-08-10" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-08-10" />
<period-end iso-date="2026-12-31" />
<target value="Yes">
<comment><narrative>
the 2024-2025 statistical yearbook has been technical validated. The official validation will take place by the end of December 2025. An update will be provided in the next ISR.
</narrative></comment>
</target>
<actual value="Oui">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Pre-primary enrollment in Community Pre-school Centers in rural areas
</narrative></title>
<baseline year="2017" iso-date="2017-10-16" value="8,360.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-10-16" />
<period-end iso-date="2026-12-31" />
<target value="38,360.00">
<comment><narrative>
An additional 8,035 pre-primary enrollment have been registered since June 2025. An update will be provided in the next ISR.
</narrative></comment>
</target>
<actual value="44,853">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of schools included in the Performance-based Financing (PBF) school grants program
</narrative></title>
<baseline year="2017" iso-date="2017-10-16" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-10-16" />
<period-end iso-date="2026-12-31" />
<target value="5,000.00">
<comment><narrative>
Based on the project progress report from the last quarter of 2024, 5,240 schools were included in the school grant program. No additional school has been registered since the last ISR, June 2025.
</narrative></comment>
</target>
<actual value="5,240.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public primary schools receiving package of grant funding and school level interventions in displaced people-affected areas
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Specific support will assist IDPs and host community pupils to meet their educational needs. This indicator captures those public primary schools benefitting from the agreed support package in the response strategy and plan (additional teachers, textbooks, sensitization, school grants)

The definition of IDPs hosting schools will be confirmed in the first year and updated each year

This indicator captures those public primary schools benefitting from the agreed support package in the response strategy and plan (additional teachers, textbooks, sensitization, school grants)
</narrative></comment>
</target>
<actual value="350.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public primary schools receiving package of grant funding and school level interventions in displaced people-affected areas
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Specific support will assist IDPs and host community pupils to meet their educational needs. This indicator captures those public primary schools benefitting from the agreed support package in the response strategy and plan (additional teachers, textbooks, sensitization, school grants)

The definition of IDPs hosting schools will be confirmed in the first year and updated each year

This indicator captures those public primary schools benefitting from the agreed support package in the response strategy and plan (additional teachers, textbooks, sensitization, school grants)
</narrative></comment>
</target>
<actual value="350.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public primary schools receiving package of grant funding and school level interventions in refugee-affected areas
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Specific support will assist refugee and host community pupils to meet their educational needs. This indicator captures those public primary schools benefitting from the agreed support package in the response strategy and plan (additional teachers, textbooks, sensitization, school grants)

The definition of refugee-affected areas will be confirmed in the first year and updated each year
</narrative></comment>
</target>
<actual value="400.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public primary schools receiving package of grant funding and school level interventions in refugee-affected areas
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Specific support will assist refugee and host community pupils to meet their educational needs. This indicator captures those public primary schools benefitting from the agreed support package in the response strategy and plan (additional teachers, textbooks, sensitization, school grants)

The definition of refugee-affected areas will be confirmed in the first year and updated each year
</narrative></comment>
</target>
<actual value="400.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Integrated Statistical Yearbook available at national level
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Yearbook includes information on: enrollment, infrastructure, results, scorecards and comprises disaggregated data (by region and gender)

The yearbook covers pre-primary through higher education, including technical and vocational education and training (TVET)
</narrative></comment>
</target>
<actual value="Oui">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Integrated Statistical Yearbook available at national level
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Yearbook includes information on: enrollment, infrastructure, results, scorecards and comprises disaggregated data (by region and gender)

The yearbook covers pre-primary through higher education, including technical and vocational education and training (TVET)
</narrative></comment>
</target>
<actual value="Oui">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of learners at the end of primary who reach the minimum proficiency level of reading
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="24.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
The indicator is the share of learners at the end of primary education who read at below the Minimum Proficiency Level (MPL), as defined by the Global Alliance to Monitor Learning (GAML) led by the UNESCO Institute for Statistics in the context of the SDG 4.1.1 monitoring. According to the GAML, the MPL for reading at the end of primary is defined as follows: “Students independently and fluently read simple, short narrative and expository texts. In line with the global Learning Poverty index, this indicator was added monitor the acquisition of foundational skills by children at the end primary.
</narrative></comment>
</target>
<actual value="30.20 (2024). We are Still waiting for PASEC results and/or National large-scale evaluation reports to assess progresses.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of learners at the end of primary who reach the minimum proficiency level of reading
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="24.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
The indicator is the share of learners at the end of primary education who read at below the Minimum Proficiency Level (MPL), as defined by the Global Alliance to Monitor Learning (GAML) led by the UNESCO Institute for Statistics in the context of the SDG 4.1.1 monitoring. According to the GAML, the MPL for reading at the end of primary is defined as follows: “Students independently and fluently read simple, short narrative and expository texts. In line with the global Learning Poverty index, this indicator was added monitor the acquisition of foundational skills by children at the end primary.
</narrative></comment>
</target>
<actual value="30.20">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Pre-primary enrollment in Community Pre-school Centers in rural areas
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="8360.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Number of pupils enrolled in CPCs in rural areas. Rural area communes are based on MINEDUB's school map
</narrative></comment>
</target>
<actual value="45,074.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Pre-primary enrollment in Community Pre-school Centers in rural areas
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="8360.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Number of pupils enrolled in CPCs in rural areas. Rural area communes are based on MINEDUB's school map
</narrative></comment>
</target>
<actual value="44,853.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Students having essential textbooks (based on the new curriculum) at public primary level (Nationwide)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Percentage is calculated by dividing the number of primary level students having at least 3 new essential textbooks (English, French and Mathematics) by the total number of Students.
</narrative></comment>
</target>
<actual value="(a) At least 94% of students of Level 1 (SIL / Class 1 CP/Class 2), 100% of Level 2 (CE1 / Class 3 CE2/ Class 4) and 54 % of Level 3 (CM1 / Class 5 CM2/Class 6) have the package of three (3) essential textbooks. Achieved for all levels except level 3. With undergoing distribution results will be fully achieved. Books are already procured. So approved the disbursement of full amount considering the low risk and IVA authorization to fully disburse this DLR.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Students having essential textbooks (based on the new curriculum) at public primary level (Nationwide)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Percentage is calculated by dividing the number of primary level students having at least 3 new essential textbooks (English, French and Mathematics) by the total number of Students.
</narrative></comment>
</target>
<actual value="(a) At least 90% of students of Level 1 (SIL / Class 1 CP/Class 2), Level 2 (CE1 / Class 3 CE2/ Class 4) and Level 3 (CM1 / Class 5 CM2/Class 6) have the package of three (3) essential textbooks">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Teachers recruited or trained
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="127,500 (including + 18,000 newly recruited trained and 20,000 teacher from private sector).">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Teachers recruited or trained
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="135,245.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public primary schools with at least 3 state paid teachers (only schools enrolling more than 100 pupils) (Nationwide)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="43.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Percentage is calculated by dividing the number of public primary schools having 100 students or more and at least three state-paid teachers by the total number of public primary schools having 100 students or more.
</narrative></comment>
</target>
<actual value="98.9">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public primary schools with at least 3 state paid teachers (only schools enrolling more than 100 pupils) (Nationwide)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="43.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Percentage is calculated by dividing the number of public primary schools having 100 students or more and at least three state-paid teachers by the total number of public primary schools having 100 students or more.
</narrative></comment>
</target>
<actual value="98">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public primary schools receiving package of grant funding and school level interventions in displaced people-affected areas
</narrative></title>
<baseline year="2020" iso-date="2020-08-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-08-10" />
<period-end iso-date="2026-12-31" />
<target value="300.00">
<comment><narrative>
The MINEDUB latest activity report indicates that 350 public primary schools in displaced people-affected areas received training in psychosocial support and resource management.
</narrative></comment>
</target>
<actual value="350.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public primary schools receiving package of grant funding and school level interventions in displaced people-affected areas
</narrative></title>
<baseline year="2020" iso-date="2020-08-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-08-10" />
<period-end iso-date="2026-12-31" />
<target value="300.00">
<comment><narrative>
The MINEDUC activity report indicates that 350 public primary schools in displaced people-affected areas received training in psychosocial support and resource management.
</narrative></comment>
</target>
<actual value="350.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public primary schools receiving package of grant funding and school level interventions in refugee-affected areas
</narrative></title>
<baseline year="2017" iso-date="2017-10-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-10-16" />
<period-end iso-date="2026-12-31" />
<target value="400.00">
<comment><narrative>
The MINEDUB activity report indicates that 400 public primary schools in refugee-affected areas received training in psychosocial support and resource management.
</narrative></comment>
</target>
<actual value="400.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public primary schools receiving package of grant funding and school level interventions in refugee-affected areas
</narrative></title>
<baseline year="2017" iso-date="2017-10-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-10-16" />
<period-end iso-date="2026-12-31" />
<target value="400.00">
<comment><narrative>
The MINEDUC activity report indicates that 400 public primary schools in refugee-affected areas received training in psychosocial support and resource management.
</narrative></comment>
</target>
<actual value="400.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of learners at the end of primary who reach the minimum proficiency level of reading
</narrative></title>
<baseline year="2018" iso-date="2018-10-16" value="24.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-10-16" />
<period-end iso-date="2026-12-31" />
<target value="35.00">
<comment><narrative>
No change. The PASEC 2025 evaluation was completed in Cameroon in May 2025. Data analysis in ongoing and results will now be available in October 2026. However the project supported a large-scale national evaluation for both MINESEC and MINEDUB. Results for MINEDUB will be available around End July 2026. Results will be reflected in the next ISR.
</narrative></comment>
</target>
<actual value="30.20%">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of learners at the end of primary who reach the minimum proficiency level of reading
</narrative></title>
<baseline year="2018" iso-date="2018-10-16" value="24.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-10-16" />
<period-end iso-date="2026-12-31" />
<target value="35.00">
<comment><narrative>
No change. The PASEC 2024 evaluation was completed in Cameroon in May 2025. Data analysis in ongoing and results will be available in June 2026. An update will be provided in the next ISR.
</narrative></comment>
</target>
<actual value="30.20%">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Pre-primary enrollment in Community Pre-school Centers in rural areas
</narrative></title>
<baseline year="2017" iso-date="2017-10-16" value="8,360.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-10-16" />
<period-end iso-date="2026-12-31" />
<target value="38,360.00">
<comment><narrative>
An additional 8,256 pre-primary enrollment have been registered since June 2025.
</narrative></comment>
</target>
<actual value="45,074">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Pre-primary enrollment in Community Pre-school Centers in rural areas
</narrative></title>
<baseline year="2017" iso-date="2017-10-16" value="8,360.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-10-16" />
<period-end iso-date="2026-12-31" />
<target value="38,360.00">
<comment><narrative>
An additional 8,035 pre-primary enrollment have been registered since June 2025. An update will be provided in the next ISR.
</narrative></comment>
</target>
<actual value="44,853">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Students having essential textbooks (based on the new curriculum) at public primary level (Nationwide)
</narrative></title>
<baseline year="2017" iso-date="2017-10-16" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-10-16" />
<period-end iso-date="2026-12-31" />
<target value="(a) At least 90% of students of Level 1 (SIL / Class 1 CP/Class 2), Level 2 (CE1 / Class 3 CE2/ Class 4) and Level 3 (CM1 / Class 5 CM2/Class 6) have the package of three (3) essential textbooks">
<comment><narrative>
A total of 13,194,300 essential textbooks (all 3 levels) have been distributed so far. The reporting of the indicator for the year 2025/2026 will be available before 31/10/2026 (following the technical validation of the 2025/2026 statistical yearbook). An update will be provided in the next ISR. Targets are exceeded.
</narrative></comment>
</target>
<actual value="94.0 % of students of Level 1 (SIL / Class 1 CP / Class 2) and 100% of Level 2 (CE1 / Class 3 CE2 / Class 4) have the package of three (3) essential textbooks (b) 54% of students of Level 3 (CM1 / Class 5 CM2 / Class 6) have the package of three (3) essential textbooks. With the next distribution the end target will be achieved.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Students having essential textbooks (based on the new curriculum) at public primary level (Nationwide)
</narrative></title>
<baseline year="2017" iso-date="2017-10-16" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-10-16" />
<period-end iso-date="2026-12-31" />
<target value="(a) At least 90% of students of Level 1 (SIL / Class 1 CP/Class 2), Level 2 (CE1 / Class 3 CE2/ Class 4) and Level 3 (CM1 / Class 5 CM2/Class 6) have the package of three (3) essential textbooks">
<comment><narrative>
A total of 2,126,997 essential textbooks (level 2) have been distributed so far. Data collection for the 2024/2025 school map is currently being finalized and results will be available by the end of December 2025. An update will be provided in the next ISR.
</narrative></comment>
</target>
<actual value="100 % of students of Level 1 (SIL / Class 1 CP / Class 2) and Level 2 (CE1 / Class 3 CE2 / Class 4) have the package of three (3) essential textbooks (b) 54% of students of Level 3 (CM1 / Class 5 CM2 / Class 6) have the package of three (3) essential textbooks. With the next distribution the end target will be achieved.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public primary schools with at least 3 state paid teachers (only schools enrolling more than 100 pupils) (Nationwide)
</narrative></title>
<baseline year="2017" iso-date="2017-10-16" value="43.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-10-16" />
<period-end iso-date="2026-12-31" />
<target value="95.00">
<comment><narrative>
This result is based on the Basic Education Ministry's HR Directorate database certified by the Tierce Party verification Agency for DLIs. Data collection for the 2025-2026 Statistical Yearbook is currently being finalized and results will be available by end of October 2026. Ministry HR Directorate and Statistical Yearbook's data will be triangulated and confirmed to stabilize and harmonize both database. To date, the targets have been exceeded, but the situation remains highly unstable due to a lack of coordination in the establishment of new schools.
</narrative></comment>
</target>
<actual value="98.9">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public primary schools with at least 3 state paid teachers (only schools enrolling more than 100 pupils) (Nationwide)
</narrative></title>
<baseline year="2017" iso-date="2017-10-16" value="43.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-10-16" />
<period-end iso-date="2026-12-31" />
<target value="95.00">
<comment><narrative>
This result is based on the Basic Education Ministry's HR Directorate database certified by the Tierce Party verification Agency for DLIs. Data collection for the 2024-2025 Statistical Yearbook is currently being finalized and results will be available by end of December 2025. Ministry HR Directorate and Statistical Yearbook's data will be triangulated and confirmed to stabilize and harmonize both database. An update will be provided in the next ISR.
</narrative></comment>
</target>
<actual value="98">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Community Pre-schools Centers (CPCs) and public primary schools engaging communities in school-level management
</narrative></title>
<baseline year="2018" iso-date="2018-08-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-16" />
<period-end iso-date="2026-12-31" />
<target value="6,400.00">
<comment><narrative>
Based on the project progress report from the last quarter of 2024, 6,955 CPCs and Public Primary Schools have been reported.
</narrative></comment>
</target>
<actual value="6,955.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of learners at the end of primary who reach the minimum proficiency level of reading
</narrative></title>
<baseline year="2018" iso-date="2018-10-16" value="24.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-10-16" />
<period-end iso-date="2026-12-31" />
<target value="35.00">
<comment><narrative>
No change. The PASEC 2024 evaluation was completed in Cameroon in May 2025. Data analysis in ongoing and results will be available in June 2026. An update will be provided in the next ISR.
</narrative></comment>
</target>
<actual value="30.20%">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Students having essential textbooks (based on the new curriculum) at public primary level (Nationwide)
</narrative></title>
<baseline year="2017" iso-date="2017-10-16" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-10-16" />
<period-end iso-date="2026-12-31" />
<target value="(a) At least 90% of students of Level 1 (SIL / Class 1 CP/Class 2), Level 2 (CE1 / Class 3 CE2/ Class 4) and Level 3 (CM1 / Class 5 CM2/Class 6) have the package of three (3) essential textbooks">
<comment><narrative>
A total of 2,126,997 essential textbooks (level 2) have been distributed so far. Data collection for the 2024/2025 school map is currently being finalized and results will be available by the end of December 2025. An update will be provided in the next ISR.
</narrative></comment>
</target>
<actual value="100 % of students of Level 1 (SIL / Class 1 CP / Class 2) and Level 2 (CE1 / Class 3 CE2 / Class 4) have the package of three (3) essential textbooks (b) 54% of students of Level 3 (CM1 / Class 5 CM2 / Class 6) have the package of three (3) essential textbooks. With the next distribution the end target will be achieved.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public primary schools with at least 3 state paid teachers (only schools enrolling more than 100 pupils) (Nationwide)
</narrative></title>
<baseline year="2017" iso-date="2017-10-16" value="43.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-10-16" />
<period-end iso-date="2026-12-31" />
<target value="95.00">
<comment><narrative>
This result is based on the Basic Education Ministry's HR Directorate database certified by the Tierce Party verification Agency for DLIs. Data collection for the 2024-2025 Statistical Yearbook is currently being finalized and results will be available by end of December 2025. Ministry HR Directorate and Statistical Yearbook's data will be triangulated and confirmed to stabilize and harmonize both database. An update will be provided in the next ISR.
</narrative></comment>
</target>
<actual value="98">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Teachers recruited or trained
</narrative></title>
<baseline year="2020" iso-date="2020-08-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-08-10" />
<period-end iso-date="2026-12-31" />
<target value="123,000.00">
<comment><narrative>
19,892 teachers have been recruited or trained as of December 2025. An update will be provided in the next ISR.
</narrative></comment>
</target>
<actual value="135,245">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public primary schools receiving package of grant funding and school level interventions in displaced people-affected areas
</narrative></title>
<baseline year="2020" iso-date="2020-08-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-08-10" />
<period-end iso-date="2026-12-31" />
<target value="300.00">
<comment><narrative>
The MINEDUC activity report indicates that 350 public primary schools in displaced people-affected areas received training in psychosocial support and resource management.
</narrative></comment>
</target>
<actual value="350.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Displaced people and people in host communities provided with services and livelihoods
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
No reporting as of December 2025. This is a new intermediate indicator CRIs added in December 2024 as part of the CRI retrofit process led by the region. The indicator is currently being calculated, and data should be available by the end of January 2030. An update will be provided in the next ISR.

This new indicator is defined as &quot;number of refugees, IDPs, and people in host communities deliberately supported with accessing and utilizing services and livelihoods&quot; (WBG - Scorecard FY24-FY30 Methodology Note). 

Based on Pilar 7, this indicator monitors the share of internally displaced people (IDPs), refugees and people in host communities. The desegregation by &quot;youth&quot; measures the share Pupils in  primary schools receiving package of grant funding and school level interventions in displaced people and refugees affected areas (Number of people), and the disaggregation by &quot;women&quot; measures the share of female - Pupils in  primary schools receiving package of grant funding.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Teacher trainers of MINESEC trained on the new curriculum
</narrative></title>
<baseline year="2017" iso-date="2017-10-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-10-16" />
<period-end iso-date="2023-06-30" />
<target value="4,500.00">
<comment><narrative>
No change. No additional Teacher Trainers of MINESEC have been trained since the last ISR June 2025.
</narrative></comment>
</target>
<actual value="2,913.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public primary schools receiving package of grant funding and school level interventions in refugee-affected areas
</narrative></title>
<baseline year="2017" iso-date="2017-10-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-10-16" />
<period-end iso-date="2026-12-31" />
<target value="400.00">
<comment><narrative>
The MINEDUC activity report indicates that 400 public primary schools in refugee-affected areas received training in psychosocial support and resource management.
</narrative></comment>
</target>
<actual value="400.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of schools included in PBF program improving their performance
</narrative></title>
<baseline year="2017" iso-date="2017-10-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-10-16" />
<period-end iso-date="2026-12-31" />
<target value="75.00">
<comment><narrative>
Based on data from the project report, no progress has been reported and data will be available by the end of July 2025. An update will be provided in the next ISR.
</narrative></comment>
</target>
<actual value="79.90">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
MINEDUB sub-divisional inspectors and MINEDUB head teachers who achieve reliability in classroom observation (as measured by the performance exam at the end of the training)
</narrative></title>
<baseline year="2020" iso-date="2020-08-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-08-10" />
<period-end iso-date="2026-12-31" />
<target value="85.00">
<comment><narrative>
No reporting since the last ISR June 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Large scale learning assessments completed at the primary and the secondary level
</narrative></title>
<baseline year="2020" iso-date="2020-08-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-08-13" />
<period-end iso-date="2026-12-31" />
<target value="4.00">
<comment><narrative>
No additional assessment have been undertaken as of November 2025. The assessment at the secondary level is ongoing and results will be published by the end of December 2025. An update will be provided in the next ISR.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students benefiting from direct interventions to enhance learning
</narrative></title>
<baseline year="2020" iso-date="2020-08-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-08-10" />
<period-end iso-date="2026-12-31" />
<target value="8,600,000.00">
<comment><narrative>
An additional 116,192 students benefiting from direct interventions to enhance learning have been registered since the last ISR. Data collection for the 2024-2025 Statistical Yearbook is ongoing and will be finalized by the end of December 2025. An update will be provided in the next ISR.
</narrative></comment>
</target>
<actual value="5,442,666.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Primary-level teachers receiving continuous coaching by relevant pedagogical supervision chain of MINEDUB
</narrative></title>
<baseline year="2020" iso-date="2020-08-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-08-10" />
<period-end iso-date="2026-12-31" />
<target value="2,500.00">
<comment><narrative>
No reporting. TEACH/COACH training interventions will take place in January 2025. An update will be provided in the next ISR.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Integrated Statistical Yearbook available at national level
</narrative></title>
<baseline year="2017" iso-date="2017-10-16" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-10-16" />
<period-end iso-date="2026-12-31" />
<target value="Yes">
<comment><narrative>
2024-2025 statistical yearbook is being finalized and will be validated and available by the end of December 2025.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Community pre-school centers in rural areas meeting quality standards (DLI4)
</narrative></title>
<baseline year="2017" iso-date="2017-10-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-10-16" />
<period-end iso-date="2026-12-31" />
<target value="1,000.00">
<comment><narrative>
Results (975 CPCs) reported in June 2025 were slightly overestimated by 10 CPCs. The finalized school map reports 965 CPCs.
</narrative></comment>
</target>
<actual value="965.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Large scale learning assessments completed at the primary and the secondary level
</narrative></title>
<baseline year="2020" iso-date="2020-08-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-08-13" />
<period-end iso-date="2026-12-31" />
<target value="4.00">
<comment><narrative>
Two national large-scale assessment have been conducted in 2023 and 2026. Furthermore, the PASEC 2025 evaluation was completed in Cameroon in May 2025. Data analysis in ongoing and results will now be available in October 2026. However the project supported a large-scale national evaluation for both MINESEC and MINEDUB. Results for MINEDUB will be available around End July 2026. Results will be reflected in the next ISR. MINESEC evaluation report will be completed in early next academic year. Feasibility appreciation will be examined during next mission.
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
MINEDUB sub-divisional inspectors and MINEDUB head teachers who achieve reliability in classroom observation (as measured by the performance exam at the end of the training)
</narrative></title>
<baseline year="2020" iso-date="2020-08-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-08-10" />
<period-end iso-date="2026-12-31" />
<target value="85.00">
<comment><narrative>
No reporting since the last ISR June 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Primary-level teachers receiving continuous coaching by relevant pedagogical supervision chain of MINEDUB
</narrative></title>
<baseline year="2020" iso-date="2020-08-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-08-10" />
<period-end iso-date="2026-12-31" />
<target value="2,500.00">
<comment><narrative>
No reporting. TEACH/COACH training interventions will take place in January 2025. An update will be provided in the next ISR.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Community Pre-schools Centers (CPCs) and public primary schools engaging communities in school-level management
</narrative></title>
<baseline year="2018" iso-date="2018-08-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-16" />
<period-end iso-date="2026-12-31" />
<target value="6,400.00">
<comment><narrative>
Based on the project progress report, 6,955 CPCs and Public Primary Schools have been reported.
</narrative></comment>
</target>
<actual value="6,955.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Integrated Statistical Yearbook available at national level
</narrative></title>
<baseline year="2017" iso-date="2017-10-16" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-10-16" />
<period-end iso-date="2026-12-31" />
<target value="Yes">
<comment><narrative>
The 2025-2026 Integrated Version of Statistical Yearbook is expected by september 2026. An update will be provided in the next ISR.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Community pre-school centers in rural areas meeting quality standards (DLI4)
</narrative></title>
<baseline year="2017" iso-date="2017-10-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-10-16" />
<period-end iso-date="2026-12-31" />
<target value="1,000.00">
<comment><narrative>
The recent CPCs national Survey Reported that 1,118 functional CPCs are enrolling over 50,000 children, predominantly in rural and underserved regions, with meaningful inclusion of refugee, displaced, and indigenous populations — including 1,042 refugees, 435 internally displaced persons, 957 Bororo, and 501 Baka children. However, only 965 effectively received project grants (45,074 children). We only report them here.
</narrative></comment>
</target>
<actual value="965.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Teacher trainers of MINESEC trained on the new curriculum
</narrative></title>
<baseline year="2017" iso-date="2017-10-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-10-16" />
<period-end iso-date="2023-06-30" />
<target value="4,500.00">
<comment><narrative>
No change. Data collection for the 2025-2026 Statistical Yearbook is ongoing and will be finalized by August 2026. An update will be provided in the next ISR.
</narrative></comment>
</target>
<actual value="2,913.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of schools included in the Performance-based Financing (PBF) school grants program
</narrative></title>
<baseline year="2017" iso-date="2017-10-16" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-10-16" />
<period-end iso-date="2026-12-31" />
<target value="5,000.00">
<comment><narrative>
The latest figures show that 5,240 schools are enrolled in the FBP for the 2025–2026 school year. No additional school has been registered since the last ISR, June 2025.
</narrative></comment>
</target>
<actual value="5,240.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of schools included in PBF program improving their performance
</narrative></title>
<baseline year="2017" iso-date="2017-10-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-10-16" />
<period-end iso-date="2026-12-31" />
<target value="75.00">
<comment><narrative>
The databases used to measure this indicator are prepared by the CTN with the assistance of a consultant. The database for 2025–2026 is currently being finalized. An update will be provided in the next ISR.
</narrative></comment>
</target>
<actual value="79.90">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students benefiting from direct interventions to enhance learning
</narrative></title>
<baseline year="2020" iso-date="2020-08-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-08-10" />
<period-end iso-date="2026-12-31" />
<target value="8,600,000.00">
<comment><narrative>
Data collection for the 2025-2026 Statistical Yearbook is ongoing and will be finalized by August 2026. An update will be provided in the next ISR.
</narrative></comment>
</target>
<actual value="5,442,666.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Impact evaluation of Performance-based Financing available and disclosed
</narrative></title>
<baseline year="2020" iso-date="2020-08-10" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-08-10" />
<period-end iso-date="2026-12-31" />
<target value="Yes">
<comment><narrative>
The Endline of the Impact Evaluation of the Cameroon Performance Based Financing (PBF) in Education ERSP Program is available. The evaluation used an RCT across 240 public primary schools in four regions, comparing three groups of 80 schools each — inputs-only, incentives-only, and inputs plus incentives — to isolate the distinct effects of resources versus performance incentives. Results found that performance incentives alone improved school behaviour, governance, and community satisfaction, but combining inputs with incentives reduced effectiveness and delayed learning gains, underscoring the need for a simplified, well-executed incentives-focused approach to convert early behavioral improvements into sustained learning outcomes.
</narrative></comment>
</target>
<actual value="Oui">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Teachers recruited or trained
</narrative></title>
<baseline year="2020" iso-date="2020-08-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-08-10" />
<period-end iso-date="2026-12-31" />
<target value="123,000.00">
<comment><narrative>
19,892 + 3000 newly recruited teachers have been recruited or trained as of May 31, 2026 in addition to the former ones. The project exceeded target. The project exceeded target.
</narrative></comment>
</target>
<actual value="149,762">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Displaced people and people in host communities provided with services and livelihoods
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
No reporting as of June 5, 2026. This is a new intermediate indicator CRIs added in December 2024 as part of the CRI retrofit process led by the region. According to PIU, data should be available by the end of August 2026. An update will be provided in the next ISR.

This new indicator is defined as &quot;number of refugees, IDPs, and people in host communities deliberately supported with accessing and utilizing services and livelihoods&quot; (WBG - Scorecard FY24-FY30 Methodology Note). 

Based on Pilar 7, this indicator monitors the share of internally displaced people (IDPs), refugees and people in host communities. The desegregation by &quot;youth&quot; measures the share Pupils in  primary schools receiving package of grant funding and school level interventions in displaced people and refugees affected areas (Number of people), and the disaggregation by &quot;women&quot; measures the share of female - Pupils in  primary schools receiving package of grant funding.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public primary schools receiving package of grant funding and school level interventions in displaced people-affected areas
</narrative></title>
<baseline year="2020" iso-date="2020-08-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-08-10" />
<period-end iso-date="2026-12-31" />
<target value="300.00">
<comment><narrative>
The MINEDUB latest activity report indicates that 350 public primary schools in displaced people-affected areas received training in psychosocial support and resource management.
</narrative></comment>
</target>
<actual value="350.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public primary schools receiving package of grant funding and school level interventions in displaced people-affected areas
</narrative></title>
<baseline year="2020" iso-date="2020-08-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-08-10" />
<period-end iso-date="2026-12-31" />
<target value="300.00">
<comment><narrative>
The MINEDUC activity report indicates that 350 public primary schools in displaced people-affected areas received training in psychosocial support and resource management.
</narrative></comment>
</target>
<actual value="350.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public primary schools receiving package of grant funding and school level interventions in refugee-affected areas
</narrative></title>
<baseline year="2017" iso-date="2017-10-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-10-16" />
<period-end iso-date="2026-12-31" />
<target value="400.00">
<comment><narrative>
The MINEDUB activity report indicates that 400 public primary schools in refugee-affected areas received training in psychosocial support and resource management.
</narrative></comment>
</target>
<actual value="400.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public primary schools receiving package of grant funding and school level interventions in refugee-affected areas
</narrative></title>
<baseline year="2017" iso-date="2017-10-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-10-16" />
<period-end iso-date="2026-12-31" />
<target value="400.00">
<comment><narrative>
The MINEDUC activity report indicates that 400 public primary schools in refugee-affected areas received training in psychosocial support and resource management.
</narrative></comment>
</target>
<actual value="400.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of learners at the end of primary who reach the minimum proficiency level of reading
</narrative></title>
<baseline year="2018" iso-date="2018-10-16" value="24.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-10-16" />
<period-end iso-date="2026-12-31" />
<target value="35.00">
<comment><narrative>
No change. The PASEC 2025 evaluation was completed in Cameroon in May 2025. Data analysis in ongoing and results will now be available in October 2026. However the project supported a large-scale national evaluation for both MINESEC and MINEDUB. Results for MINEDUB will be available around End July 2026. Results will be reflected in the next ISR.
</narrative></comment>
</target>
<actual value="30.20%">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of learners at the end of primary who reach the minimum proficiency level of reading
</narrative></title>
<baseline year="2018" iso-date="2018-10-16" value="24.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-10-16" />
<period-end iso-date="2026-12-31" />
<target value="35.00">
<comment><narrative>
No change. The PASEC 2024 evaluation was completed in Cameroon in May 2025. Data analysis in ongoing and results will be available in June 2026. An update will be provided in the next ISR.
</narrative></comment>
</target>
<actual value="30.20%">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Pre-primary enrollment in Community Pre-school Centers in rural areas
</narrative></title>
<baseline year="2017" iso-date="2017-10-16" value="8,360.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-10-16" />
<period-end iso-date="2026-12-31" />
<target value="38,360.00">
<comment><narrative>
An additional 8,256 pre-primary enrollment have been registered since June 2025.
</narrative></comment>
</target>
<actual value="45,074">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Pre-primary enrollment in Community Pre-school Centers in rural areas
</narrative></title>
<baseline year="2017" iso-date="2017-10-16" value="8,360.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-10-16" />
<period-end iso-date="2026-12-31" />
<target value="38,360.00">
<comment><narrative>
An additional 8,035 pre-primary enrollment have been registered since June 2025. An update will be provided in the next ISR.
</narrative></comment>
</target>
<actual value="44,853">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Students having essential textbooks (based on the new curriculum) at public primary level (Nationwide)
</narrative></title>
<baseline year="2017" iso-date="2017-10-16" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-10-16" />
<period-end iso-date="2026-12-31" />
<target value="(a) At least 90% of students of Level 1 (SIL / Class 1 CP/Class 2), Level 2 (CE1 / Class 3 CE2/ Class 4) and Level 3 (CM1 / Class 5 CM2/Class 6) have the package of three (3) essential textbooks">
<comment><narrative>
A total of 13,194,300 essential textbooks (all 3 levels) have been distributed so far. The reporting of the indicator for the year 2025/2026 will be available before 31/10/2026 (following the technical validation of the 2025/2026 statistical yearbook). An update will be provided in the next ISR. Targets are exceeded.
</narrative></comment>
</target>
<actual value="94.0 % of students of Level 1 (SIL / Class 1 CP / Class 2) and 100% of Level 2 (CE1 / Class 3 CE2 / Class 4) have the package of three (3) essential textbooks (b) 54% of students of Level 3 (CM1 / Class 5 CM2 / Class 6) have the package of three (3) essential textbooks. With the next distribution the end target will be achieved.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Students having essential textbooks (based on the new curriculum) at public primary level (Nationwide)
</narrative></title>
<baseline year="2017" iso-date="2017-10-16" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-10-16" />
<period-end iso-date="2026-12-31" />
<target value="(a) At least 90% of students of Level 1 (SIL / Class 1 CP/Class 2), Level 2 (CE1 / Class 3 CE2/ Class 4) and Level 3 (CM1 / Class 5 CM2/Class 6) have the package of three (3) essential textbooks">
<comment><narrative>
A total of 2,126,997 essential textbooks (level 2) have been distributed so far. Data collection for the 2024/2025 school map is currently being finalized and results will be available by the end of December 2025. An update will be provided in the next ISR.
</narrative></comment>
</target>
<actual value="100 % of students of Level 1 (SIL / Class 1 CP / Class 2) and Level 2 (CE1 / Class 3 CE2 / Class 4) have the package of three (3) essential textbooks (b) 54% of students of Level 3 (CM1 / Class 5 CM2 / Class 6) have the package of three (3) essential textbooks. With the next distribution the end target will be achieved.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public primary schools with at least 3 state paid teachers (only schools enrolling more than 100 pupils) (Nationwide)
</narrative></title>
<baseline year="2017" iso-date="2017-10-16" value="43.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-10-16" />
<period-end iso-date="2026-12-31" />
<target value="95.00">
<comment><narrative>
This result is based on the Basic Education Ministry's HR Directorate database certified by the Tierce Party verification Agency for DLIs. Data collection for the 2025-2026 Statistical Yearbook is currently being finalized and results will be available by end of October 2026. Ministry HR Directorate and Statistical Yearbook's data will be triangulated and confirmed to stabilize and harmonize both database. To date, the targets have been exceeded, but the situation remains highly unstable due to a lack of coordination in the establishment of new schools.
</narrative></comment>
</target>
<actual value="98.9">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public primary schools with at least 3 state paid teachers (only schools enrolling more than 100 pupils) (Nationwide)
</narrative></title>
<baseline year="2017" iso-date="2017-10-16" value="43.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-10-16" />
<period-end iso-date="2026-12-31" />
<target value="95.00">
<comment><narrative>
This result is based on the Basic Education Ministry's HR Directorate database certified by the Tierce Party verification Agency for DLIs. Data collection for the 2024-2025 Statistical Yearbook is currently being finalized and results will be available by end of December 2025. Ministry HR Directorate and Statistical Yearbook's data will be triangulated and confirmed to stabilize and harmonize both database. An update will be provided in the next ISR.
</narrative></comment>
</target>
<actual value="98">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P168332</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Third Fiscal Consolidation and Inclusive Growth DPO</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objectives of the proposed Third Fiscal Consolidation and Inclusive Growth Development Policy Financing operation are to support the Government of Cameroon's efforts to : (i) ensure fiscal sustainability and improve public-sector management, (ii) enhance competitiveness, and (iii) enhance the provision of social services and scale up social protection.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Third Fiscal Consolidation and Inclusive Growth Development Policy Financing in Cameroon is to improve the equity and efficiency in the allocation and use of health resources as well as social services including by scaling up social protection.  The series is organized around three pillars. Pillar 1 improves fiscal sustainability and public sector management by strengthening public debt management improving public procurement processes and the transparency of COVID-19 response funds. Pillar 2 enhances competitiveness by reducing entry barriers, improving regulations in strategic sectors, and incentivizing private sector investment in three strategic sectors (telecommunications, energy, and transport). Pillar 3 improves social services and scales up social protection. The reforms under this pillar aimed to improve the equity and efficiency in the allocation and use of health resources as well as social services including by scaling up social protection.]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0038585"><narrative>Republic of Cameroon</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="CM-COA-0038586"><narrative>Ministry of Finance</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2019-10-30"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2021-04-19"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2022-02-28"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2022-02-28"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Amina Coulibaly</narrative></person-name><telephone>+1-202-473-1000</telephone><email>acoulibaly4@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="2220957" />
                <name><narrative>Yaounde</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>3.86667 11.51667</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="15119" percentage="22" xml:lang="en"/><sector vocabulary="1" code="23010" percentage="11" xml:lang="en"/><sector vocabulary="1" code="22011" percentage="11" xml:lang="en"/><sector vocabulary="1" code="21011" percentage="11" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="11" xml:lang="en"/><sector vocabulary="1" code="15155" percentage="11" xml:lang="en"/><sector vocabulary="1" code="12110" percentage="11" xml:lang="en"/><sector vocabulary="1" code="15129" percentage="6" xml:lang="en"/><sector vocabulary="1" code="15119" percentage="6" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="11.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LZ" percentage="11.0000000" xml:lang="en"><narrative>FY17 - Other Energy and Extractives</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CI" percentage="11.0000000" xml:lang="en"><narrative>FY17 - ICT Infrastructure</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="45.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="11.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="11.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000863" percentage="11" xml:lang="en"><narrative>Access to Energy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="13" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="14" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="11" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="11" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000635" percentage="11" xml:lang="en"><narrative>Reproductive and Maternal Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="22" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="17" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="44" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="14" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="11" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000067" percentage="11" xml:lang="en"><narrative>Nutrition and Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000637" percentage="11" xml:lang="en"><narrative>Child Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="11" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000261" percentage="11" xml:lang="en"><narrative>ICT Solutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000635" percentage="11" xml:lang="en"><narrative>Reproductive and Maternal Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000412" percentage="11" xml:lang="en"><narrative>Domestic Revenue Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000413" percentage="11" xml:lang="en"><narrative>Debt Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="33" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000861" percentage="11" xml:lang="en"><narrative>Energy Efficiency</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="33" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="33" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="11" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000637" percentage="11" xml:lang="en"><narrative>Child Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="11" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="33" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000861" percentage="11" xml:lang="en"><narrative>Energy Efficiency</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="33" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000441" percentage="33" xml:lang="en"><narrative>Data production, accessibility and use</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000626" percentage="17" xml:lang="en"><narrative>Pandemic Response</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="11" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="22" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="11" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="11" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000413" percentage="11" xml:lang="en"><narrative>Debt Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000441" percentage="33" xml:lang="en"><narrative>Data production, accessibility and use</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000862" percentage="11" xml:lang="en"><narrative>Energy Policies &amp; Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000633" percentage="11" xml:lang="en"><narrative>Health Finance</narrative></sector><humanitarian-scope type="1" vocabulary="1-2" code="EP-2020-000012-001"> </humanitarian-scope><humanitarian-scope type="2" vocabulary="2-1" code="HCOVD20"> </humanitarian-scope><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">100000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">100000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">1689480.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">1689480.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">100000000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-38586"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">98310520</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2021</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-38586"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-442822</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-38586"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-371142</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-38586"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-397570</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-38586"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-406417</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-38586"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-399057</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-38586"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-411342</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-38586"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-403257</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-38586"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-436859</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-38586"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-427864</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-38586"><narrative>Ministry of Finance</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P168332"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P168332?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P168332"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of SOEs whose debt data are published in the Annual Bulletin of the Autonomous Debt Agency (CAA)
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2021-12-31" />
<target value="5.00">
<comment><narrative>
&lt;p&amp;gt;Achieved&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="7.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average length of stay of a container at the port of Douala
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="19.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2021-12-31" />
<target value="11.00">
<comment><narrative>
&lt;p&amp;gt;Target not achieved.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="16.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of textbooks per child in primary schools (one book per child)
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="14.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2021-12-31" />
<target value="2.00">
<comment><narrative>
&lt;p&amp;gt;Target achieved.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="1.70">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of SOEs publishing their audited annual financial reports within the prescribed deadlines
</narrative></title>
<baseline year="2016" iso-date="2016-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-12-30" />
<period-end iso-date="2021-12-31" />
<target value="6.00">
<comment><narrative>
&lt;p&amp;gt;Target achieved. Cameroonian Aluminum Company (ALUCAM), Cameroon Airports (ADC), National Refinery company (SONARA),&amp;nbsp;???????National Hydrocarbons Company (SNH), Cameroon Telecommunications&amp;nbsp;(CAMTEL), and Douala Port published their financial statements within the prescribed deadlines.???????&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="6.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Publication of the bi-annual audit reports on the COVID-19 related expenditures in the Ministry of Finances Website
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2021-12-31" />
<target value="2.00">

</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of births attended by skilled health care professionals in the three northern regions
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="37.60"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2021-12-31" />
<target value="42.00">
<comment><narrative>
&lt;p&amp;gt;Target achieved with margin owing to the successful implementation of the PBF health financing project.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="47.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of households covered by social safety nets
</narrative></title>
<baseline year="2016" iso-date="2016-12-30" value="40.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-12-30" />
<period-end iso-date="2021-12-31" />
<target value="180.00">
<comment><narrative>
&lt;p&amp;gt;Achieved with a significant margin owing to the successful social safety net project implementation.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="273.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Number of subscribers to Internet services as a percentage of the population
</narrative></title>
<baseline year="2016" iso-date="2016-12-30" value="25.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-12-30" />
<period-end iso-date="2021-12-31" />
<target value="35.00">
<comment><narrative>
&lt;p&amp;gt;Successful implementation with broader access to internet services.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="38.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Enhanced revenue mobilization through base broadening and tax expenditure suppression (in CFAF Billion)
</narrative></title>
<baseline year="2016" iso-date="2016-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-12-30" />
<period-end iso-date="2021-12-31" />
<target value="130.00">
<comment><narrative>
&lt;p&amp;gt;Achieved&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="350.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time required for the Road Fund to pay invoices to service providers
</narrative></title>
<baseline year="2016" iso-date="2016-12-30" value="150.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-12-30" />
<period-end iso-date="2021-12-31" />
<target value="50.00">
<comment><narrative>
&lt;p&amp;gt;Achieved. Target exceed&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="15.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of cases of problematic entries into the Integrated Wage Bill Civil Service System (SIGIPES)
</narrative></title>
<baseline year="2016" iso-date="2016-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-12-30" />
<period-end iso-date="2021-12-31" />
<target value="80.00">

</target>
<actual value="16.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time between issuance of bidding documents and signing of contracts
</narrative></title>
<baseline year="2016" iso-date="2016-12-30" value="128.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-12-30" />
<period-end iso-date="2021-12-31" />
<target value="90.00">
<comment><narrative>
&lt;p&amp;gt;Target not achieved.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="141.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Debt arrears owed by the State to ENEO Cameroon (CFAF billion)
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="102.95"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2022-12-30" />
<target value="47.00">
<comment><narrative>
&lt;p&amp;gt;Target partially achieved. The arrears from the central government to ENEO had been reduced. But the arrears to SOEs remained high, reflecting the poor financial performance of SOEs. A PforR project is ongoing to&amp;nbsp;support the Electricity sector and improve its&amp;nbsp;financial sustainability.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="25.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-10-22T23:12:38" hierarchy="1"><iati-identifier>44000-P175363</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Adaptive Safety Nets and Economic Inclusion Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objective (PDO) is to: (i) expand the coverage and shock-responsive capacity of the safety nets system for poor households, and (ii) increase access to income-generation and entrepreneurship support opportunities for youth in urban areas.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Adaptive Safety Nets and Economic Inclusion Project for Cameroon is to expand the coverage and shock-responsive capacity of the safety nets system for poor households and to increase access to income-generation and entrepreneurship support opportunities for youth in urban areas. The project comprises four components: (i) Adaptive Safety Nets, which includes Regular Cash Transfers, Emergency Cash Transfers, and the Labor-Intensive Public Works (LIPW) Program; (ii) Youth Economic Inclusion and Entrepreneurship, comprising Economic Inclusion of Youth and a Business Plan Competition; (iii) Shock-Responsive Digital Delivery Systems, including the Unified Social Registry and a Digital Payment System; and (iv) Project Management and Coordination Support, which finances technical advisory services and other material assistance required for project implementation.
]]></narrative></description><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0047510"><narrative>The Republic of Cameroon</narrative></participating-org><participating-org role="2" xml:lang="en" ref="CM–P0047510"><narrative>The Republic of Cameroon</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="CM-COA-0047511"><narrative>Ministry of Economy, Planning, and Regional Development (MINEPAT)</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2021-09-21"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2022-03-09"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2028-03-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2028-03-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Hugo Martin Brousset Chaman</narrative></person-name><telephone>+1-202-473-1000</telephone><email>hbrousset@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="CM" percentage="100"><narrative xml:lang="en">CAMEROON</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0002233387" />
            <name><narrative>Republic of Cameroon</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>7.369722 12.354722</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="16011" percentage="61" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="61" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="37" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="37" xml:lang="en"/><sector vocabulary="1" code="32130" percentage="2" xml:lang="en"/><sector vocabulary="1" code="32130" percentage="2" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="90.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SG" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="100" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="38" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000323" percentage="25" xml:lang="en"><narrative>MSME Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000521" percentage="57" xml:lang="en"><narrative>Social Safety Nets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000626" percentage="100" xml:lang="en"><narrative>Pandemic Response</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000663" percentage="38" xml:lang="en"><narrative>Active Labor Market Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="48" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="48" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000024" percentage="53" xml:lang="en"><narrative>Enterprise Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000523" percentage="13" xml:lang="en"><narrative>Social protection delivery systems</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000223" percentage="38" xml:lang="en"><narrative>Youth Employment</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="22" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="20" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="38" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000663" percentage="38" xml:lang="en"><narrative>Active Labor Market Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="37" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="22" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="38" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000067" percentage="54" xml:lang="en"><narrative>Nutrition and Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="20" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000533" percentage="48" xml:lang="en"><narrative>Forced Displacement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000243" percentage="25" xml:lang="en"><narrative>MSME Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="37" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="57" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000531" percentage="20" xml:lang="en"><narrative>Conflict Prevention</narrative></sector><humanitarian-scope type="1" vocabulary="1-2" code="EP-2020-000012-001"> </humanitarian-scope><humanitarian-scope type="2" vocabulary="2-1" code="HCOVD20"> </humanitarian-scope><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">260000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">630000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">310000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">840000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">840000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">840000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">840000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">840000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">840000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">840000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">840000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">840000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">840000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">840000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">840000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">903333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">903333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">903333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">903333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">903333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">903333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">903333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">903333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">903333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">903333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">903333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">903333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">370000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">730000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">370000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">370000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">810000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">450000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">490000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">1150000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">680000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">1680000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">1030000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">1210000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">3730000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">2130000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">2640000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">7220000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">4660000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">10450000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">4940000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">10080000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">7610000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">2410000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">2320000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">4560000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">2270000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">2260000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">4530000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">2260000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">4530000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">2270000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">2270000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">4540000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">2270000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">2270000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">4540000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">2270000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">4550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">4550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">4560000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">2280000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">2280000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">4560000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">2280000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">4450000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-30"/>
<value currency="USD" value-date="2028-03-30">43696158.73</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-30"/>
<value currency="USD" value-date="2028-03-30">43696158.73</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">160000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2022</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-47511"><narrative>Ministry of Economy, Planning, and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">38600000</value><description xml:lang="en"><narrative>Total Commitment in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-47511"><narrative>Ministry of Economy, Planning, and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">11132183</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-47511"><narrative>Ministry of Economy, Planning, and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">818261</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-47511"><narrative>Ministry of Economy, Planning, and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">739236</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-47511"><narrative>Ministry of Economy, Planning, and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">179655</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-47511"><narrative>Ministry of Economy, Planning, and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">518344</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-47511"><narrative>Ministry of Economy, Planning, and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">363782</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-47511"><narrative>Ministry of Economy, Planning, and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">848098</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-47511"><narrative>Ministry of Economy, Planning, and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">322405</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-47511"><narrative>Ministry of Economy, Planning, and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">1950303</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-47511"><narrative>Ministry of Economy, Planning, and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">516232</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-47511"><narrative>Ministry of Economy, Planning, and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">9321138</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-47511"><narrative>Ministry of Economy, Planning, and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">4772070</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-47511"><narrative>Ministry of Economy, Planning, and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">2517208</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-47511"><narrative>Ministry of Economy, Planning, and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">279540</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-47511"><narrative>Ministry of Economy, Planning, and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">352090</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-47511"><narrative>Ministry of Economy, Planning, and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">381100</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-47511"><narrative>Ministry of Economy, Planning, and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">684592</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-47511"><narrative>Ministry of Economy, Planning, and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">1879385</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-47511"><narrative>Ministry of Economy, Planning, and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">35868194</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-47511"><narrative>Ministry of Economy, Planning, and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">1113282</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-47511"><narrative>Ministry of Economy, Planning, and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">1505242</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-47511"><narrative>Ministry of Economy, Planning, and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">165693</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-47511"><narrative>Ministry of Economy, Planning, and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">4414986</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-47511"><narrative>Ministry of Economy, Planning, and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">18524901</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-47511"><narrative>Ministry of Economy, Planning, and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">1239028</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-47511"><narrative>Ministry of Economy, Planning, and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">772899</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-47511"><narrative>Ministry of Economy, Planning, and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">1919642</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-47511"><narrative>Ministry of Economy, Planning, and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">2093584</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-47511"><narrative>Ministry of Economy, Planning, and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">1318199</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-47511"><narrative>Ministry of Economy, Planning, and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">1309608</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-47511"><narrative>Ministry of Economy, Planning, and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">573739</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-47511"><narrative>Ministry of Economy, Planning, and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">7242569</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-47511"><narrative>Ministry of Economy, Planning, and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">666651</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-47511"><narrative>Ministry of Economy, Planning, and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-69132</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-47511"><narrative>Ministry of Economy, Planning, and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-73996</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-47511"><narrative>Ministry of Economy, Planning, and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-148519</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-47511"><narrative>Ministry of Economy, Planning, and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-200517</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-47511"><narrative>Ministry of Economy, Planning, and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-474741</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-47511"><narrative>Ministry of Economy, Planning, and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-613621</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44002"><narrative>IDA Credit</narrative></provider-org><receiver-org xml:lang="en" ref="CM-COA-47511"><narrative>Ministry of Economy, Planning, and Regional Development (MINEPAT)</narrative></receiver-org><flow-type code="10" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P175363"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P175363?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P175363"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women running IGAs in non-traditional sectors
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="25.00">

</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Social registry developed and implemented
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="Yes">
<comment><narrative>
A social registry is developed and implemented when it has a single registration form, a unique identifier system, a data use, access, sharing and protection manual/protocol, and a well-functioning MIS; and individuals can be regularly added while programs can use the dataset to target beneficiaries.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Communal  social centers equipped to manage the National Social Registry
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="60.00">
<comment><narrative>
With the MINAS funds and not with the IDA funds
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Microprojects chosen through meaningful consultations with targeted communities
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="80.00">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries running an IGA
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="70.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="90.00">

</target>
<actual value="70.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries receiving accompanying measures
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2028-03-15" />
<target value="80.00">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="85,5000">

</target>
<actual value="7,4058">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of social safety net programs
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="903,000">

</target>
<actual value="53,7114">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Youths (18 to 35) receiving a training
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="3,000.00">

</target>
<actual value="1447">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries with active IGAs at least 6 months after the end of the program
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="80.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households benefitting from regular cash transfers
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="53,000.00">
<comment><narrative>
Value was updated after some beneficiaries were removed either due to fraud or deceased
</narrative></comment>
</target>
<actual value="19195">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Youths (18 to 35) receiving a training
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="3,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
New firms supported under the Business Plan Competition (BPC) that are still operating 24 months after receiving assistance (financial and non-financial)
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="90.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women running IGAs in non-traditional sectors
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="25.00">

</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New firms established through BPC
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="1,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Microprojects providing on-site childcare services
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="2 per commune">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Microprojects contributing to climate change mitigation and adaptation
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="45.00">

</target>
<actual value="15.83">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Winners of BPC selected competitively
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="2,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries receiving payments digitally
</narrative></title>
<baseline year="2022" iso-date="2022-03-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-30" />
<period-end iso-date="2028-03-31" />
<target value="80.00">

</target>
<actual value="23.21">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries who completed the life and business skills training
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="85.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries who completed the life and business skills training
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="85.00">

</target>
<actual value="69.75">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Digital payments system developed and implemented
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="Yes">
<comment><narrative>
Digital payments are applied to both regular and emergency cash transfers programs, mainly in municipalities covered by the mobile phone network. The main challenge encountered when implementing digital payments is the lack of a national identity card (NIC) by a large number of poor people.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Maximum program management expenses as share of total program expenses
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="15.00">

</target>
<actual value="21.53">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries receiving accompanying measures
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2028-03-15" />
<target value="80.00">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Urban youth benefitting from entrepreneurship support services
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2027-06-15" />
<target value="2000">

</target>
<actual value="1447">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Jobs created by the firms receiving support from the project
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="6000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of productive inclusion interventions
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2028-03-15" />
<target value="6,5000">

</target>
<actual value="1,4302">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of productive inclusion interventions
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2028-03-15" />
<target value="6,5000">

</target>
<actual value="1,4302">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of productive inclusion interventions
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2028-03-15" />
<target value="6,5000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of productive inclusion interventions
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2028-03-15" />
<target value="6,5000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Jobs created by the firms receiving support from the project
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-30" />
<target value="6,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Digital payments system developed and implemented
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="Yes">
<comment><narrative>
The first digital payment started at the end of May 2024 with the regular cash transfers
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Urban youth benefitting from entrepreneurship support services
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2027-06-30" />
<target value="2,000.00">

</target>
<actual value="1000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Social registry developed and implemented
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="Yes">
<comment><narrative>
A social registry is developed and implemented when it has a single registration form, a unique identifier system, a data use, access, sharing and protection manual/protocol, and a well-functioning MIS; and individuals can be regularly added while programs can use the dataset to target beneficiaries.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Digital payments system developed and implemented
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="Yes">
<comment><narrative>
Digital payments are applied to regular cash transfers program, emergency cash transfers program and Economic inclusion of Youth program, mainly in municipalities covered by the mobile phone network. The main challenge encountered when implementing digital payments is the lack of a national identity card (NIC) by a large number of poor people and the ability of payments agencies to design a digital payment system to poor (illiterate, lack of identification documents, lack of phone, etc.).
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Digital payments system developed and implemented
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="Yes">
<comment><narrative>
Digital payments are applied to both regular and emergency cash transfers programs, mainly in municipalities covered by the mobile phone network. The main challenge encountered when implementing digital payments is the lack of a national identity card (NIC) by a large number of poor people.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Digital payments system developed and implemented
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Digital payments system developed and implemented
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries receiving accompanying measures
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2028-03-15" />
<target value="80.00">

</target>
<actual value="66.6">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Social registry developed and implemented
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="Yes">
<comment><narrative>
The recruitment process for the firm to develop the new Unified Social Registry of Cameroon is underway. However, MINAS has evaluated and improved the pilot Unified Social Registry of Cameroon it has been testing since 2022; it currently includes 377,623 households. MINAS has developed a personal data protection charter and a data sharing protocol which are currently in validation at the Prime Minister's Office.
</narrative></comment>
</target>
<actual value="Ongoing">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Social registry developed and implemented
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="Yes">
<comment><narrative>
The recruitment process for the firm to develop the new Unified Social Registry of Cameroon is underway. However, MINAS has evaluated and improved the pilot Unified Social Registry of Cameroon it has been testing since 2022; it currently includes 196,311 households.
</narrative></comment>
</target>
<actual value="Ongoing">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Social registry developed and implemented
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="Yes">
<comment><narrative>
A social registry is developed and implemented when it has a single registration form, a unique identifier system, a data use, access, sharing and protection manual/protocol, and a well-functioning MIS; and individuals can be regularly added while programs can use the dataset to target beneficiaries.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Social registry developed and implemented
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="Yes">
<comment><narrative>
A social registry is developed and implemented when it has a single registration form, a unique identifier system, a data use, access, sharing and protection manual/protocol, and a well-functioning MIS; and individuals can be regularly added while programs can use the dataset to target beneficiaries.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students supported with better education
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="6,5000">

</target>
<actual value="14,302">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Jobs created by the firms receiving support from the project
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="6000">
<comment><narrative>
The data collection for the estimation of this indicator is not yet done
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Jobs created by the firms receiving support from the project
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="6000">
<comment><narrative>
The data collection for the estimation of this indicator is not yet done
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Jobs created by the firms receiving support from the project
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="6000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Jobs created by the firms receiving support from the project
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="6000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Urban youth benefitting from entrepreneurship support services
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2027-06-15" />
<target value="2000">

</target>
<actual value="1447">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Urban youth benefitting from entrepreneurship support services
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2027-06-15" />
<target value="2000">

</target>
<actual value="1447">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Urban youth benefitting from entrepreneurship support services
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2027-06-15" />
<target value="2000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Urban youth benefitting from entrepreneurship support services
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2027-06-15" />
<target value="2000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of social safety net programs
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="903,000">

</target>
<actual value="54,9696">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of social safety net programs
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="903,000">

</target>
<actual value="54,7776">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of social safety net programs
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="903,000">

</target>
<actual value="53,7114">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries receiving cash transfers on time
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="80.00">

</target>
<actual value="83.75">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of social safety net programs
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="903,000">

</target>
<actual value="53,7114">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Microprojects providing on-site childcare services
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="2 per commune">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Microprojects contributing to climate change mitigation and adaptation
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="45.00">

</target>
<actual value="10.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of social safety net programs
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="903,000">

</target>
<actual value="53,7114">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households benefitting from regular cash transfers
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="53,000.00">
<comment><narrative>
Value was updated after some beneficiaries were removed either due to fraud or deceased
</narrative></comment>
</target>
<actual value="40447">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Grants disbursed
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="2,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Digital payments system developed and implemented
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (new services)
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="78,7400">

</target>
<actual value="1,0374">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of productive inclusion interventions
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2028-03-15" />
<target value="6,5000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries who received the productive grant
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="98.00">

</target>
<actual value="36.15">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="85,5000">

</target>
<actual value="7,4058">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
MINAS staff trained to develop, implement and maintain the National Social Registry
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="255.00">
<comment><narrative>
With the MINAS funds and not with the IDA funds
</narrative></comment>
</target>
<actual value="193">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries receiving payments digitally
</narrative></title>
<baseline year="2022" iso-date="2022-03-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-30" />
<period-end iso-date="2028-03-31" />
<target value="80.00">

</target>
<actual value="6.37">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Jobs created by the firms receiving support from the project
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="6000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries running an IGA
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="70.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="90.00">

</target>
<actual value="84">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Grants disbursed
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="2,000.00">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of emergency cash transfers
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="142500">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of productive inclusion interventions
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2028-03-15" />
<target value="6,5000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Digital payments system developed and implemented
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="Yes">
<comment><narrative>
The first digital payment started at the end of May 2024 with the regular cash transfers
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public works beneficiaries
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="55,000.00">

</target>
<actual value="10000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
New firms supported under the Business Plan Competition (BPC) that are still operating 24 months after receiving assistance (financial and non-financial)
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="90.00">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Applications received
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="6,000.00">

</target>
<actual value="2560">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries receiving payments digitally
</narrative></title>
<baseline year="2022" iso-date="2022-03-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-30" />
<period-end iso-date="2028-03-31" />
<target value="80.00">

</target>
<actual value="6.37">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women running IGAs in non-traditional sectors
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="25.00">

</target>
<actual value="6">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Social registry developed and implemented
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="Yes">
<comment><narrative>
A social registry is developed and implemented when it has a single registration form, a unique identifier system, a data use, access, sharing and protection manual/protocol, and a well-functioning MIS; and individuals can be regularly added while programs can use the dataset to target beneficiaries.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Grants disbursed
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="2,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students supported with better education
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="6,5000">

</target>
<actual value="1,4302">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Social Registry MIS operational
</narrative></title>
<baseline year="2022" iso-date="2022-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-30" />
<period-end iso-date="2027-06-30" />
<target value="Yes">
<comment><narrative>
MIS designed and implemented as described in PIM. An effective and operational MIS system is capable of generating lists and report in an effective and transparent manner. Processes can be streamlined and automated. It is expected that the system will be scaled up, fully automated and functional for the National Social Registry.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries receiving cash transfers on time
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="80.00">

</target>
<actual value="92.47">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries who completed the life and business skills training
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="85.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Applications received
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="6,000.00">

</target>
<actual value="2560">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="85,5000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Communal  social centers equipped to manage the National Social Registry
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="60.00">
<comment><narrative>
With the MINAS funds and not with the IDA funds
</narrative></comment>
</target>
<actual value="43.30">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New firms established through BPC
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="1,000.00">

</target>
<actual value="745">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
New firms supported under the Business Plan Competition (BPC) that are still operating 24 months after receiving assistance (financial and non-financial)
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="90.00">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Winners of BPC selected competitively
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="2,000.00">
<comment><narrative>
Out of the 1,000 CPA beneficiaries, 759 have already received the second installment, and 90 beneficiaries are currently in the second payment process.
</narrative></comment>
</target>
<actual value="1000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries with active IGAs at least 6 months after the end of the program
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="80.00">
<comment><narrative>
Data collection not yet done. The contracts of the NGOs in charge for supporting the PIU in the implementation of the Youth Opportunities program expired before the end of the payments.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women running IGAs in non-traditional sectors
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="25.00">

</target>
<actual value="6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Microprojects providing on-site childcare services
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="2 per commune">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Grants disbursed
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="2,000.00">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Microprojects contributing to climate change mitigation and adaptation
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="45.00">

</target>
<actual value="15.83">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Winners of BPC selected competitively
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="2,000.00">
<comment><narrative>
Out of the 1,000 CPA beneficiaries, 980 have already received the first installment, and 20 beneficiaries are currently in the payment process.
</narrative></comment>
</target>
<actual value="980">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Urban youth benefitting from entrepreneurship support services
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2027-06-15" />
<target value="2000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
New firms supported under the Business Plan Competition (BPC) that are still operating 24 months after receiving assistance (financial and non-financial)
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="90.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New firms established through BPC
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="1,000.00">

</target>
<actual value="745">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Digital payments system developed and implemented
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries running an IGA
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="70.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="90.00">

</target>
<actual value="84">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries who received the productive grant
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="98.00">

</target>
<actual value="60.02">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries receiving accompanying measures
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2028-03-15" />
<target value="80.00">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Applications received
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="6,000.00">

</target>
<actual value="2560">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries who completed the life and business skills training
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="85.00">

</target>
<actual value="69.75">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiary satisfied with the program
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="80.00">
<comment><narrative>
The data collection for the estimation of this indicator is not yet done
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Social Registry MIS operational
</narrative></title>
<baseline year="2022" iso-date="2022-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-30" />
<period-end iso-date="2027-06-30" />
<target value="Yes">
<comment><narrative>
MIS designed and implemented as described in PIM. An effective and operational MIS system is capable of generating lists and report in an effective and transparent manner. Processes can be streamlined and automated. It is expected that the system will be scaled up, fully automated and functional for the National Social Registry.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered and addressed within the project's GRM timeframe
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="97.00">
<comment><narrative>
1301 grievances addressed within the timeframe. There are 12 unresolved grievances.
</narrative></comment>
</target>
<actual value="99">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
MINAS staff trained to develop, implement and maintain the National Social Registry
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="255.00">
<comment><narrative>
With the MINAS funds and not with the IDA funds
</narrative></comment>
</target>
<actual value="193">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Youths (18 to 35) receiving a training
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="3,000.00">

</target>
<actual value="1447">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries receiving payments digitally
</narrative></title>
<baseline year="2022" iso-date="2022-03-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-30" />
<period-end iso-date="2028-03-31" />
<target value="80.00">
<comment><narrative>
This excludes the TMU-CAT (flood response); the indicator was defined before the restructuring that added the flood response.
</narrative></comment>
</target>
<actual value="23.21">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Communal  social centers equipped to manage the National Social Registry
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="60.00">
<comment><narrative>
With the MINAS funds and not with the IDA funds
</narrative></comment>
</target>
<actual value="45.28">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households benefitting from regular cash transfers
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="53,000.00">
<comment><narrative>
Value was updated after some beneficiaries were removed either due to fraud or deceased
</narrative></comment>
</target>
<actual value="40767">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public works beneficiaries
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="55,000.00">

</target>
<actual value="32494">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public works beneficiaries
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="55,000.00">

</target>
<actual value="10000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Applications received
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="6,000.00">

</target>
<actual value="2560">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Maximum program management expenses as share of total program expenses
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="15.00">

</target>
<actual value="19.6">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Jobs created by the firms receiving support from the project
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-30" />
<target value="6,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Digital payments system developed and implemented
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="Yes">
<comment><narrative>
The first digital payment started at the end of May 2024 with the regular cash transfers
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Urban youth benefitting from entrepreneurship support services
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2027-06-30" />
<target value="2,000.00">

</target>
<actual value="1000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Social registry developed and implemented
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="Yes">
<comment><narrative>
A social registry is developed and implemented when it has a single registration form, a unique identifier system, a data use, access, sharing and protection manual/protocol, and a well-functioning MIS; and individuals can be regularly added while programs can use the dataset to target beneficiaries.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Digital payments system developed and implemented
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="Yes">
<comment><narrative>
Digital payments are applied to regular cash transfers program, emergency cash transfers program and Economic inclusion of Youth program, mainly in municipalities covered by the mobile phone network. The main challenge encountered when implementing digital payments is the lack of a national identity card (NIC) by a large number of poor people and the ability of payments agencies to design a digital payment system to poor (illiterate, lack of identification documents, lack of phone, etc.).
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Digital payments system developed and implemented
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="Yes">
<comment><narrative>
Digital payments are applied to both regular and emergency cash transfers programs, mainly in municipalities covered by the mobile phone network. The main challenge encountered when implementing digital payments is the lack of a national identity card (NIC) by a large number of poor people.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Digital payments system developed and implemented
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Digital payments system developed and implemented
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Social registry developed and implemented
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="Yes">
<comment><narrative>
The recruitment process for the firm to develop the new Unified Social Registry of Cameroon is underway. However, MINAS has evaluated and improved the pilot Unified Social Registry of Cameroon it has been testing since 2022; it currently includes 377,623 households. MINAS has developed a personal data protection charter and a data sharing protocol which are currently in validation at the Prime Minister's Office.
</narrative></comment>
</target>
<actual value="Ongoing">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Social registry developed and implemented
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="Yes">
<comment><narrative>
The recruitment process for the firm to develop the new Unified Social Registry of Cameroon is underway. However, MINAS has evaluated and improved the pilot Unified Social Registry of Cameroon it has been testing since 2022; it currently includes 196,311 households.
</narrative></comment>
</target>
<actual value="Ongoing">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries with active IGAs at least 6 months after the end of the program
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="80.00">
<comment><narrative>
Data collection not yet done. The contracts of the NGOs in charge for supporting the PIU in the implementation of the Youth Opportunities program expired before the end of the payments.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Social Registry MIS operational
</narrative></title>
<baseline year="2022" iso-date="2022-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-30" />
<period-end iso-date="2027-06-30" />
<target value="Yes">
<comment><narrative>
MIS designed and implemented as described in PIM. An effective and operational MIS system is capable of generating lists and report in an effective and transparent manner. Processes can be streamlined and automated. It is expected that the system will be scaled u and fully automated and functional for the National Social Registry.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Social registry developed and implemented
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="Yes">
<comment><narrative>
A social registry is developed and implemented when it has a single registration form, a unique identifier system, a data use, access, sharing and protection manual/protocol, and a well-functioning MIS; and individuals can be regularly added while programs can use the dataset to target beneficiaries.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Social registry developed and implemented
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="Yes">
<comment><narrative>
A social registry is developed and implemented when it has a single registration form, a unique identifier system, a data use, access, sharing and protection manual/protocol, and a well-functioning MIS; and individuals can be regularly added while programs can use the dataset to target beneficiaries.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Jobs created by the firms receiving support from the project
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="6000">
<comment><narrative>
The data collection for the estimation of this indicator is not yet done
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Jobs created by the firms receiving support from the project
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="6000">
<comment><narrative>
The data collection for the estimation of this indicator is not yet done
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Jobs created by the firms receiving support from the project
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="6000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Jobs created by the firms receiving support from the project
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="6000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Microprojects providing on-site childcare services
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="2 per commune">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Urban youth benefitting from entrepreneurship support services
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2027-06-15" />
<target value="2000">

</target>
<actual value="1447">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Urban youth benefitting from entrepreneurship support services
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2027-06-15" />
<target value="2000">

</target>
<actual value="1447">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Urban youth benefitting from entrepreneurship support services
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2027-06-15" />
<target value="2000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Urban youth benefitting from entrepreneurship support services
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2027-06-15" />
<target value="2000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of emergency cash transfers
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="142500">

</target>
<actual value="131,491">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of productive inclusion interventions
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2028-03-15" />
<target value="6,5000">

</target>
<actual value="1,4302">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of productive inclusion interventions
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2028-03-15" />
<target value="6,5000">

</target>
<actual value="1,4302">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of productive inclusion interventions
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2028-03-15" />
<target value="6,5000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of productive inclusion interventions
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2028-03-15" />
<target value="6,5000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (new services)
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="78,7400">
<comment><narrative>
The calculation includes all beneficiaries of IEJ,  and the number of households benefiting from safety nets who received digital transfers multiplied by the household size of 6.
</narrative></comment>
</target>
<actual value="7,5580">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students supported with better education
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="6,5000">

</target>
<actual value="1,4302">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="85,5000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of social safety net programs
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="903,000">

</target>
<actual value="54,9696">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of social safety net programs
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="903,000">

</target>
<actual value="54,7776">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of social safety net programs
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="903,000">

</target>
<actual value="53,7114">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of social safety net programs
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="903,000">

</target>
<actual value="53,7114">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of emergency cash transfers
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="142500">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Social registry developed and implemented
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="Yes">
<comment><narrative>
The recruitment process for the firm to develop the new Unified Social Registry of Cameroon is underway. However, MINAS has evaluated and improved the pilot Unified Social Registry of Cameroon it has been testing since 2022; it currently includes 196,311 households.
</narrative></comment>
</target>
<actual value="Ongoing">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries running an IGA
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="70.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="90.00">

</target>
<actual value="70.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New firms established through BPC
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="1,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Maximum program management expenses as share of total program expenses
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="15.00">

</target>
<actual value="40.45">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries participating in human capital accompanying measures and completing the activity
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="80.00">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Social Registry MIS operational
</narrative></title>
<baseline year="2022" iso-date="2022-06-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-30" />
<period-end iso-date="2027-06-30" />
<target value="Yes">
<comment><narrative>
MIS designed and implemented as described in PIM. An effective and operational MIS system is capable of generating lists and report in an effective and transparent manner. Processes can be streamlined and automated. It is expected that the system will be scaled u and fully automated and functional for the National Social Registry.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Person days of temporary employment created
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="3,300,000.00">

</target>
<actual value="598920">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Winners of BPC selected competitively
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="2,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Youths (18 to 35) receiving a training
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="3,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of productive inclusion interventions
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2028-03-15" />
<target value="6,5000">

</target>
<actual value="1,4302">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered and addressed within the project's GRM timeframe
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="97.00">

</target>
<actual value="22.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Communal  social centers equipped to manage the National Social Registry
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="60.00">
<comment><narrative>
With the MINAS funds and not with the IDA funds
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiary satisfied with the program
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="80.00">
<comment><narrative>
The data collection for the estimation of this indicator is not yet done
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Jobs created by the firms receiving support from the project
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-30" />
<target value="6,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of emergency cash transfers
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="142500">
<comment><narrative>
The original target for this indicator was 42,500. 18,355 was reported on that target. The indicator was modified to include 100,000 more victim of flood households. 113 237 households beneficiaries of post-flood cash transfer report against this target. Bringing the total to 131,592
</narrative></comment>
</target>
<actual value="131,592">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Urban youth benefitting from entrepreneurship support services
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2027-06-30" />
<target value="2,000.00">

</target>
<actual value="1000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of emergency cash transfers
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries receiving payment on time
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="80.00">

</target>
<actual value="99.76">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries participating in GBV accompanying measures and completing the activity
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="80.00">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries who received the productive grant
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="98.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered and addressed within the project's GRM timeframe
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="97.00">
<comment><narrative>
1229 grievances addressed out of 1253 registered
</narrative></comment>
</target>
<actual value="98.08">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiary satisfied with the program
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="80.00">
<comment><narrative>
The data collection for the estimation of this indicator is not yet done
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public works beneficiaries
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="55,000.00">

</target>
<actual value="32494">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Jobs created by the firms receiving support from the project
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="6000">
<comment><narrative>
The data collection for the estimation of this indicator is not yet done
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (new services)
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="78,7400">

</target>
<actual value="7904">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiary satisfied with the program
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="80.00">
<comment><narrative>
The data collection for the estimation of this indicator is not yet done
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Social registry developed and implemented
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="Yes">
<comment><narrative>
A social registry is developed and implemented when it has a single registration form, a unique identifier system, a data use, access, sharing and protection manual/protocol, and a well-functioning MIS; and individuals can be regularly added while programs can use the dataset to target beneficiaries.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households benefitting from regular cash transfers
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="53,000.00">
<comment><narrative>
Value was updated after some beneficiaries were removed either due to fraud or deceased
</narrative></comment>
</target>
<actual value="19195">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (new services)
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="78,7400">

</target>
<actual value="1,0374">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
MINAS staff trained to develop, implement and maintain the National Social Registry
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="255.00">
<comment><narrative>
With the MINAS funds and not with the IDA funds
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries who received the productive grant
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="98.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of social safety net programs
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="903,000">

</target>
<actual value="54,7776">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Urban youth benefitting from entrepreneurship support services
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2027-06-15" />
<target value="2000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
MINAS staff trained to develop, implement and maintain the National Social Registry
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="255.00">
<comment><narrative>
With the MINAS funds and not with the IDA funds
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Maximum program management expenses as share of total program expenses
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="15.00">

</target>
<actual value="40.45">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students supported with better education
</narrative></title>
<baseline year="2022" iso-date="2022-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-15" />
<period-end iso-date="2028-03-15" />
<target value="6,5000">

</target>
<actual value="14,302">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries with active IGAs at least 6 months after the end of the program
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="80.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Microprojects contributing to climate change mitigation and adaptation
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="45.00">

</target>
<actual value="10.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered and addressed within the project's GRM timeframe
</narrative></title>
<baseline year="2022" iso-date="2022-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-31" />
<period-end iso-date="2028-03-31" />
<target value="97.00">

</target>
<actual value="22.00">

</actual>
</period>
</indicator>
</result></iati-activity></iati-activities>